SeaWest Asset Management Services, LLC, et al.; Electric Rate and Corporate Filings, 12671-12672 [E5-1094]

Download as PDF Federal Register / Vol. 70, No. 49 / Tuesday, March 15, 2005 / Notices public nor private interests will be adversely affected by continued approval of Westbank’s issuances of securities or assumptions of liability. Copies of the full text of the Commission’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https://www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Linda Mitry, Deputy Secretary. [FR Doc. E5–1086 Filed 3–14–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL05–73–000 and P–459–135] Duncan’s Point Lot Owners Association, Inc., and Duncan’s Point Homeowners Association, Inc., and Nancy A. Brunson, Juanita Brackens, Helen Davis and Pearl Hankins, individually Complainants v. Union Electric Company, d/b/a Ameran UE, Respondents; Notice of Complaint March 8, 2005. Take notice that on March 4, 2005, Duncan’s Point Lot Owners Association, Inc., et al., filed a formal complaint against Union Electric Company, d/b/a/ Ameran UE pursuant to Section 206 of the Federal Power Act, 16 U.S.C. 824e, and 18 CFR 385.206, alleging that numerous violations of statutes and Commission regulations in connection with Ameran UE’s status as a hydroelectric licensee. Duncan’s Point Lot Owners Association, Inc., et al., certifies that copies of the complaint were served on Ameran UE, by mail on March 3, 2005. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to VerDate jul<14>2003 15:31 Mar 14, 2005 Jkt 205001 the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on March 18, 2005. Linda Mitry, Deputy Secretary. [FR Doc. E5–1081 Filed 3–14–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EG05–51–000, et al.] SeaWest Asset Management Services, LLC, et al.; Electric Rate and Corporate Filings March 7, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. SeaWest Asset Management Services, LLC [Docket No. EG05–51–000] Take notice that on March 4, 2005, SeaWest Asset Management Services, LLC (SeaWest Asset Management) filed with the Commission an application for determination of exempt wholesale generator status pursuant to Part 365 of the Commission’s regulations. PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 12671 SeaWest Asset Management states that it will be engaged directly and exclusively in the business of operating certain eligible facilities and selling electric energy exclusively at wholesale within the meaning of section 32 of PUHCA. SeaWest Asset Management requests that the Commission determine that it is an EWG as it is currently owned and after consummation of the sale of 100 percent of the capital stock of its parent, SeaWest Holdings, Inc., to a wholly-owned subsidiary of the AES Corporation, AES Western Wind, LLC. SeaWest Asset Management states that a copy of the application has been served on the U.S. Secruities and Exchange Commission, the California Public Utilities Commission, and the Indiana Utility Regulatory Commission. Comment Date: 5 p.m. eastern time on March 25, 2005. 2. Florida Power & Light Company, FPL Energy Maine Hydro LLC, FPL Energy Wyman, LLC, FPL Energy Wyman IV, LLC, FPL Energy Power Marketing, Inc., Doswell Limited Partnership, FPL Energy Cape, LLC, FPL Energy Vansycle, L.L.C., ER01–838–004, Badger Windpower, LLC, Gray County Wind Energy, LLC, Calhoun Power Company I, LLC, FPL Energy Hancock County Wind, LLC, and Jamaica Bay Peaking Facility, LLC [Docket Nos. ER97–3359–007, ER98–3511– 008, ER98–3563–008, ER98–3564–008, ER98–3566–011, ER00–2391–004, ER00– 3068–004, ER01–1071–004, ER01–1972–004, ER01–2074–004, ER03–34–003, and ER03– 623–004] Take notice that on February 28, 2005, each of the above-referenced companies submitted revised tariff sheets in compliance with the Commission Orders in Investigation of Terms and Conditions of Public Utility MarketBased Rate Authorizations, 105 FERC ¶ 61,277 (2003) and Reporting Requirement for Changes in Status for Public Utilities with Market-Based Rate Authority, 110 FERC ¶ 61,097 (2005). In addition, Doswell Limited Partnership and Jamaica Bay Peaking Facility, LLC submitted revised tariff sheets to comply with Order No. 614, Designation of Electric Rate Schedule Sheets, [1996– 2000 Reg. Preambles] FERC Stat. & Regs. ¶ 31,096 (2000). Comment Date: 5 p.m. eastern time on March 18, 2005. 3. Madison Gas and Electric Company [Docket No. ER00–586–005] Take notice that on March 3, 2005, Madison Gas and Electric Company (MEG) submitted for filing its response to Commission staff’s February 15, 2005 request for additional information E:\FR\FM\15MRN1.SGM 15MRN1 12672 Federal Register / Vol. 70, No. 49 / Tuesday, March 15, 2005 / Notices regarding MGE’s updated market power analysis filed on November 9, 2004 in Docket No. ER00–586–003, as amended November 15, 2004 in Docket No. ER00– 586–004. Comment Date: 5 p.m. eastern time on March 14, 2005. 