Environmental Impact Statements; Notice of Availability, 15315-15316 [05-5933]

Download as PDF Federal Register / Vol. 70, No. 57 / Friday, March 25, 2005 / Notices ERP No. DS–NPS–K65325–CA Rating LO, Merced Wild and Scenic River Revised Comprehensive Management Plan, Amend and Supplement Information, Yosemite National Park, El Portal Administrative Site, Tuolume, Merced, Mono, Mariposa and Madera Counties, CA. Summary: EPA has no objections to the preferred alternative. However, EPA requests that the Park Service consider additional protection measures for the exceptional cultural resources in El Portal when delineating and zoning the river boundary. Final EISs ERP No. F–AFS–E65069–AL, Longleaf Ecosystem Restoration Project, Proposes a Five-Year Project to Begin Restoration of Native Longleaf, Talladega National Forest, Oakmulgee District, Tuscaloosa, Hale, Bibbs, and Perry Counties, AL. Summary: EPA supports the Forest Service in its efforts to restore the longleaf pine ecosystem and enhance red-cockade woodpecker habitat, and has no objections to this project. ERP No. F–AFS–J65410–WY, Upper Green River Area Rangeland Project, Propose Site Specific Grazing Management Practices, Bridger-Teton Forest, Sublette, Teton and Fremont Counties, WY. Summary: The Final EIS was not responsive to EPA’s comments on the Draft EIS. EPA continues to express environmental concerns with potential adverse impacts to water quality, aquatic resources, and riparian areas from livestock grazing. ERP No. F–DOI–K99033–00, Programmatic EIS—Lower Colorado River Multi-Species Conservation Program, Issuing a Incidental Take Permit based on the Plan, Extending from Lake Mead to the Southerly International Boundary with Mexico, AZ, NV and CA. Summary: EPA’s concerns have been addressed; therefore, EPA has no objection to the action as proposed. ERP No. F–FHW–F40382–MN, Ayd Mill Road Corridor, Improvements from I–35 E to St. Anthony Avenue (I–94) 2.6 kilometer (1.6 miles), Funding, City of Saint Paul, Ramsey County, MN. Summary: EPA’s concerns regarding mitigation to protect surface water quality have been satisfactorily addressed; therefore, EPA has no objection to the action as proposed. ERP No. F–NAS–K11114–HI, Outrigger Telescopes Project, Proposed for the W.M. Keck Observatory Site within the Mauna Kea Science Reserve, Funding, Construction, Installation and Operation, Island of Hawaii. VerDate jul<14>2003 16:11 Mar 24, 2005 Jkt 205001 Summary: EPA expressed continuing concerns about potential impacts to cultural resources. Dated: March 22, 2005. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 05–5934 Filed 3–24–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6661–7] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements filed March 14, 2005, through March 18, 2005, pursuant to 40 CFR 1506.9. EIS No. 050110, Draft EIS, AFS, CA, Freds Fire Restoration Project, To Reduce Long-Term Fuel Loading for the Purpose of Reducing Future Fire Severity and Resistance to Control, Eldorado National Forest, El Dorado County, CA, Comment Period Ends: May 9, 2005, Contact: Laura Hierholzer (530) 647–5382. EIS No. 050111, Draft EIS, AFS, CA, Power Fire Restoration Project, To Reduce Long-Term Fuel Loading for the Purpose of Reducing Future Severity and Resistance to Control, Amador Ranger District, Eldorado National Forest, Amador County, CA, Comment Period Ends: March 9, 2005, Contact: Patricia Ferrell (530) 642– 5146. EIS No. 050112, Final EIS, AFS, WY, Woodrock Project, Proposal for Timber Sale, Travel Management and Watershed Restoration, Implementation, Bighorn National Forest, Tongue Ranger District, Sheridan County, WY, Wait Period Ends: April 25, 2005, Contact: Scott Hill (307) 674–2600. EIS No. 050113, Draft EIS, BLM, NV, Sloan Canyon National Conservation Area, Resource Management Plan, Implementation, Cities of Las Vegas and Henderson, Clark County, NV, Comment Period Ends: June 23, 2005, Contact: Charles Carroll (702) 515– 5291. EIS No. 050114, Draft EIS, AFS, IN, Hoosier National Forest Land and Resource Management Plan, Implementation, Brown, Crawford, Dubois, Jackson, Lawrence, Martin, Monroe, Orange, Perry Counties, IN, PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 15315 Comment Period Ends: June 23, 2005, Contact: Judi Perez (812) 275–5987. EIS