Environmental Impact Statements and Regulations; Availability of EPA Comments, 17994-17995 [05-7040]
Download as PDF
17994
Federal Register / Vol. 70, No. 67 / Friday, April 8, 2005 / Notices
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6662–3]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in the
Federal Register dated April 1, 2005 (70
FR 16815).
Draft EISs
EIS No. 20040583, ERP No. D–BLM–
J65433–WY, Rawlins Field Office
Planning Area Resource Management
Plan, Addresses the Comprehensive
Analysis of Alternatives for the
Planning and Management of Public
Land and Resource Administered by
(BLM), Albany, Carbon, Laramie, and
Sweetwater Counties, WY.
Summary: EPA expressed
environmental concerns regarding
potential impacts to ecosystem
processes, air quality, water quality, and
wildlife habitat. EPA requests that the
Final EIS disclose water quality impacts
to aquatic resources more clearly and
quantitatively, specifically in grazing
allotments needing preservation of
riparian habitat and water quality.
Rating EC2.
EIS No. 20050026, ERP No. D–BIA–
F60007–WI, Beloit Casino Project, To
Expand the Tribal Governmental
Revenue Base, St. Croix Chippewa
Indians of Wisconsin and Bad River
Band of the Lake Superior Tribe of
Chippewa Indians, Rock County, WI.
Summary: EPA expressed concerns
regarding the construction and
operation of the proposed casino project
and cumulative noise and air impacts
from the proposed I–90 highway
reconfiguration. EPA requested that
these issues be evaluated in the Final
EIS along with mitigation for noise and
light pollution from increased night
time traffic, and evaluation of the use of
native vegetation in landscaping for
energy and water conservation. Rating
EC2.
EIS No. 20050032, ERP No. D–AFS–
D65049–WV, Fernow Experimental
Forest, To Continue Long-Term
Research and Initiate New Research,
VerDate jul<14>2003
19:00 Apr 07, 2005
Jkt 205001
Involving Removal of Trees,
Prescribed Burning, Stem Injection of
Selected Trees, Control Invasive Plant
Species, Northeastern Research
Station, Parson, Tucker County, WV.
Summary: EPA expressed
environmental concerns regarding
impacts to water quality and riparian
resources and requested more specific
information on herbicide treatments,
especially related to overstory trees to
control invasive plants. The Final EIS
should address stream monitoring to
assess potential impacts that may result
from the proposed actions as well as
how the public and wildlife will be
protected from prescribed fire
treatments. Rating EC2.
EIS No. 20050047, ERP No. D–BIA–
C60005–NY, Stockbridge-Munsee
Casino Project, Proposes To Address
the Tribe’s Economic Development,
Bands of Mohican Indians of
Wisconsin (the Tribe), NPDES Permit
and U.S. Army COE Section 404
Permit, Town of Thompson, Sullivan
County, NY.
Summary: EPA expressed concerns
regarding indirect and cumulative
impacts on new water and sewer lines,
traffic and air quality of the five casinos
expected to be built in Sullivan County
and the casino’s solid waste disposal.
EPA requested that these issues be
evaluated in the Final EIS along with a
detailed wetlands mitigation and
monitoring plan. Rating EC2.
EIS No. 20050074, ERP No. D–NAS–
E12007–FL, New Horizons Mission to
Pluto, Continued Preparations and
Implementation to Explore Pluto and
Potentially the Recently Discovered
Kuiper Belt, Cape Canaveral Air Force
Station, FL.
Summary: EPA has no objections
regarding this launch. Rating LO.
EIS No. 20050043, ERP No. DS–FHW–
J40166–UT, US 6 Highway Project,
Improvements from Interstate 15 (I–
15) in Spanish Fork to Interstate (I–
70) near Green River, New
Information, Funding, Right-of-Way
Permit and US Army COE Section 404
Permit, Utah, Wasatch, Carbon, and
Emery Counties, UT.
Summary: EPA expressed concerns
due to impaired waters in the project
area. Rating EC1.
EIS No. 20050002, ERP No. DS–NPS–
L65264–WA, Elwha River Ecosystem
Restoration Implementation Project,
Update Information, Olympic
Peninsula, Challam County, WA.
Summary: EPA has no objections to
the proposed action. Rating LO.
