Federal Register / Vol. 70, No. 57 / Friday, March 25, 2005 / Notices
inspection at NRC’s Public Electronic
Reading Room at https://www.nrc.gov/
reading-rm/ADAMS.html. A copy of the
PGE request for NRC approval of a
partial exemption from the provision of
10 CFR 72.30(c)(5), dated April 29,
2004, can be found at this site using the
Agencywide Documents Access and
Management System (ADAMS)
accession No. ML041260470. Any
questions should be referred to
Christopher M. Regan, Spent Fuel
Project Office, Office of Nuclear
Material Safety and Safeguards, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555, Mailstop O
13D13, telephone (301) 415–8500, fax
(301) 415–8555.
Dated at Rockville, Maryland this 17th day
of March, 2005.
For the Nuclear Regulatory Commission.
Christopher M. Regan,
Senior Project Manager, Licensing Section,
Spent Fuel Project Office, Office of Nuclear
Material Safety and Safeguards.
[FR Doc. 05–5901 Filed 3–24–05; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Notice of Availability of Interim Staff
Guidance Documents For Fuel Cycle
Facilities
Nuclear Regulatory
Commission.
ACTION: Notice of availability.
AGENCY:
FOR FURTHER INFORMATION CONTACT:
Wilkins Smith, Project Manager,
Technical Support Group, Division of
Fuel Cycle Safety and Safeguards, Office
of Nuclear Material Safety and
Safeguards, U.S. Nuclear Regulatory
Commission, Washington, DC 20005–
0001. Telephone: (301) 415–5788; fax
number: (301) 415–5370; e-mail:
wrs@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The Nuclear Regulatory Commission
(NRC) is preparing and issuing Interim
Staff Guidance (ISG) documents for fuel
cycle facilities. These ISG documents
provide clarifying guidance to the NRC
staff when reviewing licensee integrated
safety analyses, license applications or
amendment requests or other related
licensing activities for fuel cycle
facilities under subpart H of 10 CFR part
70. The NRC is soliciting public
comments on two ISG Draft documents
(ISG–01 and –04) which will be
considered in the final versions or
subsequent revisions. ISG–03 has been
issued and is provided for information.
VerDate jul<14>2003
16:11 Mar 24, 2005
Jkt 205001
II. Summary
The purpose of this notice is to
provide the public an opportunity to
review and comment on the Interim
Staff Guidance documents for fuel cycle
facilities. Draft Interim Staff Guidance–
01, Version 02, provides guidance to
NRC staff relative to methods for
qualitative evaluation of likelihood in
the context of a review of a license
application or amendment request
under 10 CFR part 70, subpart H. ISG–
01, Version 02, has been generally
revised based on NRC staff and public
comments on the initial version. Interim
Staff Guidance–03, Revision 0 has been
approved and issued and provides
guidance to NRC staff relative to
relationships between 10 CFR part 70,
subpart H, nuclear criticality safety
performance requirements and the
double contingency principle. Draft
Interim Staff Guidance–04, Version 0
provides guidance to NRC staff relative
to baseline design criteria for new
facilities and new processes at existing
facilities.
III. Further Information
Documents related to this action are
available electronically at the NRC’s
Electronic Reading Room at https://
www.nrc.gov/reading-rm/adams.html.
From this site, you can access the NRC’s
Agencywide Document Access and
Management System (ADAMS), which
provides text and image files of NRC’s
public documents. The ADAMS
accession numbers for the documents
related to this notice are provided in the
following table. If you do not have
access to ADAMS or if there are
problems in accessing the documents
located in ADAMS, contact the NRC
Public Document Room (PDR) Reference
staff at 1–800–397–4209, 301–415–4737,
or by e-mail to pdr@nrc.gov.
Interim staff guidance
Interim Staff Guidance–01, Version
02.
Interim Staff Guidance–03, Revision
0.
Interim Staff Guidance–04, Version 0.
ADAMS accession
number
ML050690286.
ML050690302.
ML050690296.
These documents may also be viewed
electronically on the public computers
located at the NRC’s PDR, O 1 F21, One
White Flint North, 11555 Rockville
Pike, Rockville, MD 20852. The PDR
reproduction contractor will copy
documents for a fee. Comments and
questions on ISG–01 and ISG–04 should
be directed to the NRC contact listed
below by April 25, 2005. Comments
PO 00000
Frm 00096
Fmt 4703
Sfmt 4703
15371
received after this date will be
considered if it is practical to do so, but
assurance of consideration cannot be
given to comments received after this
date. Wilkins Smith, Project Manager,
Technical Support Group, Division of
Fuel Cycle Safety and Safeguards, Office
of Nuclear Material Safety and
Safeguards, U.S. Nuclear Regulatory
Commission, Washington, DC 20005–
0001. Comments can also be submitted
by telephone, fax, or e-mail which are
as follows: Telephone: (301) 415–5788;
fax number: (301) 415–5370; e-mail:
wrs@nrc.gov.
Dated in Rockville, Maryland this 18th day
of March, 2005.
For the Nuclear Regulatory Commission.
David H. Tiktinsky,
Acting Chief, Technical Support Group,
Division of Fuel Cycle Safety and Safeguards,
Office of Nuclear Material Safety and
Safeguards.
