Download as PDF 17990 Federal Register / Vol. 70, No. 67 / Friday, April 8, 2005 / Notices 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link and the link to the User’s Guide. Before you can file comments you will need to create a free account which can be created by clicking on ‘‘Sign-up.’’ Comments will be considered by the Commission but will not serve to make the commentor a party to the proceeding. Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission’s Rules of Practice and Procedures (18 CFR 385.214).1 Only intervenors have the right to seek rehearing of the Commission’s decision. Affected landowners and parties with environmental concerns may be granted intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which would not be adequately represented by any other parties. You do not need intervenor status to have your comments considered. Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC or on the FERC Internet Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries and direct links to the documents. Go to https:// www.ferc.gov/esubscribenow.htm. Magalie R. Salas, Secretary. [FR Doc. E5–1638 Filed 4–7–05; 8:45 am] BILLING CODE 6717–01–P 1 Interventions may also be filed electronically via the Internet in lieu of paper. See the previous discussion on filing comments electronically. VerDate jul<14>2003 19:15 Apr 07, 2005 Jkt 205001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests April 1, 2005. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New minor license. b. Project No.: 2153–012. c. Date Filed: April 30, 2003. d. Applicant: United Water Conservation District. e. Name of Project: Santa Felicia Hydroelectric Project. f. Location: On the Piru Creek in Ventura County, California. The project affects 174.5 acres of Federal land within the Los Padres and Angeles National Forests. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Ms. Dana Wisehart, United Water Conservation District, 106 North Eighth Street, Santa Paula, CA 93060. i. FERC Contact: Kenneth Hogan at (202) 502–8434 or kenneth.hogan@ferc.gov. j. Deadline for Filing Motions To Intervene and Protests: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. Motions to intervene and protests may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov) under the ‘‘eFiling’’ link. k. This application has been accepted for filing, but is not ready for environmental analysis at this time. l. The existing Santa Felicia Project consists of: (1) A 200-foot-tall, 1200- PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 foot-long earth fill dam; (2) an 88,000 acre-foot reservoir; (3) an ungated spillway and associated works, (4) a powerhouse with two units having a total installed capacity of 1,434kilowatts and (5) appurtenant facilities. The applicant estimates that the total average annual generation would be 1,300 megawatthours. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. When the application is ready for environmental analysis, the Commission will issue a public notice requesting comments, recommendations, terms and conditions, or prescriptions. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE’’; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each E:\FR\FM\08APN1.SGM 08APN1 Federal Register / Vol. 70, No. 67 / Friday, April 8, 2005 / Notices representative of the applicant specified in the particular application. Magalie R. Salas, Secretary. [FR Doc. E5–1632 Filed 4–7–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application for Non-Project Use of Project Lands and Waters and Soliciting Comments, Motions To Intervene, and Protests March 31, 2005. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Non-project use of project lands and waters. b. Project No.: 2503–085. c. Date Filed: March 3, 2005. d. Applicant: Duke Power, a division of Duke Energy Corporation. e. Name of Project: Keowee-Toxaway Project. f. Location: Lake Keowee is located in Oconee County, South Carolina. This project does not occupy any Tribal or Federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a), 825(r) and 799 and 801. h. Applicant Contact: Mr. Joe Hall, Lake Management Representative; Duke Energy Corporation; P.O. Box 1006; Charlotte, NC 28201–1006; (704) 382– 8576. i. FERC Contact: Any questions on this notice should be addressed to Brian Romanek at (202) 502–6175 or by email: Brian.Romanek@ferc.gov. j. Deadline for Filing Comments and or Motions: April 29, 2005. All documents (original and eight copies) should be filed with: Ms. Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P– 2503–085) on any comments or motions filed. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages efilings. k. Description of Request: Duke Power, licensee for the KeoweeToxaway Hydroelectric Project, has requested Commission authorization to lease to the Waterford Communities VerDate jul<14>2003 19:00 Apr 07, 2005 Jkt 205001 Owners Association and Crescent Communities, S.C., LLC 6.54 acres of project lands for a Commercial/ Residential Marina. The Waterford Community is located on Lake Keowee in Oconee County. The marina would consist of: (1) Three cluster docks that accommodate a total of twenty-four boats and one cluster dock that accommodates six boats for Waterford Ridge; (2) one cluster dock that accommodates fourteen boats and two cluster docks that accommodate eight boats each for Waterford Farms and; (3) nine cluster docks that accommodate ten boats each for Waterford Pointe. In total, one hundred and fifty boats would be accommodated. Duke also seeks authorization to approve the irrigation and boat pump-out facilities associated with this marina. The water withdrawal needs are expected to be 8,400 gallons per day. Duke also seeks authorization to allow the stabilization of 2,803 feet of shoreline with rip-rap. l. Location of the Application: This filing is available for review at the Commission or may be viewed on the Commission’s Web site at https:// www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, contact (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions To Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, OR ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. A copy of any motion to PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 17991 intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, State, and local agencies are invited to file comments on the described applications. A copy of the applications may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Magalie R. Salas, Secretary. [FR Doc. E5–1635 Filed 4–7–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12462–000] Indian River Power Supply, LLC; Notice of Application Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, Recommendations, and Prescriptions March 31, 2005. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: 5–MW Exemption. b. Project No.: 12462–000. c. Date Filed: July 28, 2003. d. Applicant: Indian River Power Supply, LLC. e. Name of Project: Indian River. f. Location: On the Westfield River, in the Town of Russell, Hampden County, Massachusetts. g. Filed Pursuant to: Public Utility Regulatory Policies Act of 1978, 16 U.S.C. 2705, 2708. h. Applicant Contact: Peter B. Clark, P.O. Box 149, Hamilton, Massachusetts 01936. i. FERC Contact: Michael Spencer, (202) 502–6093, michael.spencer@ferc.gov. j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions is 60 days from the issuance of this notice; reply comments are due 105 days from the issuance date of this notice. All Documents (Original and Eight Copies) Should be Filed With: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. E:\FR\FM\08APN1.SGM 08APN1