4. Devon Power LLC [Docket No. ER03–563–049] Take notice that on February 28, 2005, ISO New England Inc. (ISO–NE) submitted a report updating progress made in siting, permitting and construction of transmission and generation upgrades within the New England control area, in compliance with the Commission’s order issued June 2, 2004, Devon Power LLC, et al., 107 FERC ¶ 61,240. Comment Date: 5 p.m. eastern time on March 21, 2005. 5. Wisconsin River Power Company Take notice that Wisconsin River Power Company, on March 2, 2005, tendered for filing a supplement to the market-based rate application and revised rate schedules in preparation for MISO Day-2 Market Operations filed on January 14, 2005 in Docket No. ER05– 543–000. Wisconsin River Power Company states that copies of the filing were served upon the official service list in this proceeding, PJM, MISO, the Michigan Public Service Commission and the Public Service Commission of Wisconsin. Comment Date: 5 p.m. eastern time on March 14, 2005. 6. Cleco Power LLC [Docket No. ER05–473–001] Take notice that on February 28, 2005, Cleco Power LLC (Cleco Power) filed an erratum to its January 19, 2005 Order No. 2003–B compliance filing in Docket No. ER05–473–000. Comment Date: 5 p.m. eastern time on March 21, 2005. 7. Duke Energy Washington, LLC [Docket No. ER05–623–001] Take notice that on February 28, 2005, Duke Energy Washington, LLC (Duke Washington) submitted an errata to its February 18, 2005 filing in Docket No. ER05–623–000 of its proposed tariff for reactive supply and voltage control from generation sources service. Comment Date: 5 p.m. eastern time on March 21, 2005. 8. Harvard Dedicated Energy Limited [Docket No. ER05–658–000] Take notice that on February 28, 2005, Harvard Dedicated Energy Limited 15:31 Mar 14, 2005 Jkt 205001 9. Mid-Continent Area Power Pool [Docket No. ER05–659–000] Take notice that on February 28, 2005, Mid-Continent Area Power Pool (MAPP) filed a revised Restated Agreement reflecting the changed functions of MAPP. MAPP requested an effective date of March 1, 2005. Comment Date: 5 p.m. eastern time on March 21, 2005. 10. Mill Run Windpower LLC [Docket Nos. ER05–660–000 and ER01–1710– 004] [Docket No. ER05–453–001] VerDate jul<14>2003 (HDEL) filed an application for acceptance of HDEL Rate Schedule FERC No. 1, the granting of certain blanket approvals, including the authority to sell electricity at marketbased rates, and the waiver of certain Commission Regulations. Comment Date: 5 p.m. eastern time on March 21, 2005. Take notice that on February 28, 2005, Mill Run Windpower LLC (Mill Run) filed revisions to its market-based rate tariff and code of conduct. Mill Run states that the revisions make the tariff compliant with Order No. 652, Reporting Requirements for Changes in Status for Public Utilities With MarketBased Rate Authority, 110 FERC ¶ 61,097 (2005). Mill Run requests an effective date of April 25, 2003 for the code of conduct and March 21, 2005 for the Order No. 652 compliance filing. Mill Run states that copies of the filing were served on the official service list for Docket No. ER01–1710 and on the Florida Public Service Commission. Comment Date: 5 p.m. eastern time on March 21, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. 11. Somerset Windpower LLC [Docket Nos. ER05–661–000 and ER01–2139– 005] Linda Mitry, Deputy Secretary. [FR Doc. E5–1094 Filed 3–14–05; 8:45 am] BILLING CODE 6717–01–P Take notice that on February 28, 2005, Somerset Windpower LLC (Somerset) filed revisions to its market-based rate tariff and code of conduct. Somerset states that the revisions make the tariff compliant with Order No. 652, Reporting Requirements for Changes in Status for Public Utilities With MarketBased Rate Authority, 110 FERC ¶ 61,097 (2005). Somerset requests an effective date of April 25, 2003 for the code of conduct and March 21, 2005 for the Order No. 652 compliance filing. Somerset states that copies of the filing were served on the official service list for Docket No. ER01–2139 and on the Florida Public Service Commission. Comment Date: 5 p.m. eastern time on March 21, 2005. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EG05–48–000, et al.] Invenergy Cannon Falls LLC, et al.; Electric Rate and Corporate Filings March 4, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. Invenergy Cannon Falls LLC [Docket No. EG05–48–000] Take notice that on February 25, 2005, Invenergy Cannon Falls LLC (Invenergy E:\FR\FM\15MRN1.SGM 15MRN1

