La Paloma Holding Company, LLC, et al. and Electric Rate and Corporate Filings, 17440-17443 [E5-1576]
Download as PDF
17440
Federal Register / Vol. 70, No. 65 / Wednesday, April 6, 2005 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–243–000]
[Docket No. RP96–312–146]
Tennessee Gas Pipeline Company;
Notice of Negotiated Rate Filing
Texas Eastern Transmission, LP;
Notice of Proposed Changes in FERC
Gas Tariff
March 30, 2005.
March 30, 2005.
Take notice that on March 23, 2005,
Tennessee Gas Pipeline Company
(Tennessee), 1001 Louisiana Street,
Houston, Texas 77002, tendered for
filing negotiated rate arrangement.
Tennessee states that the filed
negotiated rate arrangement reflects an
agreement between Tennessee and
Cabot Oil and Gas Marketing
Corporation for transportation under
rate schedule FT–A to become effective
April 1, 2005.
Any person desiring to protest this
filing must file in accordance with Rules
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceedings.
Such protests must be filed in
accordance with the provisions of
Section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on Tennessee.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘e-Filing’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY, contact
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1543 Filed 4–5–05; 8:45 am]
BILLING CODE 6717–01–P
VerDate jul<14>2003
18:17 Apr 05, 2005
Jkt 205001
BILLING CODE 6717–01–P
Take notice that on March 24, 2005,
Texas Eastern Transmission, LP (Texas
Eastern) tendered for filing as part of its
FERC Gas Tariff, Seventh Revised
Volume No. 1, the tariff sheets listed on
Appendix A to the filing, to become
effective April 24, 2005. Texas Eastern
states that the purpose of this filing is
to modify its tariff to remove outdated
provisions related to the
implementation of the requirements of
Order Nos. 636, et seq. on its system.
Texas Eastern states that copies of its
filing have been served upon all affected
customers of Texas Eastern and
interested state commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
PO 00000
Frm 00039
Fmt 4703
Magalie R. Salas,
Secretary.
[FR Doc. E5–1548 Filed 4–5–05; 8:45 am]
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EC05–62–000, et al.]
La Paloma Holding Company, LLC, et
al. and Electric Rate and Corporate
Filings
March 30, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. La Paloma Holding Company, LLC
and La Paloma Generating Company,
LLC
[Docket No. EC05–62–000]
On March 24, 2005, La Paloma
Holding Company, LLC (HoldCo) and La
Paloma Generating Company, LLC (La
Paloma Gen) filed with the Commission,
on behalf of themselves and the current
and future owners of equity interests in
HoldCo, an application requesting that
the Commission grant all authorizations
and approvals necessary under section
203 of the Federal Power Act for an
indirect disposition of jurisdictional
facilities as a result of certain proposed
transfers of ownership or control of
equity interests in HoldCo, and, in order
to facilitate a more liquid market for the
trading of such interests, grant
additional authorizations approving
certain categories of future transfers of
ownership or control of equity interests
in HoldCo. HoldCo states that it owns
100 percent of the equity interests in La
Paloma Gen, which owns and operates
a 1,040 megawatt electric generating
facility located near McKittrick,
California.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005.
2. Lake Road Holding Company, LLC
and Lake Road Generating Company,
L.P.
[Docket No. EC05–63–000]
On March 24, 2005, Lake Road
Holding Company, LLC (HoldCo) and
Lake Road Generating Company, L.P.
(Lake Road Gen) filed with the
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 70, No. 65 / Wednesday, April 6, 2005 / Notices
Commission, on behalf of themselves
and the current and future owners of
equity interests in HoldCo, an
application requesting that the
Commission grant all authorizations and
approvals necessary under section 203
of the Federal Power Act for an indirect
disposition of jurisdictional facilities as
a result of certain proposed transfers of
ownership or control of equity interests
in HoldCo, and, in order to facilitate a
more liquid market for the trading of
such interests, grant additional
authorizations approving certain
categories of future transfers of
ownership or control of equity interests
in HoldCo. HoldCo owns 100 percent of
the equity interests in Lake Road Gen,
which owns and operates a 750
megawatt electric generating facility
located near Killingly, Connecticut.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005.
3. Deer Park Energy Center Limited
Partnership
[Docket No. EG05–55–000]
Take notice that on March 18, 2005,
Deer Park Energy Center Limited
Partnership (Applicant) c/o Calpine
Corporation, 717 Texas Avenue, Suite
1000, Houston, TX 77002, filed with the
Commission an application for
determination of exempt wholesale
generator status pursuant to part 365 of
the Commission’s regulations.
Applicant states that it is a Delaware
limited partnership, and will own a
nominal 950 megwatt natural gas-fired
combined cycle cogeneration facility
located in Deer Park, Texas.
Applicant states that copies of the
application were served upon the
United States Securities and Exchange
Commission and Public Utility
Commission of Texas.
Comment Date: 5 p.m. Eastern Time
on April 8, 2005.
