Notice of Application for Non-Project Use of Project Lands and Waters and Soliciting Comments, Motions To Intervene, and Protests, 17991 [E5-1635]
Download as PDF
Federal Register / Vol. 70, No. 67 / Friday, April 8, 2005 / Notices
representative of the applicant specified
in the particular application.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1632 Filed 4–7–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Non-Project
Use of Project Lands and Waters and
Soliciting Comments, Motions To
Intervene, and Protests
March 31, 2005.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-project use
of project lands and waters.
b. Project No.: 2503–085.
c. Date Filed: March 3, 2005.
d. Applicant: Duke Power, a division
of Duke Energy Corporation.
e. Name of Project: Keowee-Toxaway
Project.
f. Location: Lake Keowee is located in
Oconee County, South Carolina. This
project does not occupy any Tribal or
Federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a), 825(r) and 799
and 801.
h. Applicant Contact: Mr. Joe Hall,
Lake Management Representative; Duke
Energy Corporation; P.O. Box 1006;
Charlotte, NC 28201–1006; (704) 382–
8576.
i. FERC Contact: Any questions on
this notice should be addressed to Brian
Romanek at (202) 502–6175 or by email: Brian.Romanek@ferc.gov.
j. Deadline for Filing Comments and
or Motions: April 29, 2005.
All documents (original and eight
copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Please include the project number (P–
2503–085) on any comments or motions
filed. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages efilings.
k. Description of Request: Duke
Power, licensee for the KeoweeToxaway Hydroelectric Project, has
requested Commission authorization to
lease to the Waterford Communities
VerDate jul<14>2003
19:00 Apr 07, 2005
Jkt 205001
Owners Association and Crescent
Communities, S.C., LLC 6.54 acres of
project lands for a Commercial/
Residential Marina. The Waterford
Community is located on Lake Keowee
in Oconee County. The marina would
consist of: (1) Three cluster docks that
accommodate a total of twenty-four
boats and one cluster dock that
accommodates six boats for Waterford
Ridge; (2) one cluster dock that
accommodates fourteen boats and two
cluster docks that accommodate eight
boats each for Waterford Farms and; (3)
nine cluster docks that accommodate
ten boats each for Waterford Pointe. In
total, one hundred and fifty boats would
be accommodated. Duke also seeks
authorization to approve the irrigation
and boat pump-out facilities associated
with this marina. The water withdrawal
needs are expected to be 8,400 gallons
per day. Duke also seeks authorization
to allow the stabilization of 2,803 feet of
shoreline with rip-rap.
l. Location of the Application: This
filing is available for review at the
Commission or may be viewed on the
Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
17991
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described
applications. A copy of the applications
may be obtained by agencies directly
from the Applicant. If an agency does
not file comments within the time
specified for filing comments, it will be
presumed to have no comments. One
copy of an agency’s comments must also
be sent to the Applicant’s
representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1635 Filed 4–7–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12462–000]
Indian River Power Supply, LLC;
Notice of Application Ready for
Environmental Analysis, and Soliciting
Comments, Terms and Conditions,
Recommendations, and Prescriptions
March 31, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: 5–MW
Exemption.
b. Project No.: 12462–000.
c. Date Filed: July 28, 2003.
d. Applicant: Indian River Power
Supply, LLC.
e. Name of Project: Indian River.
f. Location: On the Westfield River, in
the Town of Russell, Hampden County,
Massachusetts.
g. Filed Pursuant to: Public Utility
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708.
h. Applicant Contact: Peter B. Clark,
P.O. Box 149, Hamilton, Massachusetts
01936.
i. FERC Contact: Michael Spencer,
(202) 502–6093,
michael.spencer@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions is 60 days
from the issuance of this notice; reply
comments are due 105 days from the
issuance date of this notice.
All Documents (Original and Eight
Copies) Should be Filed With: Magalie
R. Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
E:\FR\FM\08APN1.SGM
08APN1
Agencies
[Federal Register Volume 70, Number 67 (Friday, April 8, 2005)]
[Notices]
[Page 17991]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1635]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Non-Project Use of Project Lands and
Waters and Soliciting Comments, Motions To Intervene, and Protests
March 31, 2005.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Non-project use of project lands and waters.
b. Project No.: 2503-085.
c. Date Filed: March 3, 2005.
d. Applicant: Duke Power, a division of Duke Energy Corporation.
e. Name of Project: Keowee-Toxaway Project.
f. Location: Lake Keowee is located in Oconee County, South
Carolina. This project does not occupy any Tribal or Federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a), 825(r)
and 799 and 801.
h. Applicant Contact: Mr. Joe Hall, Lake Management Representative;
Duke Energy Corporation; P.O. Box 1006; Charlotte, NC 28201-1006; (704)
382-8576.
i. FERC Contact: Any questions on this notice should be addressed
to Brian Romanek at (202) 502-6175 or by e-mail:
Brian.Romanek@ferc.gov.
j. Deadline for Filing Comments and or Motions: April 29, 2005.
All documents (original and eight copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Please include the project
number (P-2503-085) on any comments or motions filed. Comments,
protests, and interventions may be filed electronically via the
Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site under the ``e-Filing'' link.
The Commission strongly encourages e-filings.
k. Description of Request: Duke Power, licensee for the Keowee-
Toxaway Hydroelectric Project, has requested Commission authorization
to lease to the Waterford Communities Owners Association and Crescent
Communities, S.C., LLC 6.54 acres of project lands for a Commercial/
Residential Marina. The Waterford Community is located on Lake Keowee
in Oconee County. The marina would consist of: (1) Three cluster docks
that accommodate a total of twenty-four boats and one cluster dock that
accommodates six boats for Waterford Ridge; (2) one cluster dock that
accommodates fourteen boats and two cluster docks that accommodate
eight boats each for Waterford Farms and; (3) nine cluster docks that
accommodate ten boats each for Waterford Pointe. In total, one hundred
and fifty boats would be accommodated. Duke also seeks authorization to
approve the irrigation and boat pump-out facilities associated with
this marina. The water withdrawal needs are expected to be 8,400
gallons per day. Duke also seeks authorization to allow the
stabilization of 2,803 feet of shoreline with rip-rap.
l. Location of the Application: This filing is available for review
at the Commission or may be viewed on the Commission's Web site at
https://www.ferc.gov, using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or for TTY,
contact (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
p. Agency Comments--Federal, State, and local agencies are invited
to file comments on the described applications. A copy of the
applications may be obtained by agencies directly from the Applicant.
If an agency does not file comments within the time specified for
filing comments, it will be presumed to have no comments. One copy of
an agency's comments must also be sent to the Applicant's
representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E5-1635 Filed 4-7-05; 8:45 am]
BILLING CODE 6717-01-P