Bellows Falls Power Company, LLC, et al.; Electric Rate and Corporate Filings, 19748-19750 [E5-1754]
Download as PDF
19748
Federal Register / Vol. 70, No. 71 / Thursday, April 14, 2005 / Notices
Reporting Requirements for Changes in
Status for Public Utilities with MarketBased Rate Authority, 110 FERC
¶ 61,097 (2005).
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
Bellows Falls Power Company, LLC, et
al.; Electric Rate and Corporate Filings
issued March 3, 2005 in Docket No.
ER99–1757–002, 110 FERC ¶ 61,214
(2005).
Empire states that copies of the filing
have been served on all parties on the
official service list in this proceeding.
Comment Date: 5 p.m. Eastern Time
on April 21, 2005.
April 7, 2005.
4. Indeck-Oswego Limited Partnership
[Docket No. ER04–1138–002]
[Docket No. ER02–1081–002]
Take notice that on April 1, 2005, the
New York Independent System
Operator, Inc. (NYISO) filed a
compliance filing pursuant to the
Commission’s letter order issued March
9, 2005 in Docket No. ER04–1138–001.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EG05–57–000, et al.]
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Bellows Falls Power Company, LLC
[Docket No. EG05–57–000]
Take notice that on April 4, 2005,
Bellows Falls Power Company, LLC
(BFPC) filed an application for a
determination of exempt wholesale
generator status pursuant to section
32(a)(1) of the Public Utility Holding
Company Act of 1935, as amended, 15
U.S.C. 79z–5a, and Part 365 of the
Commission’s Regulations, 18 CFR Part
365. BFPC states that it is a Delaware
limited liability company that will lease
and operate the Bellows Falls
Hydroelectric Project from the Town of
Rockingham, Vermont.
Comment Date: 5 p.m. Eastern
Standard Time on April 25, 2005.
2. San Diego Gas & Electric Company,
Complainants v. Sellers of Energy and
Ancillary Services Into Markets
Operated by the California Independent
System Operator and the California
Power Exchange, Respondents;
Investigation of Practices of the
California Independent System
Operator and the California Power
Exchange
[Docket Nos. EL00–95–127 and EL00–98–
114]
On March 21, 2005, the City of Los
Angeles Department of Water and Power
(LADWP) submitted its compliance
filing containing recalculations of
emission cost offsets to be included in
the financial reruns of the California
Independent System Operator
Corporation, pursuant to the
Commission’s Order issued November
23, 2004 in Docket Nos. EL00–95–100
and EL00–98–088, 109 FERC ¶ 61,218
(2004).
Comment Date: 5 p.m. Eastern Time
on April 14, 2005.
3. The Empire District Electric
Company
[Docket No. ER99–1757–008]
Take notice that on March 31, 2005,
The Empire District Electric Company
(Empire) submitted a compliance filing,
pursuant to the Commission’s order
VerDate jul<14>2003
19:36 Apr 13, 2005
Jkt 205001
Take notice that on April 1, 2005,
Indeck-Oswego Limited Partnership
(Indeck Oswego) submitted an updated
market power analysis and an
amendment to its market-based rate
tariff to incorporate the reporting
requirements adopted by the
Commission in Order No. 652,
Reporting Requirements for Changes in
Status for Public Utilities with MarketBased Rate Authority, 110 FERC
¶ 61,097 (2005).
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
5. Cobb Electric Membership Corp.
[Docket No. ER01–1860–002]
Take notice that on April 1, 2005,
Cobb Electric Membership Corp. (Cobb)
submitted an amendment to its
Triennial Updated Market Analysis
originally filed on July 12, 2004 in
Docket No. ER01–1860–001. In addition,
Cobb submitted revised tariff sheets
incorporating the market behavior rules
adopted by the Commission in
Investigation of Terms and Conditions
of Public Utility Market-Based Rate
Authorizations, 105 FERC ¶ 61,218
(2003). Cobb’s revised tariff sheets also
incorporate the reporting requirements
adopted by the Commission in Order
No. 652, Reporting Requirements for
Changes in Status for Public Utilities
with Market-Based Rate Authority, 110
FERC ¶ 61,097 (2005) and includes
language indicating that Cobb will not
make any sales to affiliates without
prior Commission authorization
pursuant to section 205 of the Federal
Power Act.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
6. Marina Energy, L.L.C.
[Docket No. ER03–715–002]
Take notice that on April 1, 2005,
Marina Energy, L.L.C. submitted an
amendment to its market-based rate
tariff to incorporate the market behavior
rules adopted by the Commission in
Investigation of Terms and Conditions
of Public Utility Market-Based Rate
Authorizations, 105 FERC ¶ 61,218
(2003) and to incorporate the reporting
requirements adopted by the
Commission in Order No. 652,
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
7. New York Independent System
Operator, Inc.
