Environmental Impact Statements; Notice of Availability, 16815 [05-6490]
Download as PDF
Federal Register / Vol. 70, No. 62 / Friday, April 1, 2005 / Notices
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–1468 Filed 3–31–05; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6661–9]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements filed March 21, 2005,
through March 25, 2005, pursuant to
40 CFR 1506.9.
EIS No.050128, Draft EIS, AFS, ID,
Porcupine East, 9 Allotment Grazing
Analysis Project, Authorizing
Livestock Grazing, Caribou-Targhee
National Forest, Dubois Ranger
District, Cenntenial Mountains, Clark
County, ID, Comment Period Ends:
May 9, 2005, Contact: Shane Q.
Jacobson (208) 374–5422. The above
NOA EIS should have appeared in the
03/25/2005 Federal Register. The 45Day Comment Period is Calculated
from 03/25/2005.
EIS No. 050129, Final EIS, AFS, UT,
Duck Creek Fuels Treatment Analysis,
To Reduce Fuels, Enhance FireTolerant Vegetation and Provide Fuel
Breaks, Dixie National Forest, Cedar
City Ranger District, Kane County,
UT, Wait Period Ends: May 2, 2005,
Contact: David Swank (435) 865–
3700.
EIS No. 050130, Final EIS, AFS, WI,
Lakewood/Laona Plantation Thinning
Project, To Implement Vegetation
Management Activities,
Chequamegon-Nicolet National
Forest, Lakewood Ranger District,
Forest, Langlade and Oconto
Counties, WI, Wait Period Ends: May
2, 2005, Contact: Anne F. Archie (715)
362–1300.
EIS No. 050131, Draft EIS, FHW, VA,
Tri-County Parkway Location Study,
VerDate jul<14>2003
17:15 Mar 31, 2005
Jkt 205001
Construction of a New North-South
Transportation Link to Connect the
City of Manassas with I–66, Funding
and U.S. COE Section 404 Permit,
Prince William, Fairfax and Loudoun
Counties, VA, Comment Period Ends:
May 23, 2005, Contact: Ed Sundra
(804) 775–3338.
EIS No. 050132, Final EIS, BLM, CA,
West Mojave Plan, Habitat
Conservation Plan and Federal Land
Use Plan Amendment,
Implementation, California Desert
Conservation Area, Portions of San
Bernardino, Kern, Inyo, and Los
Angeles Counties, CA Wait Period
Ends: May 2, 2005, Contact: Alan
Stein (951) 697–5382.
EIS No. 050133, Draft EIS, AFS, OH,
Wayne National Forest, Proposed
Revised Land and Resource
Management Plan, Implementation,
Several Counties, OH, Comment
Period Ends: June 30, 2005, Contact:
Bob Gianniny (740) 753–0101.
EIS No. 050134, Draft EIS, AFS, ID, UT,
WY, Caribou Travel Plan Revision,
Determine the Motorized Road and
Trail System, Implementation,
Caribou-Targhee National Forest,
Westside, Soda Spring and
Montpelier Ranger Districts, Bannock,
Bear River, Bonneville, Caribou,
Franklin, Oneida and Power Counties,
ID; Box Elder and Cache Counties, UT
and Lincoln County, WY, Comment
Period Ends: May 16, 2005, Contact:
Deb Tiller (208) 524–7500.
EIS No. 050135, Draft Supplement, COE,
FL, Herbert Hoover Dike Major
Rehabilitation Evaluation Study,
Proposed to Reduce the Probability of
a Breach of Reach One, Lake
Okeechobee, Martin and Palm Beach
Counties, FL, Comment Period Ends:
May 16, 2005, Contact: Rebecca Weiss
(904) 232–1577.
