Environmental Impact Statements; Notice of Availability, 17995 [05-7041]
Download as PDF
Federal Register / Vol. 70, No. 67 / Friday, April 8, 2005 / Notices
of Motorized and Non-motorized
Recreation, Helena National Forest,
Broadwater, Lewis and Clark, and
Meagher Counties, MT.
Summary: EPA continues to have
environmental concerns regarding
erosion, habitat damage and adverse
impacts to wildlife security from
motorized uses as well as the need for
an effective monitoring and adaptive
management program for travel
management.
EIS No. 20050070, ERP No. F–FHW–
G40177–LA, Kansas Lane Connector
Project, Construction between U.S. 90
(Desiard Street) and U.S. 165 and the
Forsythe Avenue Extension, US Army
COE Section 10 and 404 Permits
Issuance, City of Monroe, Quachita
Parish, LA.
Summary: EPA has no objections to
the proposed project.
EIS No. 20050009, ERP No. FS–NOA–
A91063–00, Monkfish Fishery
Management Plan (FMP) Amendment
2, Implementation, Proposes
Measures to Address a Wide Range of
Management Issues, New England and
Mid-Atlantic.
Summary: EPA has no objection to the
proposed action.
EIS No. 20050040, ERP No. FS–AFS–
J02027–UT, Table Top Exploraory Oil
and Gas Wells, New Information from
the Approval 1994 Final EIS,
Wasatch-Cache National Forest,
Evanston Ranger District, Summit
County, UT.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: April 5, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. 05–7040 Filed 4–7–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6662–2]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed March 28, 2005, through April 1,
2005
Pursuant to 40 CFR 1506.9.
EIS No. 050139, Draft EIS, COE, AR, OK,
Arkansas River Navigation Study, To
Maintain and Improve the Navigation
VerDate jul<14>2003
19:00 Apr 07, 2005
Jkt 205001
Channel in Order to Enhance
Commercial Navigation on the
McCellan Kerr Arkansas River
Navigation System (MKARNS),
Several Counties, AR and Several
Counties, OK, Comment Period Ends:
May 24, 2005, Contact: Renee Wright
(501) 324–6139.
EIS No. 050140, Final EIS, FHW, NV,
Boulder City/US 93 Corridor
Transportation Improvements, Study
Limits are between a western
boundary on US 95 in the City of
Henderson and an eastern boundary
on US 93 west of downtown Boulder
City, NPDES and US Army COE
Section 404 Permits Issuance and
Right-of Way Grant, Clark County, NV
Wait Period Ends: May 9, 2005,
Contact: Ted P. Bendure (775) 687–
5322.
EIS No. 050141, Draft EIS, USA, FL,
Eglin Air Force Base and Hurlburt
Field Military Family Housing,
Demolition, Construction, Renovation
and Leasing (DCR&L) Program,
Okaloosa County, FL, Comment
Period Ends: May 23, 2005, Contact:
Julia Cantrell (210) 536–3515.
EIS No. 050142, Draft EIS, NOA, CA,
Programmatic—Montrose Settlements
Restoration Program (MSRP) Draft
Restoration Plan, To Restore Injured
Natural Resources, Channel Islands,
Southern California Bight including
Baja California Pacific Islands, Orange
County, CA, Comment Period Ends:
May 23, 2005, Contact: William T.
Hogarth (301) 713–1622.
EIS No. 050143, Draft EIS, FHW, LA,
AR, I–69 Corridor—Section of
Independent Utility (SIU) No. 14,
Construction from Junction I–20 near
Haughton, LA to US 82 near EI
Dorado, AR, Bossier, Claiborne and
Webster Parishes, LA and Columbia
and Union Counties, AR, Comment
Period Ends: May 30, 2005, Contact:
William Farr (225) 757–7615.
EIS No. 050144, Draft EIS, FHW, IN,
US–31 Kokomo Corridor Project,
Transportation Improvement between
IN–26 and US 35 Northern Junction,
City of Kokomo and Center Township,
Howard and Tipton Counties, IN,
Comment Period Ends: May 23, 2005,
Contact: Matt Fuller (317) 226–5234.
This document is available on the
Internet at: https://
www.us31kokomo.com.
Amended Notices
EIS No. 050105, Draft EIS, AFS, MI,
Huron-Manistee National Forests,
Proposed Land and Resource
Management Plan, Implementation,
Several Counties, MI, Comment
Period Ends: June 16, 2005, Contact:
Jeff Pullen (231) 775–2421. Revision
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
17995
of Federal Register notice published
on March 18, 2005: Correction to the
State from WI to MI.
EIS No. 050136, Draft EIS, AFS, CO, Dry
Fork Federal Coal Lease-byApplication (COC–67232), Leasing
Additional Federal Coal Lands for
Underground Coal Resource, SpecialUse-Permits and US Army COE
Section 404 Permit, Grand Mesa,
Uncompahgre and Gunnison National
Forests, Gunnison County, CO,
Comment Period Ends: May 16, 2005,
Contact: Liane Mattson (970) 874–
6697. Revision of Federal Register
notice published on April 1, 2005:
Correction to Telephone Number.
