Federal Acquisition Regulation; Submission for OMB Review; Material and Workmanship, 18380 [05-7258]
Download as PDF
18380
Federal Register / Vol. 70, No. 68 / Monday, April 11, 2005 / Notices
A. Purpose
When the Government awards a costreimbursement construction contract,
the contractor must submit to the
contracting officer and keep current a
chart showing the general executive and
administrative organization, the
personnel to be employed in connection
with the work under the contract, and
their respective duties. The chart is used
in administration of the contract and as
an aid in determining cost. The chart is
used by contract administration
personnel to assure the work is being
properly accomplished at reasonable
prices.
B. Annual Reporting Burden
Respondents: 50.
Responses Per Respondent: 1.
Annual Responses: 50.
Hours Per Response: .75.
Total Burden Hours: 38.
Obtaining Copies of Proposals:
Requesters may obtain a copy of the
information collection documents from
the General Services Administration,
FAR Secretariat (VIR), Room 4035, 1800
F Street, NW, Washington, DC 20405,
telephone (202) 501–4755. Please cite
OMB Control No. 9000–0064,
Organization and Direction of Work, in
all correspondence.
Dated: April 1, 2005.
Rodney P. Lantier
Director, Contract Policy Division.
[FR Doc. 05–7253 Filed 4–8–05; 8:45 am]
BILLING CODE 6820–EP–S
information collection requirement
concerning material and workmanship.
A request for public comments was
published in the Federal Register at 70
FR 5168,on February 1, 2005. No
comments were received.
Public comments are particularly
invited on: Whether this collection of
information is necessary for the proper
performance of functions of the FAR,
and whether it will have practical
utility; whether our estimate of the
public burden of this collection of
information is accurate, and based on
valid assumptions and methodology;
ways to enhance the quality, utility, and
clarity of the information to be
collected; and ways in which we can
minimize the burden of the collection of
information on those who are to
respond, through the use of appropriate
technological collection techniques or
other forms of information technology.
DATES: Submit comments or before May
11, 2005.
ADDRESSES: Submit comments regarding
this burden estimate or any other aspect
of this collection of information,
including suggestions for reducing this
burden to the General Services
Administration, FAR Secretariat (VIR),
1800 F Street, NW, Room 4035,
Washington, DC 20405. Please cite OMB
Control No. 9000–0062, material and
workmanship, in all correspondence.
FOR FURTHER INFORMATION CONTACT:
Cecelia Davis, Contract Policy Division,
GSA (202) 219–0202.
SUPPLEMENTARY INFORMATION:
Department of Defense (DOD),
General Services Administration (GSA),
and National Aeronautics and Space
Administration (NASA).
ACTION: Notice of request for an
extension to an existing OMB clearance.
A. Purpose
Under Federal contracts requiring that
equipment (e.g., pumps, fans,
generators, chillers, etc.) be installed in
a project, the Government must
determine that the equipment meets the
contract requirements. Therefore, the
contractor must submit sufficient data
on the particular equipment to allow the
Government to analyze the item.
The Government uses the submitted
data to determine whether or not the
equipment meets the contract
requirements in the categories of
performance, construction, and
durability. This data is placed in the
contract file and used during the
inspection of the equipment when it
arrives on the project and when it is
made operable.
SUMMARY: Under the provisions of the
Paperwork Reduction Act of 1995 (44
U.S.C. Chapter 35), the Federal
Acquisition Regulation (FAR)
Secretariat will be submitting to the
Office of Management and Budget
(OMB) a request to review and approve
an extension of a currently approved
B. Annual Reporting Burden
Respondents: 3,160.
Responses Per Respondent: 1.5.
Annual Responses: 4,740.
Hours Per Response: .25.
Total Burden Hours: 1,185.
Obtaining Copies of Proposals:
Requesters may obtain a copy of the
DEPARTMENT OF DEFENSE
GENERAL SERVICES
ADMINISTRATION
NATIONAL AERONAUTICS AND
SPACE ADMINISTRATION
[OMB Control No. 9000–0062]
Federal Acquisition Regulation;
Submission for OMB Review; Material
and Workmanship
AGENCIES:
VerDate jul<14>2003
17:45 Apr 08, 2005
Jkt 205001
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
information collection documents from
the General Services Administration,
FAR Secretariat (VIR), Room 4035, 1800
F Street, NW, Washington, DC 20405,
telephone (202) 501–4755. Please cite
OMB Control No. 9000–0062, Material
and Workmanship, in all
correspondence.
Dated: April 1, 2005
Rodney P. Lantier
Director, Contract Policy Division.
[FR Doc. 05–7258 Filed 4–8–05; 8:45 am]
BILLING CODE 6820–EP–S
DEPARTMENT OF DEFENSE
Office of the Secretary of Defense;
Notice; Initial Public Meeting of the
Defense Advisory Committee on
Military Compensation
Department of Defense, The
Defense Advisory Committee on
Military Compensation (DACMC).
