Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests, 17990-17991 [E5-1632]
Download as PDF
17990
Federal Register / Vol. 70, No. 67 / Friday, April 8, 2005 / Notices
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at
https://www.ferc.gov under the ‘‘eFiling’’ link and the link to the User’s
Guide. Before you can file comments
you will need to create a free account
which can be created by clicking on
‘‘Sign-up.’’
Comments will be considered by the
Commission but will not serve to make
the commentor a party to the
proceeding. Any person seeking to
become a party to the proceeding must
file a motion to intervene pursuant to
Rule 214 of the Commission’s Rules of
Practice and Procedures (18 CFR
385.214).1 Only intervenors have the
right to seek rehearing of the
Commission’s decision.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
contact (202) 502–8659. The eLibrary
link also provides access to the texts of
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1638 Filed 4–7–05; 8:45 am]
BILLING CODE 6717–01–P
1 Interventions may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
VerDate jul<14>2003
19:15 Apr 07, 2005
Jkt 205001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene and Protests
April 1, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New minor
license.
b. Project No.: 2153–012.
c. Date Filed: April 30, 2003.
d. Applicant: United Water
Conservation District.
e. Name of Project: Santa Felicia
Hydroelectric Project.
f. Location: On the Piru Creek in
Ventura County, California. The project
affects 174.5 acres of Federal land
within the Los Padres and Angeles
National Forests.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Dana
Wisehart, United Water Conservation
District, 106 North Eighth Street, Santa
Paula, CA 93060.
i. FERC Contact: Kenneth Hogan at
(202) 502–8434 or
kenneth.hogan@ferc.gov.
j. Deadline for Filing Motions To
Intervene and Protests: 60 days from the
issuance date of this notice.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Motions to intervene and protests may
be filed electronically via the Internet in
lieu of paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the ‘‘eFiling’’ link.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. The existing Santa Felicia Project
consists of: (1) A 200-foot-tall, 1200-
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
foot-long earth fill dam; (2) an 88,000
acre-foot reservoir; (3) an ungated
spillway and associated works, (4) a
powerhouse with two units having a
total installed capacity of 1,434kilowatts and (5) appurtenant facilities.
The applicant estimates that the total
average annual generation would be
1,300 megawatthours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
When the application is ready for
environmental analysis, the
Commission will issue a public notice
requesting comments,
recommendations, terms and
conditions, or prescriptions.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE’’; (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
E:\FR\FM\08APN1.SGM
08APN1
Federal Register / Vol. 70, No. 67 / Friday, April 8, 2005 / Notices
representative of the applicant specified
in the particular application.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1632 Filed 4–7–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Non-Project
Use of Project Lands and Waters and
Soliciting Comments, Motions To
Intervene, and Protests
March 31, 2005.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-project use
of project lands and waters.
b. Project No.: 2503–085.
c. Date Filed: March 3, 2005.
d. Applicant: Duke Power, a division
of Duke Energy Corporation.
e. Name of Project: Keowee-Toxaway
Project.
f. Location: Lake Keowee is located in
Oconee County, South Carolina. This
project does not occupy any Tribal or
Federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a), 825(r) and 799
and 801.
h. Applicant Contact: Mr. Joe Hall,
Lake Management Representative; Duke
Energy Corporation; P.O. Box 1006;
Charlotte, NC 28201–1006; (704) 382–
8576.
i. FERC Contact: Any questions on
this notice should be addressed to Brian
Romanek at (202) 502–6175 or by email: Brian.Romanek@ferc.gov.
j. Deadline for Filing Comments and
or Motions: April 29, 2005.