EIS No. 20050007, ERP No. D2–FHW–
H40397–MO, Interstate 70 Corridor
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
Improvements, Section of
Independent Utility #7 , a 40-Mile
Portion of the I–70 Corridor from just
West of Route 19 (milepost 174) to
Lake St. Louis Boulevard (milepost
214) Montgomery, Warren, St. Charles
Counties, MO.
Summary: While EPA has no
objection to the proposed action, it did
request clarification on wetlands issues.
Rating LO.
Final EISs
EIS No. 20050017, ERP No. F–NOA–
A91070–00, Atlantic Herring Fishery
Management Plan, Minimizing
Impacts on Essential Fish Habitat of
Any Species, Gulf of Maine—Georges
Bank, ME, NH, MA, CT and RI.
Summary: EPA expressed a lack of
objections to the DEIS due to the overall
benefits of the proposed action. Based
on our review of the FEIS, we found that
our issues were addressed.
EIS No. 20050027, ERP No. F–BLM–
L65462–AK, Northeast National
Petroleum Reserve Alaska Amended
Integrated Activity Plan, To Amend
1998 Northeast Petroleum Reserve, To
Consider Opening Portions of the
BLM-Administrated Lands, North
Slope Borough, AK.
Summary: EPA expressed
environmental objections given that the
selected alternative is likely to have
more adverse impacts to surface
resources and subsistence communities.
EPA recommends that BLM phase in
leases in new, environmentally sensitive
areas only after experimental mitigation
measures are proven effective for areas
currently available for leasing.
EIS No. 20050045, ERP No. F–AFS–
K65307–AZ, Coconino, Kaibab, and
Prescott National Forest, Integrated
Treatment of Noxious and Invasive
Weeds, Implementation, Coconino,
Mojave, and Yavapai Counties, AZ.
Summary: The Final EIS addressed
EPA’s concerns about impacts to
drinking water from herbicide
applications with the addition of
mitigation measures.
EIS No. 20050057, ERP No. F–AFS–
J65303–MT, Bridger Bowl Ski Area,
Permit Renewal and Master
Development Plan Update,
Implementation, Special Use Permit
and COE Section 404 Permit, Gallatin
National Forest, in the City of
Bozeman, MT.
Summary: EPA continues to express
environmental concerns regarding
impacts to wildlife habitat.
EIS No. 20050065, ERP No. F–AFS–
J65389–MT, North Belts Travel Plan
and the Dry Range Project, Provision
E:\FR\FM\08APN1.SGM
08APN1
Federal Register / Vol. 70, No. 67 / Friday, April 8, 2005 / Notices
of Motorized and Non-motorized
Recreation, Helena National Forest,
Broadwater, Lewis and Clark, and
Meagher Counties, MT.
Summary: EPA continues to have
environmental concerns regarding
erosion, habitat damage and adverse
impacts to wildlife security from
motorized uses as well as the need for
an effective monitoring and adaptive
management program for travel
management.
EIS No. 20050070, ERP No. F–FHW–
G40177–LA, Kansas Lane Connector
Project, Construction between U.S. 90
(Desiard Street) and U.S. 165 and the
Forsythe Avenue Extension, US Army
COE Section 10 and 404 Permits
Issuance, City of Monroe, Quachita
Parish, LA.
Summary: EPA has no objections to
the proposed project.
EIS No. 20050009, ERP No. FS–NOA–
A91063–00, Monkfish Fishery
Management Plan (FMP) Amendment
2, Implementation, Proposes
Measures to Address a Wide Range of
Management Issues, New England and
Mid-Atlantic.
Summary: EPA has no objection to the
proposed action.
EIS No. 20050040, ERP No. FS–AFS–
J02027–UT, Table Top Exploraory Oil
and Gas Wells, New Information from
the Approval 1994 Final EIS,
Wasatch-Cache National Forest,
Evanston Ranger District, Summit
County, UT.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: April 5, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. 05–7040 Filed 4–7–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6662–2]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed March 28, 2005, through April 1,
2005
Pursuant to 40 CFR 1506.9.
