SeaWest Asset Management Services, LLC, et al.; Electric Rate and Corporate Filings, 12671-12672 [E5-1094]
Download as PDF
Federal Register / Vol. 70, No. 49 / Tuesday, March 15, 2005 / Notices
public nor private interests will be
adversely affected by continued
approval of Westbank’s issuances of
securities or assumptions of liability.
Copies of the full text of the
Commission’s Order are available from
the Commission’s Public Reference
Room, 888 First Street, NE.,
Washington, DC 20426. The Order may
also be viewed on the Commission’s
Web site at https://www.ferc.gov, using
the eLibrary link. Enter the docket
number excluding the last three digits in
the docket number filed to access the
document. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–1086 Filed 3–14–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL05–73–000 and P–459–135]
Duncan’s Point Lot Owners
Association, Inc., and Duncan’s Point
Homeowners Association, Inc., and
Nancy A. Brunson, Juanita Brackens,
Helen Davis and Pearl Hankins,
individually Complainants v. Union
Electric Company, d/b/a Ameran UE,
Respondents; Notice of Complaint
March 8, 2005.
Take notice that on March 4, 2005,
Duncan’s Point Lot Owners Association,
Inc., et al., filed a formal complaint
against Union Electric Company, d/b/a/
Ameran UE pursuant to Section 206 of
the Federal Power Act, 16 U.S.C. 824e,
and 18 CFR 385.206, alleging that
numerous violations of statutes and
Commission regulations in connection
with Ameran UE’s status as a
hydroelectric licensee.
Duncan’s Point Lot Owners
Association, Inc., et al., certifies that
copies of the complaint were served on
Ameran UE, by mail on March 3, 2005.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
VerDate jul<14>2003
15:31 Mar 14, 2005
Jkt 205001
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 18, 2005.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–1081 Filed 3–14–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EG05–51–000, et al.]
SeaWest Asset Management Services,
LLC, et al.; Electric Rate and Corporate
Filings
March 7, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. SeaWest Asset Management Services,
LLC
[Docket No. EG05–51–000]
Take notice that on March 4, 2005,
SeaWest Asset Management Services,
LLC (SeaWest Asset Management) filed
with the Commission an application for
determination of exempt wholesale
generator status pursuant to Part 365 of
the Commission’s regulations.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
12671
SeaWest Asset Management states
that it will be engaged directly and
exclusively in the business of operating
certain eligible facilities and selling
electric energy exclusively at wholesale
within the meaning of section 32 of
PUHCA. SeaWest Asset Management
requests that the Commission determine
that it is an EWG as it is currently
owned and after consummation of the
sale of 100 percent of the capital stock
of its parent, SeaWest Holdings, Inc., to
a wholly-owned subsidiary of the AES
Corporation, AES Western Wind, LLC.
SeaWest Asset Management states
that a copy of the application has been
served on the U.S. Secruities and
Exchange Commission, the California
Public Utilities Commission, and the
Indiana Utility Regulatory Commission.
Comment Date: 5 p.m. eastern time on
March 25, 2005.
2. Florida Power & Light Company, FPL
Energy Maine Hydro LLC, FPL Energy
Wyman, LLC, FPL Energy Wyman IV,
LLC, FPL Energy Power Marketing,
Inc., Doswell Limited Partnership, FPL
Energy Cape, LLC, FPL Energy
Vansycle, L.L.C., ER01–838–004, Badger
Windpower, LLC, Gray County Wind
Energy, LLC, Calhoun Power Company
I, LLC, FPL Energy Hancock County
Wind, LLC, and Jamaica Bay Peaking
Facility, LLC
[Docket Nos. ER97–3359–007, ER98–3511–
008, ER98–3563–008, ER98–3564–008,
ER98–3566–011, ER00–2391–004, ER00–
3068–004, ER01–1071–004, ER01–1972–004,
ER01–2074–004, ER03–34–003, and ER03–
623–004]
Take notice that on February 28, 2005,
each of the above-referenced companies
submitted revised tariff sheets in
compliance with the Commission
Orders in Investigation of Terms and
Conditions of Public Utility MarketBased Rate Authorizations, 105 FERC
¶ 61,277 (2003) and Reporting
Requirement for Changes in Status for
Public Utilities with Market-Based Rate
Authority, 110 FERC ¶ 61,097 (2005). In
addition, Doswell Limited Partnership
and Jamaica Bay Peaking Facility, LLC
submitted revised tariff sheets to
comply with Order No. 614, Designation
of Electric Rate Schedule Sheets, [1996–
2000 Reg. Preambles] FERC Stat. & Regs.
¶ 31,096 (2000).