8. North American Electric Reliability
Council
[Docket No. ER05–580–001]
Take notice that on April 1, 2005, the
North American Electric Reliability
Council submitted a compliance filing
pursuant to the Commission’s order
issued March 30, 2005 in Docket No.
ER05–580–000, 110 FERC ¶ 61,388
(2005).
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
9. San Joaquin Cogen, L.L.C.
[Docket No. ER05–698–001]
Take notice that on April 1, 2005, San
Joaquin Cogen, L.L.C. (San Joaquin)
filed revisions to sections 6 and 10 of
the proposed market-based rate tariff
sheets initially filed in Docket No.
ER05–698–000 on March 11, 2005. San
Joaquin requests an effective date of
April 15, 2005.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005.
10. ISO New England Inc.
[Docket No. ER05–762–000]
Take notice that on April 1, 2005, ISO
New England Inc. (the ISO) submitted
revised tariff sheets for its Transmission,
Markets and Services Tariff, FERC
Electric Tariff No. 3 (ISO Tariff). The
ISO states that its filing seeks to
conform its financial assurance policies
(Exhibits IA and IC to Section I of the
ISO Tariff) and its Market Rule 1
(Section III of the ISO Tariff) to the
provisions filed by the New England
Power Pool (NEPOOL) Participants
Committee in Docket Nos. ER05–361–
000 and ER05–403–000 and accepted by
the Commission on February 10, 2005 in
ISO New England Inc., 110 FERC
¶ 61,111 (2005) and by letter order
issued on February 22, 2005 in New
England Power Pool, 110 FERC ¶ 61,180
(2005).
The ISO states that paper copies of the
filing were sent to the New England
E:\FR\FM\14APN1.SGM
14APN1
Federal Register / Vol. 70, No. 71 / Thursday, April 14, 2005 / Notices
19749
state governors and regulatory agencies,
and electronic copies were sent to the
ISO’s Governance Participants.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
New England state governors and
regulatory commissions and the
participants in NEPOOL.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
11. Southern California Edison
Company
14. Soyland Power Cooperative, Inc.
18. Central Maine Power Company
[Docket No. ER05–766–000]
Take notice that on April 1, 2005,
Soyland Power Cooperative, Inc.
(Soyland) tendered for filing a proposed
clarification to its formulary rate—Rate
Schedule A. Soyland states that Rate
Schedule A is the formulary rate under
which Soyland recovers the costs
associated with its service to its
members pursuant to the wholesale
power contract that Soyland has with
each member. Soyland requests an
effective date of June 1, 2005.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
[Docket No. ER05–770–000]
Take notice that on April 1, 2005,
Central Maine Power Company (CMP)
submitted an unexecuted Large
Generator Interconnection Agreement
between CMP and the International
Paper Company designated as ISO New
England, Inc., FERC Electric Tariff No.
3, Service Agreement No. IA–CMP–1.
CMP has requested an effective date of
March 1, 2005.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
[Docket No. ER05–763–000]
Take notice that on April 1, 2005,
Southern California Edison Company
(SCE) submitted proposed revisions to
SCE’s Transmission Owner Tariff,
Second Revised Volume No. 6,
Appendix VI, to reflect the incurrence
by SCE of reliability services costs
associated with the California
Independent System Operator’s M–438
Operating Procedure through
contractual means.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
12. Montana Alberta Tie Ltd.
[Docket No. ER05–764–000]
Take notice that on April 1, 2005,
Montana Alberta Tie Ltd. (MATL) filed
an application for authority to sell
transmission rights at market-based
rates. MATL states that is proposes to
develop a 230kV AC power
transmission line running from
Lethbridge, Alberta, Canada to Great
Falls, Montana. MATL requests certain
limited waivers of the Commission’s
regulations.