4. Rainbow Energy Marketing
Corporation
[Docket Nos. ER94–1061–027 and ER05–729–
000]
Take notice that on March 22, 2005,
Rainbow Energy Marketing Corporation
(Rainbow) tendered for filing an
Original Sheet No. 6 to its FERC Electric
Tariff, First Revised Volume No. 1
containing the change in status
reporting requirement, in compliance
with the Commission’s orders issued in
Docket No. ER05–351–000 and 001on
February 23, 2005, and in Docket No.
ER94–1061–024 on March 3, 2005.
In addition, Rainbow submitted First
Revised Sheet No. 1 to its FERC Electric
Tariff, First Revised Volume No. 1,
which would allow Rainbow to sell
ancillary services at market-based rates
VerDate jul<14>2003
18:17 Apr 05, 2005
Jkt 205001
within the Midwest Independent
Transmission System Operator, Inc.
Comment Date: 5 p.m. Eastern Time
on April 12, 2005.
5. Morgan Stanley Capital Group Inc.,
South Eastern Electric Development
Corporation, South Eastern Generating
Corporation, Naniwa Energy LLC,
Power Contract Finance, L.L.C., Power
Contract Financing II, L.L.C., Power
Contract Financing II, Inc., MS Retail
Development Corp. and Utility Contract
Funding II, LLC
[Docket Nos. ER94–1384–031, ER99–2329–
004, ER00–1803–003, ER01–457–003, ER02–
1485–005, ER03–1108–005, ER03–1109–004,
ER03–1315–003 and ER04–733–002]
Take notice that on March 24, 2005,
Morgan Stanley Capital Group Inc.
(MSCG), on behalf of itself and its
affiliates South Eastern Electric
Development Corporation, South
Eastern Generating Corporation, Naniwa
Energy LLC, Power Contract Finance,
L.L.C., Power Contract Financing II,
L.L.C., Power Contract Financing II,
Inc., MS Retail Development Corp., and
Utility Contract Funding II, LLC,
submitted a revised market power
analysis.
MSCG states that copies of the filing
were served on parties on the official
service lists in the above-captioned
proceedings.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005.
6. Morgan Stanley Capital Group Inc.
[Docket No. ER94–1384–032]
Take notice that on March 24, 2005,
Morgan Stanley Capital Group Inc.
(MSCG) submitted an amendment to its
Second Revised Rate Schedule FERC
No. 1 to reflect the change-in-status
reporting requirement adopted in the
Commission’s Order No. 652, Reporting
Requirement for Change in Status for
Public Utilities with Market-Based Rate
Authority, 110 FERC ¶ 61,097 (2005).
MSCG states that copies of the filing
were served on parties on the official
service list in this proceeding.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005.
7. South Eastern Electric Development
Corporation
[Docket No. ER99–2329–003]
Take notice that, on March 24, 2005,
South Eastern Electric Development
Corporation (SEEDCO) submitted
amendments to its FERC Electric Tariff,
Original Volume No. 1 to reflect the
change-in-status reporting requirement
adopted by the Commission in Order
No. 652, Reporting Requirement for
Changes in Status for Public Utilities
with Market-Based Rate Authority, 110
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
17441
FERC ¶ 61,097 (2005) and the
Commission’s Market Behavior Rules
adopted in Investigation of Terms and
Conditions of Public Utility MarketBased Rate Authorizations, 105 FERC
¶ 61,218 (2003).
SEEDCO states that copies of the
filing were served on parties on the
official service list in the abovecaptioned proceeding.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005
8. Tampa Electric Company, Panda
Gila River, L.P., Union Power Partners,
L.P., TECO EnergySource, Inc.,
Commonwealth Chesapeake Company,
L.L.C., TPS Dell, LLC, TPS McAdams,
LLC and TECO–PANDA Generating
Company, L.P.
[Docket Nos. ER99–2342–004, ER01–931–
008, ER01–930–008, ER96–1563–021, ER99–
415–007, ER02–510–004, ER02–507–004 and
ER02–1000–005]
Take notice that, on March 24, 2005,
Tampa Electric Company, Panda Gila
River, L.P., Union Power Partners, L.P.,
TECO EnergySource, Inc.,
Commonwealth Chesapeake Company,
L.L.C., TPS Dell, LLC, TPS McAdams,
LLC, and TECO–PANDA Generating
Company, L.P., (collectively, TECO
Group) submitted for filing revisions to
their respective market-based rate tariffs
to include the reporting requirement for
changes in status adopted in Reporting
Requirement for Changes in Status for
Public Utilities with Market-Based Rate
Authority, Order No. 652, 110 FERC
¶ 61,097 (2005).
The TECO Group states that copies of
the filing were served upon the parties
on the official service list compiled by
the Secretary in the captioned dockets.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005
9. Onondaga Cogeneration Limited
[Docket No. ER00–895–006 Partnership]
Take notice that on March 24, 2005,
Onondaga Cogeneration Limited
Partnership (Onondaga) filed a triennial
updated market analysis pursuant to the
Commission’s triennial rate review
requirements, the letter order issued on
February 9, 2000 in Docket No. ER00–
895–000, and the Order Implementing
New Generation Market Power Analysis
and Mitigation Procedures, Acadia
Power Partners, LLC, et al., 107 FERC
¶ 61,168 (2004). Onondaga also
submitted an amendment to its marketbased rate tariff to incorporate the
reporting requirement set forth in Order
No. 652. Reporting Requirements for
Changes in Status for Public Utilities
with Market-Based Rate Authority, 110
FERC ¶ 61,097 (2005).