Comment Date: 5 p.m. eastern time on
March 18, 2005.
3. Madison Gas and Electric Company
[Docket No. ER00–586–005]
Take notice that on March 3, 2005,
Madison Gas and Electric Company
(MEG) submitted for filing its response
to Commission staff’s February 15, 2005
request for additional information
E:\FR\FM\15MRN1.SGM
15MRN1
12672
Federal Register / Vol. 70, No. 49 / Tuesday, March 15, 2005 / Notices
regarding MGE’s updated market power
analysis filed on November 9, 2004 in
Docket No. ER00–586–003, as amended
November 15, 2004 in Docket No. ER00–
586–004.
Comment Date: 5 p.m. eastern time on
March 14, 2005.
4. Devon Power LLC
[Docket No. ER03–563–049]
Take notice that on February 28, 2005,
ISO New England Inc. (ISO–NE)
submitted a report updating progress
made in siting, permitting and
construction of transmission and
generation upgrades within the New
England control area, in compliance
with the Commission’s order issued
June 2, 2004, Devon Power LLC, et al.,
107 FERC ¶ 61,240.
Comment Date: 5 p.m. eastern time on
March 21, 2005.
5. Wisconsin River Power Company
Take notice that Wisconsin River
Power Company, on March 2, 2005,
tendered for filing a supplement to the
market-based rate application and
revised rate schedules in preparation for
MISO Day-2 Market Operations filed on
January 14, 2005 in Docket No. ER05–
543–000.
Wisconsin River Power Company
states that copies of the filing were
served upon the official service list in
this proceeding, PJM, MISO, the
Michigan Public Service Commission
and the Public Service Commission of
Wisconsin.
Comment Date: 5 p.m. eastern time on
March 14, 2005.
6. Cleco Power LLC
[Docket No. ER05–473–001]
Take notice that on February 28, 2005,
Cleco Power LLC (Cleco Power) filed an
erratum to its January 19, 2005 Order
No. 2003–B compliance filing in Docket
No. ER05–473–000.
Comment Date: 5 p.m. eastern time on
March 21, 2005.
7. Duke Energy Washington, LLC
[Docket No. ER05–623–001]
Take notice that on February 28, 2005,
Duke Energy Washington, LLC (Duke
Washington) submitted an errata to its
February 18, 2005 filing in Docket No.
ER05–623–000 of its proposed tariff for
reactive supply and voltage control from
generation sources service.
Comment Date: 5 p.m. eastern time on
March 21, 2005.
8. Harvard Dedicated Energy Limited
[Docket No. ER05–658–000]
Take notice that on February 28, 2005,
Harvard Dedicated Energy Limited
15:31 Mar 14, 2005
Jkt 205001
9. Mid-Continent Area Power Pool
[Docket No. ER05–659–000]
Take notice that on February 28, 2005,
Mid-Continent Area Power Pool (MAPP)
filed a revised Restated Agreement
reflecting the changed functions of
MAPP. MAPP requested an effective
date of March 1, 2005.
Comment Date: 5 p.m. eastern time on
March 21, 2005.
10. Mill Run Windpower LLC
[Docket Nos. ER05–660–000 and ER01–1710–
004]
[Docket No. ER05–453–001]
VerDate jul<14>2003
(HDEL) filed an application for
acceptance of HDEL Rate Schedule
FERC No. 1, the granting of certain
blanket approvals, including the
authority to sell electricity at marketbased rates, and the waiver of certain
Commission Regulations.
Comment Date: 5 p.m. eastern time on
March 21, 2005.
Take notice that on February 28, 2005,
Mill Run Windpower LLC (Mill Run)
filed revisions to its market-based rate
tariff and code of conduct. Mill Run
states that the revisions make the tariff
compliant with Order No. 652,
Reporting Requirements for Changes in
Status for Public Utilities With MarketBased Rate Authority, 110 FERC
¶ 61,097 (2005). Mill Run requests an
effective date of April 25, 2003 for the
code of conduct and March 21, 2005 for
the Order No. 652 compliance filing.
Mill Run states that copies of the
filing were served on the official service
list for Docket No. ER01–1710 and on
the Florida Public Service Commission.