MATL states that the filing has been
served on the Alberta Electric System
Operator, Alberta Energy and Utilities
Board, National Energy Board,
NorthWestern Energy and regulators in
the State of Montana. MATL also states
that the filing has been posted on its
Web site at https://www.matl.ca.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
13. New England Power Pool
[Docket No. ER05–765–000]
Take notice that on April 1, 2005, the
New England Power Pool (NEPOOL)
Participants Committee filed for
acceptance materials to permit NEPOOL
(1) to expand its membership in include
Dennis Beverage Company Inc. (Dennis
Beverage), Dennis Energy Company
(Dennis Energy) and LP&T Energy LLC
(LP&T); and (2) to terminate the
membership of Entergy-Koch Trading,
LP (Entergy-Koch). The Participants
Committee requests an effective date of
April 1, 2005 for the NEPOOL
membership of Dennis Beverage, Dennis
Energy and LP&T Energy and a March
1, 2005 effective date for the termination
of Entergy-Koch.
The Participants Committee states
that copies of the filing were sent to the
VerDate jul<14>2003
19:36 Apr 13, 2005
Jkt 205001
15. ISO New England Inc.; New
England Power Pool Participants
Committee
[Docket No. ER05–767–000]
Take notice that on April 1, 2005, ISO
New England Inc. (the ISO) and the New
England Power Pool (NEPOOL)
Participants Committee submitted an
application to revise Market Rule 1 to
modify the eligibility criteria for offerbased Reference Levels.
The ISO and NEPOOL state that
copies of the filing have been served
electronically on all NEPOOL
Participants, and paper copies have
been provided to the Governors and
utility regulatory agencies of the New
England states.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
16. Central Maine Power Company
[Docket No. ER05–768–000]
Agreement No. IA–CMP–2. CMP has
requested an effective date of March 1,
2005.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
19. Cinergy Services, Inc.
[Docket No. ER05–771–000]
Take notice that on April 1, 2005,
Cinergy Services, Inc. (Cinergy), acting
as agent for and on behalf of The
Cincinnati Gas & Electric Company, and
Ohio Valley Electric Corporation
tendered for filing an amendment to a
Facility Agreement by and between The
Cincinnati Gas & Electric Company and
Ohio Valley Electric Corporation.
Cinergy states that copies of the filing
have been served on the Indiana Utility
Regulatory Commission, Kentucky
Public Service Commission, Public
Utilities Commission of Ohio, Midwest
Independent Transmission System
Operator, Inc., and PJM Interconnection,
L.L.C.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
20. Reliant Energy Aurora, LP
Take notice that on April 1, 2005,
Central Maine Power Company (CMP)
submitted an executed Large Generator
Interconnection Agreement between
CMP and Miller Hydro Group,
designated as ISO New England, Inc.,
FERC Electric Tariff No. 3, Service
Agreement No. IA–CMP–3. CMP
requests an effective date of March 1,
2005.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
[Docket No. ER05–772–000]
17. Central Maine Power Company
Take notice that on April 1, 2005,
Reliant Energy Shelby County, LP
(Shelby County) submitted for filing a
notice of cancellation of its FERC
Electric Rate Schedule No. 1. Shelby
County requests an effective date of
April 1, 2005.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
[Docket No. ER05–769–000]
Take notice that on April 1, 2005,
Central Maine Power Company (CMP)
submitted an unexecuted Small
Generator Interconnection Agreement
between CMP and the City of Lewiston,
Maine, designated as ISO New England,
Inc., FERC Electric Tariff No. 3, Service
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Take notice that on April 1, 2005,
Reliant Energy Aurora, LP (Aurora)
submitted for filing a notice of
cancellation of its FERC Electric Rate
Schedule No. 1. Aurora requests an
effective date of April 1, 2005.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
21. Reliant Energy Shelby County, LP
[Docket No. ER05–773–000]
E:\FR\FM\14APN1.SGM
14APN1
19750
Federal Register / Vol. 70, No. 71 / Thursday, April 14, 2005 / Notices
22. Northwest Regional Transmission
Association
[Docket No. ER05–774–000]
Take notice that on April 1, 2005,
Northwest Regional Transmission
Association (NRTA) submitted for filing
a notice of termination of NRTA.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
23. Hawi Renewable Development, LLC
[Docket No. QF05–88–000]
Take notice that on April 1, 2005,
Hawi Renewable Development, LLC,
63–655 19th Avenue, P.O. Box 58–1043,
North Palm Springs, CA 92258, filed
with an application for certification of a
facility as a qualifying small power
production facility pursuant to 18 CFR
292.207(b) of the Commission’s
regulations. Applicant seeks
Commission certification of a 10.56 MW
wind-powered small power production
facility (the ‘‘Facility’’) located near the
town of Hawi on the Island of Hawaii
in Hawaii. The primary energy source to
be used by the Facility is wind.
