The Detroit Edison Company, et al.; Electric Rate and Corporate Filings, 17081-17082 [E5-1487]
Download as PDF
Federal Register / Vol. 70, No. 63 / Monday, April 4, 2005 / Notices
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–1484 Filed 4–1–05; 8:45 am]
2. Southwest Power Pool, Inc.
[Docket No. ER99–4392–006]
Take notice that on March 14, 2005,
Southwest Power Pool, Inc. (SPP)
submitted a compliance filing pursuant
to the Commission’s Order issued
February 11, 2005, 110 FERC ¶ 61,133.
SPP requested an effective date of
March 15, 2005 for its compliance filing.
SPP states it has served a copy of this
filing on all parties to the service list in
this proceeding and all affected state
commissions and also states that a
complete copy will be posted on the
SPP Web site https://www.spp.org.
Comment Date: 5 p.m. eastern time on
April 5, 2005.
3. PJM Interconnection, L.L.C.,
Commonwealth Edison Co. and
Commonwealth Edison Co. of Indiana
[Docket Nos. ER03–1335–004 and ER04–367–
006]
The Detroit Edison Company, et al.;
Electric Rate and Corporate Filings
Take notice that on March 18, 2005,
PJM Interconnection, L.L.C. (PJM), in
compliance with the Commission’s
December 22, 2004, Order,109 FERC
¶ 61,338, and the extension granted in
this proceeding on January 25, 2005,
submitted a refund report.
PJM states that copies of this filing
have been served on all parties to these
proceedings.
Comment Date: 5 p.m. eastern time on
April 8, 2005.
March 25, 2005.
4. PJM Interconnection, L.L.C.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER97–324–008, et al.]
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. The Detroit Edison Company, DTE
Energy Trading, Inc., DTE Edison
America, Inc., DTE Energy Marketing,
Inc., DTE Georgetown, L.P., DTE River
Rouge No. 1, L.L.C., Crete Energy
Venture, L.L.C.
[Docket Nos. ER97–324–008, ER97–3834–
014, ER98–3026–009, ER99–3368–005,
ER00–1746–003, ER00–1816–004, ER02–
963–005]
Take notice that on March 21, 2005,
The Detroit Edison Company, DTE
Energy Trading, Inc., DTE Edison
America, Inc., DTE Energy Marketing,
Inc., DTE Georgetown, L.P., DTE River
Rouge No. 1, L.L.C., and Crete Energy
Venture, L.L.C. (collectively, the DTE
Parties) submitted an amendment to
their December 23, 2004 filing of an
updated generation market power
analysis.
The DTE Parties state that copies of
the filing were served on parties on the
official service list in these proceedings.
Comment Date: 5 p.m. eastern time on
March 31, 2005.
VerDate jul<14>2003
15:19 Apr 01, 2005
Jkt 205001
[Docket No. ER04–608–004]
Take notice that on March 18, 2005,
PJM Interconnection, L.L.C. (PJM)
submitted a further status report on the
stakeholder process regarding a
proposal to expand the behind the meter
generation rules to enable certain
generation associated with a
distribution system to be classified as
behind the meter generation.
Comment Date: 5 p.m. eastern time on
April 8, 2005.
5. Midwest Independent Transmission
System Operator, Inc.
[Docket No. ER04–691–030]
Take notice that on March 18, 2005,
Potomac Economics, Ltd. (Potomac
Economics), the Independent Market
Monitor for the Midwest Independent
Transmission System Operator, Inc.,
submitted a compliance filing pursuant
to the Commission’s direction in its
December 20, 2004 Order, 109 FERC
¶ 61, 285 (2004).
Potomac Economics states it has
served a copy of this filing on the
official service list.
Comment Date: 5 p.m. eastern time on
April 8, 2005.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
17081
6. Florida Power & Light Company—
New England Division
[Docket No. ER04–714–005]
Take notice that on March 14, 2005,
Florida Power & Light Company—New
England Division (FPL–NED), submitted
a refund report in compliance with the
Commission’s Order issued January 26,
2005 in Docket No. ER04–714–000, 110
FERC ¶ 61,064.
Comment Date: 5 p.m. eastern time on
April 5, 2005.
