Dynegy, Inc., et al.; Electric Rate and Corporate Filings, 19746-19747 [E5-1753]
Download as PDF
19746
Federal Register / Vol. 70, No. 71 / Thursday, April 14, 2005 / Notices
Representative and U.S. Senators and
send you a Grant Award Notification
(GAN). We may also notify you
informally.
If your application is not evaluated or
not selected for funding, we notify you.
2. Administrative and National Policy
Requirements: We identify
administrative and national policy
requirements in the application package
and reference these and other
requirements in the Applicable
Regulations section of this notice.
We reference the regulations outlining
the terms and conditions of an award in
the Applicable Regulations section of
this notice and include these and other
specific conditions in the GAN. The
GAN also incorporates your approved
application as part of your binding
commitments under the grant.
3. Reporting: At the end of your
project period, you must submit a final
performance report, including financial
information, as directed by the
Secretary. If you receive a multi-year
award, you must submit an annual
performance report that provides the
most current performance and financial
expenditure information as specified by
the Secretary in 34 CFR 75.118. For
specific requirements on grantee
reporting, please review the Grant
Performance Report forms and
instructions (ED 524–B) at https://
www.ed.gov/fund/grant/apply/
appforms/appforms.html.
4. Performance Measures: We
describe the requirement for each
applicant to submit specific annual
performance goals for the required
specific performance indicators
identified in paragraph (6) of the
Requirements section of the notice of
final requirements and selection criteria,
published elsewhere in this issue of the
Federal Register.
VII. Agency Contact
For Further Information Contact:
Laura Messenger, U.S. Department of
Education, 400 Maryland Avenue, SW.,
room 11028, Potomac Center Plaza,
Washington, DC 20202–7241. telephone:
(202) 245–7840 or by e-mail:
laura.messenger@ed.gov.
If you use a telecommunications
device for the deaf (TDD), you may call
the Federal Relay Service (FRS) at 1–
800–877–8339.
Individuals with disabilities may
obtain this document in an alternative
format (e.g., Braille, large print,
audiotape, or computer diskette) on
request to the program contact person
listed in this section.
VerDate jul<14>2003
19:36 Apr 13, 2005
Jkt 205001
VIII. Other Information
Electronic Access to this Document:
You may view this document, as well as
all other documents of this Department
published in the Federal Register, in
text or Adobe Portable Document
Format (PDF) on the Internet at the
following site: https://www.ed.gov/news/
fedregister.
To use PDF you must have the Adobe
Acrobat Reader, which is available free
at this site. If you have questions about
using PDF, call the U.S. Government
Printing Office (GPO) toll free at 1–888–
293–6498, or in the Washington, DC,
area at (202) 512–1530.
Note: The official version of this document
is the document published in the Federal
Register. Free Internet access to the official
edition of the Federal Register and the Code
of Federal Regulations is available on GPO
Access at: https://www.gpoaccess.gov/nara/
index.html.
Dated: April 11, 2005.
Susan Sclafani,
Assistant Secretary for Vocational and Adult
Education.
[FR Doc. 05–7527 Filed 4–13–05; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Dynegy, Inc., et al.; Electric Rate and
Corporate Filings
April 5, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Dynegy Inc.
[Docket No. EC05–64–000]
Take notice that on March 30, 2005,
Dynegy Inc. (Applicant), on behalf of its
public utility subsidiaries, submitted an
application pursuant to section 203 of
the Federal Power Act for authorization
of a transfer of indirect control of its
jurisdictional facilities, arising from the
proposed change in the state of
incorporation of Applicant from Illinois
to Delaware.
Comment Date: 5 p.m. Eastern Time
on April 20, 2005.
2. Bear Swamp Power Company LLC
[Docket No. EG05–54–000]
Take notice that on March 17, 2005,
Bear Swamp Power Company LLC
(BSPC) filed an application for a
determination of exempt wholesale
Fmt 4703
Sfmt 4703
[Docket No. ER03–1341–002]
Take notice that on March 30, 2005,
Michigan Electric Transmission
Company, LLC, (Michigan Electric) in
compliance with the Commission’s
order issued November 17, 2003, 105
FERC ¶ 61,214, submitted schedules
showing its actual weighted average cost
of long-term debt for calendar year 2004.
Michigan Electric states that copies of
this filing were served on all parties
included on the Commission’s official
service list established in this
proceeding.
Comment Date: 5 p.m. Eastern Time
on April 20, 2005.
[Docket No. ER05–741–000]
[Docket No. EC05–54–000, et al.]