Applicant will interconnect and sell
electric energy to Hawaii Electric Light
Company, Inc.
Comment Date: 5 p.m. Eastern Time
on April 22, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
VerDate jul<14>2003
19:36 Apr 13, 2005
Jkt 205001
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1754 Filed 4–13–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER95–1007–018, et al.]
Logan Generating Company, L.P., et
al.; Electric Rate and Corporate Filings
April 6, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Logan Generating Company, L.P.,
Madison Windpower, LLC, Plains End,
LLC
[Docket Nos. ER95–1007–018, ER00–1742–
002, ER01–2741–003]
Take notice that on March 31, 2005,
Logan Generating Company, L.P.
(Logan), Madison Windpower, LLC
(Madison) and Plains End, LLC (Plains
End) (collectively, Applicants) filed a
consolidated triennial updated market
analysis. Applicants also filed amended
market-based rate tariffs that (1) update
the issuing officer as a result of changes
in the upstream ownership of
Applicants; (2) incorporate the
Commission’s reporting requirement for
changes in status set forth in Order No.
652, Reporting Requirements for
Changes in Status for Public Utilities
with Market-Based Rate Authority, 110
FERC 61,097 (2005); and (3) with
respect to the tariffs of Madison and
Plains End, incorporate the market
behavior rules adopted by the
Commission in Investigation of Terms
and Conditions of Public Utility MarketBased Rate Authorizations, 105 FERC
¶ 61,218 (2003). Further, Madison has
requested authorization to resell firm
transmission rights and Madison and
Plains End have requested termination
of the codes of conduct on file as part
of the market-based rate tariffs, because
they are no longer affiliated with Pacific
Gas and Electric Company.
Applicants state that copies of the
filing were served on the parties on the
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
official service lists in these
proceedings.
Comment Date: 5 p.m. eastern time on
April 21, 2005.
2. Snapping Shoals Electric
Membership Corp.
[Docket No. ER01–1994–002]
Take notice that on March 31, 2005,
Snapping Shoals Electric Membership
Corp. (Snapping Shoals) submitted an
amendment to its Triennial Updated
Market Analysis originally filed on July
12, 2004, as corrected on July 13, 2004,
in Docket No. ER01–1994–002. In
addition, Snapping Shoals submitted
revised tariff sheets incorporating the
market behavior rules adopted by the
Commission in Investigation of Terms
and Conditions of Public Utility MarketBased Rate Authorizations, 105 FERC
¶ 61,218 (2003). Snapping Shoals’
revised tariff sheets also incorporate the
reporting requirements adopted by the
Commission in Order No. 652,
Reporting Requirements for Changes in
Status for Public Utilities with MarketBased Rate Authority, 110 FERC
¶ 61,097 (2005) and include language
indicating that Snapping Shoals will not
make any sales to affiliates without
prior Commission authorization
pursuant to section 205 of the Federal
Power Act.
Comment Date: 5 p.m. eastern time on
April 21, 2005.
3. Great Lakes Hydro America, LLC
[Docket No. ER02–2397–003]
Take notice that on March 30, 2005,
Great Lakes Hydro America, LLC
(GLHA) submitted revised tariff sheets
to incorporate the change in status
reporting requirement adopted by the
Commission in Order No. 652,
Reporting Requirement for Changes in
Status for Public Utilities with MarketBased Rate Authority, 110 FERC
¶ 61,097 (2005). GLHA requests an
effective date of March 21, 2005.
GLHA states that copies of the filing
have been served on the parties on the
official service list for this proceeding.
Comment Date: 5 p.m. eastern time on
April 20, 2005.
4. Devon Power LLC, Middletown
Power LLC, Montville Power LLC,
Norwalk Power LLC, NRG Power
Marketing Inc.