7. Trimont Wind I LLC
[Docket No. ER05–481–001]
Take notice that on March 4, 2005,
Trimont Wind I LLC submitted a
compliance filing pursuant to the
Commission’s March 2, 2005 Order,
FERC ¶ 61,209 (March 2, 2005).
Comment Date: 5 p.m. eastern time on
April 5, 2005.
8. Allegheny Power
[Docket No. ER05–512–001]
Take notice that on March 18, 2005
Monongahela Power Company, The
Potomac Edison Company, and West
Penn Power Company, all doing
business as Allegheny Power, filed a
limited revision to each of eight First
Revised Interconnection and Operating
Agreements entered into with Allegheny
Power’s affiliate, Allegheny Energy
Supply Company, LLC (AE Supply)
originally filed on January 31, 2005, in
Docket No. ER05–512–000. Allegheny
Power states that the purpose of the
limit revisions is to revise the monthly
charge set forth in the Agreements.
Allegheny Power requests an effective
date of April 1, 2005 for the agreements.
Allegheny Power states that a copy of
the filing has been sent to AE Supply
and PJM Interconnection, LLC.
Comment Date: 5 p.m. eastern time on
April 4, 2005.
9. Westar Energy, Inc.
[Docket No. ER05–601–001]
Take notice that on March 14, 2005,
Westar Energy, Inc. (Westar) submitted
for filing a corrected Notice of
Cancellation for Rate Schedule FERC
No. 276, the Coal Participation Power
Agreement between Westar and the City
of Burlington, Kansas originally filed on
February 3, 2005.
Comment Date: 5 p.m. eastern time on
April 5, 2005.
10. Fitchburg Gas and Electric Light
Company
[Docket No. ER05–620–001]
Take notice that on March 18, 2005,
Fitchburg Gas and Electric Light
Company submitted its First Revised
Agreement for Network Integration
E:\FR\FM\04APN1.SGM
04APN1
17082
Federal Register / Vol. 70, No. 63 / Monday, April 4, 2005 / Notices
Transmission Service to Massachusetts
Bay Transportation Authority under ISO
New England, Inc. FERC Electric Tariff
No. 3.
Fitchburg states that copies of the
filing were served on Massachusetts Bay
Transportation Authority and on the
Massachusetts Department of
Telecommunications and Energy.
Comment Date: 5 p.m. eastern time on
April 8, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–1487 Filed 4–1–05; 8:45 am]
BILLING CODE 6717–01–P
EXPORT–IMPORT BANK OF THE
UNITED STATES
Economic Impact Policy
This notice is to inform the public
that the Export-Import Bank of the
VerDate jul<14>2003
15:19 Apr 01, 2005
Jkt 205001
United States has received an
application to finance the export of
approximately $211.5 million in U.S.
equipment and services to a
petrochemicals facility in Qatar. The
U.S. exports will enable the
petrochemicals facility to produce
approximately 1.3 million metric tons of
ethylene as an intermediate product (of
which 600,000 metric tons will be offtaken by a joint venture partner for its
own use), 350,000 metric tons of highdensity polyethylene per year and
approximately 345,000 metric tons of
normal alpha olefins per year.
Available information indicates the
following: the ethylene to be off-taken
by a joint venture partner will be
consumed in Qatar; the high-density
polyethylene will be consumed in Asia,
Europe, Africa and the Middle East; and
the normal alpha olefins will be
consumed in Asia, Europe, the United
States and the Middle East. Initial
production is expected to commence in
the latter part of 2008. Interested parties
may submit comments on this
transaction by e-mail to
economic.impact@exim.gov or by mail
to 811 Vermont Avenue, NW., Room
1238, Washington, DC 20571, within 14
days of the date this notice appears in
the Federal Register.
Helene S. Walsh,
Director, Policy Oversight and Review.
[FR Doc. 05–6520 Filed 4–1–05; 8:45 am]
BILLING CODE 6690–01–P
FEDERAL COMMUNICATIONS
COMMISSION
Notice of Public Information
Collection(s) Being Reviewed by the
Federal Communications Commission
March 25, 2005.
SUMMARY: The Federal Communications
Commission, as part of its continuing
effort to reduce paperwork burden
invites the general public and other
Federal agencies to take this
opportunity to comment on the
following information collection(s), as
required by the Paperwork Reduction
Act of 1995, Pub. L. 104–13. An agency
may not conduct or sponsor a collection
of information unless it displays a
currently valid control number. No
person shall be subject to any penalty
for failing to comply with a collection
of information subject to the Paperwork
Reduction Act (PRA) that does not
display a valid control number.
