NASA Exploration Transportation System Strategic Roadmap Committee; Meeting, 15130 [05-5832]
Download as PDF
15130
Federal Register / Vol. 70, No. 56 / Thursday, March 24, 2005 / Notices
TABLE 1.—SUMMARY OF POTENTIAL ENVIRONMENTAL IMPACTS OF ALTERNATIVES A, B, AND C (MITIGATION INDICATED IN
FOOTNOTES)—Continued
Alternative A: Consolidation
Resource 1
A.2.1 NASA
Johnson
Space
Center
A.2.2 NASA
Stennis
Space
Center
A.4.1 Aerospace
Technology
Park
A.4.2 Central Florida
Research
Park
A.4.3 City
Center at
Oyster
Point
A.4.4
Cummings Research Park
Alternative
B: Virtual
consolidation
Alternative
C: No
action
Environmental Justice 23
No adverse
impact.
No adverse
impact.
No adverse
impact.
No adverse
impact.
No adverse
impact.
No adverse impact.
No adverse
impact.
No adverse
impact.
1 Alternative A: NASA NSSC Environmental Management System to be developed and full-or part-time NASA NSSC Environmental Manager
to be designated. Alternatives B and C: Current NASA Center EMS would apply.
2 Alternative A: All nominations required consistency with NASA’s sustainable facilities policy.
3 No Level/Phase 1 Site Assessment. Available information does not indicate contamination likely. Confirmatory Environmental Site Assessment for contamination required prior to lease or contract.
4 Center-wide survey completed. No contamination indicated at the proposed site. State of Mississippi concurred.
5 No Level/Phase 1 Site Assessment. Available information does not indicate contamination likely. Confirmatory Environmental Site Assessment for contamination required prior to lease or contract.
6 No LevelPhase 1 Site Assessment. Available information does not indicate contamination likely. Confirmatory Environmental Site Assessment
for contamination required prior to lease or contract.
7 Level/Phase 1 Site Assessment completed. Level 2 Site Assessment not indicated.
8 Level/Phase 1 Site Assessment completed. Level 2 Site Assessment not indicated.
9 Alternative A: NASA NSSC Energy Manager, full-or part-time, to be designated. Alternatives B and C: Current on-site NASA Center Energy
Manager.
10 Noise impacts from adjoining airport to be mitigated in accordance with occupational health and safety regulations and local noise codes.
11 Confirmatory Clean Air Act General Conformity Determination (NO
X and VOCs) may be required; construction scheduling adjustment and
other mitigation may be required if results for relevant emissions exceed de minimus levels. Preliminary analysis indicated that levels would be
well below de minimus levels.
12 State Environmental Resources Permit would be required.
13 State approved stormwater management plan would be required.
14 All: If protected species are subsequently discovered on site or species on site are later designated for protection, NASA will consult with the
U.S. Fish and Wildlife Service.
15 Pre-construction survey required for migratory birds and, if results indicate presence, adjustment of construction schedule may be required.
16 Pre-construction survey required for migratory birds and Indiana bat and if results indicate presence, adjustment of construction schedule
may be required.
17 Clean Water Act sec. 404 wetlands permit from the Army Corps of Engineers required; wetlands mitigation planned off-site.
18 Alternative A: If unanticipated discovery occurs during excavation or construction, consultation with SHPO would be required to development
mitigation plan if needed that may include adjustment of the footprint or construction schedule, data recovery, curation, and public education display.
19 No impact to National Historic Landmarks at Johnson Space Center. Confirmatory site testing for archeological resources may be required,
and if results indicate presence, consultation with SHPO would be required to development mitigation plan if needed that may include adjustment
of the footprint or construction schedule, data recovery, curation, and public education display.
20 Site testing for archeological resources would be required as recommended by SHPO, and if results indicate presence, consultation with
SHPO would be required to development mitigation plan if needed that may include adjustment of the footprint or construction schedule, data recovery, curation, and public education display.
21 Confirmatory site testing for archeological resources may be required, and if results indicate presence, consultation with SHPO would be required to development mitigation plan if needed that may include adjustment of the footprint or construction schedule, data recovery, curation,
and public education display.
