Environmental Impact Statements; Notice of Availability, 12211-12212 [05-4874]
Download as PDF
Federal Register / Vol. 70, No. 47 / Friday, March 11, 2005 / Notices
Fire Management Plan (FMP),
Implementation, AZ.
Summary: EPA expressed concerns
about water quality impacts and
requested additional information on
water quality, mitigation, and
monitoring.
ERP No. D–NRC–B06005–CT Rating
EC2, GENERIC—License Renewal of
Nuclear Plants for the Millstone Power
Station, Units 2 and 3, Supplement 22
to NUREG–1437, Implementation, New
London County, CT.
Summary: EPA expressed concern
about operational and cumulative
impacts, and requested additional
information be prepared in the FEIS to
address these concerns.
ERP No. DC–IBW–K24017–00 Rating
LO, South Bay International Wastewater
Treatment Plan (SBIWTP), To Address
Treatment Alternatives from Tijuana,
Mexico that cross into United States/
Mexico Border in San Diego County,
CA.
Summary: EPA has no objections to
this project and supports continuing
inter-agency coordination to comply
with the Clean Water Act and protect
public health and the environment in
the San Diego border region.
Final EISs
ERP No. F–BLM–K65274–NV, Las
Vegas Valley Disposal Boundary Project,
Disposal and Use of Public Land under
the Management of (BLM),
Implementation, Clark County, NV.
Summary: EPA’s previous issues have
been resolved; therefore, EPA has no
objection to the action as proposed.
ERP No. F–BLM–L65440–OR Upper
Deschutes Resource Management Plan,
Implementation, Deschutes, Klamath,
Jefferson and Cook Counties, OR.
Summary: EPA continues to
recommend that water quality be a focus
in management of the area and that
303(d) listed streams be restored. EPA
supports the flexible management
strategy of the Preferred Alternative and
recommends that degraded allotments
be taken out of use until revegetated.
ERP No. F–FHW–C40159–NJ Penns
Neck Area Transportation Service
Improvements, Phase I Archeological
Survey, US 1, Sections 2S and 3J,
Funding, West Windsor and Princeton
Townships, Mercer County, and
Plainsboro Township, Middlesex
County, NJ.
Summary: EPA’s previous concerns
have been resolved; therefore, EPA has
no objection to the proposed action.
ERP No. FA–FTA–C40046–NY Erie
Canal Harbor Project (formerly known
as the Buffalo Inner Harbor
Development Project) Updated
VerDate jul<14>2003
16:40 Mar 10, 2005
Jkt 205001
Information on the Original Project, City
of Buffalo, Erie County, NY.
Summary: EPA had no objection to
the project.
ERP No. F1–FHW–F40356–WI US 10
Highway Improvements between
Marshfield and Appleton, Trestik
Road—CTH‘‘K’’ (Stevens Point Bypass),
Funding and COE Section 404 Permit,
Portage County, WI.
Summary: EPA continues to express
concern about wetlands mitigation and
the need to provide additional
cumulative impact analysis.
Dated: March 8, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–4873 Filed 3–10–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6661–3]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/
Weekly receipt of Environmental Impact
Statements
Filed February 28, 2005 Through March
4, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 050083, Final EIS, NPS, VA,
Petersburg National Battlefield
General Management Plan,
Implementation, Petersburg, VA, Wait
Period Ends: April 11, 2005, Contact:
Bob Kirby (804) 732–3571.
EIS No. 050084, Draft EIS, FRC, WA,
Capacity Replacement Project,
Construction and Operation of 79.5
miles Pipeline; Modify 5 Existing
Compressor Stations, U.S. Army COE
10 and 404 Permits, Whatcom, Skagit,
Snohomish, King, Pierce and
Thurston Counties, WA, Comment
Period Ends: April 25, 2005, Contact:
Thomas Russo 1–866 208–3372.
EIS No. 050085, Final EIS, FRC, CA,
Stanislaus Rivers Projects, Relicensing
of Hydroelectric Projects: Spring GapStanislaus FERC No. 2130; Beardsley/
Donnells FERC No. 2005; Tulloch
FERC No. 2067; and Donnells-Curtis
Transmission Line FERC No. 2118,
Tuolumne and Calaveras Counties,
CA, Wait Period Ends: April 11, 2005,
Contact: Susan O’Brien (202) 502–
8449.
EIS No. 050086, Draft EIS, AFS, WY,
Dean Project Area, Proposes to
Implement Multiple Resource
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
12211
Management Actions, Black Hills
National Forest, Bearlodge Ranger
District, Sundance, Crook County,
WA, Comment Period Ends: April 25,
2005, Contact: Steve Kozel (307) 283–
1361.