E:\FR\FM\06APN1.SGM
06APN1
17442
Federal Register / Vol. 70, No. 65 / Wednesday, April 6, 2005 / Notices
Onondaga states that copies of the
filing were served on parties on the
official service list in the abovecaptioned proceeding.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005.
10. South Eastern Generating
Corporation
[Docket No. ER00–1803–002]
Take notice that, on March 24, 2005,
South Eastern Generating Corporation
(SEGCO) submitted amendments to its
FERC Electric Tariff, Original Volume
No. 1 to reflect the change-in-status
reporting requirement adopted by the
Commission in Order No. 652,
Reporting Requirement for Changes in
Status for Public Utilities with MarketBased Rate Authority, 110 FERC
¶ 61,097 (2005) and the Commission’s
Market Behavior Rules adopted in
Investigation of Terms and Conditions
of Public Utility Market-Based Rate
Authorizations, 105 FERC ¶ 61,218
(2003).
SEGCO states that copies of the filing
were served on parties on the official
service list in the above-captioned
proceeding.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005.
11. WFEC GENCO, L.L.C.
[Docket No. ER01–388–003]
Take notice that on March 24, 2005,
WFEC GENCO, L.L.C. (GENCO)
submitted a revised updated market
power analysis. GENCO also submitted
revised tariff sheets to reflect the
change-in-status reporting requirement
adopted by the Commission in Order
No. 652, Reporting Requirement for
Changes in Status for Public Utilities
with Market-Based Rate Authority, 110
FERC ¶ 61,097 (2005).
GENCO states that copies of the filing
were served on parties on the official
service list in the above-captioned
proceeding.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005.
12. Mobile Energy, LLC and CP Pleasant
Hill, LLC
[Docket Nos. ER01–480–004 and ER01–915–
003]
Take notice that on March 24, 2005,
Mobile Energy, LLC and CPN Pleasant
Hill, LLC submitted a joint amendment
to their respective pending triennial
updated market power analyses.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005.
13. Redbud Energy, LP
[Docket Nos. ER01–1011–003]
Take notice that on March 24, 2005,
Redbud Energy LP (Redbud) submitted
VerDate jul<14>2003
18:17 Apr 05, 2005
Jkt 205001
its market power update in compliance
with the Commission’s order issued
May 13, 2004 in Acadia Power Partners,
LLC, 107 FERC ¶ 61,168 (2004).
Redbud states that copies of the filing
were served upon parties on the official
service list in the captioned proceeding.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005.
14. Redbud Energy LC
adopted by the Commission in Order
No. 652, Reporting Requirement for
Change in Status for Public Utilities
with Market-Based Rate Authority, 110
FERC ¶ 61,097 (2005).
PCF II, Inc. states that copies of the
filing were served on parties on the
official service list in this proceeding.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005.
[Docket No. ER01–1011–004]
18. Utility Contract Funding II, LLC
Take notice that on March 24, 2005,
Redbud Energy LP (Redbud) submitted
for filing revisions to its FERC Electric
Tariff, Original Volume No. 1 to include
the reporting requirement for changes in
status adopted in Order No. 652,
Reporting Requirement for Changes in
Status for Public Utilities with MarketBased Rate Authority, 110 FERC
¶ 61,097 (2005).
Redbud states that copies of the filing
were served upon the parties on the
official service list.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005.
[Docket No. ER04–733–001]
15. Astoria Energy LLC
[Docket No. ER01–3103–008]
Take notice that on March 21, 2005,
Astoria Energy LLC (Astoria) submitted
a supplement to its March 1, 2005, filing
of a request for Commission renewal of
all aspects of Astoria’s existing marketbased rate authority, together with the
waivers of and blanket authorizations
under the Federal Power Act previously
granted to Astoria. Astoria requests an
effective date of March 6, 2005.
Comment Date: 5 p.m. Eastern Time
on April 11, 2005.
Take notice that, on March 24, 2005,
Utility Contract Funding II, LLC (UCF II)
submitted an amendment to its Rate
Schedule FERC No. 1 to reflect the
change-in-status reporting requirement
adopted by the Commission in Order
No. 652, Reporting Requirement for
Change in Status for Public Utilities
with Market-Based Rate Authority, 110
FERC ¶ 61,097 (2005).
UCF II states that copies of the filing
were served on parties on the official
service list in this proceeding.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005.
19. Elk River Windfarm LLC
[Docket Nos. ER05–365–002 and ER05–365–
003]
Take notice that on March 23, 2005
and March 25, 2005, Elk River
Windfarm LLC (Elk River) submitted
Second Revised Sheet No. 8 and First
Revised Sheet No. 1, respectively, to
FERC Electric Tariff Original Volume
No. 1.
Comment Date: 5 p.m. Eastern Time
on April 15, 2005.
