Drawbridge Operation Regulations: Housatonic River, CT, 16113 [05-6309]

Download as PDF Federal Register / Vol. 70, No. 60 / Wednesday, March 30, 2005 / Rules and Regulations approved the information collection requirements contained in § 408.932(c), (d) and (e) of these final rules. The OMB control number for this collection is 0960–0692, expiring November 30, 2007. (Catalog of Federal Domestic Assistance Program Nos. 96.001, Social Security— Disability Insurance; 96.002, Social Security—Retirement Insurance; 96.004, Social Security—Survivors Insurance; 96.006, Supplemental Security Income; and 96.020, Special Benefits for Certain World War II Veterans) List of Subjects 20 CFR Part 404 Administrative practice and procedure, Blind, Disability benefits, Old-Age, Survivors and Disability Insurance; Reporting and recordkeeping requirements, Social Security. 20 CFR Part 408 Administrative practice and procedure, Aged; Reporting and recordkeeping requirements, Social Security; Special Veterans benefits, Veterans. 20 CFR Part 416 Administrative practice and procedure, Aged, Blind, Disability benefits, Public assistance programs; Reporting and recordkeeping requirements, Supplemental Security Income (SSI). Dated: March 9, 2005. Jo Anne B. Barnhart, Commissioner of Social Security. 3.5, across the Housatonic River at Stratford, Connecticut. Under this temporary deviation only one of the two-bascule leafs at the bridge need open for the passage of vessel traffic from April 1, 2005 through May 27, 2005. Two-leaf, full bridge openings, will be provided upon three days advance notice. This temporary deviation is necessary to facilitate rehabilitation repairs at the bridge. DATES: This deviation is effective from April 1, 2005 through May 27, 2005. FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First Coast Guard District, at (212) 668–7195. SUPPLEMENTARY INFORMATION: The U.S. 1 Bridge has a vertical clearance in the closed position of 32 feet at mean high water and 37 feet at mean low water. The existing drawbridge operation regulations are listed at 33 CFR 117.207. The bridge owner, Connecticut Department of Transportation, requested a temporary deviation from the drawbridge operation regulations to facilitate scheduled rehabilitation maintenance at the bridge. Under this temporary deviation only one of the two-bascule leafs need open for the passage of vessel traffic from April 1, 2005 through May 27, 2005. Two-leaf, full bridge openings, shall be provided after at least a three-day advance notice is given by calling the number posted at the bridge. This deviation from the operating regulations is authorized under 33 CFR 117.35, and will be performed with all due speed in order to return the bridge to normal operation as soon as possible. Accordingly, the final rules amending 20 CFR parts 404, 408 and 416 that were published at 70 FR 11 on January 3, 2005, Dated: March 23, 2005. Gary Kassof, are adopted as final rules without Bridge Program Manager, First Coast Guard change. I [FR Doc. 05–6204 Filed 3–29–05; 8:45 am] BILLING CODE 4191–02–P District. [FR Doc. 05–6309 Filed 3–29–05; 8:45 am] BILLING CODE 4910–15–P DEPARTMENT OF HOMELAND SECURITY DEPARTMENT OF HOMELAND SECURITY Coast Guard Coast Guard 33 CFR Part 117 33 CFR Part 165 [CGD01–05–023] [CGD05–05–021] Drawbridge Operation Regulations: Housatonic River, CT RIN 1625–AA00 Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. AGENCY: The Commander, First Coast Guard District, has issued a temporary deviation from the drawbridge operation regulations for the U.S. 1 Bridge, mile SUMMARY: VerDate jul<14>2003 16:21 Mar 29, 2005 Jkt 205001 Safety Zone; National Cherry Blossom Festival Fireworks Display, Potomac River, Washington, DC Coast Guard, DHS. Temporary final rule. AGENCY: ACTION: SUMMARY: The Coast Guard is establishing a temporary safety zone on PO 00000 Frm 00019 Fmt 4700 Sfmt 4700 16113 the Upper Potomac River in the Washington Channel, Washington, DC. This safety zone is necessary to provide for the safety of life and property during a fireworks display being held during the annual National Cherry Blossom Festival in Washington, DC. This safety zone will restrict the movement of vessel traffic in the immediate area of the fireworks discharge site. DATES: This rule is effective from 7 p.m. to 9 p.m. eastern standard time on April 2, 2005, with a rain date of April 3, 2005. ADDRESSES: Documents indicated in this preamble as being available in the docket are part of docket CGD05–05– 021 and are available for inspection or copying at Commander, Coast Guard Sector Baltimore, 2401 Hawkins Point Road, Baltimore, Maryland 21226–1791, between 8 a.m. and 3 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: Mr. Ronald L. Houck, Coast Guard Sector Baltimore, at (410) 576–2674. SUPPLEMENTARY INFORMATION: Regulatory Information We did not publish a notice of proposed rulemaking (NPRM) for this regulation. Under 5 U.S.C. 553(b)(B), the Coast Guard finds that good cause exists for not publishing an NPRM. Publishing an NPRM and delaying its effective date would be contrary to the public interest, since there is not sufficient time to publish a proposed rule in advance of the event and immediate action is needed to protect persons and vessels against the hazards associated with a fireworks display from a barge, such as premature detonation or falling burning debris. Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good cause exists for making this rule effective less than 30 days after publication in the Federal Register. This safety zone of short duration is needed to provide for the safety of persons and vessels on the Potomac River and the public at large. Advance notification of the security zone and the fireworks display will be provided to the public via marine information broadcasts and by local media. Background and Purpose On April 2, 2005, the National Cherry Blossom Festival will sponsor a fireworks display from a barge on the Washington Channel, in Washington, DC, in approximate position latitude 38°52′08.5″ N, longitude 077°01′13.0″ W. The event will consist of an aerial fireworks display of short duration. A fleet of spectator vessels is anticipated. E:\FR\FM\30MRR1.SGM 30MRR1