Agencies

[Federal Register Volume 70, Number 49 (Tuesday, March 15, 2005)]
[Notices]
[Pages 12671-12672]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-1094]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EG05-51-000, et al.]


SeaWest Asset Management Services, LLC, et al.; Electric Rate and 
Corporate Filings

March 7, 2005.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. SeaWest Asset Management Services, LLC

[Docket No. EG05-51-000]

    Take notice that on March 4, 2005, SeaWest Asset Management 
Services, LLC (SeaWest Asset Management) filed with the Commission an 
application for determination of exempt wholesale generator status 
pursuant to Part 365 of the Commission's regulations.
    SeaWest Asset Management states that it will be engaged directly 
and exclusively in the business of operating certain eligible 
facilities and selling electric energy exclusively at wholesale within 
the meaning of section 32 of PUHCA. SeaWest Asset Management requests 
that the Commission determine that it is an EWG as it is currently 
owned and after consummation of the sale of 100 percent of the capital 
stock of its parent, SeaWest Holdings, Inc., to a wholly-owned 
subsidiary of the AES Corporation, AES Western Wind, LLC.
    SeaWest Asset Management states that a copy of the application has 
been served on the U.S. Secruities and Exchange Commission, the 
California Public Utilities Commission, and the Indiana Utility 
Regulatory Commission.
    Comment Date: 5 p.m. eastern time on March 25, 2005.

2. Florida Power & Light Company, FPL Energy Maine Hydro LLC, FPL 
Energy Wyman, LLC, FPL Energy Wyman IV, LLC, FPL Energy Power 
Marketing, Inc., Doswell Limited Partnership, FPL Energy Cape, LLC, FPL 
Energy Vansycle, L.L.C., ER01-838-004, Badger Windpower, LLC, Gray 
County Wind Energy, LLC, Calhoun Power Company I, LLC, FPL Energy 
Hancock County Wind, LLC, and Jamaica Bay Peaking Facility, LLC

[Docket Nos. ER97-3359-007, ER98-3511-008, ER98-3563-008, ER98-3564-
008, ER98-3566-011, ER00-2391-004, ER00-3068-004, ER01-1071-004, ER01-
1972-004, ER01-2074-004, ER03-34-003, and ER03-623-004]

    Take notice that on February 28, 2005, each of the above-referenced 
companies submitted revised tariff sheets in compliance with the 
Commission Orders in Investigation of Terms and Conditions of Public 
Utility Market-Based Rate Authorizations, 105 FERC ] 61,277 (2003) and 
Reporting Requirement for Changes in Status for Public Utilities with 
Market-Based Rate Authority, 110 FERC ] 61,097 (2005). In addition, 
Doswell Limited Partnership and Jamaica Bay Peaking Facility, LLC 
submitted revised tariff sheets to comply with Order No. 614, 
Designation of Electric Rate Schedule Sheets, [1996-2000 Reg. 
Preambles] FERC Stat. & Regs. ] 31,096 (2000).
    Comment Date: 5 p.m. eastern time on March 18, 2005.

3. Madison Gas and Electric Company

[Docket No. ER00-586-005]

    Take notice that on March 3, 2005, Madison Gas and Electric Company 
(MEG) submitted for filing its response to Commission staff's February 
15, 2005 request for additional information

[[Page 12672]]

regarding MGE's updated market power analysis filed on November 9, 2004 
in Docket No. ER00-586-003, as amended November 15, 2004 in Docket No. 
ER00-586-004.
    Comment Date: 5 p.m. eastern time on March 14, 2005.