16. Power Contract Financing II, L.L.C.
20. Otter Tail Corporation
[Docket No. ER03–1108–004]
[Docket No. ER05–555–000]
Take notice that, on March 24, 2005,
Power Contract Financing II, L.L.C. (PCF
II, LLC) submitted an amendment to its
Rate Schedule FERC No. 1 to reflect the
change-in-status reporting requirement
adopted by the Commission in Order
No. 652, Reporting Requirement for
Change in Status for Public Utilities
with Market-Based Rate Authority, 110
FERC ¶ 61,097 (2005).
PCF II, LLC states that copies of the
filing were served on parties on the
official service list in this proceeding.
Comment Date: 5 p.m. Eastern Time
on April 14, 2005.
Take notice that on March 23, 2005,
Otter Tail Corporation, pursuant to the
Commission’s Rules of Practice and
Procedures, 18 CFR 385.216, submitted
a notice of withdrawal of its February 4,
2005 filing of a notice of succession in
the Docket No. ER05–555–000.
Comment Date: 5 p.m. Eastern Time
on April 13, 2005.
17. Power Contract Financing II, Inc.
[Docket No. ER03–1109–005]
Take notice that on March 24, 2005,
Power Contract Financing II, Inc. (PCF
II, Inc.) submitted an amendment to its
Rate Schedule FERC No. 1 to reflect the
change-in-status reporting requirement
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
21. Hot Spring Power Company
[Docket No. ER05–570–002]
Take notice that on March 23, 2005,
Hot Spring Power Company submitted
for filing Original Sheet No. 4, Revision
No. 1, Hot Spring Power Company’s
FERC Electric Rate Schedule No. 1, in
compliance with the Commission’s
letter order issued March 14, 2005, 110
FERC ¶ 61,284 (2005).
Comment Date: 5 p.m. Eastern Time
on April 13, 2005.
E:\FR\FM\06APN1.SGM
06APN1
Federal Register / Vol. 70, No. 65 / Wednesday, April 6, 2005 / Notices
22. Gulf States Wholesale Equity
Partners, LP
[Docket Nos. ER05–679–000 and ER05–679–
001]
Take notice that on March 4, 2005, as
amended on March 23, 2005, Gulf States
Wholesale Equity Partners, LP
submitted a petition requesting the
acceptance of Gulf States Wholesale
Equity Partners, LP’s Rate Schedule
FERC No. 1; the granting of certain
blanket approvals, including the
authority to sell electricity at marketbased rates; and the waiver of certain
Commission regulations. Gulf States
Wholesale Equity Partners, LP states
that it intends to engage in wholesale
electric power and energy purchases
and sales as a marketer and is not in the
business of generating or transmitting
electric power. Gulf States Wholesale
Equity Partners, LP further states that it
is involved in consulting of electricity
and marketing of wholesale power and
is not associated with any utilities,
investor owned or otherwise.
Comment Date: 5 p.m. Eastern Time
on April 13, 2005.
23. California Independent System
Operator Corporation
[Docket No. ER05–718–000]
Take notice that on March 23, 2005,
the California Independent System
Operator Corporation (CAISO) tendered
for filing an amendment to the CAISO
Tariff, Amendment No. 66, for
expedited consideration and acceptance
by the Commission. The CAISO states
that the purpose of Amendment No. 66
is to implement an interim solution to
the problem of excessive costs incurred
as a result of the manner in which
import and export bids from System
Resources are cleared and settled under
Phase 1B of the CAISO’s Market
Redesign and Technology Upgrade. The
CAISO is requesting an effective date of
March 24, 2005.
The CAISO states that this filing has
been served upon the California Public
Utilities Commission, the California
Energy Commission, the California
Electricity Oversight Board, and all
parties with effective Scheduling
Coordinator Agreements under the
CAISO Tariff.
Comment Date: 5 p.m. Eastern Time
on April 4, 2005.
24. Entergy Services, Inc.
[Docket No. ER05–719–000]
Take notice that on March 23, 2005,
Entergy Services, Inc. (Entergy Services)
submitted for filing on behalf of Entergy
Arkansas, Inc. (EAI) a 2005 Wholesale
Formula Rate Update (Update). Entergy
Services states that the Update
VerDate jul<14>2003
18:17 Apr 05, 2005
Jkt 205001
redetermines the formula rate charges
and the Transmission Loss Factor.
Comment Date: 5 p.m. Eastern Time
on April 13, 2005.
25. Basin Electric Power Cooperative
[Docket No. NJ04–2–003]
Take notice that on March 23, 2005,
Basin Electric Power Cooperative (Basin
Electric) tendered for filing a revised
Attachment L to its non-jurisdictional
open-access transmission reciprocity
tariff, FERC Electric Tariff, Original
Volume No. 1 (West-Side OATT)
pursuant to the Commission’s order
issued February 18, 2005, Basin Electric
Power Cooperative, 110 FERC ¶ 61,175
(2005). Basin Electric requests an
effective date of January 19, 2005.
Basin Electric states that copies of the
transmittal letter to the filing were
served upon customers under the WestSide OATT, the Public Service
Company of Colorado, the Iowa Utilities
Board, the Minnesota Public Utilities
Commission, the Montana Public
Service Commission, the Nebraska
Public Service Commission, the New
Mexico Public Service Commission, the
North Dakota Public Service
Commission, the South Dakota Public
Utilities Commission, and the Wyoming
Public Service Commission.
