El Paso Natural Gas Company; Notice of Compliance Filing, 19945 [E5-1767]

Download as PDF Federal Register / Vol. 70, No. 72 / Friday, April 15, 2005 / Notices Comment Date: 5 p.m. eastern time on April 15, 2005. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP03–353–002 and CP03–355– 002] Magalie R. Salas, Secretary. [FR Doc. E5–1776 Filed 4–14–05; 8:45 am] BILLING CODE 6717–01–P Eastern American Energy Corporation; Notice of Filing VerDate jul<14>2003 14:34 Apr 14, 2005 Jkt 205001 receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Magalie R. Salas, Secretary. [FR Doc. E5–1767 Filed 4–14–05; 8:45 am] BILLING CODE 6717–01–P April 7, 2005. Take notice that on February 28, 2005, Eastern American Energy Corporation (Eastern) filed a work sheet in support of Eastern’s initial rate filing as a special rate schedule under section 154.112(a) of the Commission’s regulations. Eastern states that the filing is intended to comply with the filing requirement of Ordering Paragraph (F) in the Commission’s March 25, 2004 Order in Docket Nos. CP03–353–000 and CP03–355–000, 106 FERC ¶ 61,297. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. 19945 [Docket No. RP04–110–005] DEPARTMENT OF ENERGY El Paso Natural Gas Company; Notice of Compliance Filing April 7, 2005. Take notice that on March 30, 2005, El Paso Natural Gas Company (El Paso) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1–A, Substitute Third Revised Sheet No. 287A, with an effective date of March 1, 2005. El Paso states that Substitute Third Revised Sheet No. 287A to its FERC Gas Tariff, Second Revised Volume No. 1–A, is being revised to comply with the Commission’s Order issued on February 23, 2005, addressing a pagination issue involving the procedures for redesignating primary point rights. El Paso states that copies of its filing have been sent to all parties of record and affected state commissions. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Docket No. RP05–265–000] Great Lakes Gas Transmission Limited Partnership; Notice of Proposed Changes in FERC Gas Tariff April 7, 2005. Take notice that on April 1, 2005, Great Lakes Gas Transmission Limited Partnership (Great Lakes) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, the following tariff sheets, to become effective January 1, 2005: Tenth Revised Sheet No. 3, Eighth Revised Sheet No. 3A, Ninth Revised Sheet No. 3B, Eighth Revised Sheet No. 3C. Great Lakes states that the tariff sheets listed above are being filed to revise the system and zone maps included in Great Lakes’ tariff pursuant to section 154.106(c) of the Commission’s regulations. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the E:\FR\FM\15APN1.SGM 15APN1

Agencies

[Federal Register Volume 70, Number 72 (Friday, April 15, 2005)]
[Notices]
[Page 19945]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1767]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP04-110-005]


El Paso Natural Gas Company; Notice of Compliance Filing

April 7, 2005.
    Take notice that on March 30, 2005, El Paso Natural Gas Company (El 
Paso) tendered for filing as part of its FERC Gas Tariff, Second 
Revised Volume No. 1-A, Substitute Third Revised Sheet No. 287A, with 
an effective date of March 1, 2005.
    El Paso states that Substitute Third Revised Sheet No. 287A to its 
FERC Gas Tariff, Second Revised Volume No. 1-A, is being revised to 
comply with the Commission's Order issued on February 23, 2005, 
addressing a pagination issue involving the procedures for re-
designating primary point rights.
    El Paso states that copies of its filing have been sent to all 
parties of record and affected state commissions.
    Any person desiring to protest this filing must file in accordance 
with Rule 211 of the Commission's Rules of Practice and Procedure (18 
CFR 385.211). Protests to this filing will be considered by the 
Commission in determining the appropriate action to be taken, but will 
not serve to make protestants parties to the proceeding. Such protests 
must be filed in accordance with the provisions of section 154.210 of 
the Commission's regulations (18 CFR 154.210). Anyone filing a protest 
must serve a copy of that document on all the parties to the 
proceeding.
    The Commission encourages electronic submission of protests in lieu 
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons 
unable to file electronically should submit an original and 14 copies 
of the protest to the Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
[FR Doc. E5-1767 Filed 4-14-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.