Comment Date: 5 p.m. eastern time on
March 21, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
11. Somerset Windpower LLC
[Docket Nos. ER05–661–000 and ER01–2139–
005]
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–1094 Filed 3–14–05; 8:45 am]
BILLING CODE 6717–01–P
Take notice that on February 28, 2005,
Somerset Windpower LLC (Somerset)
filed revisions to its market-based rate
tariff and code of conduct. Somerset
states that the revisions make the tariff
compliant with Order No. 652,
Reporting Requirements for Changes in
Status for Public Utilities With MarketBased Rate Authority, 110 FERC
¶ 61,097 (2005). Somerset requests an
effective date of April 25, 2003 for the
code of conduct and March 21, 2005 for
the Order No. 652 compliance filing.
Somerset states that copies of the
filing were served on the official service
list for Docket No. ER01–2139 and on
the Florida Public Service Commission.
Comment Date: 5 p.m. eastern time on
March 21, 2005.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EG05–48–000, et al.]
Invenergy Cannon Falls LLC, et al.;
Electric Rate and Corporate Filings
March 4, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Invenergy Cannon Falls LLC
[Docket No. EG05–48–000]
Take notice that on February 25, 2005,
Invenergy Cannon Falls LLC (Invenergy
E:\FR\FM\15MRN1.SGM
15MRN1
Agencies
[Federal Register Volume 70, Number 49 (Tuesday, March 15, 2005)]
[Notices]
[Pages 12671-12672]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1094]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG05-51-000, et al.]
SeaWest Asset Management Services, LLC, et al.; Electric Rate and
Corporate Filings
March 7, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. SeaWest Asset Management Services, LLC
[Docket No. EG05-51-000]
Take notice that on March 4, 2005, SeaWest Asset Management
Services, LLC (SeaWest Asset Management) filed with the Commission an
application for determination of exempt wholesale generator status
pursuant to Part 365 of the Commission's regulations.
SeaWest Asset Management states that it will be engaged directly
and exclusively in the business of operating certain eligible
facilities and selling electric energy exclusively at wholesale within
the meaning of section 32 of PUHCA. SeaWest Asset Management requests
that the Commission determine that it is an EWG as it is currently
owned and after consummation of the sale of 100 percent of the capital
stock of its parent, SeaWest Holdings, Inc., to a wholly-owned
subsidiary of the AES Corporation, AES Western Wind, LLC.
SeaWest Asset Management states that a copy of the application has
been served on the U.S. Secruities and Exchange Commission, the
California Public Utilities Commission, and the Indiana Utility
Regulatory Commission.
Comment Date: 5 p.m. eastern time on March 25, 2005.
2. Florida Power & Light Company, FPL Energy Maine Hydro LLC, FPL
Energy Wyman, LLC, FPL Energy Wyman IV, LLC, FPL Energy Power
Marketing, Inc., Doswell Limited Partnership, FPL Energy Cape, LLC, FPL
Energy Vansycle, L.L.C., ER01-838-004, Badger Windpower, LLC, Gray
County Wind Energy, LLC, Calhoun Power Company I, LLC, FPL Energy
Hancock County Wind, LLC, and Jamaica Bay Peaking Facility, LLC
[Docket Nos. ER97-3359-007, ER98-3511-008, ER98-3563-008, ER98-3564-
008, ER98-3566-011, ER00-2391-004, ER00-3068-004, ER01-1071-004, ER01-
1972-004, ER01-2074-004, ER03-34-003, and ER03-623-004]
Take notice that on February 28, 2005, each of the above-referenced
companies submitted revised tariff sheets in compliance with the
Commission Orders in Investigation of Terms and Conditions of Public
Utility Market-Based Rate Authorizations, 105 FERC ] 61,277 (2003) and
Reporting Requirement for Changes in Status for Public Utilities with
Market-Based Rate Authority, 110 FERC ] 61,097 (2005). In addition,
Doswell Limited Partnership and Jamaica Bay Peaking Facility, LLC
submitted revised tariff sheets to comply with Order No. 614,
Designation of Electric Rate Schedule Sheets, [1996-2000 Reg.
Preambles] FERC Stat. & Regs. ] 31,096 (2000).
Comment Date: 5 p.m. eastern time on March 18, 2005.
3. Madison Gas and Electric Company
[Docket No. ER00-586-005]
Take notice that on March 3, 2005, Madison Gas and Electric Company
(MEG) submitted for filing its response to Commission staff's February
15, 2005 request for additional information
[[Page 12672]]
regarding MGE's updated market power analysis filed on November 9, 2004
in Docket No. ER00-586-003, as amended November 15, 2004 in Docket No.