Comment Date: 5 p.m. Eastern Time
on April 13, 2005.
17443
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–1576 Filed 4–5–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
26. Birchwood Power Partners, L.P.
[Project No. 620–009 Alaska]
[Docket Nos. QF93–126–007 and EL05–69–
002]
NorQuest Seafoods, Inc.; Notice of
Availability of Environmental
Assessment
Take notice that on March 21, 2005,
Birchwood Power Partners, L.P. filed a
supplement to its February 28, 2005
‘‘Request for Declaratory Order, Or in
the Alternative, Petition for Order
Granting Limited Waiver of Qualifying
Facility Operating Standard.’’
Comment Date: 5 p.m. Eastern Time
on April 11, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
March 30, 2005.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for license for the Chignik Hydroelectric
Project and has prepared an
Environmental Assessment (EA) for the
project. The project is located on the
Indian Creek, in the town of Chignik,
Alaska. The project occupies about two
acres of United States land within the
boundary of the Alaska Peninsula
National Wildlife Refuge that is in the
process of being conveyed to Far West,
Inc., a local tribal Corporation.
The EA contains the staff’s analysis of
the potential environmental impacts of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major Federal
action that would significantly affect the
quality of the human environment.
E:\FR\FM\06APN1.SGM
06APN1
Agencies
[Federal Register Volume 70, Number 65 (Wednesday, April 6, 2005)]
[Notices]
[Pages 17440-17443]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1576]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC05-62-000, et al.]
La Paloma Holding Company, LLC, et al. and Electric Rate and
Corporate Filings
March 30, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. La Paloma Holding Company, LLC and La Paloma Generating Company, LLC
[Docket No. EC05-62-000]
On March 24, 2005, La Paloma Holding Company, LLC (HoldCo) and La
Paloma Generating Company, LLC (La Paloma Gen) filed with the
Commission, on behalf of themselves and the current and future owners
of equity interests in HoldCo, an application requesting that the
Commission grant all authorizations and approvals necessary under
section 203 of the Federal Power Act for an indirect disposition of
jurisdictional facilities as a result of certain proposed transfers of
ownership or control of equity interests in HoldCo, and, in order to
facilitate a more liquid market for the trading of such interests,
grant additional authorizations approving certain categories of future
transfers of ownership or control of equity interests in HoldCo. HoldCo
states that it owns 100 percent of the equity interests in La Paloma
Gen, which owns and operates a 1,040 megawatt electric generating
facility located near McKittrick, California.
Comment Date: 5 p.m. Eastern Time on April 14, 2005.
2. Lake Road Holding Company, LLC and Lake Road Generating Company,
L.P.
[Docket No. EC05-63-000]
On March 24, 2005, Lake Road Holding Company, LLC (HoldCo) and Lake
Road Generating Company, L.P. (Lake Road Gen) filed with the
[[Page 17441]]
Commission, on behalf of themselves and the current and future owners
of equity interests in HoldCo, an application requesting that the
Commission grant all authorizations and approvals necessary under
section 203 of the Federal Power Act for an indirect disposition of
jurisdictional facilities as a result of certain proposed transfers of
ownership or control of equity interests in HoldCo, and, in order to
facilitate a more liquid market for the trading of such interests,
grant additional authorizations approving certain categories of future
transfers of ownership or control of equity interests in HoldCo. HoldCo
owns 100 percent of the equity interests in Lake Road Gen, which owns
and operates a 750 megawatt electric generating facility located near
Killingly, Connecticut.
Comment Date: 5 p.m. Eastern Time on April 14, 2005.
3. Deer Park Energy Center Limited Partnership
[Docket No. EG05-55-000]
Take notice that on March 18, 2005, Deer Park Energy Center Limited
Partnership (Applicant) c/o Calpine Corporation, 717 Texas Avenue,
Suite 1000, Houston, TX 77002, filed with the Commission an application
for determination of exempt wholesale generator status pursuant to part
365 of the Commission's regulations. Applicant states that it is a
Delaware limited partnership, and will own a nominal 950 megwatt
natural gas-fired combined cycle cogeneration facility located in Deer
Park, Texas.
Applicant states that copies of the application were served upon
the United States Securities and Exchange Commission and Public Utility
Commission of Texas.
Comment Date: 5 p.m. Eastern Time on April 8, 2005.
4. Rainbow Energy Marketing Corporation
[Docket Nos. ER94-1061-027 and ER05-729-000]
Take notice that on March 22, 2005, Rainbow Energy Marketing
Corporation (Rainbow) tendered for filing an Original Sheet No. 6 to
its FERC Electric Tariff, First Revised Volume No. 1 containing the
change in status reporting requirement, in compliance with the
Commission's orders issued in Docket No. ER05-351-000 and 001on
February 23, 2005, and in Docket No. ER94-1061-024 on March 3, 2005.
In addition, Rainbow submitted First Revised Sheet No. 1 to its
FERC Electric Tariff, First Revised Volume No. 1, which would allow
Rainbow to sell ancillary services at market-based rates within the
Midwest Independent Transmission System Operator, Inc.