[FR Doc. 05–5902 Filed 3–24–05; 8:45 am]
BILLING CODE 7590–01–P
SECURITIES AND EXCHANGE
COMMISSION
Sunshine Act Meetings
Notice is hereby given, pursuant to
the provisions of the Government in the
Sunshine Act, Pub. L. 94–409, that the
Securities and Exchange Commission
will hold the following meetings during
the week of March 28, 2005:
An open meeting will be held on
Tuesday, March 29, 2005, at 10 a.m. in
Room 1C30 and closed meetings will be
held on Tuesday, March 29, 2005, at 11
a.m. and Thursday, March 31, 2005, at
2 p.m.
Commissioners, Counsel to the
Commissioners, the Secretary to the
Commission, and recording secretaries
will attend the closed meeting. Certain
staff members who have an interest in
the matters may also be present.
The General Counsel of the
Commission, or his designee, has
certified that, in his opinion, one or
more of the exemptions set forth in 5
U.S.C. 552b(c)(3), (5), (7), (9)(B), and
(10) and 17 CFR 200.402(a)(3), (5), (7),
9(ii) and (10), permit consideration of
the scheduled matters at the closed
meeting.
Commissioner Goldschmid, as duty
officer, voted to consider the items
listed for the closed meeting in closed
session.
The subject matter of the open
meeting scheduled for Tuesday, March
29, 2005, will be:
The Commission will hear oral argument
on appeals by Robert W. Armstrong, III and
E:\FR\FM\25MRN1.SGM
25MRN1
Agencies
[Federal Register Volume 70, Number 57 (Friday, March 25, 2005)]
[Notices]
[Page 15371]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-5902]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Notice of Availability of Interim Staff Guidance Documents For
Fuel Cycle Facilities
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of availability.
-----------------------------------------------------------------------
FOR FURTHER INFORMATION CONTACT: Wilkins Smith, Project Manager,
Technical Support Group, Division of Fuel Cycle Safety and Safeguards,
Office of Nuclear Material Safety and Safeguards, U.S. Nuclear
Regulatory Commission, Washington, DC 20005-0001. Telephone: (301) 415-
5788; fax number: (301) 415-5370; e-mail: wrs@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The Nuclear Regulatory Commission (NRC) is preparing and issuing
Interim Staff Guidance (ISG) documents for fuel cycle facilities. These
ISG documents provide clarifying guidance to the NRC staff when
reviewing licensee integrated safety analyses, license applications or
amendment requests or other related licensing activities for fuel cycle
facilities under subpart H of 10 CFR part 70. The NRC is soliciting
public comments on two ISG Draft documents (ISG-01 and -04) which will
be considered in the final versions or subsequent revisions. ISG-03 has
been issued and is provided for information.
II. Summary
The purpose of this notice is to provide the public an opportunity
to review and comment on the Interim Staff Guidance documents for fuel
cycle facilities. Draft Interim Staff Guidance-01, Version 02, provides
guidance to NRC staff relative to methods for qualitative evaluation of
likelihood in the context of a review of a license application or
amendment request under 10 CFR part 70, subpart H. ISG-01, Version 02,
has been generally revised based on NRC staff and public comments on
the initial version. Interim Staff Guidance-03, Revision 0 has been
approved and issued and provides guidance to NRC staff relative to
relationships between 10 CFR part 70, subpart H, nuclear criticality
safety performance requirements and the double contingency principle.
Draft Interim Staff Guidance-04, Version 0 provides guidance to NRC
staff relative to baseline design criteria for new facilities and new
processes at existing facilities.
III. Further Information
Documents related to this action are available electronically at
the NRC's Electronic Reading Room at https://www.nrc.gov/reading-rm/
adams.html. From this site, you can access the NRC's Agencywide
Document Access and Management System (ADAMS), which provides text and
image files of NRC's public documents. The ADAMS accession numbers for
the documents related to this notice are provided in the following
table. If you do not have access to ADAMS or if there are problems in
accessing the documents located in ADAMS, contact the NRC Public
Document Room (PDR) Reference staff at 1-800-397-4209, 301-415-4737, or
by e-mail to pdr@nrc.gov.
------------------------------------------------------------------------
Interim staff guidance ADAMS accession number
------------------------------------------------------------------------
Interim Staff Guidance-01, Version 02..... ML050690286.
Interim Staff Guidance-03, Revision 0..... ML050690302.
Interim Staff Guidance-04, Version 0...... ML050690296.
------------------------------------------------------------------------
These documents may also be viewed electronically on the public
computers located at the NRC's PDR, O 1 F21, One White Flint North,
11555 Rockville Pike, Rockville, MD 20852. The PDR reproduction
contractor will copy documents for a fee. Comments and questions on
ISG-01 and ISG-04 should be directed to the NRC contact listed below by
April 25, 2005. Comments received after this date will be considered if
it is practical to do so, but assurance of consideration cannot be
given to comments received after this date. Wilkins Smith, Project
Manager, Technical Support Group, Division of Fuel Cycle Safety and
Safeguards, Office of Nuclear Material Safety and Safeguards, U.S.
Nuclear Regulatory Commission, Washington, DC 20005-0001. Comments can
also be submitted by telephone, fax, or e-mail which are as follows:
Telephone: (301) 415-5788; fax number: (301) 415-5370; e-mail:
wrs@nrc.gov.
Dated in Rockville, Maryland this 18th day of March, 2005.
For the Nuclear Regulatory Commission.
David H. Tiktinsky,
Acting Chief, Technical Support Group, Division of Fuel Cycle Safety
and Safeguards, Office of Nuclear Material Safety and Safeguards.
[FR Doc. 05-5902 Filed 3-24-05; 8:45 am]
BILLING CODE 7590-01-P