Environmental Impact Statements; Notice of Availability, 15315-15316 [05-5933]
Download as PDF
Federal Register / Vol. 70, No. 57 / Friday, March 25, 2005 / Notices
ERP No. DS–NPS–K65325–CA Rating
LO, Merced Wild and Scenic River
Revised Comprehensive Management
Plan, Amend and Supplement
Information, Yosemite National Park, El
Portal Administrative Site, Tuolume,
Merced, Mono, Mariposa and Madera
Counties, CA.
Summary: EPA has no objections to
the preferred alternative.
However, EPA requests that the Park
Service consider additional protection
measures for the exceptional cultural
resources in El Portal when delineating
and zoning the river boundary.
Final EISs
ERP No. F–AFS–E65069–AL, Longleaf
Ecosystem Restoration Project, Proposes
a Five-Year Project to Begin Restoration
of Native Longleaf, Talladega National
Forest, Oakmulgee District, Tuscaloosa,
Hale, Bibbs, and Perry Counties, AL.
Summary: EPA supports the Forest
Service in its efforts to restore the
longleaf pine ecosystem and enhance
red-cockade woodpecker habitat, and
has no objections to this project.
ERP No. F–AFS–J65410–WY, Upper
Green River Area Rangeland Project,
Propose Site Specific Grazing
Management Practices, Bridger-Teton
Forest, Sublette, Teton and Fremont
Counties, WY.
Summary: The Final EIS was not
responsive to EPA’s comments on the
Draft EIS. EPA continues to express
environmental concerns with potential
adverse impacts to water quality,
aquatic resources, and riparian areas
from livestock grazing.
ERP No. F–DOI–K99033–00,
Programmatic EIS—Lower Colorado
River Multi-Species Conservation
Program, Issuing a Incidental Take
Permit based on the Plan, Extending
from Lake Mead to the Southerly
International Boundary with Mexico,
AZ, NV and CA.
Summary: EPA’s concerns have been
addressed; therefore, EPA has no
objection to the action as proposed.
ERP No. F–FHW–F40382–MN, Ayd
Mill Road Corridor, Improvements from
I–35 E to St. Anthony Avenue (I–94) 2.6
kilometer (1.6 miles), Funding, City of
Saint Paul, Ramsey County, MN.
Summary: EPA’s concerns regarding
mitigation to protect surface water
quality have been satisfactorily
addressed; therefore, EPA has no
objection to the action as proposed.
ERP No. F–NAS–K11114–HI,
Outrigger Telescopes Project, Proposed
for the W.M. Keck Observatory Site
within the Mauna Kea Science Reserve,
Funding, Construction, Installation and
Operation, Island of Hawaii.
VerDate jul<14>2003
16:11 Mar 24, 2005
Jkt 205001
Summary: EPA expressed continuing
concerns about potential impacts to
cultural resources.
Dated: March 22, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–5934 Filed 3–24–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6661–7]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements filed March 14, 2005,
through March 18, 2005, pursuant to
40 CFR 1506.9.
EIS No. 050110, Draft EIS, AFS, CA,
Freds Fire Restoration Project, To
Reduce Long-Term Fuel Loading for
the Purpose of Reducing Future Fire
Severity and Resistance to Control,
Eldorado National Forest, El Dorado
County, CA, Comment Period Ends:
May 9, 2005, Contact: Laura
Hierholzer (530) 647–5382.
EIS No. 050111, Draft EIS, AFS, CA,
Power Fire Restoration Project, To
Reduce Long-Term Fuel Loading for
the Purpose of Reducing Future
Severity and Resistance to Control,
Amador Ranger District, Eldorado
National Forest, Amador County, CA,
Comment Period Ends: March 9, 2005,
Contact: Patricia Ferrell (530) 642–
5146.
EIS No. 050112, Final EIS, AFS, WY,
Woodrock Project, Proposal for
Timber Sale, Travel Management and
Watershed Restoration,
Implementation, Bighorn National
Forest, Tongue Ranger District,
Sheridan County, WY, Wait Period
Ends: April 25, 2005, Contact: Scott
Hill (307) 674–2600.
EIS No. 050113, Draft EIS, BLM, NV,
Sloan Canyon National Conservation
Area, Resource Management Plan,
Implementation, Cities of Las Vegas
and Henderson, Clark County, NV,
Comment Period Ends: June 23, 2005,
Contact: Charles Carroll (702) 515–
5291.