Comment Date: 5 p.m. Eastern Time on April 12, 2005.
5. Morgan Stanley Capital Group Inc., South Eastern Electric
Development Corporation, South Eastern Generating Corporation, Naniwa
Energy LLC, Power Contract Finance, L.L.C., Power Contract Financing
II, L.L.C., Power Contract Financing II, Inc., MS Retail Development
Corp. and Utility Contract Funding II, LLC
[Docket Nos. ER94-1384-031, ER99-2329-004, ER00-1803-003, ER01-457-003,
ER02-1485-005, ER03-1108-005, ER03-1109-004, ER03-1315-003 and ER04-
733-002]
Take notice that on March 24, 2005, Morgan Stanley Capital Group
Inc. (MSCG), on behalf of itself and its affiliates South Eastern
Electric Development Corporation, South Eastern Generating Corporation,
Naniwa Energy LLC, Power Contract Finance, L.L.C., Power Contract
Financing II, L.L.C., Power Contract Financing II, Inc., MS Retail
Development Corp., and Utility Contract Funding II, LLC, submitted a
revised market power analysis.
MSCG states that copies of the filing were served on parties on the
official service lists in the above-captioned proceedings.
Comment Date: 5 p.m. Eastern Time on April 14, 2005.
6. Morgan Stanley Capital Group Inc.
[Docket No. ER94-1384-032]
Take notice that on March 24, 2005, Morgan Stanley Capital Group
Inc. (MSCG) submitted an amendment to its Second Revised Rate Schedule
FERC No. 1 to reflect the change-in-status reporting requirement
adopted in the Commission's Order No. 652, Reporting Requirement for
Change in Status for Public Utilities with Market-Based Rate Authority,
110 FERC ] 61,097 (2005).
MSCG states that copies of the filing were served on parties on the
official service list in this proceeding.
Comment Date: 5 p.m. Eastern Time on April 14, 2005.
7. South Eastern Electric Development Corporation
[Docket No. ER99-2329-003]
Take notice that, on March 24, 2005, South Eastern Electric
Development Corporation (SEEDCO) submitted amendments to its FERC
Electric Tariff, Original Volume No. 1 to reflect the change-in-status
reporting requirement adopted by the Commission in Order No. 652,
Reporting Requirement for Changes in Status for Public Utilities with
Market-Based Rate Authority, 110 FERC ] 61,097 (2005) and the
Commission's Market Behavior Rules adopted in Investigation of Terms
and Conditions of Public Utility Market-Based Rate Authorizations, 105
FERC ] 61,218 (2003).
SEEDCO states that copies of the filing were served on parties on
the official service list in the above-captioned proceeding.
Comment Date: 5 p.m. Eastern Time on April 14, 2005
8. Tampa Electric Company, Panda Gila River, L.P., Union Power
Partners, L.P., TECO EnergySource, Inc., Commonwealth Chesapeake
Company, L.L.C., TPS Dell, LLC, TPS McAdams, LLC and TECO-PANDA
Generating Company, L.P.
[Docket Nos. ER99-2342-004, ER01-931-008, ER01-930-008, ER96-1563-021,
ER99-415-007, ER02-510-004, ER02-507-004 and ER02-1000-005]
Take notice that, on March 24, 2005, Tampa Electric Company, Panda
Gila River, L.P., Union Power Partners, L.P., TECO EnergySource, Inc.,
Commonwealth Chesapeake Company, L.L.C., TPS Dell, LLC, TPS McAdams,
LLC, and TECO-PANDA Generating Company, L.P., (collectively, TECO
Group) submitted for filing revisions to their respective market-based
rate tariffs to include the reporting requirement for changes in status
adopted in Reporting Requirement for Changes in Status for Public
Utilities with Market-Based Rate Authority, Order No. 652, 110 FERC ]
61,097 (2005).
The TECO Group states that copies of the filing were served upon
the parties on the official service list compiled by the Secretary in
the captioned dockets.
Comment Date: 5 p.m. Eastern Time on April 14, 2005
9. Onondaga Cogeneration Limited
[Docket No. ER00-895-006 Partnership]
Take notice that on March 24, 2005, Onondaga Cogeneration Limited
Partnership (Onondaga) filed a triennial updated market analysis
pursuant to the Commission's triennial rate review requirements, the
letter order issued on February 9, 2000 in Docket No. ER00-895-000, and
the Order Implementing New Generation Market Power Analysis and
Mitigation Procedures, Acadia Power Partners, LLC, et al., 107 FERC ]
61,168 (2004). Onondaga also submitted an amendment to its market-based
rate tariff to incorporate the reporting requirement set forth in Order
No. 652. Reporting Requirements for Changes in Status for Public
Utilities with Market-Based Rate Authority, 110 FERC ] 61,097 (2005).
[[Page 17442]]
Onondaga states that copies of the filing were served on parties on
the official service list in the above-captioned proceeding.
Comment Date: 5 p.m. Eastern Time on April 14, 2005.