No. 050115, Final Supplement, NRC, AL, Generic EIS—License Renewal of Nuclear Plants, Joseph M. Farley Nuclear Plants, Units 1 and 2, Supplemental 18 to NUREG–1437 (TAC Nos. MCO768 and MCO769), Houston County, AL, Wait Period Ends: April 25, 2005, Contact: Jack Cushing (301) 415–1424. EIS No. 050116, Draft EIS, COE, Programmatic—Lower Colorado River Basin Study, Provide Flood Damage Reduction and Ecosystem Restoration, Colorado River, TX, Comment Period Ends: May 9, 2005, Contact: Rob Newman (817) 886–1762. EIS No. 050117, Draft EIS, BLM, NV, Emigrant Mine Project, Develop and Operate an Open Pit Mine, Construct a Waste Rock Disposal Facility, South of Carlin in Elko County, NV, Comment Period Ends: May 24, 2005, Contact: Tom Schmidt (775) 753– 0200. EIS No. 050118, Draft EIS, AFS, MI, Ottawa National Forest, Proposed Land and Resource Management Plan, Forest Plan Revision, Implementation, Baraga, Gogebic, Houghton, Iron, Marquette and Ontonagan Counties, MI, Comment Period Ends: June 23, 2005, Contact: Robert Brenner (906) 932–1330. EIS No. 050119, Draft EIS, AFS, OR, Timberline Express Project, To Improve the Winter Recreational Opportunities, Implementation, Zigzag Ranger District, Mt. Hood National Forest, Clackamas County, OR, Comment Period Ends: May 9, 2005, Contact: Gary L. Larsen (503) 668–1700. EIS No. 050120, Draft Supplement, AFS, CO, Baylor Park Blowdown Project, New Information, Salvage and Treat Down and Damaged Timber, To Reduce Impact of Spruce Beetles, Implementation, White River National Forest, Sopris and Rifle Ranger District, Garfield, Mesa, and Pitkin Counties, CO, Comment Period Ends: May 9, 2005, Contact: Jim Thinnes (970) 945–3201. EIS No. 050121, Draft EIS, AFS, MT, Northeast Yaak Project, Proposed Harvest To Reduce Fuels in Old Growth, Implementation, Kootenai National Forest, Three Rivers Ranger District, Lincoln County, MT, Comment Period Ends: May 9, 2005, Contact: Eric Dickinson (406) 295– 4693. EIS No. 050122, Final EIS, DOE, AZ, Sahuarita-Nogales Transmission Line, Construction and Operation of a 345,000-volt (345 kV) Electric Transmission Line across the United E:\FR\FM\25MRN1.SGM 25MRN1 15316 Federal Register / Vol. 70, No. 57 / Friday, March 25, 2005 / Notices States Border with Mexico, Application for Presidential Permit, Tucson Electric Power (TEP), Nogales, AZ, Wait Period Ends: April 25, 2005, Contact: Dr. Jerry Pell (202) 586–3362. EIS No. 050123, Final Supplemental, NOA, NC, FL, SC, GA, South Atlantic Shrimp Fishery Management Plan, Amendment 6, Propose To Amend the Bycatch Reduction Device (BRD) Testing Protocol System, South Atlantic Region, Wait Period Ends: April 25, 2005, Contact: Dr. Roy Crabtree (727) 570–5301. EIS No. 050124, Final Supplement, GSA, MD, U.S. Food and Drug Administration (FDA) Consolidation, Updated and New Information, Constructing a New Eastern Access Road and over Paint Branch, Construct Additional Facilities To Support Expand Program, Relocating the Day Care Center, Federal Research Center at White Oak, Silver Spring, Montgomery County, MD, Wait Period Ends: April 26, 2005, Contact: Shapour Ebadi (301) 595–5156. EIS No. 050125, Final EIS, NPS, KY, TN, Big South Fork National River and Recreation Area, General Management Plan, Implementation, Resources, Roads and Trails, McCreary, KY and Fentress, Morgan, Pickett and Scott Counties, TN, Wait Period Ends: April 25, 2005, Contact: Reed Detring (423) 569–9778. EIS No. 050126, Draft EIS, COE, CA, Programmatic—San Luis Obispo Creek Watershed, Waterway Management Plan, Stream Maintenance and Management Plan, City of San Luis Obispo and County of San Luis Obispo, Community of Avila Beach, San Luis Obispo County, Comment Period Ends: Due: July 10, 2005, Contact: Bruce Henderson (805) 585–2145. EIS No. 050127, Draft EIS, AFS, MI, Hiawatha National Forest, Proposed Land and Resource Management Plan, Forest Plan Revision, Implementation, Alger, Cheboygan, Chippewa, Delta, Luce and Mackinac Counties, MI, Comment Period Ends: June 23, 2005, Contact: Dave Maercklein (906) 786– 4062. Amended Notices EIS No. 050076, Draft EIS, NOA, ME, RI, CT, Atlantic Large Whale Take Reduction Plan, Proposed Amendments To Implement Specific Gear Modifications for Trap/Pot and Gillnet Fisheries, Broad-Based Gear Modifications, Exclusive Economic Zone (EEZ), ME, CT and RI, Comment Period Ends: May 16, 2005, Contact: Mary Colligan (978) 281–9328. VerDate jul<14>2003 16:11 Mar 24, 2005 Jkt 205001 Revision of Federal Register notice published on February 25, 2005: CEQ Comment Period Ending April 26, 2005, has been extended to May 16, 2005. EIS No. 050105, Draft EIS, AFS, MI, Huron-Manistee National Forests, Proposed Land and Resource Management Plan, Implementation, Several Counties, WI, Comment Period Ends: June 16, 2005, Contact: Jeff Pullen (231) 775–2421. Revision of Federal Register notice published on March 18, 2005: Correction to Title and Comment Period from May 2, 2005, to June 16, 2005. Dated: March 22, 2005. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 05–5933 Filed 3–24–05; 8:45 am] BILLING CODE 6560–50–P The Federal Communications Commission will attempt to accommodate as many persons as possible. Admittance, however, will be limited to the seating available. Unless so requested by the Council’s Chair, there will be no public oral participation, but the public may submit written comments to Jeffery Goldthorp, the Federal Communications Commission’s Designated Federal Officer for the Technological Advisory Council, before the meeting. Mr. Goldthorp’s e-mail address is Jeffery.Goldthorp@fcc.gov. Mail delivery address is: Federal Communications Commission, 445 12th Street, SW., Room 7–A325, Washington, DC 20554. Federal Communications Commission. Marlene H. Dortch, Secretary. [FR Doc. 05–5929 Filed 3–24–05; 8:45 am] BILLING CODE 6712–01–P FEDERAL COMMUNICATIONS COMMISSION Technological Advisory Council Federal Communications Commission. ACTION: Notice of public meeting. AGENCY: In accordance with the Federal Advisory Committee Act, this notice advises interested persons of the 2005 meetings of the Technological Advisory Council (‘‘Council’’) under its charter renewed as of November 19, 2004. SUMMARY: April 15, 2005 at 10 a.m. to 3 p.m.; July 28, 2005 at 10 a.m. to 3 p.m; and October 27, 2005 at 10 a.m. to 3 p.m. DATES: Federal Communications Commission, 445 12th Street, SW., Commission Meeting Room (TW–C305), Washington, DC. FOR FURTHER INFORMATION CONTACT: Jeffery Goldthorp, (202) 418–1096 (voice), (202) 418–2989 (TTY), or email: Jeffery.Goldthorp@fcc.gov. SUPPLEMENTARY INFORMATION: Increasing innovation and rapid advances in technology have accelerated changes in the ways that telecommunications services are provided to, and accessed by, users of communications services. The Federal Communications Commission must remain abreast of new developments in technologies and related communications to fulfill its responsibilities under the Communications Act. At the first meeting, on April 15, 2005 under the Council’s new charter, the Council will consider the topics of wireless device security and IP network security. ADDRESSES: PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 FEDERAL RESERVE SYSTEM Change in Bank Control Notices; Acquisition of Shares of Bank or Bank Holding Companies The notificants listed below have applied under the Change in Bank Control Act (12 U.S.C. 1817(j)) and § 225.41 of the Board’s Regulation Y (12 CFR 225.41) to acquire a bank or bank holding company. The factors that are considered in acting on the notices are set forth in paragraph 7 of the Act (12 U.S.C. 1817(j)(7)). The notices are available for immediate inspection at the Federal Reserve Bank indicated. The notices also will be available for inspection at the office of the Board of Governors. Interested persons may express their views in writing to the Reserve Bank indicated for that notice or to the offices of the Board of Governors. Comments must be received not later than April 8, 2005. A. Federal Reserve Bank of Kansas City (Donna J. Ward, Assistant Vice President) 925 Grand Avenue, Kansas City, Missouri 64198-0001: 1. Kenneth D. Klehm, Edmond, Oklahoma; and G. Blake Hogan, Houston, Texas, as trustees for the William M. Cameron 2004 Family Trusts; to retain voting shares of First Fidelity Bancorp, Inc., and thereby indirectly retain voting shares of First Fidelity Bank, National Association, Oklahoma City, Oklahoma. 2. Robert E. Mickey, Jr., Holden, Missouri, individually and as trustee of the Marilyn Mickey Clay 2005 Irrevocable Trust; to acquire voting E:\FR\FM\25MRN1.SGM 25MRN1