EIS No. 050114, Draft EIS, AFS, IN,
Hoosier National Forest Land and
Resource Management Plan,
Implementation, Brown, Crawford,
Dubois, Jackson, Lawrence, Martin,
Monroe, Orange, Perry Counties, IN,
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
15315
Comment Period Ends: June 23, 2005,
Contact: Judi Perez (812) 275–5987.
EIS No. 050115, Final Supplement,
NRC, AL, Generic EIS—License
Renewal of Nuclear Plants, Joseph M.
Farley Nuclear Plants, Units 1 and 2,
Supplemental 18 to NUREG–1437
(TAC Nos. MCO768 and MCO769),
Houston County, AL, Wait Period
Ends: April 25, 2005, Contact: Jack
Cushing (301) 415–1424.
EIS No. 050116, Draft EIS, COE,
Programmatic—Lower Colorado River
Basin Study, Provide Flood Damage
Reduction and Ecosystem Restoration,
Colorado River, TX, Comment Period
Ends: May 9, 2005, Contact: Rob
Newman (817) 886–1762.
EIS No. 050117, Draft EIS, BLM, NV,
Emigrant Mine Project, Develop and
Operate an Open Pit Mine, Construct
a Waste Rock Disposal Facility, South
of Carlin in Elko County, NV,
Comment Period Ends: May 24, 2005,
Contact: Tom Schmidt (775) 753–
0200.
EIS No. 050118, Draft EIS, AFS, MI,
Ottawa National Forest, Proposed
Land and Resource Management Plan,
Forest Plan Revision, Implementation,
Baraga, Gogebic, Houghton, Iron,
Marquette and Ontonagan Counties,
MI, Comment Period Ends: June 23,
2005, Contact: Robert Brenner (906)
932–1330.
EIS No. 050119, Draft EIS, AFS, OR,
Timberline Express Project, To
Improve the Winter Recreational
Opportunities, Implementation,
Zigzag Ranger District, Mt. Hood
National Forest, Clackamas County,
OR, Comment Period Ends: May 9,
2005, Contact: Gary L. Larsen (503)
668–1700.
EIS No. 050120, Draft Supplement, AFS,
CO, Baylor Park Blowdown Project,
New Information, Salvage and Treat
Down and Damaged Timber, To
Reduce Impact of Spruce Beetles,
Implementation, White River National
Forest, Sopris and Rifle Ranger
District, Garfield, Mesa, and Pitkin
Counties, CO, Comment Period Ends:
May 9, 2005, Contact: Jim Thinnes
(970) 945–3201.
EIS No. 050121, Draft EIS, AFS, MT,
Northeast Yaak Project, Proposed
Harvest To Reduce Fuels in Old
Growth, Implementation, Kootenai
National Forest, Three Rivers Ranger
District, Lincoln County, MT,
Comment Period Ends: May 9, 2005,
Contact: Eric Dickinson (406) 295–
4693.
EIS No. 050122, Final EIS, DOE, AZ,
Sahuarita-Nogales Transmission Line,
Construction and Operation of a
345,000-volt (345 kV) Electric
Transmission Line across the United
E:\FR\FM\25MRN1.SGM
25MRN1
15316
Federal Register / Vol. 70, No. 57 / Friday, March 25, 2005 / Notices
States Border with Mexico,
Application for Presidential Permit,
Tucson Electric Power (TEP), Nogales,
AZ, Wait Period Ends: April 25, 2005,
Contact: Dr. Jerry Pell (202) 586–3362.
EIS No. 050123, Final Supplemental,
NOA, NC, FL, SC, GA, South Atlantic
Shrimp Fishery Management Plan,
Amendment 6, Propose To Amend the
Bycatch Reduction Device (BRD)
Testing Protocol System, South
Atlantic Region, Wait Period Ends:
April 25, 2005, Contact: Dr. Roy
Crabtree (727) 570–5301.
EIS No. 050124, Final Supplement,
GSA, MD, U.S. Food and Drug
Administration (FDA) Consolidation,
Updated and New Information,
Constructing a New Eastern Access
Road and over Paint Branch,
Construct Additional Facilities To
Support Expand Program, Relocating
the Day Care Center, Federal Research
Center at White Oak, Silver Spring,
Montgomery County, MD, Wait Period
Ends: April 26, 2005, Contact:
Shapour Ebadi (301) 595–5156.
EIS No. 050125, Final EIS, NPS, KY, TN,
Big South Fork National River and
Recreation Area, General Management
Plan, Implementation, Resources,
Roads and Trails, McCreary, KY and
Fentress, Morgan, Pickett and Scott
Counties, TN, Wait Period Ends: April
25, 2005, Contact: Reed Detring (423)
569–9778.