[Docket No. ER04–23–012]
Take notice that on March 31, 2005,
Devon Power LLC, Middletown Power
LLC, Montville Power LLC, and
Norwalk Power LLC (collectively NRG)
submitted a refund report showing the
refunds made to ISO New England as
the result of the Commission’s Order
E:\FR\FM\14APN1.SGM
14APN1
Agencies
[Federal Register Volume 70, Number 71 (Thursday, April 14, 2005)]
[Notices]
[Pages 19748-19750]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1754]
[[Page 19748]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG05-57-000, et al.]
Bellows Falls Power Company, LLC, et al.; Electric Rate and
Corporate Filings
April 7, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Bellows Falls Power Company, LLC
[Docket No. EG05-57-000]
Take notice that on April 4, 2005, Bellows Falls Power Company, LLC
(BFPC) filed an application for a determination of exempt wholesale
generator status pursuant to section 32(a)(1) of the Public Utility
Holding Company Act of 1935, as amended, 15 U.S.C. 79z-5a, and Part 365
of the Commission's Regulations, 18 CFR Part 365. BFPC states that it
is a Delaware limited liability company that will lease and operate the
Bellows Falls Hydroelectric Project from the Town of Rockingham,
Vermont.
Comment Date: 5 p.m. Eastern Standard Time on April 25, 2005.
2. San Diego Gas & Electric Company, Complainants v. Sellers of Energy
and Ancillary Services Into Markets Operated by the California
Independent System Operator and the California Power Exchange,
Respondents; Investigation of Practices of the California Independent
System Operator and the California Power Exchange
[Docket Nos. EL00-95-127 and EL00-98-114]
On March 21, 2005, the City of Los Angeles Department of Water and
Power (LADWP) submitted its compliance filing containing recalculations
of emission cost offsets to be included in the financial reruns of the
California Independent System Operator Corporation, pursuant to the
Commission's Order issued November 23, 2004 in Docket Nos. EL00-95-100
and EL00-98-088, 109 FERC ] 61,218 (2004).
Comment Date: 5 p.m. Eastern Time on April 14, 2005.
3. The Empire District Electric Company
[Docket No. ER99-1757-008]
Take notice that on March 31, 2005, The Empire District Electric
Company (Empire) submitted a compliance filing, pursuant to the
Commission's order issued March 3, 2005 in Docket No. ER99-1757-002,
110 FERC ] 61,214 (2005).
Empire states that copies of the filing have been served on all
parties on the official service list in this proceeding.
Comment Date: 5 p.m. Eastern Time on April 21, 2005.
4. Indeck-Oswego Limited Partnership
[Docket No. ER02-1081-002]
Take notice that on April 1, 2005, Indeck-Oswego Limited
Partnership (Indeck Oswego) submitted an updated market power analysis
and an amendment to its market-based rate tariff to incorporate the
reporting requirements adopted by the Commission in Order No. 652,
Reporting Requirements for Changes in Status for Public Utilities with
Market-Based Rate Authority, 110 FERC ] 61,097 (2005).
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
5. Cobb Electric Membership Corp.
[Docket No. ER01-1860-002]
Take notice that on April 1, 2005, Cobb Electric Membership Corp.
(Cobb) submitted an amendment to its Triennial Updated Market Analysis
originally filed on July 12, 2004 in Docket No. ER01-1860-001. In
addition, Cobb submitted revised tariff sheets incorporating the market
behavior rules adopted by the Commission in Investigation of Terms and
Conditions of Public Utility Market-Based Rate Authorizations, 105 FERC
] 61,218 (2003). Cobb's revised tariff sheets also incorporate the
reporting requirements adopted by the Commission in Order No. 652,
Reporting Requirements for Changes in Status for Public Utilities with
Market-Based Rate Authority, 110 FERC ] 61,097 (2005) and includes
language indicating that Cobb will not make any sales to affiliates
without prior Commission authorization pursuant to section 205 of the
Federal Power Act.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
6. Marina Energy, L.L.C.
[Docket No. ER03-715-002]
Take notice that on April 1, 2005, Marina Energy, L.L.C. submitted
an amendment to its market-based rate tariff to incorporate the market
behavior rules adopted by the Commission in Investigation of Terms and
Conditions of Public Utility Market-Based Rate Authorizations, 105 FERC
] 61,218 (2003) and to incorporate the reporting requirements adopted
by the Commission in Order No. 652, Reporting Requirements for Changes
in Status for Public Utilities with Market-Based Rate Authority, 110
FERC ] 61,097 (2005).
