Drawbridge Operation Regulations: Housatonic River, CT, 16113 [05-6309]
Download as PDF
Federal Register / Vol. 70, No. 60 / Wednesday, March 30, 2005 / Rules and Regulations
approved the information collection
requirements contained in § 408.932(c),
(d) and (e) of these final rules. The OMB
control number for this collection is
0960–0692, expiring November 30,
2007.
(Catalog of Federal Domestic Assistance
Program Nos. 96.001, Social Security—
Disability Insurance; 96.002, Social
Security—Retirement Insurance; 96.004,
Social Security—Survivors Insurance;
96.006, Supplemental Security Income; and
96.020, Special Benefits for Certain World
War II Veterans)
List of Subjects
20 CFR Part 404
Administrative practice and
procedure, Blind, Disability benefits,
Old-Age, Survivors and Disability
Insurance; Reporting and recordkeeping
requirements, Social Security.
20 CFR Part 408
Administrative practice and
procedure, Aged; Reporting and
recordkeeping requirements, Social
Security; Special Veterans benefits,
Veterans.
20 CFR Part 416
Administrative practice and
procedure, Aged, Blind, Disability
benefits, Public assistance programs;
Reporting and recordkeeping
requirements, Supplemental Security
Income (SSI).
Dated: March 9, 2005.
Jo Anne B. Barnhart,
Commissioner of Social Security.
3.5, across the Housatonic River at
Stratford, Connecticut. Under this
temporary deviation only one of the
two-bascule leafs at the bridge need
open for the passage of vessel traffic
from April 1, 2005 through May 27,
2005. Two-leaf, full bridge openings,
will be provided upon three days
advance notice. This temporary
deviation is necessary to facilitate
rehabilitation repairs at the bridge.
DATES: This deviation is effective from
April 1, 2005 through May 27, 2005.
FOR FURTHER INFORMATION CONTACT: Judy
Leung-Yee, Project Officer, First Coast
Guard District, at (212) 668–7195.
SUPPLEMENTARY INFORMATION: The U.S. 1
Bridge has a vertical clearance in the
closed position of 32 feet at mean high
water and 37 feet at mean low water.
The existing drawbridge operation
regulations are listed at 33 CFR 117.207.
The bridge owner, Connecticut
Department of Transportation, requested
a temporary deviation from the
drawbridge operation regulations to
facilitate scheduled rehabilitation
maintenance at the bridge.
Under this temporary deviation only
one of the two-bascule leafs need open
for the passage of vessel traffic from
April 1, 2005 through May 27, 2005.
Two-leaf, full bridge openings, shall be
provided after at least a three-day
advance notice is given by calling the
number posted at the bridge.
This deviation from the operating
regulations is authorized under 33 CFR
117.35, and will be performed with all
due speed in order to return the bridge
to normal operation as soon as possible.
Accordingly, the final rules amending
20 CFR parts 404, 408 and 416 that were
published at 70 FR 11 on January 3, 2005, Dated: March 23, 2005.
Gary Kassof,
are adopted as final rules without
Bridge Program Manager, First Coast Guard
change.
I
[FR Doc. 05–6204 Filed 3–29–05; 8:45 am]
BILLING CODE 4191–02–P
District.
[FR Doc. 05–6309 Filed 3–29–05; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
Coast Guard
33 CFR Part 117
33 CFR Part 165
[CGD01–05–023]
[CGD05–05–021]
Drawbridge Operation Regulations:
Housatonic River, CT
RIN 1625–AA00
Coast Guard, DHS.
ACTION: Notice of temporary deviation
from regulations.
AGENCY:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the drawbridge operation
regulations for the U.S. 1 Bridge, mile
SUMMARY:
VerDate jul<14>2003
16:21 Mar 29, 2005
Jkt 205001
Safety Zone; National Cherry Blossom
Festival Fireworks Display, Potomac
River, Washington, DC
Coast Guard, DHS.
Temporary final rule.
