I. General Information
Linda Spencer; Environmental
Protection Agency; 1200 Pennsylvania
Avenue, MC 2822T; Washington, DC
20460; phone: 202 566 1651; fax: 202
566 1624; e-mail:
Spencer.linda@epa.gov.
The
standards are comprised of data
elements, formats, and definitions. Each
standard document provides an
overview diagram that depicts the
organization of the standard.
• Key changes to the standards
include:
• Identifiers and Code Lists are paired
with context data elements.
• Contact Information Data
Standard—becomes the primary
standard for all contact related
information and is referenced in other
data standards.
• Facility Site Identification Data
Standard—is restructured to reference
rather than replicate appropriate
primary standards (e.g., contact
information) and to include the Federal
Facility Data Standard information.
• Federal Facility Data Standard—is
incorporated entirely into the Facility
Site Identification Data Standard and is
no longer its own standard.
These standards were developed and
revised by the Environmental Data
Standards Council (EDSC). The EDSC is
a partnership of among EPA, States,
Tribes which promotes the efficient
sharing of environmental information
through the cooperative development of
data standards. The EDSC conducted a
technical review of the revised
standards by U.S. EPA staff and the
States in the Fall 2004. These
documents reflect changes based on the
comments received during the review.
The standards are intended for use in
environmental data exchanges among
States, Tribal entities and the U.S. EPA.
They are not meant to dictate or to limit
data an agency chooses to collect for its
own internal purposes. Changes in data
standards should not be interpreted to
mean that revisions to databases or
information systems are required. What
they do mean is that formats for sharing
data with Exchange Network (EN)
partners will change because the
Exchange Network has adopted Shared
Schema Components based on the data
standards. The SSCs are available on the
Exchange Network Web site at https://
www.exchangenetwork.net.
The draft data standards and
‘‘Frequently Asked Questions’’
document can be found on EDSC’s Web
site https://www.envdatastandards.net/
SUPPLEMENTARY INFORMATION:
VerDate jul<14>2003
14:34 Apr 14, 2005
Jkt 205001
19951
Environmental Impact Statements;
Notice of Availability
Filed April 4, 2005 Through April 8,
2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050145, FINAL EIS, FHW,
MO, I–64/US 40 Corridor,
Reconstruction of the existing I–64/
US 40 Facility with New Interchange
Configurations and Roadway,
Funding, City of St. Louis, St. Louis
County, MO, Wait Period Ends: May
20, 2005, Contact: Don Neumann
(573) 636–7104.
EIS No. 20050146, FINAL EIS, NPS, AR,
MS, LA, TN, KY Vicksburg Campaign
Trail (VCT) Feasibility Study, To
Examine and Evaluate a Number of
Sites, Implementation, Mississippi
River, AR, LA, TN, MS and KY, Wait
Period Ends: May 16, 2005, Contact:
Richard Sussman (404) 562–3124.
EIS No. 20050147, FINAL EIS, AFS, ID,
American and Crooked Rivers Project,
Improve Forest Health and Reduce
Hazardous Fuels, Implementation,
Nez Perce National Forest, Red River
Ranger District, Idaho County, ID,
Wait Period Ends: May 16, 2005,
Contact: Ester McCullough (208) 983–
0885.
EIS No. 20050148, FINAL EIS, FHW, ID,
Fernan Lake Safety Improvement
Project, Proposal to Reconstruct or
Resurface 17.2 km (10.7 mi) Idaho
Forest Highway 80 (ID PFH 80)
commonly known as Fernan Lake
Road, Right-of-Way Permit, Idaho
Panhandle National Forests, Coeur d’
Alene River Ranger District, Kootenai
County, ID, Wait Period Ends: May
16, 2005, Contact: Sajid Aftab (360)
619–7895.
EIS No. 20050149, DRAFT EIS, FHW,
WI, U.S. 41 Highway Corridor Project,
Transportation Improvement between
the Cities of Oconto and Peshtigo,
Funding, Marinette and Oconto
Counties, WI, Comment Period Ends:
June 6, 2005, Contact: Johnny Gerbitz
(608) 829–7511.
EIS No. 20050150, FINAL EIS, NAS,
Programmatic EIS—Mars Exploration
Program (MEP) Implementation, Wait
Period Ends: May 16, 2005, Contact:
Mark R. Dahl (202) 358–4800.