Frm 00020
3. Michigan Electric Transmission
Company, LLC
4. Public Service Company of New
Mexico
Federal Energy Regulatory
Commission
PO 00000
generator status pursuant to section
32(a)(1) of the Public Utility Holding
Company Act of 1935, as amended, 15
U.S.C. 79z–5a, and Part 365 of the
Commission’s regulations. BSPC states
that it is a Delaware limited liability
company that will operate and
subsequently acquire and operate the
Bear Swamp Pumped Storage
Hydroelectric Facility and the Fife
Brook Hydroelectric Facility.
Comment Date: 5 p.m. Eastern Time
on April 27, 2005.
Take notice that on March 30, 2005,
Public Service Company of New Mexico
(PNM) tendered for filing a notice of
change in rates and the provision for
compensation for line losses for firm
point-to-point and network integration
transmission services under its FERC
Electric Tariff, Second Revised Volume
No. 4 (OATT), and for firm point-topoint transmission services under nonOATT bilateral contracts between PNM
and its firm transmission service
customers. PNM requests an effective
date of June 1, 2005, for the proposed
rate changes.
PNM states that copies of the filing
have been served on all affected
customers, the New Mexico Public
Regulation Commission, and the New
Mexico Attorney General. Copies of the
filing are available for public inspection
at PNM’s offices in Albuquerque, New
Mexico.
Comment Date: 5 p.m. Eastern Time
April 20, 2005.
5. Cambridge Electric Light Company;
Commonwealth Electric Company
[Docket No. ER05–742–000]
Take notice that on March 30, 2005,
Cambridge Electric Light Company and
Commonwealth Electric Company
E:\FR\FM\14APN1.SGM
14APN1
Federal Register / Vol. 70, No. 71 / Thursday, April 14, 2005 / Notices
(collectively, Companies) submitted
revisions to Schedule 21–CEL and
Schedule 21–CEC of Section II of the
Transmission, Markets and Services
Tariff of ISO New England Inc., FERC
Electric Tariff, No. 3 (ISO–NE Tariff).
The Companies request an effective date
of June 1, 2005
Comment Date: 5 p.m. Eastern Time
on April 20, 2005.
6. Pacific Summit Energy LLC
[Docket No. ER05–743–000]
Take notice that on March 30, 2005,
Pacific Summit Energy LLC (PSE)
tendered for filing with the
Commission, pursuant to 18 CFR 35.13
(2004), a petition to accept for filing its
initial market-based rate tariff to sell
electric power and ancillary services;
waive certain of the Commission’s
regulations promulgated under the
Federal Power Act; and grant certain
blanket approvals under other such
Commission regulations.
Comment Date: 5 p.m. Eastern Time
on April 20, 2005.
7. Major Lending, LLC
[Docket No. ER05–744–000]
Take notice that on March 30, 2005,
Major Lending, LLC (Major Lending)
petitioned the Commission for
acceptance of its Rate Schedule FERC
No. 1; the granting of certain blanket
approvals, including the authority to
sell electricity at market based rates; and
waiver of certain Commission
regulations. Major Lending states that it
intends to engage in wholesale electric
power and energy purchases and sales
as a marketer. Major Lending further
states it is not in the business of
generating or transmitting electric
power.
Comment Date: 5 p.m. Eastern Time
on April 20, 2005.
8. Northeast Utilities Company
[Docket No. ER05–745–000]
Take notice that on March 30, 2005,
Northeast Utilities Service Company
(NUSCO), on behalf of its operating
companies, filed a service agreement
with Unitil Energy Systems, Inc.
NUSCO requests that the service
agreement be made effective June 1,
2005.
NUSCO states that copies of the filing
were served on the customer and the
Connecticut, Massachusetts and New
Hampshire state regulatory
commissions.
Comment Date: 5 p.m. Eastern Time
on April 20, 2005.
VerDate jul<14>2003
19:36 Apr 13, 2005
Jkt 205001
9. PSI Energy, Inc.
[Docket No. ER05–746–000]
Take notice that on March 30, 2005,
PSI Energy, Inc., (PSI) tendered for filing
the Transmission and Local Facilities
(T&LF) Agreement for Calendar Year
2003 Reconciliation between PSI and
Wabash Valley Power Association, Inc.,
and between PSI and Indiana Municipal
Power Agency, designated as PSI’s Rate
Schedule FERC No. 253.
Comment Date: 5 p.m. Eastern Time
on April 12, 2005.
10. ISO New England Inc. and New
England Power Pool
[Docket No. ER05–747–000]
Take notice that on March 30, 2005,
ISO New England Inc., joined by the
New England Power Pool (NEPOOL)
Participants Committee, filed
amendments to Section III of the
Transmission, Markets and Services
Tariff of ISO New England Inc., FERC
Electric Tariff No. 3. NEPOOL states that
the amendments make clarifying
changes to provisions governing the
Forward Reserve Market and partial delisting of Resources.