Agencies

[Federal Register Volume 70, Number 67 (Friday, April 8, 2005)]
[Notices]
[Pages 17990-17991]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1632]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application Accepted for Filing and Soliciting Motions 
To Intervene and Protests

April 1, 2005.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New minor license.
    b. Project No.: 2153-012.
    c. Date Filed: April 30, 2003.
    d. Applicant: United Water Conservation District.
    e. Name of Project: Santa Felicia Hydroelectric Project.
    f. Location: On the Piru Creek in Ventura County, California. The 
project affects 174.5 acres of Federal land within the Los Padres and 
Angeles National Forests.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Ms. Dana Wisehart, United Water Conservation 
District, 106 North Eighth Street, Santa Paula, CA 93060.
    i. FERC Contact: Kenneth Hogan at (202) 502-8434 or 
kenneth.hogan@ferc.gov.
    j. Deadline for Filing Motions To Intervene and Protests: 60 days 
from the issuance date of this notice.
    All documents (original and eight copies) should be filed with: 
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    Motions to intervene and protests may be filed electronically via 
the Internet in lieu of paper. The Commission strongly encourages 
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's Web site (https://www.ferc.gov) under the ``e-
Filing'' link.
    k. This application has been accepted for filing, but is not ready 
for environmental analysis at this time.
    l. The existing Santa Felicia Project consists of: (1) A 200-foot-
tall, 1200-foot-long earth fill dam; (2) an 88,000 acre-foot reservoir; 
(3) an ungated spillway and associated works, (4) a powerhouse with two 
units having a total installed capacity of 1,434-kilowatts and (5) 
appurtenant facilities. The applicant estimates that the total average 
annual generation would be 1,300 megawatthours.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for 
inspection and reproduction at the address in item h above.
    You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    n. Anyone may submit a protest or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, 385.211, and 385.214. In determining the appropriate 
action to take, the Commission will consider all protests filed, but 
only those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any protests 
or motions to intervene must be received on or before the specified 
deadline date for the particular application.
    When the application is ready for environmental analysis, the 
Commission will issue a public notice requesting comments, 
recommendations, terms and conditions, or prescriptions.
    All filings must (1) bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE''; (2) set forth in the heading 
the name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each

[[Page 17991]]

representative of the applicant specified in the particular 
application.

Magalie R. Salas,
Secretary.
[FR Doc. E5-1632 Filed 4-7-05; 8:45 am]
BILLING CODE 6717-01-P