Erie Boulevard Hydropower, L.P.; Notice of Settlement Agreement Accepted for Filing and Soliciting Comments, 16501-16502 [E5-1428]
Download as PDF
Federal Register / Vol. 70, No. 61 / Thursday, March 31, 2005 / Notices
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described
applications. A copy of the applications
may be obtained by agencies directly
from the Applicant. If an agency does
not file comments within the time
specified for filing comments, it will be
presumed to have no comments. One
copy of an agency’s comments must also
be sent to the Applicant’s
representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1421 Filed 3–30–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Settlement Agreement and
Soliciting Comments
March 22, 2005.
Take notice that the following
settlement agreement has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Settlement
Agreement.
b. Project Nos.: 2071–013; 2111–018;
and 935–053.
c. Date Filed: March 15, 2005.
d. Applicant: PacifiCorp.
e. Name of Projects: Yale
Hydroelectric Project (2071); Swift No. 1
Hydroelectric Project (2111); and
Merwin Hydroelectric Project (935).
f. Location: On the North Fork Lewis
River, in Cowlitz, Clark, and Skamania
County Washington. The Yale and
Merwin Projects occupy 84 and 142.15
acres, respectively, of Federal land
administered by the Bureau of Land
Management. The Swift No. 1 Project
occupies 63.25 acres of Federal land
administered by the Bureau of Land
Management and 229.00 acres of
Federal lands administered by the U.S.
Forest Service.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r) and Rule
VerDate jul<14>2003
15:30 Mar 30, 2005
Jkt 205001
602 of the Commission’s Rules of
Practice and Procedure, 18 CFR 385.602.
h. Applicant Contact: Frank C. Shrier,
Lead Project Manager, Hydro Licensing,
PacifiCorp, 825 NE. Multnomah Street,
Suite 1500, Portland, Oregon 97232;
Telephone (503) 813–6622.
i. FERC Contact: Jon Cofrancesco at
(202) 502–8951; or e-mail at
jon.cofrancesco@ferc.gov.
j. Deadline for filing comments: 20
days from the filing date. Reply
comments due 30 days from the filing
date.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Comments may be filed electronically
via the Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
k. PacifiCorp and American Rivers
have entered into an agreement for the
purpose of, under certain
circumstances, further enhancing
reservoir survival of salmonids in
addition to the measures in the
comprehensive settlement agreement
previously filed for the licensing
proceedings for these projects and the
Swift No. 2 Project (P–2213–011), in
December 2004. The agreement
concerns the evaluation of the causes of
reservoir mortality for salmonids and
the funding of appropriate improvement
measures to address reservoir mortality.
The parties request the Commission
accept the settlement agreement in its
license orders without material
modification.
l. A copy of the settlement agreement
is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll-
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
16501
free at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1422 Filed 3–30–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2539–003]
Erie Boulevard Hydropower, L.P.;
Notice of Settlement Agreement
Accepted for Filing and Soliciting
Comments
March 24, 2005.
Take notice that the following
settlement agreement has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Settlement
agreement.
b. Project No.: 2539–003.
c. Date Filed: March 9, 2005.
d. Applicant: Erie Boulevard
Hydropower, L.P.
e. Name of Project: School Street
Hydroelectric Project
f. Location: On the Mohawk River in
Albany and Saratoga county, New York.
The project does not occupy any Federal
or tribal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r) and Rule
602 of the Commission’s Rules of
Practice and Procedure, 18 CFR 385.602.
h. Applicant Contact: Jerry L. Sabattis,
Hydro Licensing Coordinator, Brascan
Power New York, 225 Greenfield
Parkway, Suite 201, Liverpool, NY
13088; Telephone (315) 413–2787; email—jerry.sabattis@brascanpower.com.
i. FERC Contact: Emily Carter at (202)
502–6512; or e-mail at
emily.carter@ferc.gov.