Agencies

[Federal Register Volume 70, Number 60 (Wednesday, March 30, 2005)]
[Rules and Regulations]
[Page 16113]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-6309]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[CGD01-05-023]


Drawbridge Operation Regulations: Housatonic River, CT

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, First Coast Guard District, has issued a 
temporary deviation from the drawbridge operation regulations for the 
U.S. 1 Bridge, mile 3.5, across the Housatonic River at Stratford, 
Connecticut. Under this temporary deviation only one of the two-bascule 
leafs at the bridge need open for the passage of vessel traffic from 
April 1, 2005 through May 27, 2005. Two-leaf, full bridge openings, 
will be provided upon three days advance notice. This temporary 
deviation is necessary to facilitate rehabilitation repairs at the 
bridge.

DATES: This deviation is effective from April 1, 2005 through May 27, 
2005.

FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First 
Coast Guard District, at (212) 668-7195.

SUPPLEMENTARY INFORMATION: The U.S. 1 Bridge has a vertical clearance 
in the closed position of 32 feet at mean high water and 37 feet at 
mean low water. The existing drawbridge operation regulations are 
listed at 33 CFR 117.207.
    The bridge owner, Connecticut Department of Transportation, 
requested a temporary deviation from the drawbridge operation 
regulations to facilitate scheduled rehabilitation maintenance at the 
bridge.
    Under this temporary deviation only one of the two-bascule leafs 
need open for the passage of vessel traffic from April 1, 2005 through 
May 27, 2005. Two-leaf, full bridge openings, shall be provided after 
at least a three-day advance notice is given by calling the number 
posted at the bridge.
    This deviation from the operating regulations is authorized under 
33 CFR 117.35, and will be performed with all due speed in order to 
return the bridge to normal operation as soon as possible.

    Dated: March 23, 2005.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 05-6309 Filed 3-29-05; 8:45 am]