EIS No. 050126, Draft EIS, COE, CA,
Programmatic—San Luis Obispo
Creek Watershed, Waterway
Management Plan, Stream
Maintenance and Management Plan,
City of San Luis Obispo and County
of San Luis Obispo, Community of
Avila Beach, San Luis Obispo County,
Comment Period Ends: Due: July 10,
2005, Contact: Bruce Henderson (805)
585–2145.
EIS No. 050127, Draft EIS, AFS, MI,
Hiawatha National Forest, Proposed
Land and Resource Management Plan,
Forest Plan Revision, Implementation,
Alger, Cheboygan, Chippewa, Delta,
Luce and Mackinac Counties, MI,
Comment Period Ends: June 23, 2005,
Contact: Dave Maercklein (906) 786–
4062.
Amended Notices
EIS No. 050076, Draft EIS, NOA, ME, RI,
CT, Atlantic Large Whale Take
Reduction Plan, Proposed
Amendments To Implement Specific
Gear Modifications for Trap/Pot and
Gillnet Fisheries, Broad-Based Gear
Modifications, Exclusive Economic
Zone (EEZ), ME, CT and RI, Comment
Period Ends: May 16, 2005, Contact:
Mary Colligan (978) 281–9328.
VerDate jul<14>2003
16:11 Mar 24, 2005
Jkt 205001
Revision of Federal Register notice
published on February 25, 2005: CEQ
Comment Period Ending April 26, 2005,
has been extended to May 16, 2005.
EIS No. 050105, Draft EIS, AFS, MI,
Huron-Manistee National Forests,
Proposed Land and Resource
Management Plan, Implementation,
Several Counties, WI, Comment
Period Ends: June 16, 2005, Contact:
Jeff Pullen (231) 775–2421.
Revision of Federal Register notice
published on March 18, 2005:
Correction to Title and Comment Period
from May 2, 2005, to June 16, 2005.
Dated: March 22, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–5933 Filed 3–24–05; 8:45 am]
BILLING CODE 6560–50–P
The Federal Communications
Commission will attempt to
accommodate as many persons as
possible. Admittance, however, will be
limited to the seating available. Unless
so requested by the Council’s Chair,
there will be no public oral
participation, but the public may submit
written comments to Jeffery Goldthorp,
the Federal Communications
Commission’s Designated Federal
Officer for the Technological Advisory
Council, before the meeting. Mr.
Goldthorp’s e-mail address is
Jeffery.Goldthorp@fcc.gov. Mail delivery
address is: Federal Communications
Commission, 445 12th Street, SW.,
Room 7–A325, Washington, DC 20554.
Federal Communications Commission.
Marlene H. Dortch,
Secretary.
[FR Doc. 05–5929 Filed 3–24–05; 8:45 am]
BILLING CODE 6712–01–P
FEDERAL COMMUNICATIONS
COMMISSION
Technological Advisory Council
Federal Communications
Commission.
ACTION: Notice of public meeting.
AGENCY:
In accordance with the
Federal Advisory Committee Act, this
notice advises interested persons of the
2005 meetings of the Technological
Advisory Council (‘‘Council’’) under its
charter renewed as of November 19,
2004.
SUMMARY:
April 15, 2005 at 10 a.m. to 3
p.m.; July 28, 2005 at 10 a.m. to 3 p.m;
and October 27, 2005 at 10 a.m. to 3
p.m.
DATES:
Federal Communications
Commission, 445 12th Street, SW.,
Commission Meeting Room (TW–C305),
Washington, DC.
FOR FURTHER INFORMATION CONTACT:
Jeffery Goldthorp, (202) 418–1096
(voice), (202) 418–2989 (TTY), or email:
Jeffery.Goldthorp@fcc.gov.
SUPPLEMENTARY INFORMATION: Increasing
innovation and rapid advances in
technology have accelerated changes in
the ways that telecommunications
services are provided to, and accessed
by, users of communications services.
The Federal Communications
Commission must remain abreast of new
developments in technologies and
related communications to fulfill its
responsibilities under the
Communications Act. At the first
meeting, on April 15, 2005 under the
Council’s new charter, the Council will
consider the topics of wireless device
security and IP network security.
ADDRESSES:
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
FEDERAL RESERVE SYSTEM
Change in Bank Control Notices;
Acquisition of Shares of Bank or Bank
Holding Companies
The notificants listed below have
applied under the Change in Bank
Control Act (12 U.S.C. 1817(j)) and
§ 225.41 of the Board’s Regulation Y (12
CFR 225.41) to acquire a bank or bank
holding company. The factors that are
considered in acting on the notices are
set forth in paragraph 7 of the Act (12
U.S.C. 1817(j)(7)).