10. South Eastern Generating Corporation
[Docket No. ER00-1803-002]
Take notice that, on March 24, 2005, South Eastern Generating
Corporation (SEGCO) submitted amendments to its FERC Electric Tariff,
Original Volume No. 1 to reflect the change-in-status reporting
requirement adopted by the Commission in Order No. 652, Reporting
Requirement for Changes in Status for Public Utilities with Market-
Based Rate Authority, 110 FERC ] 61,097 (2005) and the Commission's
Market Behavior Rules adopted in Investigation of Terms and Conditions
of Public Utility Market-Based Rate Authorizations, 105 FERC ] 61,218
(2003).
SEGCO states that copies of the filing were served on parties on
the official service list in the above-captioned proceeding.
Comment Date: 5 p.m. Eastern Time on April 14, 2005.
11. WFEC GENCO, L.L.C.
[Docket No. ER01-388-003]
Take notice that on March 24, 2005, WFEC GENCO, L.L.C. (GENCO)
submitted a revised updated market power analysis. GENCO also submitted
revised tariff sheets to reflect the change-in-status reporting
requirement adopted by the Commission in Order No. 652, Reporting
Requirement for Changes in Status for Public Utilities with Market-
Based Rate Authority, 110 FERC ] 61,097 (2005).
GENCO states that copies of the filing were served on parties on
the official service list in the above-captioned proceeding.
Comment Date: 5 p.m. Eastern Time on April 14, 2005.
12. Mobile Energy, LLC and CP Pleasant Hill, LLC
[Docket Nos. ER01-480-004 and ER01-915-003]
Take notice that on March 24, 2005, Mobile Energy, LLC and CPN
Pleasant Hill, LLC submitted a joint amendment to their respective
pending triennial updated market power analyses.
Comment Date: 5 p.m. Eastern Time on April 14, 2005.
13. Redbud Energy, LP
[Docket Nos. ER01-1011-003]
Take notice that on March 24, 2005, Redbud Energy LP (Redbud)
submitted its market power update in compliance with the Commission's
order issued May 13, 2004 in Acadia Power Partners, LLC, 107 FERC ]
61,168 (2004).
Redbud states that copies of the filing were served upon parties on
the official service list in the captioned proceeding.
Comment Date: 5 p.m. Eastern Time on April 14, 2005.
14. Redbud Energy LC
[Docket No. ER01-1011-004]
Take notice that on March 24, 2005, Redbud Energy LP (Redbud)
submitted for filing revisions to its FERC Electric Tariff, Original
Volume No. 1 to include the reporting requirement for changes in status
adopted in Order No. 652, Reporting Requirement for Changes in Status
for Public Utilities with Market-Based Rate Authority, 110 FERC ]
61,097 (2005).
Redbud states that copies of the filing were served upon the
parties on the official service list.
Comment Date: 5 p.m. Eastern Time on April 14, 2005.
15. Astoria Energy LLC
[Docket No. ER01-3103-008]
Take notice that on March 21, 2005, Astoria Energy LLC (Astoria)
submitted a supplement to its March 1, 2005, filing of a request for
Commission renewal of all aspects of Astoria's existing market-based
rate authority, together with the waivers of and blanket authorizations
under the Federal Power Act previously granted to Astoria. Astoria
requests an effective date of March 6, 2005.
Comment Date: 5 p.m. Eastern Time on April 11, 2005.
16. Power Contract Financing II, L.L.C.
[Docket No. ER03-1108-004]
Take notice that, on March 24, 2005, Power Contract Financing II,
L.L.C. (PCF II, LLC) submitted an amendment to its Rate Schedule FERC
No. 1 to reflect the change-in-status reporting requirement adopted by
the Commission in Order No. 652, Reporting Requirement for Change in
Status for Public Utilities with Market-Based Rate Authority, 110 FERC
] 61,097 (2005).
PCF II, LLC states that copies of the filing were served on parties
on the official service list in this proceeding.
Comment Date: 5 p.m. Eastern Time on April 14, 2005.
17. Power Contract Financing II, Inc.
[Docket No. ER03-1109-005]
Take notice that on March 24, 2005, Power Contract Financing II,
Inc. (PCF II, Inc.) submitted an amendment to its Rate Schedule FERC
No. 1 to reflect the change-in-status reporting requirement adopted by
the Commission in Order No. 652, Reporting Requirement for Change in
Status for Public Utilities with Market-Based Rate Authority, 110 FERC
] 61,097 (2005).
PCF II, Inc. states that copies of the filing were served on
parties on the official service list in this proceeding.
Comment Date: 5 p.m. Eastern Time on April 14, 2005.
18. Utility Contract Funding II, LLC
[Docket No. ER04-733-001]
Take notice that, on March 24, 2005, Utility Contract Funding II,
LLC (UCF II) submitted an amendment to its Rate Schedule FERC No. 1 to
reflect the change-in-status reporting requirement adopted by the
Commission in Order No. 652, Reporting Requirement for Change in Status
for Public Utilities with Market-Based Rate Authority, 110 FERC ]
61,097 (2005).
UCF II states that copies of the filing were served on parties on
the official service list in this proceeding.
Comment Date: 5 p.m. Eastern Time on April 14, 2005.
