CenterPoint Energy Gas Transmission Company; Notice of Availability of the Environmental Assessment for the Proposed Line Ad Expansion Project, 19432 [E5-1734]

Download as PDF 19432 Federal Register / Vol. 70, No. 70 / Wednesday, April 13, 2005 / Notices This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–1727 Filed 4–12–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP05–3–000] CenterPoint Energy Gas Transmission Company; Notice of Availability of the Environmental Assessment for the Proposed Line Ad Expansion Project April 5, 2005. The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) on the natural gas pipeline facilities proposed by CenterPoint Energy Gas Transmission Company (CEGT) in the above-referenced docket. The EA was prepared to satisfy the requirements of the National Environmental Policy Act. The staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment. The EA assesses the potential environmental effects of the construction and operation of the proposed two new compressor stations, Hinton and Allen, in Caddo and Hughes counties, Oklahoma, respectively, and additional compression at an existing compressor station facility in Grady County, Oklahoma, including: • A 10,310-horsepower (hp) Compressor Station in Caddo County, Oklahoma; • A 13,220-hp Compressor Station in Hughes County, Oklahoma; and • An additional 4,735-hp of compression and appurtenant facilities to the existing Amber Compressor Station in Grady County, Oklahoma. The purpose of the proposed facilities would be to increase the transportation VerDate jul<14>2003 18:37 Apr 12, 2005 Jkt 205001 capacity on CEGT’s Line AD by 112,900 Dth per day which would enable the Line AD capacity to receive Rocky Mountain gas supplies for transportation west to east across CEGT’s system. The EA has been placed in the public files of the Commission. A limited number of copies of the EA are available for distribution and public inspection at: Federal Energy Regulatory Commission, Public Reference Room, 888 First Street, NE., Room 2A, Washington, DC 20426, (202) 502–8371. Copies of the EA have been mailed to everyone who responded to the November 1, 2004 Notice of Intent and parties to this proceeding. Any person wishing to comment on the EA may do so. To ensure consideration prior to a Commission decision on the proposal, it is important that we receive your comments before the date specified below. Please carefully follow these instructions to ensure that your comments are received in time and properly recorded: • Send an original and two copies of your comments to: Secretary, Federal Energy Regulatory Commission, 888 First St., NE., Room 1A, Washington, DC 20426; • Label one copy of the comments for the attention of the Gas Branch 3, PJ11.3. • Reference Docket No. CP05–03– 000; and • Mail your comments so that they will be received in Washington, DC on or before May 6, 2005. Please note that we are continuing to experience delays in mail deliveries from the U.S. Postal Service. As a result, we will include all comments that we receive within a reasonable time frame in our environmental analysis of this project. However, the Commission strongly encourages electronic filing of any comments or interventions or protests to this proceeding. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link and the link to the User’s Guide. Before you can file comments you will need to create a free account which can be created by clicking on ‘‘Sign-up.’’ Comments will be considered by the Commission but will not serve to make the commentor a party to the proceeding. Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission’s Rules of Practice and Procedures (18 CFR PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 385.214).1 Only intervenors have the right to seek rehearing of the Commission’s decision. Affected landowners and parties with environmental concerns may be granted intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which would not be adequately represented by any other parties. You do not need intervenor status to have your comments considered. Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC or on the FERC Internet Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries and direct links to the documents. Go to https:// www.ferc.gov/esubscribenow.htm. Magalie R. Salas, Secretary. [FR Doc. E5–1734 Filed 4–12–05; 8:45 am] BILLING CODE 6717–01–P 1 Interventions may also be filed electronically via the Internet in lieu of paper. See the previous discussion on filing comments electronically. E:\FR\FM\13APN1.SGM 13APN1

Agencies

[Federal Register Volume 70, Number 70 (Wednesday, April 13, 2005)]
[Notices]
[Page 19432]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1734]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP05-3-000]


CenterPoint Energy Gas Transmission Company; Notice of 
Availability of the Environmental Assessment for the Proposed Line Ad 
Expansion Project