EIS No. 050087, Draft Supplement,
BLM, NV, Ruby Hill Mine
Expansion—East Archimedes Project,
Extension of Existing Open Pit,
Expansion of Two Existing Waste
Rock Disposal Areas, Plan-ofOperations Permit, Eureka County,
NV, Comment Period Ends: April 25,
2005, Contact: Caleb Hiner (775) 635–
4052.
EIS No. 050088, Final EIS, NOA, Reef
Fish Fishery Management Plan (FMP)
Amendment 23, To Set Vermilion
Snapper Sustainable Fisheries Act
Targets and Thresholds and to
Establish a Plan to End Overfishing
and Rebuild the Stock,
Implementation, Gulf of Mexico, Wait
Period Ends: April 11, 2005, Contact:
Dr. Roy E. Crabtree (727) 570–5305.
EIS No. 050089, Draft EIS, FHW, CA,
Los Banos Bypass Project, Construct
from CA–152 in Merced County
beginning near Volta Road west of Los
Banos, bypassing Los Banos, ending
near the Santa Fe Grade Road, U.S.
Army COE Section 404 Permit,
Merced County, CA, Comment Period
Ends: May 6, 2005, Contact: Mahfoud
Licha (916) 498–5866.
EIS No. 050090, Draft Supplement, IBR,
CA, Battle Creek Salmon and
Steelhead Restoration Project, To
Address New Significant Information,
Habitat Restoration in Battle Creek
and Tributaries, License Amendment
Issuance, Implementation, Tehama
and Shasta Counties, CA, Comment
Period Ends: April 25, 2005, Contact:
Mary Marshall (916) 978–5248.
EIS No. 050091, Draft EIS, FRC, TX, LA,
Golden Pass Liquefied Natural Gas
(LNG) Import Terminal and Natural
Gas Pipeline Facilities, Construction
and Operation, Jefferson, Orange,
Newton Counties, TX and Calcasieu
Parish, LA, Comment Period Ends:
April 25, 2005, Contact: Thomas
Russo 1–866–208–3372.
EIS No. 050092, Final EIS, AFS, OR,
Lemolo Watershed Projects, Updated
and New Information concerning
Recommendations Steamed from the
Diamond Lake/Lemolo Lake
Watershed Analysis, (WA),
Implementation, Umpqua National
Forest, Diamond Lake Ranger District,
Douglas County, OR, Wait Period
Ends: April 11, 2005, Contact: Rick
Abbott (541) 498–2531.
EIS No. 050093, Draft EIS, NOA, CA,
Monterey Accelerated Research
Systems (MARS) Cabled Observatory,
E:\FR\FM\11MRN1.SGM
11MRN1
12212
Federal Register / Vol. 70, No. 47 / Friday, March 11, 2005 / Notices
Proposes to Install and Operate an
Advanced Undersea Cabled
Observatory, Monterey Bay, Pacific
Ocean Offshore of Moss Landing,
Monterey County, CA, Comment
Period Ends: April 26, 2005, Contact:
Deirdre Hall (831) 647–4207.
EIS No. 050094, Draft EIS, COE, WA, ID,
Lower Snake River Navigation
Maintenance, To Perform Routine
Maintenance of the Federal
Navigation Channel and Berthing
Areas, Lower Snake and Clearwater
Rivers, WA and ID, Comment Period
Ends: April 25, 2005, Contact: Jack
Sands (509) 527–7287. This document
is available on the Internet at:
https://www.nww.usace.army.mil/
channel_maint/one-year/default.htm.
EIS No. 050095, Draft EIS, FTA, CA,
Warm Springs Extension, Proposing
5.4 Mile Extension of the BART
System in the City of Fremont,
Funding, San Francisco Bay Area
Rapid Transit District, Alameda
County, CA, Comment Period Ends:
April 25, 2005, Contact: Lorraine
Lerman (415) 744–2735.
EIS No. 050096, Draft EIS, NRC, IL,
Early Site Permit (ESP) at the Exelon
ESP Site, Application for ESP on One
Additional Nuclear Unit, within the
Clinton Power Station (CPS), NUREG–
1815, DeWitt County, IL, Comment
Period Ends: April 25, 2005, Contact:
Thomas Kenyon (301) 415–1120.