Comments are requested concerning (a)
Whether the proposed collection of
information is necessary for the proper
performance of the functions of the
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Commission, including whether the
information shall have practical utility;
(b) the accuracy of the Commission’s
burden estimate; (c) ways to enhance
the quality, utility, and clarity of the
information collected; and (d) ways to
minimize the burden of the collection of
information on the respondents,
including the use of automated
collection techniques or other forms of
information technology.
DATES: Written Paperwork Reduction
Act (PRA) comments should be
submitted on or before May 4, 2005. If
you anticipate that you will be
submitting comments, but find it
difficult to do so within the period of
time allowed by this notice, you should
advise the contact listed below as soon
as possible.
ADDRESSES: Direct all comments
regarding this Paperwork Reduction Act
submission to Judith B. Herman, Federal
Communications Commission, Room 1–
C804, 445 12th Street, SW., DC 20554 or
via the Internet to JudithB.Herman@fcc.gov.
For
additional information or copies of the
information collection(s), contact Judith
B. Herman at 202–418–0214 or via the
Internet at Judith-B.Herman@fcc.gov.
SUPPLEMENTARY INFORMATION:
OMB Control No.: 3060–0734.
Title: Accounting Safeguards, CC
Docket No. 96–150, 47 U.S.C. sections
260 and sections 271–276, Sections
54.209, 53.211, and 53.213.
Form No: N/A.
Type of Review: Extension of a
currently approved collection.
Respondents: Business or other forprofit.
Number of Respondents: 50.
Estimated Time Per Response: 24–
19,200 hours.
Frequency of Response: On occasion
and biennial reporting requirements,
third party disclosure requirement and
recordkeeping requirement.
Total Annual Burden: 131,523 hours.
Total Annual Cost: $2,000,000.
Privacy Act Impact Assessment: N/A.
Needs and Uses: With this submission
to the Office of Management and Budget
(OMB), the Commission is extending
this collection (no change in
requirements) for this information
collection in order to obtain the full
three-year clearance from OMB. The
Commission has adjusted the burden
hours and burden costs to more
accurately reflect the Commission’s
actual experience in conducting section
272 audits.
Under section 272 and the
Commission’s implementing rules, a
Bell Operating Company (BOC) and its
FOR FURTHER INFORMATION CONTACT:
E:\FR\FM\04APN1.SGM
04APN1
Agencies
[Federal Register Volume 70, Number 63 (Monday, April 4, 2005)]
[Notices]
[Pages 17081-17082]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1487]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER97-324-008, et al.]
The Detroit Edison Company, et al.; Electric Rate and Corporate
Filings
March 25, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. The Detroit Edison Company, DTE Energy Trading, Inc., DTE Edison
America, Inc., DTE Energy Marketing, Inc., DTE Georgetown, L.P., DTE
River Rouge No. 1, L.L.C., Crete Energy Venture, L.L.C.
[Docket Nos. ER97-324-008, ER97-3834-014, ER98-3026-009, ER99-3368-005,
ER00-1746-003, ER00-1816-004, ER02-963-005]
Take notice that on March 21, 2005, The Detroit Edison Company, DTE
Energy Trading, Inc., DTE Edison America, Inc., DTE Energy Marketing,
Inc., DTE Georgetown, L.P., DTE River Rouge No. 1, L.L.C., and Crete
Energy Venture, L.L.C. (collectively, the DTE Parties) submitted an
amendment to their December 23, 2004 filing of an updated generation
market power analysis.
The DTE Parties state that copies of the filing were served on
parties on the official service list in these proceedings.
Comment Date: 5 p.m. eastern time on March 31, 2005.
2. Southwest Power Pool, Inc.
[Docket No. ER99-4392-006]
Take notice that on March 14, 2005, Southwest Power Pool, Inc.
(SPP) submitted a compliance filing pursuant to the Commission's Order
issued February 11, 2005, 110 FERC ] 61,133. SPP requested an effective
date of March 15, 2005 for its compliance filing.
SPP states it has served a copy of this filing on all parties to
the service list in this proceeding and all affected state commissions
and also states that a complete copy will be posted on the SPP Web site
https://www.spp.org.
