Record of Decision for the Proposed Leasing of Lands at Fort Bliss, Texas for the Proposed Siting, Construction, and Operation by the City of El Paso of a Brackish Water Desalination Plant and Support Facilities, 13017 [05-5326]
Download as PDF
Federal Register / Vol. 70, No. 51 / Thursday, March 17, 2005 / Notices
Board members whose terms expire may
be made by individuals, firms or
associations. Nominations will:
(1) State the region to be represented.
(2) State whether the nominee is
representing carriers, shippers or both.
(3) Provide information on the
nominee’s personal qualifications.
(4) Include the commercial operations
of the carrier and/or shipper with whom
the nominee is affiliated. This
commercial operations information will
show the actual or estimated ton-miles
of each commodity carried or shipped
on the inland waterways system in a
recent year (or years) using the
waterway regions and commodity
categories previously listed.
Nominations received in response to
Federal Register notice published on
January 14, 2004 (69 FR 2122) have been
retained for consideration.
Renomination is not required but may
be desirable.
e. Deadline for Nominations. All
nominations must be received at the
address shown above no later than April
22, 2005.
Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 05–5327 Filed 3–16–05; 8:45 am]
BILLING CODE 3710–92–M
DEPARTMENT OF DEFENSE
Department of the Army
Record of Decision for the Proposed
Leasing of Lands at Fort Bliss, Texas
for the Proposed Siting, Construction,
and Operation by the City of El Paso
of a Brackish Water Desalination Plant
and Support Facilities
Department of the Army, DoD.
Notice.
AGENCY:
ACTION:
The Department of the Army
announces the execution of a Record of
Decision (ROD) to grant an easement to
the City of El Paso, El Paso Water
Utilities (EPWU), for land in the South
Training Areas of Fort Bliss for
construction and operation of a
desalination plant and support facilities,
including wells, pipelines, and disposal
sites for the residual brine, referred to as
concentrate, resulting from the
desalination process. The ROD was
signed on March 7, 2005, pursuant to
the completion of a Final Environmental
Impact Statement (FEIS) dated
December 2004.
ADDRESSES: To obtain copies of the
ROD, contact John F. Barrera (915) 568–
3908 or write to: Fort Bliss Directorate
of the Environment, ATTN: IMSW–
SUMMARY:
VerDate jul<14>2003
14:51 Mar 16, 2005
Jkt 205001
BLS–Z, Building 624, Pleasanton Road,
Fort Bliss, TX 79916–6812.
FOR FURTHER INFORMATION CONTACT: John
F. Barrera, (915) 568–3908.
SUPPLEMENTARY INFORMATION: The
desalination plant is needed to provide
an additional reliable source of potable
water for the City of El Paso and Fort
Bliss. Currently, both EPWU and Fort
Bliss pump fresh groundwater from the
Hueco Bolson Aquifer. Ongoing
withdrawals of fresh groundwater from
the bolson exceed the aquifer’s recharge
rate. Pumping of fresh groundwater by
EPWU, the Army, Ciudad Juarez, and
others has resulted in declining
groundwater levels in the bolson.
Brackish groundwater is intruding into
the aquifer’s freshwater area and has the
potential to affect existing water wells
on Fort Bliss and in other areas of El
Paso. The desalination plant will treat
brackish (salty) water from the Hueco
Bolson Aquifer to provide potable water
for use by the city and Fort Bliss.
The FEIS addressed the potential
environmental effects of the proposed
project and analyzed seven alternatives
in detail; six action alternatives and the
No Action Alternative. The six action
alternatives comprised alternative
combinations of three candidate sites for
the desalination plant itself—Sites 1, 2,
and 3—and two alternatives for
disposing of the concentrate, deep-well
injection and evaporation ponds. The
Army has decided to grant an easement
to EPWU to implement Alternative 3,
consisting of desalination plant Site 3,
an undeveloped site near Montana
Avenue east of El Paso International
Airport, and disposal of the concentrate
through deep-well injection at a location
in the northeast corner of the South
Training Areas of Fort Bliss near the
Texas-New Mexico border.
In reaching this decision, the Army
considered its own needs for a reliable
source of potable water, compatibility
with its training mission, and the
environmental consequences associated
with each alternative. The Army
decided not to select the No Action
Alternative because it fails to address
the issues of declining freshwater
supplies and impending brackish
groundwater intrusion on Fort Bliss
wells. Among the action alternatives,
the Army selected deep-well injection
as the preferred concentrate disposal
method because it is the preferred
method of EPWU and, with the
protection provided by the Texas
Commission on Environmental Quality
permitting process, appears to have less
potential for adverse environmental
impacts than the evaporation ponds.
The three desalination plant sites do not
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
13017
differ materially in their compatibility
with the Army’s mission or their
environmental effects; therefore, the
Army selected Site 3 because it is
EPWU’s preferred site due to its
proximity to roads and utilities, as well
as to EPWU’s water distribution system.
All practicable means of avoiding or
minimizing environmental harm have
been adopted through site selection and
mitigation measures. The desalination
plant site does not contain sensitive
cultural or biological resources, and a
desalination plant is compatible with
near-by land uses. Mitigation measures
to be implemented by EPWU to further
reduce the potential for adverse
environmental impact include the
following:
1. Using dust suppression measures
during ground disturbance to prevent
erosion and wind-blown dust.
2. Installing pressure monitors in the
concentrate pipeline to detect leaks or
catastrophic failures and developing an
emergency action plan to minimize the
release of concentrate during an
accident or equipment failure.
3. Designing the access road to the
desalination plant site to minimize
impact to traffic flow on Montana
Avenue.