EIS No. 050136, Draft EIS, AFS, CO, Dry
Fork Federal Coal Lease-byApplication (COC–67232), Leasing
Additional Federal Coal Lands for
Underground Coal Resource, SpecialUse-Permits and U.S. Army COE
Section 404 Permit, Grand Mesa,
Uncompahgre and Gunnison National
Forests, Gunnison County, CO,
Comment Period Ends: May 16, 2005,
Contact: Liane Mattson (970) 844–
6697.
EIS No. 050137, Draft EIS, AFS, VT,
Green Mountain National Forest,
Propose Revised Land and Resource
Management Plan, Implementation,
Forest Plan Revision, Addison,
Bennington, Rutland, Washington,
Windham and Windsor Counties, VT,
Comment Period Ends: June 30, 2005,
Contact: Jay Strand (802) 767–4261.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
16815
EIS No. 050138, Draft Supplement, NIH,
MA, National Emerging Infectious
Disease Laboratories, Additional
Information on Two Alternatives,
Construction of National
Biocontainment Laboratory,
BioSquare Research Park, Boston
University Medical Center Campus,
Boston, MA, Comment Period Ends:
May 18, 2005, Contact: Valerie
Nottingham (301) 496–7775.
Amended Notices
EIS No. 050063, Final EIS, AFS, UT,
Monticello and Blanding Municipal
Watershed Improvement Projects,
Implementation, Manti-La Sal
National Forest, Monticello Ranger
District, San Juan County, UT, Due:
March 21, 2005, Contact: Greg T.
Montgomery (435) 636–3348.
Published FR—02–18–05—Retracted
due to noncompliance of Section
1506.9 of the Council on
Environmental Quality Regulations.
EIS No. 050111, Draft EIS, AFS, CA,
Power Fire Restoration Project, To
Reduce Long-Term Fuel Loading for
the Purpose of Reducing Future
Severity and Resistance to Control,
Amador Ranger District, Eldorado
National Forest, Amador County, CA,
Comment Period Ends: May 9, 2005,
Contact: Patricia Ferrell (530) 642–
5146. Revision of FR Notice Published
on 3/25/2005: Correction to CEQ
Comment Period from March 9, 2005
to May 9, 2005.
Dated: March 29, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–6490 Filed 3–31–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6662–1]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under Section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
(202) 564–7146.
E:\FR\FM\01APN1.SGM
01APN1
Agencies
[Federal Register Volume 70, Number 62 (Friday, April 1, 2005)]
[Notices]
[Page 16815]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-6490]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6661-9]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements filed March 21, 2005,
through March 25, 2005, pursuant to 40 CFR 1506.9.
EIS No.050128, Draft EIS, AFS, ID, Porcupine East, 9 Allotment Grazing
Analysis Project, Authorizing Livestock Grazing, Caribou-Targhee
National Forest, Dubois Ranger District, Cenntenial Mountains, Clark
County, ID, Comment Period Ends: May 9, 2005, Contact: Shane Q.
Jacobson (208) 374-5422. The above NOA EIS should have appeared in the
03/25/2005 Federal Register. The 45-Day Comment Period is Calculated
from 03/25/2005.
EIS No. 050129, Final EIS, AFS, UT, Duck Creek Fuels Treatment
Analysis, To Reduce Fuels, Enhance Fire-Tolerant Vegetation and Provide
Fuel Breaks, Dixie National Forest, Cedar City Ranger District, Kane
County, UT, Wait Period Ends: May 2, 2005, Contact: David Swank (435)
865-3700.
EIS No. 050130, Final EIS, AFS, WI, Lakewood/Laona Plantation Thinning
Project, To Implement Vegetation Management Activities, Chequamegon-
Nicolet National Forest, Lakewood Ranger District, Forest, Langlade and
Oconto Counties, WI, Wait Period Ends: May 2, 2005, Contact: Anne F.
Archie (715) 362-1300.
EIS No. 050131, Draft EIS, FHW, VA, Tri-County Parkway Location Study,
Construction of a New North-South Transportation Link to Connect the
City of Manassas with I-66, Funding and U.S. COE Section 404 Permit,
Prince William, Fairfax and Loudoun Counties, VA, Comment Period Ends:
May 23, 2005, Contact: Ed Sundra (804) 775-3338.
