Maritimes & Northeast Pipeline, L.L.C.; Notice of Proposed Changes in FERC Gas Tariff, 16811-16812 [E5-1464]

Download as PDF Federal Register / Vol. 70, No. 62 / Friday, April 1, 2005 / Notices 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Linda Mitry, Deputy Secretary. [FR Doc. E5–1459 Filed 3–31–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP05–238–000] East Tennessee Natural Gas, LLC; Notice of Proposed Changes in FERC Gas Tariff March 25, 2005. Take notice that on March 21, 2005, East Tennessee Natural Gas, LLC (East Tennessee) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, First Revised Sheet No. 391A, to be effective April 21, 2005. East Tennessee states that the purpose of this filing is to delete the tariff provisions related to the CIG/Granite State policy from section 41.4 of the General Terms and Conditions of its FERC Gas Tariff. East Tennessee states that copies of this filing have been served upon all affected customers of East Tennessee and interested state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of § 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone VerDate jul<14>2003 17:15 Mar 31, 2005 Jkt 205001 filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Linda Mitry, Deputy Secretary. [FR Doc. E5–1463 Filed 3–31–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP05–241–000] Florida Gas Transmission Company; Notice of Proposed Changes in FERC Gas Tariff March 25, 2005. 16811 accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of § 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Take notice that on March 22, 2005, Florida Gas Transmission Company (FGT) tendered for filing to become part of its FERC Gas Tariff, Third Revised Volume No. 1, the following tariff sheets, effective April 1, 2005: Linda Mitry, Deputy Secretary. [FR Doc. E5–1466 Filed 3–31–05; 8:45 am] Seventieth Revised Sheet No. 8A Sixty-Second Revised Sheet No. 8A.01 Sixty-Second Revised Sheet No. 8A.02 Twenty-Second Revised Sheet No. 8A.04 Sixty-Fifth Revised Sheet No. 8B Fifty-Eighth Revised Sheet No. 8B.01 Fourteenth Revised Sheet No. 8B.02 FEDERAL ENERGY REGULATORY COMMISSION FGT states that the tariff sheets listed above are being filed pursuant to section 27.A.2.b of the General Terms and Conditions of FGT’s Tariff, which provides for flex adjustments to FGT’s Base Fuel Reimbursement Charge Percentage. Any person desiring to intervene or to protest this filing must file in PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 BILLING CODE 6717–01–P [Docket No. RP05–239–000] Maritimes & Northeast Pipeline, L.L.C.; Notice of Proposed Changes in FERC Gas Tariff March 25, 2005. Take notice that on March 21, 2005, Maritimes & Northeast Pipeline, L.L.C. (Maritimes) tendered for filing as part of its FERC Gas Tariff, First Revised Volume No. 1, Third Revised Sheet No. 305A, to be effective April 21, 2005. Maritimes states that the purpose of this E:\FR\FM\01APN1.SGM 01APN1 16812 Federal Register / Vol. 70, No. 62 / Friday, April 1, 2005 / Notices filing is to delete the tariff provisions related to the CIG/Granite State policy from section 27.4 of the General Terms and Conditions of its FERC Gas Tariff. Maritimes states that copies of this filing have been served upon all affected customers of Maritimes and interested state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Linda Mitry, Deputy Secretary. [FR Doc. E5–1464 Filed 3–31–05; 8:45 am] BILLING CODE 6717–01–P VerDate jul<14>2003 17:15 Mar 31, 2005 Jkt 205001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket RP05–233–000] Northern Natural Gas Company; Notice of Proposed Changes in FERC Gas Tariff March 25, 2005. Take notice that on March 18, 2005, Northern Natural Gas Company (Northern) tendered for filing to become part of its FERC Gas Tariff, Fifth Revised Volume No. 1, Fourth Revised Sheet No. 304, with an effective date of April 18, 2005. Northern states that it is filing the above-referenced tariff sheet in connection with the Commission’s Order on Remand in Williston Basin Interstate Pipeline Co. issued March 3, 2005, to eliminate tariff language implementing the CIG/Granite State discount policy. Northern further states that copies of the filing have been mailed to each of its customers and interested state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of § 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Linda Mitry, Deputy Secretary. [FR Doc. E5–1460 Filed 3–31–05; 8:45 am] BILLING CODE 6717–01–P FEDERAL ENERGY REGULATORY COMMISSION [Docket No. RP05–240–000] Texas Eastern Transmission, LP Notice of Proposed Changes in FERC Gas Tariff March 25, 2005. Take notice that on March 21, 2005, Texas Eastern Transmission, LP (Texas Eastern) tendered for filing as part of its FERC Gas Tariff, Seventh Revised Volume No. 1, Fourth Revised Sheet No. 644 and First Revised Sheet No. 644A, to be effective April 21, 2005. Texas Eastern states that the purpose of this filing is to delete the tariff provisions related to the CIG/Granite State policy from section 28.3 of the General Terms and Conditions of its FERC Gas Tariff. Texas Eastern states that copies of this filing have been served upon all affected customers of Texas Eastern and interested state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of § 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. E:\FR\FM\01APN1.SGM 01APN1

Agencies

[Federal Register Volume 70, Number 62 (Friday, April 1, 2005)]
[Notices]
[Pages 16811-16812]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1464]


-----------------------------------------------------------------------

FEDERAL ENERGY REGULATORY COMMISSION

[Docket No. RP05-239-000]


Maritimes & Northeast Pipeline, L.L.C.; Notice of Proposed 
Changes in FERC Gas Tariff

March 25, 2005.
    Take notice that on March 21, 2005, Maritimes & Northeast Pipeline, 
L.L.C. (Maritimes) tendered for filing as part of its FERC Gas Tariff, 
First Revised Volume No. 1, Third Revised Sheet No. 305A, to be 
effective April 21, 2005. Maritimes states that the purpose of this

[[Page 16812]]

filing is to delete the tariff provisions related to the CIG/Granite 
State policy from section 27.4 of the General Terms and Conditions of 
its FERC Gas Tariff.
    Maritimes states that copies of this filing have been served upon 
all affected customers of Maritimes and interested state commissions.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible online at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Linda Mitry,
Deputy Secretary.
[FR Doc. E5-1464 Filed 3-31-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.