EIS No. 050097, Final EIS, FRC, TX,
Cheniere Corpus Christi Liquefied
Natural Gas (LNG) Project, To Provide
Facilities for the Importation, Storage
and Vaporization of Liquefied Natural
Gas, Nueces and San Patricio
Counties, TX, Wait Period Ends: April
11, 2005, Contact: Thomas Russo 1–
866–208–3372.
EIS No. 050098, Final EIS, FAA, PA,
Philadelphia International Airport
Project, Proposed Runway 17–35
Extension Project, Funding, NPDES
Permit and U.S. Army COE Section
404 Permit, Philadelphia, PA, Wait
Period Ends: April 11, 2005, Contact:
Susan McDonald (717) 730–2841.
This document is available on the
Internet at: https://
www.PHLrunway17–35eis.com
Amended Notices
EIS No. 040544, Draft Supplement,
FHW, UT, Legacy Parkway Project,
Construction from I215 at 2100 North
in Salt Lake City to I–15 and U.S. 89
near Farmington, Updated
VerDate jul<14>2003
16:40 Mar 10, 2005
Jkt 205001
Information, Funding and US Army
COE Section 404 Permit, Salt Lake
and Davis Counties, UT, Comment
Period Ends: March 21, 2005, Contact:
Gregory Punske (801) 963–0182.
Revision of the Federal Register
Notice Published on 12/03/2005: CEQ
Comment Period Ending on 3/4/2005
has been Extended to 3/21/2005.
EIS No. 050012, Draft EIS, IBR, CA,
Central Valley Project Long-Term
Water Service Contract Renewals—
American River Division, Proposes to
Renew Long-Term Water Service
Contracts, Sacramento, Placer and El
Dorado Counties, CA, Comment
Period Ends: March 21, 2005, Contact:
David Robinson (916) 989–7179.
Revision of the Federal Register
Notice Published on 1/21/2005: CEQ
Comment Period Ending 3/7/2005 has
been Extended to 3/21/2005.
EIS No. 050022, Draft EIS, AFS, WA,
Methow Transmission Project,
Construction of New Transmission
Line or Reconstruction an Existing
Line, Okanogan and Wenatchee
National Forests, Methow Valley
Ranger District, Okanogan County,
WA, Due: March 31, 2005, Contact:
Jan Flatten (509) 826–3277. Revision
of the Federal Register Notice
Published on 1/28/2005: CEQ Review
Period Ending 3/15/2005 has been
extended to 3/31/2005.
EIS No. 050071, Final EIS, FHW, MI, I–
94/Rehabilitation Project,
Transportation Improvements to a 6.7
mile portion of I–94 from east I–96
west end to Conner Avenue on the
east end, Funding and NPDES Permit,
City of Detroit, Wayne County, MI,
Due: April 29, 2005, Contact:
Adbelmoez Abdalla (517) 702–1820.
Revision of the Federal Register
Notice Published on 02/2/054: CEQ
Comment Period Ending 3/28/2005
has been Extended to 4/29/2005.
Dated: March 8, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–4874 Filed 3–10–05; 8:45 am]
BILLING CODE 6560–50–P
PO 00000
EXPORT-IMPORT BANK OF THE US
[Public Notice 73]
Agency Information Collection
Activities: Submission for OMB
Review; Comment Request
Export-Import Bank of the U.S.
Notice and request for
comments.
AGENCY:
ACTION:
SUMMARY: The Export-Import Bank, as a
part of its continuing effort to reduce
paperwork and respondent burden,
invites the general public and other
Federal agencies to comment on the
proposed information collection, as
required by the Paperwork Reduction
Act of 1995.
DATES: Written comments should be
received on or before April 11, 2005, to
be assured of consideration.
ADDRESSES: Direct all comments to
David Rostker, Office of Management
and Budget, Office of Information and
Regulatory Affairs, NEOB Room 10202,
Washington, DC 20503, (202) 395–3897.
SUPPLEMENTARY INFORMATION:
Titles and Form Numbers: Short-Term
Multi-Buyer Export Credit Insurance
Policy Application, EIB 92–50.
OMB Number: 3048–0009.
Type of Review: Revision of 1 of 7
forms in a currently approved
collection. This review affects only the
form noted above.
Need and Use: The information
requested enables the applicant to
provide Ex-Im Bank with the
information necessary to obtain
legislatively required assurance of
repayment and fulfills other statutory
requirements.
Affected Public: The form affects
entities involved in the export of U.S.
goods and services, including exporters,
insurance brokers, and non-profit or
state and local governments acting as
facilitators.
Estimated Annual Responses: 500.
Estimated Time Per Respondent: 1⁄2
hour.