AGENCY:
ACTION:
SUMMARY: The Coast Guard is
establishing a temporary safety zone on
PO 00000
Frm 00019
Fmt 4700
Sfmt 4700
16113
the Upper Potomac River in the
Washington Channel, Washington, DC.
This safety zone is necessary to provide
for the safety of life and property during
a fireworks display being held during
the annual National Cherry Blossom
Festival in Washington, DC. This safety
zone will restrict the movement of
vessel traffic in the immediate area of
the fireworks discharge site.
DATES: This rule is effective from 7 p.m.
to 9 p.m. eastern standard time on April
2, 2005, with a rain date of April 3,
2005.
ADDRESSES: Documents indicated in this
preamble as being available in the
docket are part of docket CGD05–05–
021 and are available for inspection or
copying at Commander, Coast Guard
Sector Baltimore, 2401 Hawkins Point
Road, Baltimore, Maryland 21226–1791,
between 8 a.m. and 3 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Mr.
Ronald L. Houck, Coast Guard Sector
Baltimore, at (410) 576–2674.
SUPPLEMENTARY INFORMATION:
Regulatory Information
We did not publish a notice of
proposed rulemaking (NPRM) for this
regulation. Under 5 U.S.C. 553(b)(B), the
Coast Guard finds that good cause exists
for not publishing an NPRM. Publishing
an NPRM and delaying its effective date
would be contrary to the public interest,
since there is not sufficient time to
publish a proposed rule in advance of
the event and immediate action is
needed to protect persons and vessels
against the hazards associated with a
fireworks display from a barge, such as
premature detonation or falling burning
debris.
Under 5 U.S.C. 553(d)(3), the Coast
Guard finds that good cause exists for
making this rule effective less than 30
days after publication in the Federal
Register. This safety zone of short
duration is needed to provide for the
safety of persons and vessels on the
Potomac River and the public at large.
Advance notification of the security
zone and the fireworks display will be
provided to the public via marine
information broadcasts and by local
media.
Background and Purpose
On April 2, 2005, the National Cherry
Blossom Festival will sponsor a
fireworks display from a barge on the
Washington Channel, in Washington,
DC, in approximate position latitude
38°52′08.5″ N, longitude 077°01′13.0″
W. The event will consist of an aerial
fireworks display of short duration. A
fleet of spectator vessels is anticipated.
E:\FR\FM\30MRR1.SGM
30MRR1
Agencies
[Federal Register Volume 70, Number 60 (Wednesday, March 30, 2005)]
[Rules and Regulations]
[Page 16113]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-6309]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD01-05-023]
Drawbridge Operation Regulations: Housatonic River, CT
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the drawbridge operation regulations for the
U.S. 1 Bridge, mile 3.5, across the Housatonic River at Stratford,
Connecticut. Under this temporary deviation only one of the two-bascule
leafs at the bridge need open for the passage of vessel traffic from
April 1, 2005 through May 27, 2005. Two-leaf, full bridge openings,
will be provided upon three days advance notice. This temporary
deviation is necessary to facilitate rehabilitation repairs at the
bridge.
DATES: This deviation is effective from April 1, 2005 through May 27,
2005.
FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First
Coast Guard District, at (212) 668-7195.
SUPPLEMENTARY INFORMATION: The U.S. 1 Bridge has a vertical clearance
in the closed position of 32 feet at mean high water and 37 feet at
mean low water. The existing drawbridge operation regulations are
listed at 33 CFR 117.207.
The bridge owner, Connecticut Department of Transportation,
requested a temporary deviation from the drawbridge operation
regulations to facilitate scheduled rehabilitation maintenance at the
bridge.
Under this temporary deviation only one of the two-bascule leafs
need open for the passage of vessel traffic from April 1, 2005 through
May 27, 2005. Two-leaf, full bridge openings, shall be provided after
at least a three-day advance notice is given by calling the number
posted at the bridge.
This deviation from the operating regulations is authorized under
33 CFR 117.35, and will be performed with all due speed in order to
return the bridge to normal operation as soon as possible.
Dated: March 23, 2005.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 05-6309 Filed 3-29-05; 8:45 am]
BILLING CODE 4910-15-P