Invenergy Cannon Falls LLC, et al.; Electric Rate and Corporate Filings, 12672-12674 [E5-1095]

Download as PDF 12672 Federal Register / Vol. 70, No. 49 / Tuesday, March 15, 2005 / Notices regarding MGE’s updated market power analysis filed on November 9, 2004 in Docket No. ER00–586–003, as amended November 15, 2004 in Docket No. ER00– 586–004. Comment Date: 5 p.m. eastern time on March 14, 2005. 4. Devon Power LLC [Docket No. ER03–563–049] Take notice that on February 28, 2005, ISO New England Inc. (ISO–NE) submitted a report updating progress made in siting, permitting and construction of transmission and generation upgrades within the New England control area, in compliance with the Commission’s order issued June 2, 2004, Devon Power LLC, et al., 107 FERC ¶ 61,240. Comment Date: 5 p.m. eastern time on March 21, 2005. 5. Wisconsin River Power Company Take notice that Wisconsin River Power Company, on March 2, 2005, tendered for filing a supplement to the market-based rate application and revised rate schedules in preparation for MISO Day-2 Market Operations filed on January 14, 2005 in Docket No. ER05– 543–000. Wisconsin River Power Company states that copies of the filing were served upon the official service list in this proceeding, PJM, MISO, the Michigan Public Service Commission and the Public Service Commission of Wisconsin. Comment Date: 5 p.m. eastern time on March 14, 2005. 6. Cleco Power LLC [Docket No. ER05–473–001] Take notice that on February 28, 2005, Cleco Power LLC (Cleco Power) filed an erratum to its January 19, 2005 Order No. 2003–B compliance filing in Docket No. ER05–473–000. Comment Date: 5 p.m. eastern time on March 21, 2005. 7. Duke Energy Washington, LLC [Docket No. ER05–623–001] Take notice that on February 28, 2005, Duke Energy Washington, LLC (Duke Washington) submitted an errata to its February 18, 2005 filing in Docket No. ER05–623–000 of its proposed tariff for reactive supply and voltage control from generation sources service. Comment Date: 5 p.m. eastern time on March 21, 2005. 8. Harvard Dedicated Energy Limited [Docket No. ER05–658–000] Take notice that on February 28, 2005, Harvard Dedicated Energy Limited 15:31 Mar 14, 2005 Jkt 205001 9. Mid-Continent Area Power Pool [Docket No. ER05–659–000] Take notice that on February 28, 2005, Mid-Continent Area Power Pool (MAPP) filed a revised Restated Agreement reflecting the changed functions of MAPP. MAPP requested an effective date of March 1, 2005. Comment Date: 5 p.m. eastern time on March 21, 2005. 10. Mill Run Windpower LLC [Docket Nos. ER05–660–000 and ER01–1710– 004] [Docket No. ER05–453–001] VerDate jul<14>2003 (HDEL) filed an application for acceptance of HDEL Rate Schedule FERC No. 1, the granting of certain blanket approvals, including the authority to sell electricity at marketbased rates, and the waiver of certain Commission Regulations. Comment Date: 5 p.m. eastern time on March 21, 2005. Take notice that on February 28, 2005, Mill Run Windpower LLC (Mill Run) filed revisions to its market-based rate tariff and code of conduct. Mill Run states that the revisions make the tariff compliant with Order No. 652, Reporting Requirements for Changes in Status for Public Utilities With MarketBased Rate Authority, 110 FERC ¶ 61,097 (2005). Mill Run requests an effective date of April 25, 2003 for the code of conduct and March 21, 2005 for the Order No. 652 compliance filing. Mill Run states that copies of the filing were served on the official service list for Docket No. ER01–1710 and on the Florida Public Service Commission. Comment Date: 5 p.m. eastern time on March 21, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. 