Estimated Annual Burden: 250.
Frequency of Reporting or Use:
Applications submitted one time,
renewals annually.
Dated: March 7, 2005.
Solomon Bush,
Agency Clearance Officer.
BILLING CODE 6690–01–M
Frm 00042
Fmt 4703
Sfmt 4703
E:\FR\FM\11MRN1.SGM
11MRN1
Agencies
[Federal Register Volume 70, Number 47 (Friday, March 11, 2005)]
[Notices]
[Pages 12211-12212]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-4874]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6661-3]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/
Weekly receipt of Environmental Impact Statements
Filed February 28, 2005 Through March 4, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 050083, Final EIS, NPS, VA, Petersburg National Battlefield
General Management Plan, Implementation, Petersburg, VA, Wait Period
Ends: April 11, 2005, Contact: Bob Kirby (804) 732-3571.
EIS No. 050084, Draft EIS, FRC, WA, Capacity Replacement Project,
Construction and Operation of 79.5 miles Pipeline; Modify 5 Existing
Compressor Stations, U.S. Army COE 10 and 404 Permits, Whatcom, Skagit,
Snohomish, King, Pierce and Thurston Counties, WA, Comment Period Ends:
April 25, 2005, Contact: Thomas Russo 1-866 208-3372.
EIS No. 050085, Final EIS, FRC, CA, Stanislaus Rivers Projects,
Relicensing of Hydroelectric Projects: Spring Gap-Stanislaus FERC No.
2130; Beardsley/Donnells FERC No. 2005; Tulloch FERC No. 2067; and
Donnells-Curtis Transmission Line FERC No. 2118, Tuolumne and Calaveras
Counties, CA, Wait Period Ends: April 11, 2005, Contact: Susan O'Brien
(202) 502-8449.
EIS No. 050086, Draft EIS, AFS, WY, Dean Project Area, Proposes to
Implement Multiple Resource Management Actions, Black Hills National
Forest, Bearlodge Ranger District, Sundance, Crook County, WA, Comment
Period Ends: April 25, 2005, Contact: Steve Kozel (307) 283-1361.
EIS No. 050087, Draft Supplement, BLM, NV, Ruby Hill Mine Expansion--
East Archimedes Project, Extension of Existing Open Pit, Expansion of
Two Existing Waste Rock Disposal Areas, Plan-of-Operations Permit,
Eureka County, NV, Comment Period Ends: April 25, 2005, Contact: Caleb
Hiner (775) 635-4052.
EIS No. 050088, Final EIS, NOA, Reef Fish Fishery Management Plan (FMP)
Amendment 23, To Set Vermilion Snapper Sustainable Fisheries Act
Targets and Thresholds and to Establish a Plan to End Overfishing and
Rebuild the Stock, Implementation, Gulf of Mexico, Wait Period Ends:
April 11, 2005, Contact: Dr. Roy E. Crabtree (727) 570-5305.
EIS No. 050089, Draft EIS, FHW, CA, Los Banos Bypass Project, Construct
from CA-152 in Merced County beginning near Volta Road west of Los
Banos, bypassing Los Banos, ending near the Santa Fe Grade Road, U.S.
Army COE Section 404 Permit, Merced County, CA, Comment Period Ends:
May 6, 2005, Contact: Mahfoud Licha (916) 498-5866.
EIS No. 050090, Draft Supplement, IBR, CA, Battle Creek Salmon and
Steelhead Restoration Project, To Address New Significant Information,
Habitat Restoration in Battle Creek and Tributaries, License Amendment
Issuance, Implementation, Tehama and Shasta Counties, CA, Comment
Period Ends: April 25, 2005, Contact: Mary Marshall (916) 978-5248.
EIS No. 050091, Draft EIS, FRC, TX, LA, Golden Pass Liquefied Natural
Gas (LNG) Import Terminal and Natural Gas Pipeline Facilities,
Construction and Operation, Jefferson, Orange, Newton Counties, TX and
Calcasieu Parish, LA, Comment Period Ends: April 25, 2005, Contact:
Thomas Russo 1-866-208-3372.
EIS No. 050092, Final EIS, AFS, OR, Lemolo Watershed Projects, Updated
and New Information concerning Recommendations Steamed from the Diamond
Lake/Lemolo Lake Watershed Analysis, (WA), Implementation, Umpqua
National Forest, Diamond Lake Ranger District, Douglas County, OR, Wait
Period Ends: April 11, 2005, Contact: Rick Abbott (541) 498-2531.