ER00-586-004.
Comment Date: 5 p.m. eastern time on March 14, 2005.
4. Devon Power LLC
[Docket No. ER03-563-049]
Take notice that on February 28, 2005, ISO New England Inc. (ISO-
NE) submitted a report updating progress made in siting, permitting and
construction of transmission and generation upgrades within the New
England control area, in compliance with the Commission's order issued
June 2, 2004, Devon Power LLC, et al., 107 FERC ] 61,240.
Comment Date: 5 p.m. eastern time on March 21, 2005.
5. Wisconsin River Power Company
[Docket No. ER05-453-001]
Take notice that Wisconsin River Power Company, on March 2, 2005,
tendered for filing a supplement to the market-based rate application
and revised rate schedules in preparation for MISO Day-2 Market
Operations filed on January 14, 2005 in Docket No. ER05-543-000.
Wisconsin River Power Company states that copies of the filing were
served upon the official service list in this proceeding, PJM, MISO,
the Michigan Public Service Commission and the Public Service
Commission of Wisconsin.
Comment Date: 5 p.m. eastern time on March 14, 2005.
6. Cleco Power LLC
[Docket No. ER05-473-001]
Take notice that on February 28, 2005, Cleco Power LLC (Cleco
Power) filed an erratum to its January 19, 2005 Order No. 2003-B
compliance filing in Docket No. ER05-473-000.
Comment Date: 5 p.m. eastern time on March 21, 2005.
7. Duke Energy Washington, LLC
[Docket No. ER05-623-001]
Take notice that on February 28, 2005, Duke Energy Washington, LLC
(Duke Washington) submitted an errata to its February 18, 2005 filing
in Docket No. ER05-623-000 of its proposed tariff for reactive supply
and voltage control from generation sources service.
Comment Date: 5 p.m. eastern time on March 21, 2005.
8. Harvard Dedicated Energy Limited
[Docket No. ER05-658-000]
Take notice that on February 28, 2005, Harvard Dedicated Energy
Limited (HDEL) filed an application for acceptance of HDEL Rate
Schedule FERC No. 1, the granting of certain blanket approvals,
including the authority to sell electricity at market-based rates, and
the waiver of certain Commission Regulations.
Comment Date: 5 p.m. eastern time on March 21, 2005.
9. Mid-Continent Area Power Pool
[Docket No. ER05-659-000]
Take notice that on February 28, 2005, Mid-Continent Area Power
Pool (MAPP) filed a revised Restated Agreement reflecting the changed
functions of MAPP. MAPP requested an effective date of March 1, 2005.
Comment Date: 5 p.m. eastern time on March 21, 2005.
10. Mill Run Windpower LLC
[Docket Nos. ER05-660-000 and ER01-1710-004]
Take notice that on February 28, 2005, Mill Run Windpower LLC (Mill
Run) filed revisions to its market-based rate tariff and code of
conduct. Mill Run states that the revisions make the tariff compliant
with Order No. 652, Reporting Requirements for Changes in Status for
Public Utilities With Market-Based Rate Authority, 110 FERC ] 61,097
(2005). Mill Run requests an effective date of April 25, 2003 for the
code of conduct and March 21, 2005 for the Order No. 652 compliance
filing.
Mill Run states that copies of the filing were served on the
official service list for Docket No. ER01-1710 and on the Florida
Public Service Commission.
Comment Date: 5 p.m. eastern time on March 21, 2005.
11. Somerset Windpower LLC
[Docket Nos. ER05-661-000 and ER01-2139-005]
Take notice that on February 28, 2005, Somerset Windpower LLC
(Somerset) filed revisions to its market-based rate tariff and code of
conduct. Somerset states that the revisions make the tariff compliant
with Order No. 652, Reporting Requirements for Changes in Status for
Public Utilities With Market-Based Rate Authority, 110 FERC ] 61,097
(2005). Somerset requests an effective date of April 25, 2003 for the
code of conduct and March 21, 2005 for the Order No. 652 compliance
filing.
Somerset states that copies of the filing were served on the
official service list for Docket No. ER01-2139 and on the Florida
Public Service Commission.
Comment Date: 5 p.m. eastern time on March 21, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-1094 Filed 3-14-05; 8:45 am]
BILLING CODE 6717-01-P