11. Somerset Windpower LLC [Docket Nos. ER05–661–000 and ER01–2139– 005] Linda Mitry, Deputy Secretary. [FR Doc. E5–1094 Filed 3–14–05; 8:45 am] BILLING CODE 6717–01–P Take notice that on February 28, 2005, Somerset Windpower LLC (Somerset) filed revisions to its market-based rate tariff and code of conduct. Somerset states that the revisions make the tariff compliant with Order No. 652, Reporting Requirements for Changes in Status for Public Utilities With MarketBased Rate Authority, 110 FERC ¶ 61,097 (2005). Somerset requests an effective date of April 25, 2003 for the code of conduct and March 21, 2005 for the Order No. 652 compliance filing. Somerset states that copies of the filing were served on the official service list for Docket No. ER01–2139 and on the Florida Public Service Commission. Comment Date: 5 p.m. eastern time on March 21, 2005. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EG05–48–000, et al.] Invenergy Cannon Falls LLC, et al.; Electric Rate and Corporate Filings March 4, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. Invenergy Cannon Falls LLC [Docket No. EG05–48–000] Take notice that on February 25, 2005, Invenergy Cannon Falls LLC (Invenergy E:\FR\FM\15MRN1.SGM 15MRN1 Federal Register / Vol. 70, No. 49 / Tuesday, March 15, 2005 / Notices CF) filed with the Federal Energy Regulatory Commission an application for determination of exempt wholesale generator status pursuant to part 365 of the Commission’s regulations. Invenergy CF states it is a Delaware limited liability company that will construct, own and operate an approximately 357 MW electric generation facility located in Cannon Falls, Minnesota. Invenergy CF further states it will sell power exclusively at wholesale. Comment Date: 5 p.m. eastern time on March 18, 2005. 2. Judith Gap Energy LLC 5. Grant Energy, Inc. Comment Date: 5 p.m. eastern time on March 21, 2005. [Docket No. ER05–557–001] Take notice that on February 28, 2005, Grant Energy, Inc. (Grant) amended its petition to the Commission filed February 4, 2005 in Docket No. ER05– 557–000 for acceptance of Grant Rate Schedule FERC No. 1; the granting of certain blanket approvals, including the authority to sell electricity at marketbased rates; and the waiver of certain Commission regulations. Comment Date: 5 p.m. eastern time on March 14, 2005. 6. Southwest Power Pool, Inc. [Docket No. ER05–651–000] [Docket No. EG05–49–000] Take notice that on February 25, 2005, Judith Gap Energy LLC (Judith Gap) filed with the Federal Energy Regulatory Commission an application for determination of exempt wholesale generator status pursuant to part 365 of the Commission’s regulations. Judith Gap states it is a Montana limited liability company that will construct, own and operate an approximately up to 188 MW electric generation facility located in Wheatland County, Montana. Judith Gap further states it will sell power exclusively at wholesale. Comment Date: 5 p.m. eastern time on March 18, 2005. Take notice that on February 28, 2005, Southwest Power Pool, Inc. (SPP) submitted for filing an unexecuted large generator interconnection agreement between SPP, FPL Energy Cowboy Wind, LLC (FPL Energy), and Public Service Company of Oklahoma (PSO). SPP seeks an effective date of March 1, 2005. SPP states that both FPL Energy and PSO were served with a copy of this filing. Comment Date: 5 p.m. eastern time March 21, 2005. 7. Southwest Power Pool, Inc. [Docket No. ER05–652–000] Take notice that on February 25, 2005, Spring Canyon Energy LLC (Spring Canyon) filed with the Federal Energy Regulatory Commission an application for determination of exempt wholesale generator status pursuant to part 365 of the Commission’s regulations. Spring Canyon states it is a Delaware limited liability company that will construct, own and operate an approximately up to 188 MW electric generation facility located in Logan, County, Colorado. Spring Canyon further states it will sell power exclusively at wholesale. Comment Date: 5 p.m. eastern time on March 18, 2005. Take notice that on February 28, 2005, Southwest Power Pool, Inc. (SPP) submitted a filing to revise its Open Access Transmission Tariff to implement a regional transmission cost allocation proposal with regard to new transmission upgrades. SPP states that it also submitted its filing to comply with the Commission’s February 10, 2004 order in Docket No. RT04–1–000. SPP seeks an effective date of May 5, 2005 for the cost allocation proposal. SPP states it has served a copy of this filing on all parties to this proceeding, as well as upon each of its members and customers. SPP further states that a complete copy of this filing will be posted on the SPP Web site https:// www.spp.org, and is also being served on all affected state commissions. Comment Date: 5 p.m. eastern time on March 21, 2005. 