j. Deadline for filing comments on the
settlement is 20 days from the issuance
of this notice; reply comments are due
30 days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
E:\FR\FM\31MRN1.SGM
31MRN1
16502
Federal Register / Vol. 70, No. 61 / Thursday, March 31, 2005 / Notices
Comments may be filed electronically
via the Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
k. The Project Description:
The School Street Project consists of:
(1) A 1,280-foot-long and 16-foot-high
masonry gravity dam; (2) a reservoir
with a surface area of approximately 100
acres and a storage capacity of about 788
acre-feet; (3) a concrete, chute-type
spillway; (4) a 4,400-foot-long, 150-footwide, and 14-foot-deep diversion canal;
(5) a 170-foot by 78-foot powerhouse
located downstream from the dam
containing five generating units with a
combined capacity of 38.8 megawatts
(MW); and (6) appurtenant facilities.
l. Erie Boulevard Hydropower filed
the settlement agreement on March 9,
2005, on behalf of themselves and six
parties to resolve, among the signatories,
issues related to the pending application
for new major license for the School
Street Hydroelectric Project. The
settlement includes measures for run-ofriver operations, instream flows, aquatic
habitat, aesthetic flows, fish protection
and downstream passage, recreation,
cultural resources, monitoring and
evaluation, and coordination among the
parties. The parties request the
Commission accept the relevant
provisions of the settlement agreement
in its license orders without material
modification.
n. Copies of the settlement are
available for review in the Public
Reference Room at the Commission or
may be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. Copies are also
available for inspection and
reproduction at the address listed in
item ‘‘h’’.
o. Anyone may submit comments in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, .214. In determining the
appropriate action to take, the
Commission will consider all comments
filed. Any comments must be received
on or before the specified comment
date.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS’’ or
‘‘REPLY COMMENTS;’’ (2) set forth in
the heading the name of the applicant
and the project number (P–2539); (3)
VerDate jul<14>2003
15:30 Mar 30, 2005
Jkt 205001
furnish the name, address, and
telephone number of the person
commenting; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
settlement directly from the applicant.
A copy of all filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1428 Filed 3–30–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD05–3–000]
Promoting Regional Transmission
Planning and Expansion To Facilitate
Fuel Diversity Including Expanded
Uses of Coal-Fired Resources;
Supplemental Notice of Technical
Conference
to nominate themselves as speakers
should do so using this electronic link:
https://www.ferc.gov/whats-new/
registration/coal-05-13-speakerform.asp. Such nominations must be
made before the close of business
Friday, April 1, 2005, so that a final
agenda for the technical conference can
be drafted and published.
Although registration is not a strict
requirement, in-person attendees are
asked to register for the conference online by close of business on May 10,
2005 at https://www.ferc.gov/whats-new/
registration/coal-05-13-form.asp.
Transcripts of the conference will be
immediately available from Ace
Reporting Company (202–347–3700 or
1–800–266–6646) for a fee. They will be
available for the public on the
Commission’s eLibrary system and on
the calendar page posting for this event
seven calendar days after FERC receives
the transcript. Additionally, Capitol
Connection offers the opportunity for
remote listening of the conference via
Real Audio or a Phone Bridge
Connection for a fee. Persons interested
in making arrangements should contact
David Reininger or Julia Morelli at
Capitol Connection (703–933–3100) as
soon as possible or visit the Capitol
Connection Web site at https://
www.capitolconnection.org and click on
‘‘FERC.’’
For additional information, please
contact Sarah McKinley at 202–502–
8004, sarah.mckinley@ferc.gov.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1417 Filed 3–30–05; 8:45 am]
BILLING CODE 6717–01–P
March 21, 2005.
As announced in a Notice of
Technical Conference issued on
February 16, 2005 in the above
referenced proceedings, a technical
conference will be held on Friday, May
13, 2005, to identify regional solutions
to promoting regional transmission
planning, expansion and enhancement
to facilitate fuel diversity including
increased integration of coal-fired
resources to the transmission grid. The
conference will be held at the
Charleston Marriott Town Center, 200
Lee Street East, Charleston, West
Virginia 25301. Take note that the
conference is now scheduled to begin at
8:30 a.m. (instead of 9 a.m.) and end at
approximately 5 p.m. (EDT). The
Commissioners will attend and
participate.
A proposed agenda is attached. The
Commission is now soliciting
nominations for speakers at the
technical conference. Persons wishing
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. AD05–5–000 and PL03–1–000]
Transmission Independence and
Investment and Pricing Policy for
Efficient Operation and Expansion of
the Transmission Grid; Notice of
Technical Conference
March 21, 2005.