The ISO and NEPOOL state that paper
copies of the filing were sent to the New
England state governors and regulatory
agencies, and electronic copies were
sent to the Governance Participants.
Comment Date: 5 p.m. Eastern Time
on April 20, 2005.
11. California Independent System
Operator Corporation
[Docket No. ER05–748–000]
Take notice that on March 30, 2005,
the California Independent System
Operator Corporation (ISO), tendered for
filing a Notice of Cancellation of the
letter agreement between the ISO and
Reliant Energy Services (RES) and the
letter agreement between the ISO and
Sempra Energy Resources (SER), both
dated and effective as of December 4,
2003. ISO states that the purpose of this
filing is to accommodate a planned
change in the dynamic scheduling of the
El Dorado Energy Merchant Power Plant
planned for April 1, 2005.
The ISO states that this filing has been
served on RES, SER, the California
Public Utilities Commission, the
California Electricity Oversight Board,
and all entities that are on the official
service list.
Comment Date: 5 p.m. Eastern Time
on April 20, 2005.
12. California Independent System
Operator Corporation
[Docket No. ER05–749–000]
Take notice that on March 30, 2005the
California Independent System Operator
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
19747
Corporation (ISO), tendered for filing a
Dynamic Scheduling Agreement for
Scheduling Coordinators (DSA) between
the ISO and Reliant Energy Services,
Inc. (RES) for acceptance by the
Commission. The ISO requests an
effective date of April 1, 2005.
The ISO states that this filing has been
served on RES, Sempra Energy
Resources, the California Public Utilities
Commission, and the California
Electricity Oversight Board.
Comment Date: 5 p.m. Eastern Time
on April 20, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1753 Filed 4–13–05; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\14APN1.SGM
14APN1
Agencies
[Federal Register Volume 70, Number 71 (Thursday, April 14, 2005)]
[Notices]
[Pages 19746-19747]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1753]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC05-54-000, et al.]
Dynegy, Inc., et al.; Electric Rate and Corporate Filings
April 5, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Dynegy Inc.
[Docket No. EC05-64-000]
Take notice that on March 30, 2005, Dynegy Inc. (Applicant), on
behalf of its public utility subsidiaries, submitted an application
pursuant to section 203 of the Federal Power Act for authorization of a
transfer of indirect control of its jurisdictional facilities, arising
from the proposed change in the state of incorporation of Applicant
from Illinois to Delaware.
Comment Date: 5 p.m. Eastern Time on April 20, 2005.
2. Bear Swamp Power Company LLC
[Docket No. EG05-54-000]
Take notice that on March 17, 2005, Bear Swamp Power Company LLC
(BSPC) filed an application for a determination of exempt wholesale
generator status pursuant to section 32(a)(1) of the Public Utility
Holding Company Act of 1935, as amended, 15 U.S.C. 79z-5a, and Part 365
of the Commission's regulations. BSPC states that it is a Delaware
limited liability company that will operate and subsequently acquire
and operate the Bear Swamp Pumped Storage Hydroelectric Facility and
the Fife Brook Hydroelectric Facility.
Comment Date: 5 p.m. Eastern Time on April 27, 2005.
3. Michigan Electric Transmission Company, LLC
[Docket No. ER03-1341-002]
Take notice that on March 30, 2005, Michigan Electric Transmission
Company, LLC, (Michigan Electric) in compliance with the Commission's
order issued November 17, 2003, 105 FERC ] 61,214, submitted schedules
showing its actual weighted average cost of long-term debt for calendar
year 2004.
Michigan Electric states that copies of this filing were served on
all parties included on the Commission's official service list
established in this proceeding.
Comment Date: 5 p.m. Eastern Time on April 20, 2005.
4. Public Service Company of New Mexico
[Docket No. ER05-741-000]
Take notice that on March 30, 2005, Public Service Company of New
Mexico (PNM) tendered for filing a notice of change in rates and the
provision for compensation for line losses for firm point-to-point and
network integration transmission services under its FERC Electric
Tariff, Second Revised Volume No. 4 (OATT), and for firm point-to-point
transmission services under non-OATT bilateral contracts between PNM
and its firm transmission service customers. PNM requests an effective
date of June 1, 2005, for the proposed rate changes.
PNM states that copies of the filing have been served on all
affected customers, the New Mexico Public Regulation Commission, and
the New Mexico Attorney General. Copies of the filing are available for
public inspection at PNM's offices in Albuquerque, New Mexico.
Comment Date: 5 p.m. Eastern Time April 20, 2005.
