Georgia Energy Cooperative; Notice of Issuance of Order, 17242 [E5-1510]
Download as PDF
17242
Federal Register / Vol. 70, No. 64 / Tuesday, April 5, 2005 / Notices
that the Commission amend the
authorization previously granted on
June 16, 2004, in Docket No. ES04–32–
000, to permit Consumers to issue an
additional $1 billion of long-term
securities (for a total of $2.5 billion) for
general corporate purposes and an
additional $1 billion of long-term
securities (for a total of $2 billion) for
refinancing or refunding existing longterm securities.
Consumers also requests a waiver
from the Commission’s competitive
bidding and negotiated placement
requirements at 18 CFR 34.2.
Any person desiring to intervene or to
protest this filing should file with the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a motion to intervene. All such
motions or protests should be filed on
or before the comment date, and, to the
extent applicable, must be served on the
applicant and on any other person
designated on the official service list.
This filing is available for review at the
Commission or may be viewed on the
Commission’s Web site at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659. Protests and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: April 19, 2005.
Magalie R. Salas,
Secretary
[FR Doc. E5–1505 Filed 4–4–05; 8:45 am]
BILLING CODE 6717–01–P
VerDate jul<14>2003
19:48 Apr 04, 2005
Jkt 205001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER05–349–000 and ER05–349–
001]
Georgia Energy Cooperative; Notice of
Issuance of Order
March 29, 2005.
Georgia Energy Cooperative (GEC)
filed an application for market-based
rate authority, with an accompanying
tariff. The proposed rate tariff provides
for wholesale sales of energy and
capacity at market-based rates. GEC also
requested waiver of various Commission
regulations. In particular, GEC requested
that the Commission grant blanket
approval under 18 CFR part 34 of all
future issuances of securities and
assumptions of liability by GEC.
On March 24, 2005, the Commission
granted the request for blanket approval
under part 34, subject to the following:
Any person desiring to be heard or to
protest the blanket approval of
issuances of securities or assumptions of
liability by GEC should file a motion to
intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest, is April 25, 2005.
Absent a request to be heard in
opposition by the deadline above, GEC
is authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of GEC,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approval of GEC’s issuances of
securities or assumptions of liability.
Copies of the full text of the
Commission’s Order are available from
the Commission’s Public Reference
Room, 888 First Street, NE.,
Washington, DC 20426. The Order may
also be viewed on the Commission’s
Web site at https://www.ferc.gov, using
the eLibrary link. Enter the docket
number excluding the last three digits in
the docket number filed to access the
document. Comments, protests, and
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
interventions may be filed electronically
via the internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1510 Filed 4–4–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER05–350–000 and ER05–350–
001]
Mitchell Electric Membership
Corporation; Notice of Issuance of
Order
March 29, 2005.
Mitchell Electric Membership
Corporation (Mitchell) filed an
application for market-based rate
authority, with an accompanying tariff.
The proposed rate tariff provides for
wholesale sales of energy and capacity
at market-based rates. Mitchell also
requested waiver of various Commission
regulations. In particular, Mitchell
requested that the Commission grant
blanket approval under 18 CFR Part 34
of all future issuances of securities and
assumptions of liability by Mitchell.
On March 25, 2005, the Commission
granted the request for blanket approval
under Part 34, subject to the following:
Any person desiring to be heard or to
protest the blanket approval of
issuances of securities or assumptions of
liability by Mitchell should file a
motion to intervene or protest with the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, D.C.
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure. 18 CFR 385.211,
385.214 (2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest, is April 25, 2005.
Absent a request to be heard in
opposition by the deadline above,
Mitchell is authorized to issue securities
and assume obligations or liabilities as
a guarantor, indorser, surety, or
otherwise in respect of any security of
another person; provided that Mitchell,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
E:\FR\FM\05APN1.SGM
05APN1
Agencies
[Federal Register Volume 70, Number 64 (Tuesday, April 5, 2005)]
[Notices]
[Page 17242]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1510]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER05-349-000 and ER05-349-001]
Georgia Energy Cooperative; Notice of Issuance of Order
March 29, 2005.
Georgia Energy Cooperative (GEC) filed an application for market-
based rate authority, with an accompanying tariff. The proposed rate
tariff provides for wholesale sales of energy and capacity at market-
based rates. GEC also requested waiver of various Commission
regulations. In particular, GEC requested that the Commission grant
blanket approval under 18 CFR part 34 of all future issuances of
securities and assumptions of liability by GEC.
On March 24, 2005, the Commission granted the request for blanket
approval under part 34, subject to the following:
Any person desiring to be heard or to protest the blanket approval
of issuances of securities or assumptions of liability by GEC should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure. 18 CFR 385.211, 385.214 (2004).
Notice is hereby given that the deadline for filing motions to
intervene or protest, is April 25, 2005.
Absent a request to be heard in opposition by the deadline above,
GEC is authorized to issue securities and assume obligations or
liabilities as a guarantor, indorser, surety, or otherwise in respect
of any security of another person; provided that such issuance or
assumption is for some lawful object within the corporate purposes of
GEC, compatible with the public interest, and is reasonably necessary
or appropriate for such purposes.
The Commission reserves the right to require a further showing that
neither public nor private interests will be adversely affected by
continued approval of GEC's issuances of securities or assumptions of
liability.
Copies of the full text of the Commission's Order are available
from the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426. The Order may also be viewed on the Commission's
Web site at https://www.ferc.gov, using the eLibrary link. Enter the
docket number excluding the last three digits in the docket number
filed to access the document. Comments, protests, and interventions may
be filed electronically via the internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5-1510 Filed 4-4-05; 8:45 am]
BILLING CODE 6717-01-P