The notices are available for
immediate inspection at the Federal
Reserve Bank indicated. The notices
also will be available for inspection at
the office of the Board of Governors.
Interested persons may express their
views in writing to the Reserve Bank
indicated for that notice or to the offices
of the Board of Governors. Comments
must be received not later than April 8,
2005.
A. Federal Reserve Bank of Kansas
City (Donna J. Ward, Assistant Vice
President) 925 Grand Avenue, Kansas
City, Missouri 64198-0001:
1. Kenneth D. Klehm, Edmond,
Oklahoma; and G. Blake Hogan,
Houston, Texas, as trustees for the
William M. Cameron 2004 Family
Trusts; to retain voting shares of First
Fidelity Bancorp, Inc., and thereby
indirectly retain voting shares of First
Fidelity Bank, National Association,
Oklahoma City, Oklahoma.
2. Robert E. Mickey, Jr., Holden,
Missouri, individually and as trustee of
the Marilyn Mickey Clay 2005
Irrevocable Trust; to acquire voting
E:\FR\FM\25MRN1.SGM
25MRN1
Agencies
[Federal Register Volume 70, Number 57 (Friday, March 25, 2005)]
[Notices]
[Pages 15315-15316]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-5933]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6661-7]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements filed March 14, 2005,
through March 18, 2005, pursuant to 40 CFR 1506.9.
EIS No. 050110, Draft EIS, AFS, CA, Freds Fire Restoration Project, To
Reduce Long-Term Fuel Loading for the Purpose of Reducing Future Fire
Severity and Resistance to Control, Eldorado National Forest, El Dorado
County, CA, Comment Period Ends: May 9, 2005, Contact: Laura Hierholzer
(530) 647-5382.
EIS No. 050111, Draft EIS, AFS, CA, Power Fire Restoration Project, To
Reduce Long-Term Fuel Loading for the Purpose of Reducing Future
Severity and Resistance to Control, Amador Ranger District, Eldorado
National Forest, Amador County, CA, Comment Period Ends: March 9, 2005,
Contact: Patricia Ferrell (530) 642-5146.
EIS No. 050112, Final EIS, AFS, WY, Woodrock Project, Proposal for
Timber Sale, Travel Management and Watershed Restoration,
Implementation, Bighorn National Forest, Tongue Ranger District,
Sheridan County, WY, Wait Period Ends: April 25, 2005, Contact: Scott
Hill (307) 674-2600.
EIS No. 050113, Draft EIS, BLM, NV, Sloan Canyon National Conservation
Area, Resource Management Plan, Implementation, Cities of Las Vegas and
Henderson, Clark County, NV, Comment Period Ends: June 23, 2005,
Contact: Charles Carroll (702) 515-5291.
EIS No. 050114, Draft EIS, AFS, IN, Hoosier National Forest Land and
Resource Management Plan, Implementation, Brown, Crawford, Dubois,
Jackson, Lawrence, Martin, Monroe, Orange, Perry Counties, IN, Comment
Period Ends: June 23, 2005, Contact: Judi Perez (812) 275-5987.
EIS No. 050115, Final Supplement, NRC, AL, Generic EIS--License Renewal
of Nuclear Plants, Joseph M. Farley Nuclear Plants, Units 1 and 2,
Supplemental 18 to NUREG-1437 (TAC Nos. MCO768 and MCO769), Houston
County, AL, Wait Period Ends: April 25, 2005, Contact: Jack Cushing
(301) 415-1424.
EIS No. 050116, Draft EIS, COE, Programmatic--Lower Colorado River
Basin Study, Provide Flood Damage Reduction and Ecosystem Restoration,
Colorado River, TX, Comment Period Ends: May 9, 2005, Contact: Rob
Newman (817) 886-1762.
EIS No. 050117, Draft EIS, BLM, NV, Emigrant Mine Project, Develop and
Operate an Open Pit Mine, Construct a Waste Rock Disposal Facility,
South of Carlin in Elko County, NV, Comment Period Ends: May 24, 2005,
Contact: Tom Schmidt (775) 753-0200.
EIS No. 050118, Draft EIS, AFS, MI, Ottawa National Forest, Proposed
Land and Resource Management Plan, Forest Plan Revision,
Implementation, Baraga, Gogebic, Houghton, Iron, Marquette and
Ontonagan Counties, MI, Comment Period Ends: June 23, 2005, Contact:
Robert Brenner (906) 932-1330.