22 Confirmatory site testing for archeological resources may be required, and if results indicate presence, consultation with SHPO would be required to development mitigation plan if needed that may include adjustment of the footprint or construction schedule, data recovery, curation,
and public education display.
23 Alternative A: NASA NSSC EJ Strategy would be developed. Alternatives B and C: Current NASA Center EJ Strategy would apply.
[FR Doc. 05–5772 Filed 3–23–05; 8:45 am]
BILLING CODE 7510–13–P
NATIONAL AERONAUTICS AND
SPACE ADMINISTRATION
[Notice 05–061]
NASA Exploration Transportation
System Strategic Roadmap
Committee; Meeting
National Aeronautics and
Space Administration (NASA).
ACTION: Notice of meeting.
AGENCY:
SUMMARY: In accordance with the
Federal Advisory Committee Act, Public
Law 92–463, as amended, the National
Aeronautics and Space Administration
announces a forthcoming meeting of the
VerDate jul<14>2003
15:04 Mar 23, 2005
Jkt 205001
NASA Exploration Transportation
System Strategic Roadmap Committee.
DATES: Monday, April 18, 2005, 8 a.m.
to 6 p.m.; and Tuesday, April 19, 2005,
8 a.m. to 5 p.m.
ADDRESSES: Hilton Crystal City Hotel,
2399, Jefferson Davis Highway,
Arlington, VA 22202.
FOR FURTHER INFORMATION CONTACT: Dr.
Dana Gould, MS 149, National
Aeronautics and Space Administration
Langley Research Center, Hampton, VA
23681–2199 (757) 864–7747.
SUPPLEMENTARY INFORMATION: The
meeting will be open to the public up
to the capacity of the room. Visitors to
the meeting will be requested to sign a
visitor’s register.
The agenda for the meeting includes
the following topics:
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
—Summary of Relevant Strategic
Roadmaps.
—Summary of Relevant Capability
Roadmaps.
—Overview of Roadmap Integration.
—Transportation Roadmap Update and
Deliberations.
It is imperative that the meeting be
held on this date to accommodate the
scheduling priorities of the key
participants.
Dated: March 18, 2005.
P. Diane Rausch,
Advisory Committee Management Officer,
National Aeronautics and Space
Administration.
[FR Doc. 05–5832 Filed 3–23–05; 8:45 am]
BILLING CODE 7510–13–P
E:\FR\FM\24MRN1.SGM
24MRN1
Agencies
[Federal Register Volume 70, Number 56 (Thursday, March 24, 2005)]
[Notices]
[Page 15130]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-5832]
-----------------------------------------------------------------------
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
[Notice 05-061]
NASA Exploration Transportation System Strategic Roadmap
Committee; Meeting
AGENCY: National Aeronautics and Space Administration (NASA).
ACTION: Notice of meeting.
-----------------------------------------------------------------------
SUMMARY: In accordance with the Federal Advisory Committee Act, Public
Law 92-463, as amended, the National Aeronautics and Space
Administration announces a forthcoming meeting of the NASA Exploration
Transportation System Strategic Roadmap Committee.
DATES: Monday, April 18, 2005, 8 a.m. to 6 p.m.; and Tuesday, April 19,
2005, 8 a.m. to 5 p.m.
ADDRESSES: Hilton Crystal City Hotel, 2399, Jefferson Davis Highway,
Arlington, VA 22202.
FOR FURTHER INFORMATION CONTACT: Dr. Dana Gould, MS 149, National
Aeronautics and Space Administration Langley Research Center, Hampton,
VA 23681-2199 (757) 864-7747.
SUPPLEMENTARY INFORMATION: The meeting will be open to the public up to
the capacity of the room. Visitors to the meeting will be requested to
sign a visitor's register.
The agenda for the meeting includes the following topics:
--Summary of Relevant Strategic Roadmaps.
--Summary of Relevant Capability Roadmaps.
--Overview of Roadmap Integration.
--Transportation Roadmap Update and Deliberations.
It is imperative that the meeting be held on this date to
accommodate the scheduling priorities of the key participants.
Dated: March 18, 2005.
P. Diane Rausch,
Advisory Committee Management Officer, National Aeronautics and Space
Administration.
[FR Doc. 05-5832 Filed 3-23-05; 8:45 am]
BILLING CODE 7510-13-P