EIS No. 050139, Draft EIS, COE, AR, OK,
Arkansas River Navigation Study, To
Maintain and Improve the Navigation
VerDate jul<14>2003
19:00 Apr 07, 2005
Jkt 205001
Channel in Order to Enhance
Commercial Navigation on the
McCellan Kerr Arkansas River
Navigation System (MKARNS),
Several Counties, AR and Several
Counties, OK, Comment Period Ends:
May 24, 2005, Contact: Renee Wright
(501) 324–6139.
EIS No. 050140, Final EIS, FHW, NV,
Boulder City/US 93 Corridor
Transportation Improvements, Study
Limits are between a western
boundary on US 95 in the City of
Henderson and an eastern boundary
on US 93 west of downtown Boulder
City, NPDES and US Army COE
Section 404 Permits Issuance and
Right-of Way Grant, Clark County, NV
Wait Period Ends: May 9, 2005,
Contact: Ted P. Bendure (775) 687–
5322.
EIS No. 050141, Draft EIS, USA, FL,
Eglin Air Force Base and Hurlburt
Field Military Family Housing,
Demolition, Construction, Renovation
and Leasing (DCR&L) Program,
Okaloosa County, FL, Comment
Period Ends: May 23, 2005, Contact:
Julia Cantrell (210) 536–3515.
EIS No. 050142, Draft EIS, NOA, CA,
Programmatic—Montrose Settlements
Restoration Program (MSRP) Draft
Restoration Plan, To Restore Injured
Natural Resources, Channel Islands,
Southern California Bight including
Baja California Pacific Islands, Orange
County, CA, Comment Period Ends:
May 23, 2005, Contact: William T.
Hogarth (301) 713–1622.
EIS No. 050143, Draft EIS, FHW, LA,
AR, I–69 Corridor—Section of
Independent Utility (SIU) No. 14,
Construction from Junction I–20 near
Haughton, LA to US 82 near EI
Dorado, AR, Bossier, Claiborne and
Webster Parishes, LA and Columbia
and Union Counties, AR, Comment
Period Ends: May 30, 2005, Contact:
William Farr (225) 757–7615.
EIS No. 050144, Draft EIS, FHW, IN,
US–31 Kokomo Corridor Project,
Transportation Improvement between
IN–26 and US 35 Northern Junction,
City of Kokomo and Center Township,
Howard and Tipton Counties, IN,
Comment Period Ends: May 23, 2005,
Contact: Matt Fuller (317) 226–5234.
This document is available on the
Internet at: https://
www.us31kokomo.com.
Amended Notices
EIS No. 050105, Draft EIS, AFS, MI,
Huron-Manistee National Forests,
Proposed Land and Resource
Management Plan, Implementation,
Several Counties, MI, Comment
Period Ends: June 16, 2005, Contact:
Jeff Pullen (231) 775–2421. Revision
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
17995
of Federal Register notice published
on March 18, 2005: Correction to the
State from WI to MI.
EIS No. 050136, Draft EIS, AFS, CO, Dry
Fork Federal Coal Lease-byApplication (COC–67232), Leasing
Additional Federal Coal Lands for
Underground Coal Resource, SpecialUse-Permits and US Army COE
Section 404 Permit, Grand Mesa,
Uncompahgre and Gunnison National
Forests, Gunnison County, CO,
Comment Period Ends: May 16, 2005,
Contact: Liane Mattson (970) 874–
6697. Revision of Federal Register
notice published on April 1, 2005:
Correction to Telephone Number.
Dated: April 5, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. 05–7041 Filed 4–7–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[OPPT–2005–0012; FRL–7708–9]
Endocrine Disruptor Methods
Validation Advisory Committee
(EDMVAC); Notice of Public Meeting
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: There will be a meeting of the
Endocrine Disruptor Methods
Validation Advisory Committe
(EDMVAC) on April 26–28, 2005, in
Washington, DC. This meeting, as with
all EDMVAC meetings, is open to the
public. Seating is on a first-come basis.
The purpose of the meeting is to receive
advice and input from the EDMVAC on:
Steroidogenesis, Uterotrophic, Fish
Screen Studies, and Amphibian
Metamorphosis Assays.
DATES: The meeting will be held on
Wednesday, April 26, 2005, from 12:30
p.m. to 5:30 p.m.; Thursday, April 27,
2005, from 8:30 a.m. to 5:30 p.m.; and
Friday, April 28, 2005, from 8 a.m. to
12:15 p.m., eastern standard time.