Agencies

[Federal Register Volume 70, Number 57 (Friday, March 25, 2005)]
[Notices]
[Pages 15315-15316]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-5933]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6661-7]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements filed March 14, 2005, 
through March 18, 2005, pursuant to 40 CFR 1506.9.
EIS No. 050110, Draft EIS, AFS, CA, Freds Fire Restoration Project, To 
Reduce Long-Term Fuel Loading for the Purpose of Reducing Future Fire 
Severity and Resistance to Control, Eldorado National Forest, El Dorado 
County, CA, Comment Period Ends: May 9, 2005, Contact: Laura Hierholzer 
(530) 647-5382.
EIS No. 050111, Draft EIS, AFS, CA, Power Fire Restoration Project, To 
Reduce Long-Term Fuel Loading for the Purpose of Reducing Future 
Severity and Resistance to Control, Amador Ranger District, Eldorado 
National Forest, Amador County, CA, Comment Period Ends: March 9, 2005, 
Contact: Patricia Ferrell (530) 642-5146.
EIS No. 050112, Final EIS, AFS, WY, Woodrock Project, Proposal for 
Timber Sale, Travel Management and Watershed Restoration, 
Implementation, Bighorn National Forest, Tongue Ranger District, 
Sheridan County, WY, Wait Period Ends: April 25, 2005, Contact: Scott 
Hill (307) 674-2600.
EIS No. 050113, Draft EIS, BLM, NV, Sloan Canyon National Conservation 
Area, Resource Management Plan, Implementation, Cities of Las Vegas and 
Henderson, Clark County, NV, Comment Period Ends: June 23, 2005, 
Contact: Charles Carroll (702) 515-5291.
EIS No. 050114, Draft EIS, AFS, IN, Hoosier National Forest Land and 
Resource Management Plan, Implementation, Brown, Crawford, Dubois, 
Jackson, Lawrence, Martin, Monroe, Orange, Perry Counties, IN, Comment 
Period Ends: June 23, 2005, Contact: Judi Perez (812) 275-5987.
EIS No. 050115, Final Supplement, NRC, AL, Generic EIS--License Renewal 
of Nuclear Plants, Joseph M. Farley Nuclear Plants, Units 1 and 2, 
Supplemental 18 to NUREG-1437 (TAC Nos. MCO768 and MCO769), Houston 
County, AL, Wait Period Ends: April 25, 2005, Contact: Jack Cushing 
(301) 415-1424.
EIS No. 050116, Draft EIS, COE, Programmatic--Lower Colorado River 
Basin Study, Provide Flood Damage Reduction and Ecosystem Restoration, 
Colorado River, TX, Comment Period Ends: May 9, 2005, Contact: Rob 
Newman (817) 886-1762.
EIS No. 050117, Draft EIS, BLM, NV, Emigrant Mine Project, Develop and 
Operate an Open Pit Mine, Construct a Waste Rock Disposal Facility, 
South of Carlin in Elko County, NV, Comment Period Ends: May 24, 2005, 
Contact: Tom Schmidt (775) 753-0200.
EIS No. 050118, Draft EIS, AFS, MI, Ottawa National Forest, Proposed 
Land and Resource Management Plan, Forest Plan Revision, 
Implementation, Baraga, Gogebic, Houghton, Iron, Marquette and 
Ontonagan Counties, MI, Comment Period Ends: June 23, 2005, Contact: 
Robert Brenner (906) 932-1330.
EIS No. 050119, Draft EIS, AFS, OR, Timberline Express Project, To 
Improve the Winter Recreational Opportunities, Implementation, Zigzag 
Ranger District, Mt. Hood National Forest, Clackamas County, OR, 
Comment Period Ends: May 9, 2005, Contact: Gary L. Larsen (503) 668-
1700.
EIS No. 050120, Draft Supplement, AFS, CO, Baylor Park Blowdown 
Project, New Information, Salvage and Treat Down and Damaged Timber, To 
Reduce Impact of Spruce Beetles, Implementation, White River National 
Forest, Sopris and Rifle Ranger District, Garfield, Mesa, and Pitkin 
Counties, CO, Comment Period Ends: May 9, 2005, Contact: Jim Thinnes 
(970) 945-3201.
EIS No. 050121, Draft EIS, AFS, MT, Northeast Yaak Project, Proposed 
Harvest To Reduce Fuels in Old Growth, Implementation, Kootenai 
National Forest, Three Rivers Ranger District, Lincoln County, MT, 
Comment Period Ends: May 9, 2005, Contact: Eric Dickinson (406) 295-
4693.
EIS No. 050122, Final EIS, DOE, AZ, Sahuarita-Nogales Transmission 
Line, Construction and Operation of a 345,000-volt (345 kV) Electric 
Transmission Line across the United