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
7. New York Independent System Operator, Inc.
[Docket No. ER04-1138-002]
Take notice that on April 1, 2005, the New York Independent System
Operator, Inc. (NYISO) filed a compliance filing pursuant to the
Commission's letter order issued March 9, 2005 in Docket No. ER04-1138-
001.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
8. North American Electric Reliability Council
[Docket No. ER05-580-001]
Take notice that on April 1, 2005, the North American Electric
Reliability Council submitted a compliance filing pursuant to the
Commission's order issued March 30, 2005 in Docket No. ER05-580-000,
110 FERC ] 61,388 (2005).
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
9. San Joaquin Cogen, L.L.C.
[Docket No. ER05-698-001]
Take notice that on April 1, 2005, San Joaquin Cogen, L.L.C. (San
Joaquin) filed revisions to sections 6 and 10 of the proposed market-
based rate tariff sheets initially filed in Docket No. ER05-698-000 on
March 11, 2005. San Joaquin requests an effective date of April 15,
2005.
Comment Date: 5 p.m. Eastern Time on April 14, 2005.
10. ISO New England Inc.
[Docket No. ER05-762-000]
Take notice that on April 1, 2005, ISO New England Inc. (the ISO)
submitted revised tariff sheets for its Transmission, Markets and
Services Tariff, FERC Electric Tariff No. 3 (ISO Tariff). The ISO
states that its filing seeks to conform its financial assurance
policies (Exhibits IA and IC to Section I of the ISO Tariff) and its
Market Rule 1 (Section III of the ISO Tariff) to the provisions filed
by the New England Power Pool (NEPOOL) Participants Committee in Docket
Nos. ER05-361-000 and ER05-403-000 and accepted by the Commission on
February 10, 2005 in ISO New England Inc., 110 FERC ] 61,111 (2005) and
by letter order issued on February 22, 2005 in New England Power Pool,
110 FERC ] 61,180 (2005).
The ISO states that paper copies of the filing were sent to the New
England
[[Page 19749]]
state governors and regulatory agencies, and electronic copies were
sent to the ISO's Governance Participants.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
11. Southern California Edison Company
[Docket No. ER05-763-000]
Take notice that on April 1, 2005, Southern California Edison
Company (SCE) submitted proposed revisions to SCE's Transmission Owner
Tariff, Second Revised Volume No. 6, Appendix VI, to reflect the
incurrence by SCE of reliability services costs associated with the
California Independent System Operator's M-438 Operating Procedure
through contractual means.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
12. Montana Alberta Tie Ltd.
[Docket No. ER05-764-000]
Take notice that on April 1, 2005, Montana Alberta Tie Ltd. (MATL)
filed an application for authority to sell transmission rights at
market-based rates. MATL states that is proposes to develop a 230kV AC
power transmission line running from Lethbridge, Alberta, Canada to
Great Falls, Montana. MATL requests certain limited waivers of the
Commission's regulations.
MATL states that the filing has been served on the Alberta Electric
System Operator, Alberta Energy and Utilities Board, National Energy
Board, NorthWestern Energy and regulators in the State of Montana. MATL
also states that the filing has been posted on its Web site at https://
www.matl.ca.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
13. New England Power Pool
[Docket No. ER05-765-000]
Take notice that on April 1, 2005, the New England Power Pool
(NEPOOL) Participants Committee filed for acceptance materials to
permit NEPOOL (1) to expand its membership in include Dennis Beverage
Company Inc. (Dennis Beverage), Dennis Energy Company (Dennis Energy)
and LP&T Energy LLC (LP&T); and (2) to terminate the membership of
Entergy-Koch Trading, LP (Entergy-Koch). The Participants Committee
requests an effective date of April 1, 2005 for the NEPOOL membership
of Dennis Beverage, Dennis Energy and LP&T Energy and a March 1, 2005
effective date for the termination of Entergy-Koch.
The Participants Committee states that copies of the filing were
sent to the New England state governors and regulatory commissions and
the participants in NEPOOL.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
14. Soyland Power Cooperative, Inc.
[Docket No. ER05-766-000]
Take notice that on April 1, 2005, Soyland Power Cooperative, Inc.