Request to participate in the meeting
must be received by EPA on or before
April 21, 2005. To ensure proper receipt
by EPA, it is imperative that you
identify docket identification (ID)
number OPPT–2005–0012 in the subject
line on the first page of your request.
Individuals requiring special
accommodations at the meeting,
including wheelchair access, should
contact the person listed under FOR
FURTHER INFORMATION CONTACT at least 5
business days prior to the meeting.
E:\FR\FM\08APN1.SGM
08APN1
Agencies
[Federal Register Volume 70, Number 67 (Friday, April 8, 2005)]
[Notices]
[Pages 17994-17995]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-7040]
[[Page 17994]]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6662-3]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in the Federal Register dated
April 1, 2005 (70 FR 16815).
Draft EISs
EIS No. 20040583, ERP No. D-BLM-J65433-WY, Rawlins Field Office
Planning Area Resource Management Plan, Addresses the Comprehensive
Analysis of Alternatives for the Planning and Management of Public Land
and Resource Administered by (BLM), Albany, Carbon, Laramie, and
Sweetwater Counties, WY.
Summary: EPA expressed environmental concerns regarding potential
impacts to ecosystem processes, air quality, water quality, and
wildlife habitat. EPA requests that the Final EIS disclose water
quality impacts to aquatic resources more clearly and quantitatively,
specifically in grazing allotments needing preservation of riparian
habitat and water quality. Rating EC2.
EIS No. 20050026, ERP No. D-BIA-F60007-WI, Beloit Casino Project, To
Expand the Tribal Governmental Revenue Base, St. Croix Chippewa Indians
of Wisconsin and Bad River Band of the Lake Superior Tribe of Chippewa
Indians, Rock County, WI.
Summary: EPA expressed concerns regarding the construction and
operation of the proposed casino project and cumulative noise and air
impacts from the proposed I-90 highway reconfiguration. EPA requested
that these issues be evaluated in the Final EIS along with mitigation
for noise and light pollution from increased night time traffic, and
evaluation of the use of native vegetation in landscaping for energy
and water conservation. Rating EC2.
EIS No. 20050032, ERP No. D-AFS-D65049-WV, Fernow Experimental Forest,
To Continue Long-Term Research and Initiate New Research, Involving
Removal of Trees, Prescribed Burning, Stem Injection of Selected Trees,
Control Invasive Plant Species, Northeastern Research Station, Parson,
Tucker County, WV.
Summary: EPA expressed environmental concerns regarding impacts to
water quality and riparian resources and requested more specific
information on herbicide treatments, especially related to overstory
trees to control invasive plants. The Final EIS should address stream
monitoring to assess potential impacts that may result from the
proposed actions as well as how the public and wildlife will be
protected from prescribed fire treatments. Rating EC2.
EIS No. 20050047, ERP No. D-BIA-C60005-NY, Stockbridge-Munsee Casino
Project, Proposes To Address the Tribe's Economic Development, Bands of
Mohican Indians of Wisconsin (the Tribe), NPDES Permit and U.S. Army
COE Section 404 Permit, Town of Thompson, Sullivan County, NY.
Summary: EPA expressed concerns regarding indirect and cumulative
impacts on new water and sewer lines, traffic and air quality of the
five casinos expected to be built in Sullivan County and the casino's
solid waste disposal. EPA requested that these issues be evaluated in
the Final EIS along with a detailed wetlands mitigation and monitoring
plan. Rating EC2.
EIS No. 20050074, ERP No. D-NAS-E12007-FL, New Horizons Mission to
Pluto, Continued Preparations and Implementation to Explore Pluto and
Potentially the Recently Discovered Kuiper Belt, Cape Canaveral Air
Force Station, FL.
Summary: EPA has no objections regarding this launch. Rating LO.
EIS No. 20050043, ERP No. DS-FHW-J40166-UT, US 6 Highway Project,
Improvements from Interstate 15 (I-15) in Spanish Fork to Interstate
(I-70) near Green River, New Information, Funding, Right-of-Way Permit
and US Army COE Section 404 Permit, Utah, Wasatch, Carbon, and Emery
Counties, UT.