4. The Detroit Edison Company 8. Southwest Reserve Sharing Group [Docket Nos. EL01–51–007, ER01–1649–007] [Docket No. ER05–653–000] Take notice that on March 1, 2005, The Detroit Edison Company (Detroit Edison) filed an amendment to First Revised Replacement Sheet No. 22 of Detroit Edison’s Distribution Interconnection Agreement with Dearborn Industrial Generation, LLC. Comment Date: 5 p.m. eastern time on March 22, 2005. Take notice that on February 28, 2005, Tucson Electric Power Company tendered for filing, on behalf of the members of the Southwest Reserve Sharing Group, an amendment to the Southwest Reserve Sharing Group Participation Agreement expanding membership to include New Harquahala Generating Company. 3. Spring Canyon Energy LLC [Docket No. EG05–50–000] VerDate jul<14>2003 15:31 Mar 14, 2005 Jkt 205001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 12673 9. Phoenix Energy Trading, LLC [Docket No. ER05–654–000] Take notice that on February 28, 2005, Phoenix Energy Trading, LLC. (PHOENIX) petitioned the Commission for acceptance of PHOENIX Rate Schedule FERC No. 1; the granting of certain blanket approvals, including the authority to sell electricity at marketbased rates; and the waiver of certain Commission regulations. PHOENIX states that it intends to engage in wholesale electric power and energy purchases and sales as a marketer. PHOENIX further states it is not in the business of generating or transmitting electric power. Comment Date: 5 p.m. eastern time on March 21, 2005. 10. Midwest Independent Transmission System Operator, Inc. [Docket No. ER05–656–000] Take notice that, on February 28, 2005, the Midwest Independent Transmission System Operator, Inc. (Midwest ISO) submitted an agreement for compensation of generator-supplied services by and among White Pine Electric Power, LLC (Generator), American Transmission Company, LLC (Transmission Owner) and the Midwest ISO. The Midwest ISO states it has served copies of this filing on the parties to this agreement. In addition, the Midwest ISO states it has electronically served a copy of this filing upon all Midwest ISO members, member representatives of transmission owners and nontransmission owners, the Midwest ISO Advisory Committee participants, as well as all state commissions within the region. In addition, Midwest ISO states that the filing has been electronically posted on the Midwest ISO’s Web site at https://www.midwestiso.org under the heading ‘‘Filings to FERC.’’ Comment Date: 5 p.m. eastern time March 21, 2005. 11. Ocean State Power I, Ocean State Power II [Docket No. ER05–657–000] Take notice that on February 28, 2005, Ocean State Power I and Ocean State Power II (collectively, Ocean State) tendered for filing revised tariff sheets to Rate Schedule FERC Nos. 1–8 to update Ocean State’s rate of return on equity (ROE). Ocean State also tendered for filing changes to Rate Schedule FERC Nos. 1 and 5 reflecting a substitution of purchaser. Ocean State requested an effective date of April 29, E:\FR\FM\15MRN1.SGM 15MRN1 12674 Federal Register / Vol. 70, No. 49 / Tuesday, March 15, 2005 / Notices 2005 for the ROE changes and December 21, 2004 for the substitution of purchaser. Ocean State indicates that copies of the filing have been served on Ocean State’s power purchasers, the Commonwealth of Massachusetts Department of Telecommunications and Energy and the Rhode Island Public Utilities Commission. Comment Date: 5 p.m. eastern time on March 21, 2005. 