All documents (original and eight
copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Please include the project number (P–
2503–085) on any comments or motions
filed. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages efilings.
k. Description of Request: Duke
Power, licensee for the KeoweeToxaway Hydroelectric Project, has
requested Commission authorization to
lease to the Waterford Communities
VerDate jul<14>2003
19:00 Apr 07, 2005
Jkt 205001
Owners Association and Crescent
Communities, S.C., LLC 6.54 acres of
project lands for a Commercial/
Residential Marina. The Waterford
Community is located on Lake Keowee
in Oconee County. The marina would
consist of: (1) Three cluster docks that
accommodate a total of twenty-four
boats and one cluster dock that
accommodates six boats for Waterford
Ridge; (2) one cluster dock that
accommodates fourteen boats and two
cluster docks that accommodate eight
boats each for Waterford Farms and; (3)
nine cluster docks that accommodate
ten boats each for Waterford Pointe. In
total, one hundred and fifty boats would
be accommodated. Duke also seeks
authorization to approve the irrigation
and boat pump-out facilities associated
with this marina. The water withdrawal
needs are expected to be 8,400 gallons
per day. Duke also seeks authorization
to allow the stabilization of 2,803 feet of
shoreline with rip-rap.
l. Location of the Application: This
filing is available for review at the
Commission or may be viewed on the
Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
17991
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described
applications. A copy of the applications
may be obtained by agencies directly
from the Applicant. If an agency does
not file comments within the time
specified for filing comments, it will be
presumed to have no comments. One
copy of an agency’s comments must also
be sent to the Applicant’s
representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1635 Filed 4–7–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12462–000]
Indian River Power Supply, LLC;
Notice of Application Ready for
Environmental Analysis, and Soliciting
Comments, Terms and Conditions,
Recommendations, and Prescriptions
March 31, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: 5–MW
Exemption.
b. Project No.: 12462–000.
c. Date Filed: July 28, 2003.
d. Applicant: Indian River Power
Supply, LLC.
e. Name of Project: Indian River.
f. Location: On the Westfield River, in
the Town of Russell, Hampden County,
Massachusetts.
g. Filed Pursuant to: Public Utility
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708.
h. Applicant Contact: Peter B. Clark,
P.O. Box 149, Hamilton, Massachusetts
01936.
i. FERC Contact: Michael Spencer,
(202) 502–6093,
michael.spencer@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions is 60 days
from the issuance of this notice; reply
comments are due 105 days from the
issuance date of this notice.
All Documents (Original and Eight
Copies) Should be Filed With: Magalie
R. Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
E:\FR\FM\08APN1.SGM
08APN1
Agencies
[Federal Register Volume 70, Number 67 (Friday, April 8, 2005)]
[Notices]
[Pages 17990-17991]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1632]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting Motions
To Intervene and Protests
April 1, 2005.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New minor license.
b. Project No.: 2153-012.
c. Date Filed: April 30, 2003.
d. Applicant: United Water Conservation District.
e. Name of Project: Santa Felicia Hydroelectric Project.
f. Location: On the Piru Creek in Ventura County, California. The
project affects 174.5 acres of Federal land within the Los Padres and
Angeles National Forests.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Dana Wisehart, United Water Conservation
District, 106 North Eighth Street, Santa Paula, CA 93060.
i. FERC Contact: Kenneth Hogan at (202) 502-8434 or
kenneth.hogan@ferc.gov.
j. Deadline for Filing Motions To Intervene and Protests: 60 days
from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Motions to intervene and protests may be filed electronically via
the Internet in lieu of paper. The Commission strongly encourages
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's Web site (https://www.ferc.gov) under the ``e-
Filing'' link.
k. This application has been accepted for filing, but is not ready
for environmental analysis at this time.
l. The existing Santa Felicia Project consists of: (1) A 200-foot-
tall, 1200-foot-long earth fill dam; (2) an 88,000 acre-foot reservoir;
(3) an ungated spillway and associated works, (4) a powerhouse with two
units having a total installed capacity of 1,434-kilowatts and (5)
appurtenant facilities. The applicant estimates that the total average
annual generation would be 1,300 megawatthours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, 385.211, and 385.214. In determining the appropriate
action to take, the Commission will consider all protests filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any protests
or motions to intervene must be received on or before the specified
deadline date for the particular application.
When the application is ready for environmental analysis, the
Commission will issue a public notice requesting comments,
recommendations, terms and conditions, or prescriptions.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE''; (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each
[[Page 17991]]
representative of the applicant specified in the particular
application.
Magalie R. Salas,
Secretary.
[FR Doc. E5-1632 Filed 4-7-05; 8:45 am]
BILLING CODE 6717-01-P