April 5, 2005.
    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) on the 
natural gas pipeline facilities proposed by CenterPoint Energy Gas 
Transmission Company (CEGT) in the above-referenced docket.
    The EA was prepared to satisfy the requirements of the National 
Environmental Policy Act. The staff concludes that approval of the 
proposed project, with appropriate mitigating measures, would not 
constitute a major federal action significantly affecting the quality 
of the human environment.
    The EA assesses the potential environmental effects of the 
construction and operation of the proposed two new compressor stations, 
Hinton and Allen, in Caddo and Hughes counties, Oklahoma, respectively, 
and additional compression at an existing compressor station facility 
in Grady County, Oklahoma, including:
     A 10,310-horsepower (hp) Compressor Station in Caddo 
County, Oklahoma;
     A 13,220-hp Compressor Station in Hughes County, Oklahoma; 
and
     An additional 4,735-hp of compression and appurtenant 
facilities to the existing Amber Compressor Station in Grady County, 
Oklahoma.
    The purpose of the proposed facilities would be to increase the 
transportation capacity on CEGT's Line AD by 112,900 Dth per day which 
would enable the Line AD capacity to receive Rocky Mountain gas 
supplies for transportation west to east across CEGT's system.
    The EA has been placed in the public files of the Commission. A 
limited number of copies of the EA are available for distribution and 
public inspection at: Federal Energy Regulatory Commission, Public 
Reference Room, 888 First Street, NE., Room 2A, Washington, DC 20426, 
(202) 502-8371.
    Copies of the EA have been mailed to everyone who responded to the 
November 1, 2004 Notice of Intent and parties to this proceeding.
    Any person wishing to comment on the EA may do so. To ensure 
consideration prior to a Commission decision on the proposal, it is 
important that we receive your comments before the date specified 
below. Please carefully follow these instructions to ensure that your 
comments are received in time and properly recorded:
     Send an original and two copies of your comments to: 
Secretary, Federal Energy Regulatory Commission, 888 First St., NE., 
Room 1A, Washington, DC 20426;
     Label one copy of the comments for the attention of the 
Gas Branch 3, PJ11.3.
     Reference Docket No. CP05-03-000; and
     Mail your comments so that they will be received in 
Washington, DC on or before May 6, 2005.
    Please note that we are continuing to experience delays in mail 
deliveries from the U.S. Postal Service. As a result, we will include 
all comments that we receive within a reasonable time frame in our 
environmental analysis of this project. However, the Commission 
strongly encourages electronic filing of any comments or interventions 
or protests to this proceeding. See 18 CFR 385.2001(a)(1)(iii) and the 
instructions on the Commission's Web site at https://www.ferc.gov under 
the ``e-Filing'' link and the link to the User's Guide. Before you can 
file comments you will need to create a free account which can be 
created by clicking on ``Sign-up.''
    Comments will be considered by the Commission but will not serve to 
make the commentor a party to the proceeding. Any person seeking to 
become a party to the proceeding must file a motion to intervene 
pursuant to Rule 214 of the Commission's Rules of Practice and 
Procedures (18 CFR 385.214).\1\ Only intervenors have the right to seek 
rehearing of the Commission's decision.
---------------------------------------------------------------------------

    \1\ Interventions may also be filed electronically via the 
Internet in lieu of paper. See the previous discussion on filing 
comments electronically.
---------------------------------------------------------------------------

    Affected landowners and parties with environmental concerns may be 
granted intervenor status upon showing good cause by stating that they 
have a clear and direct interest in this proceeding which would not be 
adequately represented by any other parties. You do not need intervenor 
status to have your comments considered.
    Additional information about the project is available from the 
Commission's Office of External Affairs, at 1-866-208-FERC or on the 
FERC Internet Web site (https://www.ferc.gov) using the eLibrary link. 
Click on the eLibrary link, click on ``General Search'' and enter the 
docket number excluding the last three digits in the Docket Number 
field. Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission now offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries and direct links to 
the documents. Go to https://www.ferc.gov/esubscribenow.htm.

Magalie R. Salas,
Secretary.
[FR Doc. E5-1734 Filed 4-12-05; 8:45 am]
BILLING CODE 6717-01-P