12. Birchwood Power Partners, L.P. [Docket Nos. QF93–126–004, EL05–69–000] Take notice that on February 28, 2005, Birchwood Power Partners, L.P. (Birchwood) submitted a request for declaratory order and a petition for limited waiver of the operating standard for its cogeneration facility located in King George County, Virginia for the calendar year 2001 pursuant to section 292.205(c) of the Commission’s regulations. Comment Date: 5 p.m. eastern time on March 21, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call VerDate jul<14>2003 15:31 Mar 14, 2005 Jkt 205001 (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Linda Mitry, Deputy Secretary. [FR Doc. E5–1095 Filed 3–14–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER99–1522–003, et al.] Bangor Hydro-Electric Company, et al.; Electric Rate and Corporate Filings March 8, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. Bangor Hydro-Electric Company, Emera Energy Services, Inc., Emera Energy U.S. Subsidiary No. 1, Inc. [Docket Nos. ER99–1522–003, ER02–723– 002, and ER04–359–001] Take notice that on March 1, 2005, Bangor Hydro-Electric Company (Bangor Hydro), Emera Energy Services, Inc. (EES) and Emera Energy U.S. Subsidiary No. 1, Inc. (Emera Energy Sub No. 1) tendered for filing a triennial market power analysis and tariff revisions in compliance with Order No. 652, Reporting Requirements for Changes in Status for Public Utilities with Market-Based Rate Authority, 110 FERC ¶ 61,097 (2005). Bangor Hydro, EES and Emera Energy Sub No. 1 state that copies of the filing were served on the parties listed on the official service lists, their market-based rate tariff jurisdictional customers, the Maine Public Utilities Commission and Maine’s Office of Public Advocate. Comment Date: 5 p.m. eastern time on March 22, 2005. 2. Astoria Energy LLC [Docket No. ER01–3103–007] Take notice that on March 1, 2005, Astoria Energy LLC filed a triennial updated market power analysis and revised tariff sheets in compliance with Order No. 652, Reporting Requirements for Changes in Status for Public Utilities with Market-Based Rate Authority, 110 FERC ¶ 61,097 (2005). Comment Date: 5 p.m. eastern time on March 22, 2005. PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 3. Devon Power LLC, Middletown Power LLC, Montville Power LLC, Norwalk Power LLC, NRG Power Marketing Inc. [Docket No. ER04–23–009] Take notice that on March 1, 2005, Devon Power LLC, Middletown Power LLC, Montville Power LLC and Norwalk Power LLC (collectively, NRG) tendered for filing a statement showing the C–1 and C–2 costs incurred during the period April 1, 2004, through December 31, 2004, in compliance with the Commission’s order issued January 27, 2005, in ISO New England., et al., 110 FERC ¶ 61,079 (2005). Comment Date: 5 p.m. eastern time on March 22, 2005. 4. Midwest Independent Transmission System Operator, Inc. [Docket No. ER05–662–000] Take notice that on March 1, 2005, the Midwest Independent Transmission System Operator, Inc. (Midwest ISO) submitted a large generator interconnection agreement among Darlington Wind Farm, LLC, American Transmission Company LLC and the Midwest ISO. Midwest ISO states that a copy of the filing was served on the parties to the interconnection agreement. Comment Date: 5 p.m. eastern time on March 22, 2005. 5. New England Power Pool [Docket No. ER05–663–000] Take notice that on March 1, 2005, the New England Power Pool (NEPOOL) Participants Committee filed for acceptance materials to permit NEPOOL to expand its membership to include the Lincoln Paper and Tissue, Inc. (Lincoln Paper), PPM Energy, Inc. (PPM Energy) and Rentricity Inc. (Rentricity). The Participants Committee requests effective dates of March 1, 2005, for Lincoln Paper, April 1, 2005, for Rentricity and May 1, 2005, for PPM Energy. The Participants Committee states that copies of the materials were sent to the New England state governors and regulatory commissions and the participants in NEPOOL. Comment Date: 5 p.m. eastern time on March 22, 2005. 6. Southwest Power Pool, Inc. [Docket No. ER05–666–000] Take notice that on March 1, 2005, Southwest Power Pool, Inc. (SPP) submitted revisions to its regional Open Access Transmission Tariff (OATT or Tariff) proposing the following: (1) To revise Section 3 of its OATT to add a new Schedule 4–A to offer Generation E:\FR\FM\15MRN1.SGM 15MRN1