Comment Date: 5 p.m. eastern time on April 5, 2005.
3. PJM Interconnection, L.L.C., Commonwealth Edison Co. and
Commonwealth Edison Co. of Indiana
[Docket Nos. ER03-1335-004 and ER04-367-006]
Take notice that on March 18, 2005, PJM Interconnection, L.L.C.
(PJM), in compliance with the Commission's December 22, 2004, Order,109
FERC ] 61,338, and the extension granted in this proceeding on January
25, 2005, submitted a refund report.
PJM states that copies of this filing have been served on all
parties to these proceedings.
Comment Date: 5 p.m. eastern time on April 8, 2005.
4. PJM Interconnection, L.L.C.
[Docket No. ER04-608-004]
Take notice that on March 18, 2005, PJM Interconnection, L.L.C.
(PJM) submitted a further status report on the stakeholder process
regarding a proposal to expand the behind the meter generation rules to
enable certain generation associated with a distribution system to be
classified as behind the meter generation.
Comment Date: 5 p.m. eastern time on April 8, 2005.
5. Midwest Independent Transmission System Operator, Inc.
[Docket No. ER04-691-030]
Take notice that on March 18, 2005, Potomac Economics, Ltd.
(Potomac Economics), the Independent Market Monitor for the Midwest
Independent Transmission System Operator, Inc., submitted a compliance
filing pursuant to the Commission's direction in its December 20, 2004
Order, 109 FERC ] 61, 285 (2004).
Potomac Economics states it has served a copy of this filing on the
official service list.
Comment Date: 5 p.m. eastern time on April 8, 2005.
6. Florida Power & Light Company--New England Division
[Docket No. ER04-714-005]
Take notice that on March 14, 2005, Florida Power & Light Company--
New England Division (FPL-NED), submitted a refund report in compliance
with the Commission's Order issued January 26, 2005 in Docket No. ER04-
714-000, 110 FERC ] 61,064.
Comment Date: 5 p.m. eastern time on April 5, 2005.
7. Trimont Wind I LLC
[Docket No. ER05-481-001]
Take notice that on March 4, 2005, Trimont Wind I LLC submitted a
compliance filing pursuant to the Commission's March 2, 2005 Order,
FERC ] 61,209 (March 2, 2005).
Comment Date: 5 p.m. eastern time on April 5, 2005.
8. Allegheny Power
[Docket No. ER05-512-001]
Take notice that on March 18, 2005 Monongahela Power Company, The
Potomac Edison Company, and West Penn Power Company, all doing business
as Allegheny Power, filed a limited revision to each of eight First
Revised Interconnection and Operating Agreements entered into with
Allegheny Power's affiliate, Allegheny Energy Supply Company, LLC (AE
Supply) originally filed on January 31, 2005, in Docket No. ER05-512-
000. Allegheny Power states that the purpose of the limit revisions is
to revise the monthly charge set forth in the Agreements. Allegheny
Power requests an effective date of April 1, 2005 for the agreements.
Allegheny Power states that a copy of the filing has been sent to
AE Supply and PJM Interconnection, LLC.
Comment Date: 5 p.m. eastern time on April 4, 2005.
9. Westar Energy, Inc.
[Docket No. ER05-601-001]
Take notice that on March 14, 2005, Westar Energy, Inc. (Westar)
submitted for filing a corrected Notice of Cancellation for Rate
Schedule FERC No. 276, the Coal Participation Power Agreement between
Westar and the City of Burlington, Kansas originally filed on February
3, 2005.
Comment Date: 5 p.m. eastern time on April 5, 2005.
10. Fitchburg Gas and Electric Light Company
[Docket No. ER05-620-001]
Take notice that on March 18, 2005, Fitchburg Gas and Electric
Light Company submitted its First Revised Agreement for Network
Integration
[[Page 17082]]
Transmission Service to Massachusetts Bay Transportation Authority
under ISO New England, Inc. FERC Electric Tariff No. 3.
Fitchburg states that copies of the filing were served on
Massachusetts Bay Transportation Authority and on the Massachusetts
Department of Telecommunications and Energy.
Comment Date: 5 p.m. eastern time on April 8, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-1487 Filed 4-1-05; 8:45 am]