Take notice that on April 22, 2005,
the Federal Energy Regulatory
Commission will hold a technical
conference to examine impediments to
investment in electric transmission
infrastructure and explore potential
solutions—including the formation of
new business models as well as
appropriate ratemaking policies that
would encourage new investment in
transmission. The technical conference
E:\FR\FM\31MRN1.SGM
31MRN1
Agencies
[Federal Register Volume 70, Number 61 (Thursday, March 31, 2005)]
[Notices]
[Pages 16501-16502]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1428]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2539-003]
Erie Boulevard Hydropower, L.P.; Notice of Settlement Agreement
Accepted for Filing and Soliciting Comments
March 24, 2005.
Take notice that the following settlement agreement has been filed
with the Commission and is available for public inspection.
a. Type of Application: Settlement agreement.
b. Project No.: 2539-003.
c. Date Filed: March 9, 2005.
d. Applicant: Erie Boulevard Hydropower, L.P.
e. Name of Project: School Street Hydroelectric Project
f. Location: On the Mohawk River in Albany and Saratoga county, New
York. The project does not occupy any Federal or tribal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r)
and Rule 602 of the Commission's Rules of Practice and Procedure, 18
CFR 385.602.
h. Applicant Contact: Jerry L. Sabattis, Hydro Licensing
Coordinator, Brascan Power New York, 225 Greenfield Parkway, Suite 201,
Liverpool, NY 13088; Telephone (315) 413-2787; e-mail_
jerry.sabattis@brascanpower.com.
i. FERC Contact: Emily Carter at (202) 502-6512; or e-mail at
emily.carter@ferc.gov.
j. Deadline for filing comments on the settlement is 20 days from
the issuance of this notice; reply comments are due 30 days from the
issuance date of this notice.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
[[Page 16502]]
Comments may be filed electronically via the Internet in lieu of
paper. The Commission strongly encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov) under the ``e-Filing'' link.
k. The Project Description:
The School Street Project consists of: (1) A 1,280-foot-long and
16-foot-high masonry gravity dam; (2) a reservoir with a surface area
of approximately 100 acres and a storage capacity of about 788 acre-
feet; (3) a concrete, chute-type spillway; (4) a 4,400-foot-long, 150-
foot-wide, and 14-foot-deep diversion canal; (5) a 170-foot by 78-foot
powerhouse located downstream from the dam containing five generating
units with a combined capacity of 38.8 megawatts (MW); and (6)
appurtenant facilities.
l. Erie Boulevard Hydropower filed the settlement agreement on
March 9, 2005, on behalf of themselves and six parties to resolve,
among the signatories, issues related to the pending application for
new major license for the School Street Hydroelectric Project. The
settlement includes measures for run-of-river operations, instream
flows, aquatic habitat, aesthetic flows, fish protection and downstream
passage, recreation, cultural resources, monitoring and evaluation, and
coordination among the parties. The parties request the Commission
accept the relevant provisions of the settlement agreement in its
license orders without material modification.
n. Copies of the settlement are available for review in the Public
Reference Room at the Commission or may be viewed on the Commission's
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number, excluding the last three digits in the docket number
field, to access the document. For assistance, contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676,
or for TTY, (202) 502-8659. Copies are also available for inspection
and reproduction at the address listed in item ``h''.
o. Anyone may submit comments in accordance with the requirements
of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In
determining the appropriate action to take, the Commission will
consider all comments filed. Any comments must be received on or before
the specified comment date.
All filings must (1) bear in all capital letters the title
``COMMENTS'' or ``REPLY COMMENTS;'' (2) set forth in the heading the
name of the applicant and the project number (P-2539); (3) furnish the
name, address, and telephone number of the person commenting; and (4)
otherwise comply with the requirements of 18 CFR 385.2001 through
385.2005. All comments must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may
obtain copies of the settlement directly from the applicant. A copy of
all filings in reference to this application must be accompanied by
proof of service on all persons listed in the service list prepared by
the Commission in this proceeding, in accordance with 18 CFR 4.34(b)
and 385.2010.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Magalie R. Salas,
Secretary.
[FR Doc. E5-1428 Filed 3-30-05; 8:45 am]
BILLING CODE 6717-01-P