CenterPoint Energy-Mississippi River Transmission Corporation; Notice of Compliance Filing, 16493 [E5-1433]

Download as PDF Federal Register / Vol. 70, No. 61 / Thursday, March 31, 2005 / Notices Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–1430 Filed 3–30–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission submitted a compliance filing pursuant to the Commission’s March 7, 2005 order in Docket No. CP04–334–001, 110 FERC ¶ 61,252 (2005). MRT states that it is revising the language of section 9 of its tariff’s General Terms and Conditions to authorize MRT to buy and sell gas to ensure fulfillment of its service obligations. MRT states that copies of the filing were served on parties on the official service list in the above-captioned proceeding. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed on or before the date as indicated below. Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Protest Date: 5 p.m. eastern time on April 8, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–1433 Filed 3–30–05; 8:45 am] [Docket No. CP04–334–002] CenterPoint Energy—Mississippi River Transmission Corporation; Notice of Compliance Filing BILLING CODE 6717–01–P March 24, 2005. Take notice that on March 15, 2005, CenterPoint Energy—Mississippi River Transmission Corporation (MRT) VerDate jul<14>2003 15:30 Mar 30, 2005 Jkt 205001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 16493 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP05–232–000] CenterPoint Energy Gas Transmission Company; Notice of Proposed Changes in FERC Gas Tariff March 24, 2005. Take notice that on March 18, 2005, CenterPoint Energy Gas Transmission Company (CEGT) tendered for filing as part of its FERC Gas Tariff, Sixth Revised Volume No. 1, the following revised tariff sheets to be effective May 1, 2005: Fifth Revised Sheet No. 17 Fifth Revised Sheet No. 18 Fifth Revised Sheet No. 19 Fifth Revised Sheet No. 31 Fifth Revised Sheet No. 32 CEGT states that the purpose of this filing is to adjust CEGT’s fuel percentages and Electric Power Costs Tracker pursuant to Sections 27 and 28 of its General Terms and Conditions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of § 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the E:\FR\FM\31MRN1.SGM 31MRN1

Agencies

[Federal Register Volume 70, Number 61 (Thursday, March 31, 2005)]
[Notices]
[Page 16493]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1433]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP04-334-002]


CenterPoint Energy--Mississippi River Transmission Corporation; 
Notice of Compliance Filing

March 24, 2005.
    Take notice that on March 15, 2005, CenterPoint Energy--Mississippi 
River Transmission Corporation (MRT) submitted a compliance filing 
pursuant to the Commission's March 7, 2005 order in Docket No. CP04-
334-001, 110 FERC ] 61,252 (2005).
    MRT states that it is revising the language of section 9 of its 
tariff's General Terms and Conditions to authorize MRT to buy and sell 
gas to ensure fulfillment of its service obligations.
    MRT states that copies of the filing were served on parties on the 
official service list in the above-captioned proceeding.
    Any person desiring to protest this filing must file in accordance 
with Rule 211 of the Commission's Rules of Practice and Procedure (18 
CFR 385.211). Protests to this filing will be considered by the 
Commission in determining the appropriate action to be taken, but will 
not serve to make protestants parties to the proceeding. Such protests 
must be filed on or before the date as indicated below. Anyone filing a 
protest must serve a copy of that document on all the parties to the 
proceeding.
    The Commission encourages electronic submission of protests in lieu 
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons 
unable to file electronically should submit an original and 14 copies 
of the protest to the Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Protest Date: 5 p.m. eastern time on April 8, 2005.

Magalie R. Salas,
Secretary.
[FR Doc. E5-1433 Filed 3-30-05; 8:45 am]
BILLING CODE 6717-01-P