SUMMARY: Name of Committee: The
Defense Advisory Committee on
Military Compensation (DACMC).
Committee Membership: Chairman:
ADM (Ret) Donald L. Pilling. Members:
Dr. John P. White; Gen (Ret) Lester L.
Lyles; Mr. Frederic W. Cook; Dr. Walter
Oi; Dr. Martin Anderson; and Mr.
Joseph E. Jannotta.
General Function of the Committee:
The Committee will provide the
Secretary of Defense, through the Under
Secretary of Defense (Personnel and
Readiness), with assistance and advice
on matters pertaining to military
compensation. The Committee will
examine what types of military
compensation and benefits are the most
effective for meeting the needs of the
Nation.
Contact Person: Mr. Terry Mintz,
Designated Federal Official, Defense
Advisory Committee on Military
Compensation, 2521 S. Clark Street,
Arlington, VA 22202. Telephone: 703–
699–2700.
Agenda: On May 11, 2005, from 10
a.m. to 12 p.m., the Committee will
discuss various aspects of the military
pay and benefits system, such as
compensation that recognizes danger,
risk, and hardship that members
experience; the appropriate balance
between in-service and post-service
compensation; the appropriate balance
between cash and non-cash
compensation; and the structure, level,
and relevance of Reserve and Guard
compensation, considering their
changed utilization.
Procedure: Public participation in
Committee discussions at this initial
meeting will not be permitted. Written
submissions of data, information, and
AGENCY:
E:\FR\FM\11APN1.SGM
11APN1
Agencies
[Federal Register Volume 70, Number 68 (Monday, April 11, 2005)]
[Notices]
[Page 18380]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-7258]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
GENERAL SERVICES ADMINISTRATION
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
[OMB Control No. 9000-0062]
Federal Acquisition Regulation; Submission for OMB Review;
Material and Workmanship
AGENCIES: Department of Defense (DOD), General Services Administration
(GSA), and National Aeronautics and Space Administration (NASA).
ACTION: Notice of request for an extension to an existing OMB
clearance.
-----------------------------------------------------------------------
SUMMARY: Under the provisions of the Paperwork Reduction Act of 1995
(44 U.S.C. Chapter 35), the Federal Acquisition Regulation (FAR)
Secretariat will be submitting to the Office of Management and Budget
(OMB) a request to review and approve an extension of a currently
approved information collection requirement concerning material and
workmanship. A request for public comments was published in the Federal
Register at 70 FR 5168,on February 1, 2005. No comments were received.
Public comments are particularly invited on: Whether this
collection of information is necessary for the proper performance of
functions of the FAR, and whether it will have practical utility;
whether our estimate of the public burden of this collection of
information is accurate, and based on valid assumptions and
methodology; ways to enhance the quality, utility, and clarity of the
information to be collected; and ways in which we can minimize the
burden of the collection of information on those who are to respond,
through the use of appropriate technological collection techniques or
other forms of information technology.
DATES: Submit comments or before May 11, 2005.
ADDRESSES: Submit comments regarding this burden estimate or any other
aspect of this collection of information, including suggestions for
reducing this burden to the General Services Administration, FAR
Secretariat (VIR), 1800 F Street, NW, Room 4035, Washington, DC 20405.
Please cite OMB Control No. 9000-0062, material and workmanship, in all
correspondence.
FOR FURTHER INFORMATION CONTACT: Cecelia Davis, Contract Policy
Division, GSA (202) 219-0202.
SUPPLEMENTARY INFORMATION:
A. Purpose
Under Federal contracts requiring that equipment (e.g., pumps,
fans, generators, chillers, etc.) be installed in a project, the
Government must determine that the equipment meets the contract
requirements. Therefore, the contractor must submit sufficient data on
the particular equipment to allow the Government to analyze the item.
The Government uses the submitted data to determine whether or not
the equipment meets the contract requirements in the categories of
performance, construction, and durability. This data is placed in the
contract file and used during the inspection of the equipment when it
arrives on the project and when it is made operable.
B. Annual Reporting Burden
Respondents: 3,160.
Responses Per Respondent: 1.5.
Annual Responses: 4,740.
Hours Per Response: .25.
Total Burden Hours: 1,185.
Obtaining Copies of Proposals: Requesters may obtain a copy of the
information collection documents from the General Services
Administration, FAR Secretariat (VIR), Room 4035, 1800 F Street, NW,
Washington, DC 20405, telephone (202) 501-4755. Please cite OMB Control
No. 9000-0062, Material and Workmanship, in all correspondence.
Dated: April 1, 2005
Rodney P. Lantier
Director, Contract Policy Division.
[FR Doc. 05-7258 Filed 4-8-05; 8:45 am]
BILLING CODE 6820-EP-S