EIS No. 050132, Final EIS, BLM, CA, West Mojave Plan, Habitat
Conservation Plan and Federal Land Use Plan Amendment, Implementation,
California Desert Conservation Area, Portions of San Bernardino, Kern,
Inyo, and Los Angeles Counties, CA Wait Period Ends: May 2, 2005,
Contact: Alan Stein (951) 697-5382.
EIS No. 050133, Draft EIS, AFS, OH, Wayne National Forest, Proposed
Revised Land and Resource Management Plan, Implementation, Several
Counties, OH, Comment Period Ends: June 30, 2005, Contact: Bob Gianniny
(740) 753-0101.
EIS No. 050134, Draft EIS, AFS, ID, UT, WY, Caribou Travel Plan
Revision, Determine the Motorized Road and Trail System,
Implementation, Caribou-Targhee National Forest, Westside, Soda Spring
and Montpelier Ranger Districts, Bannock, Bear River, Bonneville,
Caribou, Franklin, Oneida and Power Counties, ID; Box Elder and Cache
Counties, UT and Lincoln County, WY, Comment Period Ends: May 16, 2005,
Contact: Deb Tiller (208) 524-7500.
EIS No. 050135, Draft Supplement, COE, FL, Herbert Hoover Dike Major
Rehabilitation Evaluation Study, Proposed to Reduce the Probability of
a Breach of Reach One, Lake Okeechobee, Martin and Palm Beach Counties,
FL, Comment Period Ends: May 16, 2005, Contact: Rebecca Weiss (904)
232-1577.
EIS No. 050136, Draft EIS, AFS, CO, Dry Fork Federal Coal Lease-by-
Application (COC-67232), Leasing Additional Federal Coal Lands for
Underground Coal Resource, Special-Use-Permits and U.S. Army COE
Section 404 Permit, Grand Mesa, Uncompahgre and Gunnison National
Forests, Gunnison County, CO, Comment Period Ends: May 16, 2005,
Contact: Liane Mattson (970) 844-6697.
EIS No. 050137, Draft EIS, AFS, VT, Green Mountain National Forest,
Propose Revised Land and Resource Management Plan, Implementation,
Forest Plan Revision, Addison, Bennington, Rutland, Washington, Windham
and Windsor Counties, VT, Comment Period Ends: June 30, 2005, Contact:
Jay Strand (802) 767-4261.
EIS No. 050138, Draft Supplement, NIH, MA, National Emerging Infectious
Disease Laboratories, Additional Information on Two Alternatives,
Construction of National Biocontainment Laboratory, BioSquare Research
Park, Boston University Medical Center Campus, Boston, MA, Comment
Period Ends: May 18, 2005, Contact: Valerie Nottingham (301) 496-7775.
Amended Notices
EIS No. 050063, Final EIS, AFS, UT, Monticello and Blanding Municipal
Watershed Improvement Projects, Implementation, Manti-La Sal National
Forest, Monticello Ranger District, San Juan County, UT, Due: March 21,
2005, Contact: Greg T. Montgomery (435) 636-3348. Published FR--02-18-
05--Retracted due to noncompliance of Section 1506.9 of the Council on
Environmental Quality Regulations.
EIS No. 050111, Draft EIS, AFS, CA, Power Fire Restoration Project, To
Reduce Long-Term Fuel Loading for the Purpose of Reducing Future
Severity and Resistance to Control, Amador Ranger District, Eldorado
National Forest, Amador County, CA, Comment Period Ends: May 9, 2005,
Contact: Patricia Ferrell (530) 642-5146. Revision of FR Notice
Published on 3/25/2005: Correction to CEQ Comment Period from March 9,
2005 to May 9, 2005.
Dated: March 29, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-6490 Filed 3-31-05; 8:45 am]
BILLING CODE 6560-50-P