Agencies

[Federal Register Volume 70, Number 49 (Tuesday, March 15, 2005)]
[Notices]
[Pages 12672-12674]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1095]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EG05-48-000, et al.]


Invenergy Cannon Falls LLC, et al.; Electric Rate and Corporate 
Filings

March 4, 2005.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. Invenergy Cannon Falls LLC

[Docket No. EG05-48-000]

    Take notice that on February 25, 2005, Invenergy Cannon Falls LLC 
(Invenergy

[[Page 12673]]

CF) filed with the Federal Energy Regulatory Commission an application 
for determination of exempt wholesale generator status pursuant to part 
365 of the Commission's regulations.
    Invenergy CF states it is a Delaware limited liability company that 
will construct, own and operate an approximately 357 MW electric 
generation facility located in Cannon Falls, Minnesota. Invenergy CF 
further states it will sell power exclusively at wholesale.
    Comment Date: 5 p.m. eastern time on March 18, 2005.

2. Judith Gap Energy LLC

[Docket No. EG05-49-000]

    Take notice that on February 25, 2005, Judith Gap Energy LLC 
(Judith Gap) filed with the Federal Energy Regulatory Commission an 
application for determination of exempt wholesale generator status 
pursuant to part 365 of the Commission's regulations.
    Judith Gap states it is a Montana limited liability company that 
will construct, own and operate an approximately up to 188 MW electric 
generation facility located in Wheatland County, Montana. Judith Gap 
further states it will sell power exclusively at wholesale.
    Comment Date: 5 p.m. eastern time on March 18, 2005.

3. Spring Canyon Energy LLC

[Docket No. EG05-50-000]

    Take notice that on February 25, 2005, Spring Canyon Energy LLC 
(Spring Canyon) filed with the Federal Energy Regulatory Commission an 
application for determination of exempt wholesale generator status 
pursuant to part 365 of the Commission's regulations.
    Spring Canyon states it is a Delaware limited liability company 
that will construct, own and operate an approximately up to 188 MW 
electric generation facility located in Logan, County, Colorado. Spring 
Canyon further states it will sell power exclusively at wholesale.
    Comment Date: 5 p.m. eastern time on March 18, 2005.

4. The Detroit Edison Company

[Docket Nos. EL01-51-007, ER01-1649-007]

    Take notice that on March 1, 2005, The Detroit Edison Company 
(Detroit Edison) filed an amendment to First Revised Replacement Sheet 
No. 22 of Detroit Edison's Distribution Interconnection Agreement with 
Dearborn Industrial Generation, LLC.
    Comment Date: 5 p.m. eastern time on March 22, 2005.

5. Grant Energy, Inc.

[Docket No. ER05-557-001]

    Take notice that on February 28, 2005, Grant Energy, Inc. (Grant) 
amended its petition to the Commission filed February 4, 2005 in Docket 
No. ER05-557-000 for acceptance of Grant Rate Schedule FERC No. 1; the 
granting of certain blanket approvals, including the authority to sell 
electricity at market-based rates; and the waiver of certain Commission 
regulations.
    Comment Date: 5 p.m. eastern time on March 14, 2005.

6. Southwest Power Pool, Inc.

[Docket No. ER05-651-000]

    Take notice that on February 28, 2005, Southwest Power Pool, Inc. 
(SPP) submitted for filing an unexecuted large generator 
interconnection agreement between SPP, FPL Energy Cowboy Wind, LLC (FPL 
Energy), and Public Service Company of Oklahoma (PSO). SPP seeks an 
effective date of March 1, 2005.
    SPP states that both FPL Energy and PSO were served with a copy of 
this filing.
    Comment Date: 5 p.m. eastern time March 21, 2005.