EIS No. 050119, Draft EIS, AFS, OR, Timberline Express Project, To
Improve the Winter Recreational Opportunities, Implementation, Zigzag
Ranger District, Mt. Hood National Forest, Clackamas County, OR,
Comment Period Ends: May 9, 2005, Contact: Gary L. Larsen (503) 668-
1700.
EIS No. 050120, Draft Supplement, AFS, CO, Baylor Park Blowdown
Project, New Information, Salvage and Treat Down and Damaged Timber, To
Reduce Impact of Spruce Beetles, Implementation, White River National
Forest, Sopris and Rifle Ranger District, Garfield, Mesa, and Pitkin
Counties, CO, Comment Period Ends: May 9, 2005, Contact: Jim Thinnes
(970) 945-3201.
EIS No. 050121, Draft EIS, AFS, MT, Northeast Yaak Project, Proposed
Harvest To Reduce Fuels in Old Growth, Implementation, Kootenai
National Forest, Three Rivers Ranger District, Lincoln County, MT,
Comment Period Ends: May 9, 2005, Contact: Eric Dickinson (406) 295-
4693.
EIS No. 050122, Final EIS, DOE, AZ, Sahuarita-Nogales Transmission
Line, Construction and Operation of a 345,000-volt (345 kV) Electric
Transmission Line across the United
[[Page 15316]]
States Border with Mexico, Application for Presidential Permit, Tucson
Electric Power (TEP), Nogales, AZ, Wait Period Ends: April 25, 2005,
Contact: Dr. Jerry Pell (202) 586-3362.
EIS No. 050123, Final Supplemental, NOA, NC, FL, SC, GA, South Atlantic
Shrimp Fishery Management Plan, Amendment 6, Propose To Amend the
Bycatch Reduction Device (BRD) Testing Protocol System, South Atlantic
Region, Wait Period Ends: April 25, 2005, Contact: Dr. Roy Crabtree
(727) 570-5301.
EIS No. 050124, Final Supplement, GSA, MD, U.S. Food and Drug
Administration (FDA) Consolidation, Updated and New Information,
Constructing a New Eastern Access Road and over Paint Branch, Construct
Additional Facilities To Support Expand Program, Relocating the Day
Care Center, Federal Research Center at White Oak, Silver Spring,
Montgomery County, MD, Wait Period Ends: April 26, 2005, Contact:
Shapour Ebadi (301) 595-5156.
EIS No. 050125, Final EIS, NPS, KY, TN, Big South Fork National River
and Recreation Area, General Management Plan, Implementation,
Resources, Roads and Trails, McCreary, KY and Fentress, Morgan, Pickett
and Scott Counties, TN, Wait Period Ends: April 25, 2005, Contact: Reed
Detring (423) 569-9778.
EIS No. 050126, Draft EIS, COE, CA, Programmatic--San Luis Obispo Creek
Watershed, Waterway Management Plan, Stream Maintenance and Management
Plan, City of San Luis Obispo and County of San Luis Obispo, Community
of Avila Beach, San Luis Obispo County, Comment Period Ends: Due: July
10, 2005, Contact: Bruce Henderson (805) 585-2145.
EIS No. 050127, Draft EIS, AFS, MI, Hiawatha National Forest, Proposed
Land and Resource Management Plan, Forest Plan Revision,
Implementation, Alger, Cheboygan, Chippewa, Delta, Luce and Mackinac
Counties, MI, Comment Period Ends: June 23, 2005, Contact: Dave
Maercklein (906) 786-4062.
Amended Notices
EIS No. 050076, Draft EIS, NOA, ME, RI, CT, Atlantic Large Whale Take
Reduction Plan, Proposed Amendments To Implement Specific Gear
Modifications for Trap/Pot and Gillnet Fisheries, Broad-Based Gear
Modifications, Exclusive Economic Zone (EEZ), ME, CT and RI, Comment
Period Ends: May 16, 2005, Contact: Mary Colligan (978) 281-9328.
Revision of Federal Register notice published on February 25, 2005:
CEQ Comment Period Ending April 26, 2005, has been extended to May 16,
2005.
EIS No. 050105, Draft EIS, AFS, MI, Huron-Manistee National Forests,
Proposed Land and Resource Management Plan, Implementation, Several
Counties, WI, Comment Period Ends: June 16, 2005, Contact: Jeff Pullen
(231) 775-2421.
Revision of Federal Register notice published on March 18, 2005:
Correction to Title and Comment Period from May 2, 2005, to June 16,
2005.
Dated: March 22, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-5933 Filed 3-24-05; 8:45 am]
BILLING CODE 6560-50-P