4. Devon Power LLC

[Docket No. ER03-563-049]

    Take notice that on February 28, 2005, ISO New England Inc. (ISO-
NE) submitted a report updating progress made in siting, permitting and 
construction of transmission and generation upgrades within the New 
England control area, in compliance with the Commission's order issued 
June 2, 2004, Devon Power LLC, et al., 107 FERC ] 61,240.
    Comment Date: 5 p.m. eastern time on March 21, 2005.

5. Wisconsin River Power Company

[Docket No. ER05-453-001]

    Take notice that Wisconsin River Power Company, on March 2, 2005, 
tendered for filing a supplement to the market-based rate application 
and revised rate schedules in preparation for MISO Day-2 Market 
Operations filed on January 14, 2005 in Docket No. ER05-543-000.
    Wisconsin River Power Company states that copies of the filing were 
served upon the official service list in this proceeding, PJM, MISO, 
the Michigan Public Service Commission and the Public Service 
Commission of Wisconsin.
    Comment Date: 5 p.m. eastern time on March 14, 2005.

6. Cleco Power LLC

[Docket No. ER05-473-001]

    Take notice that on February 28, 2005, Cleco Power LLC (Cleco 
Power) filed an erratum to its January 19, 2005 Order No. 2003-B 
compliance filing in Docket No. ER05-473-000.
    Comment Date: 5 p.m. eastern time on March 21, 2005.

7. Duke Energy Washington, LLC

[Docket No. ER05-623-001]

    Take notice that on February 28, 2005, Duke Energy Washington, LLC 
(Duke Washington) submitted an errata to its February 18, 2005 filing 
in Docket No. ER05-623-000 of its proposed tariff for reactive supply 
and voltage control from generation sources service.
    Comment Date: 5 p.m. eastern time on March 21, 2005.

8. Harvard Dedicated Energy Limited

[Docket No. ER05-658-000]

    Take notice that on February 28, 2005, Harvard Dedicated Energy 
Limited (HDEL) filed an application for acceptance of HDEL Rate 
Schedule FERC No. 1, the granting of certain blanket approvals, 
including the authority to sell electricity at market-based rates, and 
the waiver of certain Commission Regulations.
    Comment Date: 5 p.m. eastern time on March 21, 2005.

9. Mid-Continent Area Power Pool

[Docket No. ER05-659-000]

    Take notice that on February 28, 2005, Mid-Continent Area Power 
Pool (MAPP) filed a revised Restated Agreement reflecting the changed 
functions of MAPP. MAPP requested an effective date of March 1, 2005.
    Comment Date: 5 p.m. eastern time on March 21, 2005.

10. Mill Run Windpower LLC

[Docket Nos. ER05-660-000 and ER01-1710-004]

    Take notice that on February 28, 2005, Mill Run Windpower LLC (Mill 
Run) filed revisions to its market-based rate tariff and code of 
conduct. Mill Run states that the revisions make the tariff compliant 
with Order No. 652, Reporting Requirements for Changes in Status for 
Public Utilities With Market-Based Rate Authority, 110 FERC ] 61,097 
(2005). Mill Run requests an effective date of April 25, 2003 for the 
code of conduct and March 21, 2005 for the Order No. 652 compliance 
filing.
    Mill Run states that copies of the filing were served on the 
official service list for Docket No. ER01-1710 and on the Florida 
Public Service Commission.
    Comment Date: 5 p.m. eastern time on March 21, 2005.

11. Somerset Windpower LLC

[Docket Nos. ER05-661-000 and ER01-2139-005]

    Take notice that on February 28, 2005, Somerset Windpower LLC 
(Somerset) filed revisions to its market-based rate tariff and code of 
conduct. Somerset states that the revisions make the tariff compliant 
with Order No. 652, Reporting Requirements for Changes in Status for 
Public Utilities With Market-Based Rate Authority, 110 FERC ] 61,097 
(2005). Somerset requests an effective date of April 25, 2003 for the 
code of conduct and March 21, 2005 for the Order No. 652 compliance 
filing.
    Somerset states that copies of the filing were served on the 
official service list for Docket No. ER01-2139 and on the Florida 
Public Service Commission.
    Comment Date: 5 p.m. eastern time on March 21, 2005.

Standard Paragraph

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all parties to this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Linda Mitry,
Deputy Secretary.
[FR Doc. E5-1094 Filed 3-14-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.