7. Southwest Power Pool, Inc.

[Docket No. ER05-652-000]

    Take notice that on February 28, 2005, Southwest Power Pool, Inc. 
(SPP) submitted a filing to revise its Open Access Transmission Tariff 
to implement a regional transmission cost allocation proposal with 
regard to new transmission upgrades. SPP states that it also submitted 
its filing to comply with the Commission's February 10, 2004 order in 
Docket No. RT04-1-000. SPP seeks an effective date of May 5, 2005 for 
the cost allocation proposal.
    SPP states it has served a copy of this filing on all parties to 
this proceeding, as well as upon each of its members and customers. SPP 
further states that a complete copy of this filing will be posted on 
the SPP Web site https://www.spp.org, and is also being served on all 
affected state commissions.
    Comment Date: 5 p.m. eastern time on March 21, 2005.

8. Southwest Reserve Sharing Group

[Docket No. ER05-653-000]

    Take notice that on February 28, 2005, Tucson Electric Power 
Company tendered for filing, on behalf of the members of the Southwest 
Reserve Sharing Group, an amendment to the Southwest Reserve Sharing 
Group Participation Agreement expanding membership to include New 
Harquahala Generating Company.
    Comment Date: 5 p.m. eastern time on March 21, 2005.

9. Phoenix Energy Trading, LLC

[Docket No. ER05-654-000]

    Take notice that on February 28, 2005, Phoenix Energy Trading, LLC. 
(PHOENIX) petitioned the Commission for acceptance of PHOENIX Rate 
Schedule FERC No. 1; the granting of certain blanket approvals, 
including the authority to sell electricity at market-based rates; and 
the waiver of certain Commission regulations.
    PHOENIX states that it intends to engage in wholesale electric 
power and energy purchases and sales as a marketer. PHOENIX further 
states it is not in the business of generating or transmitting electric 
power.
    Comment Date: 5 p.m. eastern time on March 21, 2005.

10. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER05-656-000]

    Take notice that, on February 28, 2005, the Midwest Independent 
Transmission System Operator, Inc. (Midwest ISO) submitted an agreement 
for compensation of generator-supplied services by and among White Pine 
Electric Power, LLC (Generator), American Transmission Company, LLC 
(Transmission Owner) and the Midwest ISO.
    The Midwest ISO states it has served copies of this filing on the 
parties to this agreement. In addition, the Midwest ISO states it has 
electronically served a copy of this filing upon all Midwest ISO 
members, member representatives of transmission owners and non-
transmission owners, the Midwest ISO Advisory Committee participants, 
as well as all state commissions within the region. In addition, 
Midwest ISO states that the filing has been electronically posted on 
the Midwest ISO's Web site at https://www.midwestiso.org under the 
heading ``Filings to FERC.''
    Comment Date: 5 p.m. eastern time March 21, 2005.

11. Ocean State Power I, Ocean State Power II

[Docket No. ER05-657-000]

    Take notice that on February 28, 2005, Ocean State Power I and 
Ocean State Power II (collectively, Ocean State) tendered for filing 
revised tariff sheets to Rate Schedule FERC Nos. 1-8 to update Ocean 
State's rate of return on equity (ROE). Ocean State also tendered for 
filing changes to Rate Schedule FERC Nos. 1 and 5 reflecting a 
substitution of purchaser. Ocean State requested an effective date of 
April 29,

[[Page 12674]]

2005 for the ROE changes and December 21, 2004 for the substitution of 
purchaser.
    Ocean State indicates that copies of the filing have been served on 
Ocean State's power purchasers, the Commonwealth of Massachusetts 
Department of Telecommunications and Energy and the Rhode Island Public 
Utilities Commission.
    Comment Date: 5 p.m. eastern time on March 21, 2005.

12. Birchwood Power Partners, L.P.

[Docket Nos. QF93-126-004, EL05-69-000]

    Take notice that on February 28, 2005, Birchwood Power Partners, 
L.P. (Birchwood) submitted a request for declaratory order and a 
petition for limited waiver of the operating standard for its 
cogeneration facility located in King George County, Virginia for the 
calendar year 2001 pursuant to section 292.205(c) of the Commission's 
regulations.
    Comment Date: 5 p.m. eastern time on March 21, 2005.

Standard Paragraph

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all parties to this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Linda Mitry,
Deputy Secretary.
[FR Doc. E5-1095 Filed 3-14-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.