Notice of Settlement Agreement and Soliciting Comments, 16501 [E5-1422]
Download as PDF
Federal Register / Vol. 70, No. 61 / Thursday, March 31, 2005 / Notices
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described
applications. A copy of the applications
may be obtained by agencies directly
from the Applicant. If an agency does
not file comments within the time
specified for filing comments, it will be
presumed to have no comments. One
copy of an agency’s comments must also
be sent to the Applicant’s
representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1421 Filed 3–30–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Settlement Agreement and
Soliciting Comments
March 22, 2005.
Take notice that the following
settlement agreement has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Settlement
Agreement.
b. Project Nos.: 2071–013; 2111–018;
and 935–053.
c. Date Filed: March 15, 2005.
d. Applicant: PacifiCorp.
e. Name of Projects: Yale
Hydroelectric Project (2071); Swift No. 1
Hydroelectric Project (2111); and
Merwin Hydroelectric Project (935).
f. Location: On the North Fork Lewis
River, in Cowlitz, Clark, and Skamania
County Washington. The Yale and
Merwin Projects occupy 84 and 142.15
acres, respectively, of Federal land
administered by the Bureau of Land
Management. The Swift No. 1 Project
occupies 63.25 acres of Federal land
administered by the Bureau of Land
Management and 229.00 acres of
Federal lands administered by the U.S.
Forest Service.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r) and Rule
VerDate jul<14>2003
15:30 Mar 30, 2005
Jkt 205001
602 of the Commission’s Rules of
Practice and Procedure, 18 CFR 385.602.
h. Applicant Contact: Frank C. Shrier,
Lead Project Manager, Hydro Licensing,
PacifiCorp, 825 NE. Multnomah Street,
Suite 1500, Portland, Oregon 97232;
Telephone (503) 813–6622.
i. FERC Contact: Jon Cofrancesco at
(202) 502–8951; or e-mail at
jon.cofrancesco@ferc.gov.
j. Deadline for filing comments: 20
days from the filing date. Reply
comments due 30 days from the filing
date.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Comments may be filed electronically
via the Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
k. PacifiCorp and American Rivers
have entered into an agreement for the
purpose of, under certain
circumstances, further enhancing
reservoir survival of salmonids in
addition to the measures in the
comprehensive settlement agreement
previously filed for the licensing
proceedings for these projects and the
Swift No. 2 Project (P–2213–011), in
December 2004. The agreement
concerns the evaluation of the causes of
reservoir mortality for salmonids and
the funding of appropriate improvement
measures to address reservoir mortality.
The parties request the Commission
accept the settlement agreement in its
license orders without material
modification.
l. A copy of the settlement agreement
is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll-
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
16501
free at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Magalie R. Salas,
Secretary.
[FR Doc. E5–1422 Filed 3–30–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2539–003]
Erie Boulevard Hydropower, L.P.;
Notice of Settlement Agreement
Accepted for Filing and Soliciting
Comments
March 24, 2005.
Take notice that the following
settlement agreement has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Settlement
agreement.
b. Project No.: 2539–003.
c. Date Filed: March 9, 2005.
d. Applicant: Erie Boulevard
Hydropower, L.P.
e. Name of Project: School Street
Hydroelectric Project
f. Location: On the Mohawk River in
Albany and Saratoga county, New York.
The project does not occupy any Federal
or tribal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r) and Rule
602 of the Commission’s Rules of
Practice and Procedure, 18 CFR 385.602.
h. Applicant Contact: Jerry L. Sabattis,
Hydro Licensing Coordinator, Brascan
Power New York, 225 Greenfield
Parkway, Suite 201, Liverpool, NY
13088; Telephone (315) 413–2787; email—jerry.sabattis@brascanpower.com.
i. FERC Contact: Emily Carter at (202)
502–6512; or e-mail at
emily.carter@ferc.gov.
j. Deadline for filing comments on the
settlement is 20 days from the issuance
of this notice; reply comments are due
30 days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
E:\FR\FM\31MRN1.SGM
31MRN1
Agencies
[Federal Register Volume 70, Number 61 (Thursday, March 31, 2005)]
[Notices]
[Page 16501]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1422]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Settlement Agreement and Soliciting Comments
March 22, 2005.
Take notice that the following settlement agreement has been filed
with the Commission and is available for public inspection.
a. Type of Application: Settlement Agreement.
b. Project Nos.: 2071-013; 2111-018; and 935-053.
c. Date Filed: March 15, 2005.
d. Applicant: PacifiCorp.
e. Name of Projects: Yale Hydroelectric Project (2071); Swift No. 1
Hydroelectric Project (2111); and Merwin Hydroelectric Project (935).
f. Location: On the North Fork Lewis River, in Cowlitz, Clark, and
Skamania County Washington. The Yale and Merwin Projects occupy 84 and
142.15 acres, respectively, of Federal land administered by the Bureau
of Land Management. The Swift No. 1 Project occupies 63.25 acres of
Federal land administered by the Bureau of Land Management and 229.00
acres of Federal lands administered by the U.S. Forest Service.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r)
and Rule 602 of the Commission's Rules of Practice and Procedure, 18
CFR 385.602.
h. Applicant Contact: Frank C. Shrier, Lead Project Manager, Hydro
Licensing, PacifiCorp, 825 NE. Multnomah Street, Suite 1500, Portland,
Oregon 97232; Telephone (503) 813-6622.
i. FERC Contact: Jon Cofrancesco at (202) 502-8951; or e-mail at
jon.cofrancesco@ferc.gov.
j. Deadline for filing comments: 20 days from the filing date.
Reply comments due 30 days from the filing date.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Comments may be filed electronically via the Internet in lieu of
paper. The Commission strongly encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov) under the ``e-Filing'' link.
k. PacifiCorp and American Rivers have entered into an agreement
for the purpose of, under certain circumstances, further enhancing
reservoir survival of salmonids in addition to the measures in the
comprehensive settlement agreement previously filed for the licensing
proceedings for these projects and the Swift No. 2 Project (P-2213-
011), in December 2004. The agreement concerns the evaluation of the
causes of reservoir mortality for salmonids and the funding of
appropriate improvement measures to address reservoir mortality. The
parties request the Commission accept the settlement agreement in its
license orders without material modification.
l. A copy of the settlement agreement is available for review at
the Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Magalie R. Salas,
Secretary.
[FR Doc. E5-1422 Filed 3-30-05; 8:45 am]
BILLING CODE 6717-01-P