Summary: EPA expressed concerns due to impaired waters in the
project area. Rating EC1.
EIS No. 20050002, ERP No. DS-NPS-L65264-WA, Elwha River Ecosystem
Restoration Implementation Project, Update Information, Olympic
Peninsula, Challam County, WA.
Summary: EPA has no objections to the proposed action. Rating LO.
EIS No. 20050007, ERP No. D2-FHW-H40397-MO, Interstate 70 Corridor
Improvements, Section of Independent Utility 7 , a 40-Mile
Portion of the I-70 Corridor from just West of Route 19 (milepost 174)
to Lake St. Louis Boulevard (milepost 214) Montgomery, Warren, St.
Charles Counties, MO.
Summary: While EPA has no objection to the proposed action, it did
request clarification on wetlands issues. Rating LO.
Final EISs
EIS No. 20050017, ERP No. F-NOA-A91070-00, Atlantic Herring Fishery
Management Plan, Minimizing Impacts on Essential Fish Habitat of Any
Species, Gulf of Maine--Georges Bank, ME, NH, MA, CT and RI.
Summary: EPA expressed a lack of objections to the DEIS due to the
overall benefits of the proposed action. Based on our review of the
FEIS, we found that our issues were addressed.
EIS No. 20050027, ERP No. F-BLM-L65462-AK, Northeast National Petroleum
Reserve Alaska Amended Integrated Activity Plan, To Amend 1998
Northeast Petroleum Reserve, To Consider Opening Portions of the BLM-
Administrated Lands, North Slope Borough, AK.
Summary: EPA expressed environmental objections given that the
selected alternative is likely to have more adverse impacts to surface
resources and subsistence communities. EPA recommends that BLM phase in
leases in new, environmentally sensitive areas only after experimental
mitigation measures are proven effective for areas currently available
for leasing.
EIS No. 20050045, ERP No. F-AFS-K65307-AZ, Coconino, Kaibab, and
Prescott National Forest, Integrated Treatment of Noxious and Invasive
Weeds, Implementation, Coconino, Mojave, and Yavapai Counties, AZ.
Summary: The Final EIS addressed EPA's concerns about impacts to
drinking water from herbicide applications with the addition of
mitigation measures.
EIS No. 20050057, ERP No. F-AFS-J65303-MT, Bridger Bowl Ski Area,
Permit Renewal and Master Development Plan Update, Implementation,
Special Use Permit and COE Section 404 Permit, Gallatin National
Forest, in the City of Bozeman, MT.
Summary: EPA continues to express environmental concerns regarding
impacts to wildlife habitat.
EIS No. 20050065, ERP No. F-AFS-J65389-MT, North Belts Travel Plan and
the Dry Range Project, Provision
[[Page 17995]]
of Motorized and Non-motorized Recreation, Helena National Forest,
Broadwater, Lewis and Clark, and Meagher Counties, MT.
Summary: EPA continues to have environmental concerns regarding
erosion, habitat damage and adverse impacts to wildlife security from
motorized uses as well as the need for an effective monitoring and
adaptive management program for travel management.
EIS No. 20050070, ERP No. F-FHW-G40177-LA, Kansas Lane Connector
Project, Construction between U.S. 90 (Desiard Street) and U.S. 165 and
the Forsythe Avenue Extension, US Army COE Section 10 and 404 Permits
Issuance, City of Monroe, Quachita Parish, LA.
Summary: EPA has no objections to the proposed project.
EIS No. 20050009, ERP No. FS-NOA-A91063-00, Monkfish Fishery Management
Plan (FMP) Amendment 2, Implementation, Proposes Measures to Address a
Wide Range of Management Issues, New England and Mid-Atlantic.
Summary: EPA has no objection to the proposed action.
EIS No. 20050040, ERP No. FS-AFS-J02027-UT, Table Top Exploraory Oil
and Gas Wells, New Information from the Approval 1994 Final EIS,
Wasatch-Cache National Forest, Evanston Ranger District, Summit County,
UT.
Summary: No formal comment letter was sent to the preparing agency.
Dated: April 5, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 05-7040 Filed 4-7-05; 8:45 am]
BILLING CODE 6560-50-P