5. Cambridge Electric Light Company; Commonwealth Electric Company
[Docket No. ER05-742-000]
Take notice that on March 30, 2005, Cambridge Electric Light
Company and Commonwealth Electric Company
[[Page 19747]]
(collectively, Companies) submitted revisions to Schedule 21-CEL and
Schedule 21-CEC of Section II of the Transmission, Markets and Services
Tariff of ISO New England Inc., FERC Electric Tariff, No. 3 (ISO-NE
Tariff). The Companies request an effective date of June 1, 2005
Comment Date: 5 p.m. Eastern Time on April 20, 2005.
6. Pacific Summit Energy LLC
[Docket No. ER05-743-000]
Take notice that on March 30, 2005, Pacific Summit Energy LLC (PSE)
tendered for filing with the Commission, pursuant to 18 CFR 35.13
(2004), a petition to accept for filing its initial market-based rate
tariff to sell electric power and ancillary services; waive certain of
the Commission's regulations promulgated under the Federal Power Act;
and grant certain blanket approvals under other such Commission
regulations.
Comment Date: 5 p.m. Eastern Time on April 20, 2005.
7. Major Lending, LLC
[Docket No. ER05-744-000]
Take notice that on March 30, 2005, Major Lending, LLC (Major
Lending) petitioned the Commission for acceptance of its Rate Schedule
FERC No. 1; the granting of certain blanket approvals, including the
authority to sell electricity at market based rates; and waiver of
certain Commission regulations. Major Lending states that it intends to
engage in wholesale electric power and energy purchases and sales as a
marketer. Major Lending further states it is not in the business of
generating or transmitting electric power.
Comment Date: 5 p.m. Eastern Time on April 20, 2005.
8. Northeast Utilities Company
[Docket No. ER05-745-000]
Take notice that on March 30, 2005, Northeast Utilities Service
Company (NUSCO), on behalf of its operating companies, filed a service
agreement with Unitil Energy Systems, Inc. NUSCO requests that the
service agreement be made effective June 1, 2005.
NUSCO states that copies of the filing were served on the customer
and the Connecticut, Massachusetts and New Hampshire state regulatory
commissions.
Comment Date: 5 p.m. Eastern Time on April 20, 2005.
9. PSI Energy, Inc.
[Docket No. ER05-746-000]
Take notice that on March 30, 2005, PSI Energy, Inc., (PSI)
tendered for filing the Transmission and Local Facilities (T&LF)
Agreement for Calendar Year 2003 Reconciliation between PSI and Wabash
Valley Power Association, Inc., and between PSI and Indiana Municipal
Power Agency, designated as PSI's Rate Schedule FERC No. 253.
Comment Date: 5 p.m. Eastern Time on April 12, 2005.
10. ISO New England Inc. and New England Power Pool
[Docket No. ER05-747-000]
Take notice that on March 30, 2005, ISO New England Inc., joined by
the New England Power Pool (NEPOOL) Participants Committee, filed
amendments to Section III of the Transmission, Markets and Services
Tariff of ISO New England Inc., FERC Electric Tariff No. 3. NEPOOL
states that the amendments make clarifying changes to provisions
governing the Forward Reserve Market and partial de-listing of
Resources.
The ISO and NEPOOL state that paper copies of the filing were sent
to the New England state governors and regulatory agencies, and
electronic copies were sent to the Governance Participants.
Comment Date: 5 p.m. Eastern Time on April 20, 2005.
11. California Independent System Operator Corporation
[Docket No. ER05-748-000]
Take notice that on March 30, 2005, the California Independent
System Operator Corporation (ISO), tendered for filing a Notice of
Cancellation of the letter agreement between the ISO and Reliant Energy
Services (RES) and the letter agreement between the ISO and Sempra
Energy Resources (SER), both dated and effective as of December 4,
2003. ISO states that the purpose of this filing is to accommodate a
planned change in the dynamic scheduling of the El Dorado Energy
Merchant Power Plant planned for April 1, 2005.
The ISO states that this filing has been served on RES, SER, the
California Public Utilities Commission, the California Electricity
Oversight Board, and all entities that are on the official service
list.
Comment Date: 5 p.m. Eastern Time on April 20, 2005.
12. California Independent System Operator Corporation
[Docket No. ER05-749-000]
Take notice that on March 30, 2005the California Independent System
Operator Corporation (ISO), tendered for filing a Dynamic Scheduling
Agreement for Scheduling Coordinators (DSA) between the ISO and Reliant
Energy Services, Inc. (RES) for acceptance by the Commission. The ISO
requests an effective date of April 1, 2005.
The ISO states that this filing has been served on RES, Sempra
Energy Resources, the California Public Utilities Commission, and the
California Electricity Oversight Board.
Comment Date: 5 p.m. Eastern Time on April 20, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5-1753 Filed 4-13-05; 8:45 am]
BILLING CODE 6717-01-P