Dominion Cove Point LNG, LP; Notice of New Public Comment Period (Scoping)�09�09�09�09�09, 14671 [E5-1273]
Download as PDF
Federal Register / Vol. 70, No. 55 / Wednesday, March 23, 2005 / Notices
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
order to provide adequate opportunity
for newly identified stakeholders to
become involved in our Pre-Filing
Review Process, the Commission staff is
opening a new public comment period.
This comment period is specific to only
those newly identified facilities. The
Commission staff is particularly
interested in learning about issues not
already addressed or identified from the
project’s previous scoping period.
Please note this public comment period
will close onApril 18, 2005.
The Commission staff has notified the
newly identified stakeholders, and has
invited them to participate in the
ongoing pre-filing review. A copy of this
letter, along with an enclosure that lists
all the proposed facilities in Dominion’s
updated Cove Point LNG Expansion
Project, may be viewed on the
Commission’s Web site, at https://
www.ferc.gov (click on eLibrary and
enter the docket number listed above).
Magalie R. Salas,
Secretary.
[FR Doc. E5–1273 Filed 3–22–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Magalie R. Salas,
Secretary.
[FR Doc. E5–1274 Filed 3–22–05; 8:45 am]
Notice of Application Accepting for
Filing and Soliciting Motions to
Intervene, Protests and Comments
BILLING CODE 6717–01–P
March 17, 2005
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF04–15–000]
Dominion Cove Point LNG, LP; Notice
of New Public Comment Period
(Scoping)
March 16, 2005.
On October 14, 2004, the Secretary of
the Commission issued a ‘‘Notice of
Intent To Prepare an Environmental
Impact Statement (EIS) for the Proposed
Dominion Cove Point LNG Expansion
Project, Request for Comments on
Environmental Issues, and Notice of
Public Scoping Meetings and Site Visits
(NOI)’’. On November 1, 2004, we
identified additional stakeholders in the
project area and extended the public
comment period, which expired on
December 10, 2004.
Dominion Transmission, Incorporated
(DTI) has identified additional facilities
for inclusion in its proposed project. In
VerDate jul<14>2003
16:27 Mar 22, 2005
Jkt 205001
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12566–000.
c. Date filed: December 13, 2004.
d. Applicant: Edward T. Navickis.
e. Name of Project: East Park Dam
Power Project.
f. Location: On the East Park
Reservoir, part of the Stoney Creek
Watershed, near the town of Stonyford
in Colusa County, California.
g. Filed Pursuant to: Federal Power
Act, 16 USC 791(a)–825(r).
h. Applicant Contact: Mr. Edward T.
Navickis, P.O. Box 910, Penn Valley, CA
95946, (530) 432–9226, FAX (530) 432–
2520.
i. FERC Contact: Etta Foster, (202)
502–8769.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with Magalie R.
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
14671
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE, Washington, DC. 20426.
Please include the project number (P–
12566–000) on any comments, protests,
or motions filed.
k. Description of Project: The
proposed project would consist of: (1) A
100 foot extension of the existing
diameter outlet pipe; (2) a reservoir with
a storage capacity of 50,900 acre-feet; (3)
a new 600 square-foot powerhouse at
the edge of the existing plunge pool,
containing one generating unit with an
installed capacity of 1,325 kW; (4)
approximately 2 miles of third power
wire line upgrades and approximately 2
miles of new three phase power line
tying into PG&E’s existing distribution
system; (5) a powerline easement
approximately one mile-long , and 20feet wide; (6) a road easement
approximately one mile-long and 30-feet
wide; (7) approximately 40,000 squarefeet of land at the base of the dam for
the powerhouse; and (8) appurtenant
facilities.
The project would have an annual
generation of 4 million kilowatt-hours
that would be sold to Pacific Gas &
Electric Company, an independent
power distributor, or the California PX.
l. Location of Application: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE,
Room 2A, Washington, DC 20426, or by
calling (202) 502-8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h.
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary PermitAnyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
E:\FR\FM\23MRN1.SGM
23MRN1
Agencies
[Federal Register Volume 70, Number 55 (Wednesday, March 23, 2005)]
[Notices]
[Page 14671]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1273]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PF04-15-000]
Dominion Cove Point LNG, LP; Notice of New Public Comment Period
(Scoping)
March 16, 2005.
On October 14, 2004, the Secretary of the Commission issued a
``Notice of Intent To Prepare an Environmental Impact Statement (EIS)
for the Proposed Dominion Cove Point LNG Expansion Project, Request for
Comments on Environmental Issues, and Notice of Public Scoping Meetings
and Site Visits (NOI)''. On November 1, 2004, we identified additional
stakeholders in the project area and extended the public comment
period, which expired on December 10, 2004.
Dominion Transmission, Incorporated (DTI) has identified additional
facilities for inclusion in its proposed project. In order to provide
adequate opportunity for newly identified stakeholders to become
involved in our Pre-Filing Review Process, the Commission staff is
opening a new public comment period. This comment period is specific to
only those newly identified facilities. The Commission staff is
particularly interested in learning about issues not already addressed
or identified from the project's previous scoping period. Please note
this public comment period will close onApril 18, 2005.
The Commission staff has notified the newly identified
stakeholders, and has invited them to participate in the ongoing pre-
filing review. A copy of this letter, along with an enclosure that
lists all the proposed facilities in Dominion's updated Cove Point LNG
Expansion Project, may be viewed on the Commission's Web site, at
https://www.ferc.gov (click on eLibrary and enter the docket number
listed above).
Magalie R. Salas,
Secretary.
[FR Doc. E5-1273 Filed 3-22-05; 8:45 am]
BILLING CODE 6717-01-P