EIS No. 20050151, DRAFT EIS, AFS,
CA, Ansel Adams and John Muir
Wildernesses, Trail and Commercial
Pack Sock Management,
Implementation, Inyo, Mono, Madera
and Fresno Counties, CA, Comment
Period Ends: June 15, 2005, Contact:
MaryBeth Hennessy (760) 873–2448.
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Amended Notices
EIS No. 20050086, DRAFT EIS, AFS,
WY, Dean Project Area, Proposes to
Implement Multiple Resource
Management Actions, Black Hills
National Forest, Bearlodge Ranger
A. How Can I Get Copies of These
Documents and Other Related
Information?
1. Docket. EPA has established an
official public docket for this action
under Docket ID No. OEI–2005–0002.
The official public docket is the
collection of materials that is available
for public viewing at the OEI Docket in
the EPA Docket Center, (EPA/DC) EPA
West, Room B102, 1301 Constitution
Ave., NW., Washington, DC. The EPA
Docket Center Public Reading Room is
open from 8:30 a.m. to 4:30 p.m.,
Monday through Friday, excluding legal
holidays. The telephone number for the
Public Reading Room is (202) 566–1744
and the telephone number for the OEI
Docket is (202) 566–1752.
2. Electronic Access. You may access
this Federal Register document
electronically through the EPA Internet
under the ‘‘Federal Register’’ listings at
https://www.epa.gov/fedrgstr/.
An electronic version of the public
docket is available through EPA’s
electronic public docket and comment
system, EPA Dockets. You may use EPA
Dockets at https://www.epa.gov/edocket/
to view public comments, access the
index listing of the contents of the
official public docket, and to access
those documents in the public docket
that are available electronically.
Although not all docket materials may
be available electronically, you may still
access any of the publicly available
docket materials through the docket
facility identified in Unit I.B. Once in
the system, select ‘‘search,’’ then key in
the appropriate docket identification
number.
Dated: April 8, 2005.
Oscar Morales,
Director, Collection Strategies Division, Office
of Environmental Information, Office of
Information Collection.
[FR Doc. 05–7576 Filed 4–14–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6662–4]
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
E:\FR\FM\15APN1.SGM
15APN1
19952
Federal Register / Vol. 70, No. 72 / Friday, April 15, 2005 / Notices
District, Sundance, Crook County,
WA, Comment Period Ends: May 2,
2005, Contact: Steve Kozel (307) 283–
1361.
Revision of Federal Register Notice
Published on 3/11/2005: CEQ Comment
Period Ending on 4/25/2005 has been
Extended to 5/2/2005.
EIS No. 20050104, DRAFT EIS, NPS,
CA, Golden Gate National Recreation
Area (GGNRA) Fire Management Plan,
Implementation, Muir Woods
National Monument, Fort Point
National Historic Site, San Mateo, San
Francisco and Marin Counties, CA,
Comment Period Ends: May 27, 2005,
Contact: Alex Naar (415) 331–6374.
Revision of Federal Register Notice
Published on 03/18/2005: Correction to
Agency from AFS to NPS also,
correction to Comment Period from 05/
17/05 to 5/27/2005.
EIS No. 20050140, FINAL EIS, FHW,
NV, Boulder City/US 93 Corridor
Transportation Improvements, Study
Limits are between a western
boundary on US 95 in the City of
Henderson and an eastern boundary
on U.S. 93 west of downtown Boulder
City, NPDES and U.S. Army COE
Section 404 Permits Issuance and
Right-of Way Grant, Clark County,
NV, Wait Period Ends: May 13, 2005,
Contact: Ted P. Bendure (775) 687–
5322.
Revision of Federal Register Notice
Published on 04/08/05: CEQ Comment
Period Ending 05/09/2005 has been
extended to 05/13/2005.
Dated: April 12, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. 05–7570 Filed 4–14–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6662–5]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and section
102(2)(c) of the National Environmental
Policy Act, as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in the
VerDate jul<14>2003
14:34 Apr 14, 2005
Jkt 205001
Federal Register dated April 1, 2005 (70
FR 16815).
Draft EISs
EIS No. 20040549, ERP No. D–FHW–
D40326–MD, Intercounty Connector
(ICC) from I–270 to US–1, Funding
and U.S. Army COE Section 404
Permit, Montgomery and Prince
George’s Counties, MD.