19. Elk River Windfarm LLC
[ Docket Nos. ER05-365-002 and ER05-365-003]
Take notice that on March 23, 2005 and March 25, 2005, Elk River
Windfarm LLC (Elk River) submitted Second Revised Sheet No. 8 and First
Revised Sheet No. 1, respectively, to FERC Electric Tariff Original
Volume No. 1.
Comment Date: 5 p.m. Eastern Time on April 15, 2005.
20. Otter Tail Corporation
[Docket No. ER05-555-000]
Take notice that on March 23, 2005, Otter Tail Corporation,
pursuant to the Commission's Rules of Practice and Procedures, 18 CFR
385.216, submitted a notice of withdrawal of its February 4, 2005
filing of a notice of succession in the Docket No. ER05-555-000.
Comment Date: 5 p.m. Eastern Time on April 13, 2005.
21. Hot Spring Power Company
[Docket No. ER05-570-002]
Take notice that on March 23, 2005, Hot Spring Power Company
submitted for filing Original Sheet No. 4, Revision No. 1, Hot Spring
Power Company's FERC Electric Rate Schedule No. 1, in compliance with
the Commission's letter order issued March 14, 2005, 110 FERC ] 61,284
(2005).
Comment Date: 5 p.m. Eastern Time on April 13, 2005.
[[Page 17443]]
22. Gulf States Wholesale Equity Partners, LP
[Docket Nos. ER05-679-000 and ER05-679-001]
Take notice that on March 4, 2005, as amended on March 23, 2005,
Gulf States Wholesale Equity Partners, LP submitted a petition
requesting the acceptance of Gulf States Wholesale Equity Partners,
LP's Rate Schedule FERC No. 1; the granting of certain blanket
approvals, including the authority to sell electricity at market-based
rates; and the waiver of certain Commission regulations. Gulf States
Wholesale Equity Partners, LP states that it intends to engage in
wholesale electric power and energy purchases and sales as a marketer
and is not in the business of generating or transmitting electric
power. Gulf States Wholesale Equity Partners, LP further states that it
is involved in consulting of electricity and marketing of wholesale
power and is not associated with any utilities, investor owned or
otherwise.
Comment Date: 5 p.m. Eastern Time on April 13, 2005.
23. California Independent System Operator Corporation
[Docket No. ER05-718-000]
Take notice that on March 23, 2005, the California Independent
System Operator Corporation (CAISO) tendered for filing an amendment to
the CAISO Tariff, Amendment No. 66, for expedited consideration and
acceptance by the Commission. The CAISO states that the purpose of
Amendment No. 66 is to implement an interim solution to the problem of
excessive costs incurred as a result of the manner in which import and
export bids from System Resources are cleared and settled under Phase
1B of the CAISO's Market Redesign and Technology Upgrade. The CAISO is
requesting an effective date of March 24, 2005.
The CAISO states that this filing has been served upon the
California Public Utilities Commission, the California Energy
Commission, the California Electricity Oversight Board, and all parties
with effective Scheduling Coordinator Agreements under the CAISO
Tariff.
Comment Date: 5 p.m. Eastern Time on April 4, 2005.
24. Entergy Services, Inc.
[Docket No. ER05-719-000]
Take notice that on March 23, 2005, Entergy Services, Inc. (Entergy
Services) submitted for filing on behalf of Entergy Arkansas, Inc.
(EAI) a 2005 Wholesale Formula Rate Update (Update). Entergy Services
states that the Update redetermines the formula rate charges and the
Transmission Loss Factor.
Comment Date: 5 p.m. Eastern Time on April 13, 2005.
25. Basin Electric Power Cooperative
[Docket No. NJ04-2-003]
Take notice that on March 23, 2005, Basin Electric Power
Cooperative (Basin Electric) tendered for filing a revised Attachment L
to its non-jurisdictional open-access transmission reciprocity tariff,
FERC Electric Tariff, Original Volume No. 1 (West-Side OATT) pursuant
to the Commission's order issued February 18, 2005, Basin Electric
Power Cooperative, 110 FERC ] 61,175 (2005). Basin Electric requests an
effective date of January 19, 2005.
Basin Electric states that copies of the transmittal letter to the
filing were served upon customers under the West-Side OATT, the Public
Service Company of Colorado, the Iowa Utilities Board, the Minnesota
Public Utilities Commission, the Montana Public Service Commission, the
Nebraska Public Service Commission, the New Mexico Public Service
Commission, the North Dakota Public Service Commission, the South
Dakota Public Utilities Commission, and the Wyoming Public Service
Commission.
Comment Date: 5 p.m. Eastern Time on April 13, 2005.
26. Birchwood Power Partners, L.P.
[Docket Nos. QF93-126-007 and EL05-69-002]
Take notice that on March 21, 2005, Birchwood Power Partners, L.P.
filed a supplement to its February 28, 2005 ``Request for Declaratory
Order, Or in the Alternative, Petition for Order Granting Limited
Waiver of Qualifying Facility Operating Standard.''
Comment Date: 5 p.m. Eastern Time on April 11, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-1576 Filed 4-5-05; 8:45 am]
BILLING CODE 6717-01-P