Columbia Gas Transmission Corporation; Notice of Refund Report, 16494 [E5-1423]
Download as PDF
16494
Federal Register / Vol. 70, No. 61 / Thursday, March 31, 2005 / Notices
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1431 Filed 3–30–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP95–408–062]
Columbia Gas Transmission
Corporation; Notice of Refund Report
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Protest Date: 5 p.m. eastern time on
March 31, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1423 Filed 3–30–05; 8:45 am]
BILLING CODE 6717–01–P
March 24, 2005.
Take notice that on March 17, 2005,
Columbia Gas Transmission Corporation
(Columbia) tendered for filing its final
true-up report to comply with the
November 22, 1996 Offer of Settlement
(Settlement) approved by the
Commission on April 17, 1997 in
Docket Nos. RP95–408–013, et al.,
Columbia Gas Transmission
Corporation, 97 FERC ¶ 61,044 (1997).
Columbia states that the Settlement
permitted Columbia to reflect in its base
rates a settlement component to be
collected from firm transportation
customers for the ‘‘period beginning
November 1, 1996 and ending October
31, 2004.’’ Columbia further explains
that, in accordance with the settlement’s
true-up mechanism, Columbia is hereby
providing a final true-up of the revenues
collected by Columbia during the
twelve-month period ending October 31,
2004.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
the date as indicated below. Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
VerDate jul<14>2003
15:30 Mar 30, 2005
Jkt 205001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER05–534–000]
Eastern Desert Power LLC; Notice of
Issuance of Order
March 24, 2005.
Eastern Desert Power LLC (Eastern
Desert) filed an application for marketbased rate authority, with an
accompanying tariff. The proposed tariff
provides for wholesale sales of energy,
capacity and ancillary services at
market-based rates. Eastern Desert also
requested waiver of various Commission
regulations. In particular, Eastern Desert
requested that the Commission grant
blanket approval under 18 CFR part 34
of all future issuances of securities and
assumptions of liability by Eastern
Desert.
On March 23, 2005, the Commission
granted the request for blanket approval
under part 34, subject to the following:
Any person desiring to be heard or to
protest the blanket approval of
issuances of securities or assumptions of
liability by Eastern Desert should file a
motion to intervene or protest with the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure. 18 CFR 385.211,
385.214 (2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest, is April 22, 2005.
Absent a request to be heard in
opposition by the deadline above,
Eastern Desert is authorized to issue
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
securities and assume obligations or
liabilities as a guarantor, indorser,
surety, or otherwise in respect of any
security of another person; provided
that such issuance or assumption is for
some lawful object within the corporate
purposes of Eastern Desert, compatible
with the public interest, and is
reasonably necessary or appropriate for
such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approval of Eastern Desert’s issuances of
securities or assumptions of liability.
Copies of the full text of the
Commission’s Order are available from
the Commission’s Public Reference
Room, 888 First Street, NE.,
Washington, DC 20426. The Order may
also be viewed on the Commission’s
Web site at https://www.ferc.gov, using
the eLibrary link. Enter the docket
number excluding the last three digits in
the docket number filed to access the
document. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1426 Filed 3–30–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER05–487–000]
FPL Energy Cowboy Wind, LLC; Notice
of Issuance of Order
March 24, 2005.
FPL Energy Cowboy Wind, LLC (FPL
Cowboy) filed an application for marketbased rate authority, with an
accompanying tariff. The proposed tariff
provides for wholesale sales of energy,
capacity and ancillary services at
market-based rates. FPL Cowboy also
requested waiver of various Commission
regulations. In particular, FPL Cowboy
requested that the Commission grant
blanket approval under 18 CFR part 34
of all future issuances of securities and
assumptions of liability by FPL Cowboy.
On March 23, 2005, the Commission
granted the request for blanket approval
under part 34, subject to the following:
Any person desiring to be heard or to
protest the blanket approval of
E:\FR\FM\31MRN1.SGM
31MRN1
Agencies
[Federal Register Volume 70, Number 61 (Thursday, March 31, 2005)]
[Notices]
[Page 16494]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1423]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP95-408-062]
Columbia Gas Transmission Corporation; Notice of Refund Report
March 24, 2005.
Take notice that on March 17, 2005, Columbia Gas Transmission
Corporation (Columbia) tendered for filing its final true-up report to
comply with the November 22, 1996 Offer of Settlement (Settlement)
approved by the Commission on April 17, 1997 in Docket Nos. RP95-408-
013, et al., Columbia Gas Transmission Corporation, 97 FERC ] 61,044
(1997).
Columbia states that the Settlement permitted Columbia to reflect
in its base rates a settlement component to be collected from firm
transportation customers for the ``period beginning November 1, 1996
and ending October 31, 2004.'' Columbia further explains that, in
accordance with the settlement's true-up mechanism, Columbia is hereby
providing a final true-up of the revenues collected by Columbia during
the twelve-month period ending October 31, 2004.
Any person desiring to protest this filing must file in accordance
with Rule 211 of the Commission's Rules of Practice and Procedure (18
CFR 385.211). Protests to this filing will be considered by the
Commission in determining the appropriate action to be taken, but will
not serve to make protestants parties to the proceeding. Such protests
must be filed on or before the date as indicated below. Anyone filing a
protest must serve a copy of that document on all the parties to the
proceeding.
The Commission encourages electronic submission of protests in lieu
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons
unable to file electronically should submit an original and 14 copies
of the protest to the Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Protest Date: 5 p.m. eastern time on March 31, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5-1423 Filed 3-30-05; 8:45 am]
BILLING CODE 6717-01-P