Summary: EPA expressed
environmental objections with the
Corridor 1 alternative, due to impacts to
wetlands and stream habitat in forested
parkland. EPA expressed environmental
concerns with the Corridor 2 Alternative
due to potential impacts from secondary
development, natural resource and
community impacts and potential
impact to a nearby reservoir. Rating
EO2.
EIS No. 20040600, ERP No. D–FHW–
D40327–PA, Southern Beltway
Transportation Project, Improvement
from US–22 in Robinson Township to
Interstate 79 in South Fayette
Township and Cecil Township,
Funding and U.S. Army COE Section
404 Permit, Washington and
Allegheny Counties, PA.
Summary: EPA expressed
environmental concerns due to potential
impacts to surface water, wetlands,
forested habitat, threatened and
endangered species, and possible
environmental justice areas. Rating EC2.
EIS No. 20050012, ERP No. D–IBR–
K39090–CA, Central Valley Project
Long-Term Water Service Contract
Renewals—American River Division,
Proposes to Renew Long-Term Water
Service Contracts, Sacramento, Placer,
and El Dorado Counties, CA.
Summary: EPA expressed concerns
due to cumulative impacts and
environmental tradeoffs of potential
increased water diversions from the
American River. Rating EC2.
EIS No. 20050024, ERP No. D–AFS–
J65437–CO, Gold Camp Road Plan,
Develop a Feasible Plan to Manage the
Operation of Tunnel #3 and the 8.5
mile Road Segment, Pike National
Forest, Pike Peak Ranger District,
Colorado Springs, El Paso County,
CO.
Summary: EPA expressed
environmental concerns due to air
quality, water quality, and wildlife
habitat impacts. Watersheds in the
project area are in a degraded condition,
and opening the road to motorized
vehicles has the potential to increase
sediment loads to the watersheds.
Rating EC2.
EIS No. 20050028, ERP No. DS–FHW–
L40203–AK, Juneau Access
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
Transportation Project, Improvements
in the Lynn Canal/Taiya Inlet
Corridor between Juneau and Haines/
Skagway, Updated Information,
Special-Use-Permit and COE Section
10 and 404 Permits, Tongass National
Forest, Klondike Gold Rush National
Historic Park, Haines State Forest,
City and Borough of Juneau, Haines
Borough, Cities Haines and Skagway,
AK.
Summary: EPA has environmental
objections with the proposed project,
since there was insufficient information
to demonstrate that the preferred
alternative is the least environmentally
damaging practicable alternative in
compliance with the Clean Water Act
Section 404(b)(1) Guidelines. EPA
recommends that the Final EIS include
a preliminary 404(b)(1) evaluation,
compensatory mitigation for
unavoidable wetland impacts, site
specific hydrological information and
analysis for bridge/culvert designs,
monitoring and adaptive management,
and further analysis of indirect and
cumulative effects. Rating EO2.
EIS No. 20050051, ERP No. DS–AFS–
F65033–IL, Kudzu Eradication,
Proposal to Eradicate Known Kudzu
Infestations, Updated Information,
Shawnee National Forest, Application
for Herbicide and Mechanical
Treatment, Jackson, Alexander and
Pope Counties, IL.
Summary: EPA has no objections to
the use of the two selected herbicides
for control of Kudzu. Rating LO.
Final EISs
EIS No. 20040469, ERP No. F–COE–
L01009–ID, Emerald Creek Garnet
Project, Proposal to Mine Garnet
Reserves within the St. Maries River
Floodplain near Fernwood, Walla
Walla District, Issuance of Several
Permits, Benewah and Shoshone
Counties, ID.
Summary: The Final EIS responded to
EPA’s previous concerns.
EIS No. 20050073, ERP No. F–AFS–
L65464–ID, South Bear River Range
Allotment Management Plan
Revisions, Continued Livestock
Grazing on Ten Allotments, CaribouTarghee National Forest, Montpelier
Ranger District, Bear Lake and
Franklin Counties, ID.
Summary: The Final EIS provided
additional information on alternatives,
however EPA continues to have
concerns about water quality and
recommends long term protection and
restoration of streams.