Dated: April 5, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. 05–7041 Filed 4–7–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[OPPT–2005–0012; FRL–7708–9]
Endocrine Disruptor Methods
Validation Advisory Committee
(EDMVAC); Notice of Public Meeting
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: There will be a meeting of the
Endocrine Disruptor Methods
Validation Advisory Committe
(EDMVAC) on April 26–28, 2005, in
Washington, DC. This meeting, as with
all EDMVAC meetings, is open to the
public. Seating is on a first-come basis.
The purpose of the meeting is to receive
advice and input from the EDMVAC on:
Steroidogenesis, Uterotrophic, Fish
Screen Studies, and Amphibian
Metamorphosis Assays.
DATES: The meeting will be held on
Wednesday, April 26, 2005, from 12:30
p.m. to 5:30 p.m.; Thursday, April 27,
2005, from 8:30 a.m. to 5:30 p.m.; and
Friday, April 28, 2005, from 8 a.m. to
12:15 p.m., eastern standard time.
Request to participate in the meeting
must be received by EPA on or before
April 21, 2005. To ensure proper receipt
by EPA, it is imperative that you
identify docket identification (ID)
number OPPT–2005–0012 in the subject
line on the first page of your request.
Individuals requiring special
accommodations at the meeting,
including wheelchair access, should
contact the person listed under FOR
FURTHER INFORMATION CONTACT at least 5
business days prior to the meeting.
E:\FR\FM\08APN1.SGM
08APN1
Agencies
[Federal Register Volume 70, Number 67 (Friday, April 8, 2005)]
[Notices]
[Page 17995]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-7041]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6662-2]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed March 28, 2005, through April 1, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 050139, Draft EIS, COE, AR, OK, Arkansas River Navigation
Study, To Maintain and Improve the Navigation Channel in Order to
Enhance Commercial Navigation on the McCellan Kerr Arkansas River
Navigation System (MKARNS), Several Counties, AR and Several Counties,
OK, Comment Period Ends: May 24, 2005, Contact: Renee Wright (501) 324-
6139.
EIS No. 050140, Final EIS, FHW, NV, Boulder City/US 93 Corridor
Transportation Improvements, Study Limits are between a western
boundary on US 95 in the City of Henderson and an eastern boundary on
US 93 west of downtown Boulder City, NPDES and US Army COE Section 404
Permits Issuance and Right-of Way Grant, Clark County, NV Wait Period
Ends: May 9, 2005, Contact: Ted P. Bendure (775) 687-5322.
EIS No. 050141, Draft EIS, USA, FL, Eglin Air Force Base and Hurlburt
Field Military Family Housing, Demolition, Construction, Renovation and
Leasing (DCR&L) Program, Okaloosa County, FL, Comment Period Ends: May
23, 2005, Contact: Julia Cantrell (210) 536-3515.
EIS No. 050142, Draft EIS, NOA, CA, Programmatic--Montrose Settlements
Restoration Program (MSRP) Draft Restoration Plan, To Restore Injured
Natural Resources, Channel Islands, Southern California Bight including
Baja California Pacific Islands, Orange County, CA, Comment Period
Ends: May 23, 2005, Contact: William T. Hogarth (301) 713-1622.
EIS No. 050143, Draft EIS, FHW, LA, AR, I-69 Corridor--Section of
Independent Utility (SIU) No. 14, Construction from Junction I-20 near
Haughton, LA to US 82 near EI Dorado, AR, Bossier, Claiborne and
Webster Parishes, LA and Columbia and Union Counties, AR, Comment
Period Ends: May 30, 2005, Contact: William Farr (225) 757-7615.
EIS No. 050144, Draft EIS, FHW, IN, US-31 Kokomo Corridor Project,
Transportation Improvement between IN-26 and US 35 Northern Junction,
City of Kokomo and Center Township, Howard and Tipton Counties, IN,
Comment Period Ends: May 23, 2005, Contact: Matt Fuller (317) 226-5234.
This document is available on the Internet at: https://
www.us31kokomo.com.
Amended Notices
EIS No. 050105, Draft EIS, AFS, MI, Huron-Manistee National Forests,
Proposed Land and Resource Management Plan, Implementation, Several
Counties, MI, Comment Period Ends: June 16, 2005, Contact: Jeff Pullen
(231) 775-2421. Revision of Federal Register notice published on March
18, 2005: Correction to the State from WI to MI.
EIS No. 050136, Draft EIS, AFS, CO, Dry Fork Federal Coal Lease-by-
Application (COC-67232), Leasing Additional Federal Coal Lands for
Underground Coal Resource, Special-Use-Permits and US Army COE Section
404 Permit, Grand Mesa, Uncompahgre and Gunnison National Forests,
Gunnison County, CO, Comment Period Ends: May 16, 2005, Contact: Liane
Mattson (970) 874-6697. Revision of Federal Register notice published
on April 1, 2005: Correction to Telephone Number.
Dated: April 5, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 05-7041 Filed 4-7-05; 8:45 am]
BILLING CODE 6560-50-P