(Soyland) tendered for filing a proposed clarification to its formulary
rate--Rate Schedule A. Soyland states that Rate Schedule A is the
formulary rate under which Soyland recovers the costs associated with
its service to its members pursuant to the wholesale power contract
that Soyland has with each member. Soyland requests an effective date
of June 1, 2005.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
15. ISO New England Inc.; New England Power Pool Participants Committee
[Docket No. ER05-767-000]
Take notice that on April 1, 2005, ISO New England Inc. (the ISO)
and the New England Power Pool (NEPOOL) Participants Committee
submitted an application to revise Market Rule 1 to modify the
eligibility criteria for offer-based Reference Levels.
The ISO and NEPOOL state that copies of the filing have been served
electronically on all NEPOOL Participants, and paper copies have been
provided to the Governors and utility regulatory agencies of the New
England states.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
16. Central Maine Power Company
[Docket No. ER05-768-000]
Take notice that on April 1, 2005, Central Maine Power Company
(CMP) submitted an executed Large Generator Interconnection Agreement
between CMP and Miller Hydro Group, designated as ISO New England,
Inc., FERC Electric Tariff No. 3, Service Agreement No. IA-CMP-3. CMP
requests an effective date of March 1, 2005.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
17. Central Maine Power Company
[Docket No. ER05-769-000]
Take notice that on April 1, 2005, Central Maine Power Company
(CMP) submitted an unexecuted Small Generator Interconnection Agreement
between CMP and the City of Lewiston, Maine, designated as ISO New
England, Inc., FERC Electric Tariff No. 3, Service Agreement No. IA-
CMP-2. CMP has requested an effective date of March 1, 2005.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
18. Central Maine Power Company
[Docket No. ER05-770-000]
Take notice that on April 1, 2005, Central Maine Power Company
(CMP) submitted an unexecuted Large Generator Interconnection Agreement
between CMP and the International Paper Company designated as ISO New
England, Inc., FERC Electric Tariff No. 3, Service Agreement No. IA-
CMP-1. CMP has requested an effective date of March 1, 2005.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
19. Cinergy Services, Inc.
[Docket No. ER05-771-000]
Take notice that on April 1, 2005, Cinergy Services, Inc.
(Cinergy), acting as agent for and on behalf of The Cincinnati Gas &
Electric Company, and Ohio Valley Electric Corporation tendered for
filing an amendment to a Facility Agreement by and between The
Cincinnati Gas & Electric Company and Ohio Valley Electric Corporation.
Cinergy states that copies of the filing have been served on the
Indiana Utility Regulatory Commission, Kentucky Public Service
Commission, Public Utilities Commission of Ohio, Midwest Independent
Transmission System Operator, Inc., and PJM Interconnection, L.L.C.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
20. Reliant Energy Aurora, LP
[Docket No. ER05-772-000]
Take notice that on April 1, 2005, Reliant Energy Aurora, LP
(Aurora) submitted for filing a notice of cancellation of its FERC
Electric Rate Schedule No. 1. Aurora requests an effective date of
April 1, 2005.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
21. Reliant Energy Shelby County, LP
[Docket No. ER05-773-000]
Take notice that on April 1, 2005, Reliant Energy Shelby County, LP
(Shelby County) submitted for filing a notice of cancellation of its
FERC Electric Rate Schedule No. 1. Shelby County requests an effective
date of April 1, 2005.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
[[Page 19750]]
22. Northwest Regional Transmission Association
[Docket No. ER05-774-000]
Take notice that on April 1, 2005, Northwest Regional Transmission
Association (NRTA) submitted for filing a notice of termination of
NRTA.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
23. Hawi Renewable Development, LLC
[Docket No. QF05-88-000]
Take notice that on April 1, 2005, Hawi Renewable Development, LLC,
63-655 19th Avenue, P.O. Box 58-1043, North Palm Springs, CA 92258,
filed with an application for certification of a facility as a
qualifying small power production facility pursuant to 18 CFR
292.207(b) of the Commission's regulations. Applicant seeks Commission
certification of a 10.56 MW wind-powered small power production
facility (the ``Facility'') located near the town of Hawi on the Island
of Hawaii in Hawaii. The primary energy source to be used by the
Facility is wind. Applicant will interconnect and sell electric energy
to Hawaii Electric Light Company, Inc.
Comment Date: 5 p.m. Eastern Time on April 22, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible online at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5-1754 Filed 4-13-05; 8:45 am]
BILLING CODE 6717-01-P