4. Establishing a procedure for EPWU
to coordinate access to the injection
wells and concentrate pipelines with
Fort Bliss to ensure required
maintenance can be performed with
minimal interference with the Army’s
mission at Fort Bliss.
These mitigation measures will be
included as conditions of the easement
to be granted by the Army to EPWU.
Hugh M. Exton, Jr.,
Director, SWRO, Installation Management
Agency.
[FR Doc. 05–5326 Filed 3–16–05; 8:45 am]
BILLING CODE 3710–08–M
DEPARTMENT OF DEFENSE
Department of the Army
Board of Visitors, United States
Military Academy (USMA)
Department of the Army, DoD.
ACTION: Notice of open meeting.
AGENCY:
SUMMARY: In accordance with section
10(a)(2) of the Federal Advisory
Committee Act (Pub. L. 92–463),
announcement is made of the following
meeting:
Name of Committee: Board of
Visitors, United States Military
Academy.
Date: Wednesday, April 13, 2005.
E:\FR\FM\17MRN1.SGM
17MRN1
Agencies
[Federal Register Volume 70, Number 51 (Thursday, March 17, 2005)]
[Notices]
[Page 13017]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-5326]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army
Record of Decision for the Proposed Leasing of Lands at Fort
Bliss, Texas for the Proposed Siting, Construction, and Operation by
the City of El Paso of a Brackish Water Desalination Plant and Support
Facilities
AGENCY: Department of the Army, DoD.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Department of the Army announces the execution of a Record
of Decision (ROD) to grant an easement to the City of El Paso, El Paso
Water Utilities (EPWU), for land in the South Training Areas of Fort
Bliss for construction and operation of a desalination plant and
support facilities, including wells, pipelines, and disposal sites for
the residual brine, referred to as concentrate, resulting from the
desalination process. The ROD was signed on March 7, 2005, pursuant to
the completion of a Final Environmental Impact Statement (FEIS) dated
December 2004.
ADDRESSES: To obtain copies of the ROD, contact John F. Barrera (915)
568-3908 or write to: Fort Bliss Directorate of the Environment, ATTN:
IMSW-BLS-Z, Building 624, Pleasanton Road, Fort Bliss, TX 79916-6812.
FOR FURTHER INFORMATION CONTACT: John F. Barrera, (915) 568-3908.
SUPPLEMENTARY INFORMATION: The desalination plant is needed to provide
an additional reliable source of potable water for the City of El Paso
and Fort Bliss. Currently, both EPWU and Fort Bliss pump fresh
groundwater from the Hueco Bolson Aquifer. Ongoing withdrawals of fresh
groundwater from the bolson exceed the aquifer's recharge rate. Pumping
of fresh groundwater by EPWU, the Army, Ciudad Juarez, and others has
resulted in declining groundwater levels in the bolson. Brackish
groundwater is intruding into the aquifer's freshwater area and has the
potential to affect existing water wells on Fort Bliss and in other
areas of El Paso. The desalination plant will treat brackish (salty)
water from the Hueco Bolson Aquifer to provide potable water for use by
the city and Fort Bliss.
The FEIS addressed the potential environmental effects of the
proposed project and analyzed seven alternatives in detail; six action
alternatives and the No Action Alternative. The six action alternatives
comprised alternative combinations of three candidate sites for the
desalination plant itself--Sites 1, 2, and 3--and two alternatives for
disposing of the concentrate, deep-well injection and evaporation
ponds. The Army has decided to grant an easement to EPWU to implement
Alternative 3, consisting of desalination plant Site 3, an undeveloped
site near Montana Avenue east of El Paso International Airport, and
disposal of the concentrate through deep-well injection at a location
in the northeast corner of the South Training Areas of Fort Bliss near
the Texas-New Mexico border.
In reaching this decision, the Army considered its own needs for a
reliable source of potable water, compatibility with its training
mission, and the environmental consequences associated with each
alternative. The Army decided not to select the No Action Alternative
because it fails to address the issues of declining freshwater supplies
and impending brackish groundwater intrusion on Fort Bliss wells. Among
the action alternatives, the Army selected deep-well injection as the
preferred concentrate disposal method because it is the preferred
method of EPWU and, with the protection provided by the Texas
Commission on Environmental Quality permitting process, appears to have
less potential for adverse environmental impacts than the evaporation
ponds. The three desalination plant sites do not differ materially in
their compatibility with the Army's mission or their environmental
effects; therefore, the Army selected Site 3 because it is EPWU's
preferred site due to its proximity to roads and utilities, as well as
to EPWU's water distribution system.
All practicable means of avoiding or minimizing environmental harm
have been adopted through site selection and mitigation measures. The
desalination plant site does not contain sensitive cultural or
biological resources, and a desalination plant is compatible with near-
by land uses. Mitigation measures to be implemented by EPWU to further
reduce the potential for adverse environmental impact include the
following:
1. Using dust suppression measures during ground disturbance to
prevent erosion and wind-blown dust.
2. Installing pressure monitors in the concentrate pipeline to
detect leaks or catastrophic failures and developing an emergency
action plan to minimize the release of concentrate during an accident
or equipment failure.
3. Designing the access road to the desalination plant site to
minimize impact to traffic flow on Montana Avenue.
4. Establishing a procedure for EPWU to coordinate access to the
injection wells and concentrate pipelines with Fort Bliss to ensure
required maintenance can be performed with minimal interference with
the Army's mission at Fort Bliss.
These mitigation measures will be included as conditions of the
easement to be granted by the Army to EPWU.
Hugh M. Exton, Jr.,
Director, SWRO, Installation Management Agency.
[FR Doc. 05-5326 Filed 3-16-05; 8:45 am]