[[Page 15316]]

States Border with Mexico, Application for Presidential Permit, Tucson 
Electric Power (TEP), Nogales, AZ, Wait Period Ends: April 25, 2005, 
Contact: Dr. Jerry Pell (202) 586-3362.
EIS No. 050123, Final Supplemental, NOA, NC, FL, SC, GA, South Atlantic 
Shrimp Fishery Management Plan, Amendment 6, Propose To Amend the 
Bycatch Reduction Device (BRD) Testing Protocol System, South Atlantic 
Region, Wait Period Ends: April 25, 2005, Contact: Dr. Roy Crabtree 
(727) 570-5301.
EIS No. 050124, Final Supplement, GSA, MD, U.S. Food and Drug 
Administration (FDA) Consolidation, Updated and New Information, 
Constructing a New Eastern Access Road and over Paint Branch, Construct 
Additional Facilities To Support Expand Program, Relocating the Day 
Care Center, Federal Research Center at White Oak, Silver Spring, 
Montgomery County, MD, Wait Period Ends: April 26, 2005, Contact: 
Shapour Ebadi (301) 595-5156.
EIS No. 050125, Final EIS, NPS, KY, TN, Big South Fork National River 
and Recreation Area, General Management Plan, Implementation, 
Resources, Roads and Trails, McCreary, KY and Fentress, Morgan, Pickett 
and Scott Counties, TN, Wait Period Ends: April 25, 2005, Contact: Reed 
Detring (423) 569-9778.
EIS No. 050126, Draft EIS, COE, CA, Programmatic--San Luis Obispo Creek 
Watershed, Waterway Management Plan, Stream Maintenance and Management 
Plan, City of San Luis Obispo and County of San Luis Obispo, Community 
of Avila Beach, San Luis Obispo County, Comment Period Ends: Due: July 
10, 2005, Contact: Bruce Henderson (805) 585-2145.
EIS No. 050127, Draft EIS, AFS, MI, Hiawatha National Forest, Proposed 
Land and Resource Management Plan, Forest Plan Revision, 
Implementation, Alger, Cheboygan, Chippewa, Delta, Luce and Mackinac 
Counties, MI, Comment Period Ends: June 23, 2005, Contact: Dave 
Maercklein (906) 786-4062.

Amended Notices

EIS No. 050076, Draft EIS, NOA, ME, RI, CT, Atlantic Large Whale Take 
Reduction Plan, Proposed Amendments To Implement Specific Gear 
Modifications for Trap/Pot and Gillnet Fisheries, Broad-Based Gear 
Modifications, Exclusive Economic Zone (EEZ), ME, CT and RI, Comment 
Period Ends: May 16, 2005, Contact: Mary Colligan (978) 281-9328.

    Revision of Federal Register notice published on February 25, 2005: 
CEQ Comment Period Ending April 26, 2005, has been extended to May 16, 
2005.

EIS No. 050105, Draft EIS, AFS, MI, Huron-Manistee National Forests, 
Proposed Land and Resource Management Plan, Implementation, Several 
Counties, WI, Comment Period Ends: June 16, 2005, Contact: Jeff Pullen 
(231) 775-2421.

    Revision of Federal Register notice published on March 18, 2005: 
Correction to Title and Comment Period from May 2, 2005, to June 16, 
2005.

    Dated: March 22, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-5933 Filed 3-24-05; 8:45 am]