EIS No. 050093, Draft EIS, NOA, CA, Monterey Accelerated Research
Systems (MARS) Cabled Observatory,
[[Page 12212]]
Proposes to Install and Operate an Advanced Undersea Cabled
Observatory, Monterey Bay, Pacific Ocean Offshore of Moss Landing,
Monterey County, CA, Comment Period Ends: April 26, 2005, Contact:
Deirdre Hall (831) 647-4207.
EIS No. 050094, Draft EIS, COE, WA, ID, Lower Snake River Navigation
Maintenance, To Perform Routine Maintenance of the Federal Navigation
Channel and Berthing Areas, Lower Snake and Clearwater Rivers, WA and
ID, Comment Period Ends: April 25, 2005, Contact: Jack Sands (509) 527-
7287. This document is available on the Internet at: https://
www.nww.usace.army.mil/channel_maint/one-year/default.htm.
EIS No. 050095, Draft EIS, FTA, CA, Warm Springs Extension, Proposing
5.4 Mile Extension of the BART System in the City of Fremont, Funding,
San Francisco Bay Area Rapid Transit District, Alameda County, CA,
Comment Period Ends: April 25, 2005, Contact: Lorraine Lerman (415)
744-2735.
EIS No. 050096, Draft EIS, NRC, IL, Early Site Permit (ESP) at the
Exelon ESP Site, Application for ESP on One Additional Nuclear Unit,
within the Clinton Power Station (CPS), NUREG-1815, DeWitt County, IL,
Comment Period Ends: April 25, 2005, Contact: Thomas Kenyon (301) 415-
1120.
EIS No. 050097, Final EIS, FRC, TX, Cheniere Corpus Christi Liquefied
Natural Gas (LNG) Project, To Provide Facilities for the Importation,
Storage and Vaporization of Liquefied Natural Gas, Nueces and San
Patricio Counties, TX, Wait Period Ends: April 11, 2005, Contact:
Thomas Russo 1-866-208-3372.
EIS No. 050098, Final EIS, FAA, PA, Philadelphia International Airport
Project, Proposed Runway 17-35 Extension Project, Funding, NPDES Permit
and U.S. Army COE Section 404 Permit, Philadelphia, PA, Wait Period
Ends: April 11, 2005, Contact: Susan McDonald (717) 730-2841. This
document is available on the Internet at: https://www.PHLrunway17-
35eis.com
Amended Notices
EIS No. 040544, Draft Supplement, FHW, UT, Legacy Parkway Project,
Construction from I215 at 2100 North in Salt Lake City to I-15 and U.S.
89 near Farmington, Updated Information, Funding and US Army COE
Section 404 Permit, Salt Lake and Davis Counties, UT, Comment Period
Ends: March 21, 2005, Contact: Gregory Punske (801) 963-0182. Revision
of the Federal Register Notice Published on 12/03/2005: CEQ Comment
Period Ending on 3/4/2005 has been Extended to 3/21/2005.
EIS No. 050012, Draft EIS, IBR, CA, Central Valley Project Long-Term
Water Service Contract Renewals--American River Division, Proposes to
Renew Long-Term Water Service Contracts, Sacramento, Placer and El
Dorado Counties, CA, Comment Period Ends: March 21, 2005, Contact:
David Robinson (916) 989-7179. Revision of the Federal Register Notice
Published on 1/21/2005: CEQ Comment Period Ending 3/7/2005 has been
Extended to 3/21/2005.
EIS No. 050022, Draft EIS, AFS, WA, Methow Transmission Project,
Construction of New Transmission Line or Reconstruction an Existing
Line, Okanogan and Wenatchee National Forests, Methow Valley Ranger
District, Okanogan County, WA, Due: March 31, 2005, Contact: Jan
Flatten (509) 826-3277. Revision of the Federal Register Notice
Published on 1/28/2005: CEQ Review Period Ending 3/15/2005 has been
extended to 3/31/2005.
EIS No. 050071, Final EIS, FHW, MI, I-94/Rehabilitation Project,
Transportation Improvements to a 6.7 mile portion of I-94 from east I-
96 west end to Conner Avenue on the east end, Funding and NPDES Permit,
City of Detroit, Wayne County, MI, Due: April 29, 2005, Contact:
Adbelmoez Abdalla (517) 702-1820. Revision of the Federal Register
Notice Published on 02/2/054: CEQ Comment Period Ending 3/28/2005 has
been Extended to 4/29/2005.
Dated: March 8, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-4874 Filed 3-10-05; 8:45 am]