EIS No. 20050029, ERP No. FS–FHW–
E40183–FL, FL–23 Extension (Branan
E:\FR\FM\15APN1.SGM
15APN1
Agencies
[Federal Register Volume 70, Number 72 (Friday, April 15, 2005)]
[Notices]
[Pages 19951-19952]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-7570]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6662-4]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed April 4, 2005 Through April 8, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 20050145, FINAL EIS, FHW, MO, I-64/US 40 Corridor,
Reconstruction of the existing I-64/US 40 Facility with New Interchange
Configurations and Roadway, Funding, City of St. Louis, St. Louis
County, MO, Wait Period Ends: May 20, 2005, Contact: Don Neumann (573)
636-7104.
EIS No. 20050146, FINAL EIS, NPS, AR, MS, LA, TN, KY Vicksburg Campaign
Trail (VCT) Feasibility Study, To Examine and Evaluate a Number of
Sites, Implementation, Mississippi River, AR, LA, TN, MS and KY, Wait
Period Ends: May 16, 2005, Contact: Richard Sussman (404) 562-3124.
EIS No. 20050147, FINAL EIS, AFS, ID, American and Crooked Rivers
Project, Improve Forest Health and Reduce Hazardous Fuels,
Implementation, Nez Perce National Forest, Red River Ranger District,
Idaho County, ID, Wait Period Ends: May 16, 2005, Contact: Ester
McCullough (208) 983-0885.
EIS No. 20050148, FINAL EIS, FHW, ID, Fernan Lake Safety Improvement
Project, Proposal to Reconstruct or Resurface 17.2 km (10.7 mi) Idaho
Forest Highway 80 (ID PFH 80) commonly known as Fernan Lake Road,
Right-of-Way Permit, Idaho Panhandle National Forests, Coeur d' Alene
River Ranger District, Kootenai County, ID, Wait Period Ends: May 16,
2005, Contact: Sajid Aftab (360) 619-7895.
EIS No. 20050149, DRAFT EIS, FHW, WI, U.S. 41 Highway Corridor Project,
Transportation Improvement between the Cities of Oconto and Peshtigo,
Funding, Marinette and Oconto Counties, WI, Comment Period Ends: June
6, 2005, Contact: Johnny Gerbitz (608) 829-7511.
EIS No. 20050150, FINAL EIS, NAS, Programmatic EIS--Mars Exploration
Program (MEP) Implementation, Wait Period Ends: May 16, 2005, Contact:
Mark R. Dahl (202) 358-4800.
EIS No. 20050151, DRAFT EIS, AFS, CA, Ansel Adams and John Muir
Wildernesses, Trail and Commercial Pack Sock Management,
Implementation, Inyo, Mono, Madera and Fresno Counties, CA, Comment
Period Ends: June 15, 2005, Contact: MaryBeth Hennessy (760) 873-2448.
Amended Notices
EIS No. 20050086, DRAFT EIS, AFS, WY, Dean Project Area, Proposes to
Implement Multiple Resource Management Actions, Black Hills National
Forest, Bearlodge Ranger
[[Page 19952]]
District, Sundance, Crook County, WA, Comment Period Ends: May 2, 2005,
Contact: Steve Kozel (307) 283-1361.
Revision of Federal Register Notice Published on 3/11/2005: CEQ
Comment Period Ending on 4/25/2005 has been Extended to 5/2/2005.
EIS No. 20050104, DRAFT EIS, NPS, CA, Golden Gate National Recreation
Area (GGNRA) Fire Management Plan, Implementation, Muir Woods National
Monument, Fort Point National Historic Site, San Mateo, San Francisco
and Marin Counties, CA, Comment Period Ends: May 27, 2005, Contact:
Alex Naar (415) 331-6374.
Revision of Federal Register Notice Published on 03/18/2005:
Correction to Agency from AFS to NPS also, correction to Comment Period
from 05/17/05 to 5/27/2005.
EIS No. 20050140, FINAL EIS, FHW, NV, Boulder City/US 93 Corridor
Transportation Improvements, Study Limits are between a western
boundary on US 95 in the City of Henderson and an eastern boundary on
U.S. 93 west of downtown Boulder City, NPDES and U.S. Army COE Section
404 Permits Issuance and Right-of Way Grant, Clark County, NV, Wait
Period Ends: May 13, 2005, Contact: Ted P. Bendure (775) 687-5322.
Revision of Federal Register Notice Published on 04/08/05: CEQ
Comment Period Ending 05/09/2005 has been extended to 05/13/2005.
Dated: April 12, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 05-7570 Filed 4-14-05; 8:45 am]
BILLING CODE 6560-50-P