Environmental Impact Statements and Regulations; Availability of EPA Comments, 12210-12211 [05-4873]
Download as PDF
12210
Federal Register / Vol. 70, No. 47 / Friday, March 11, 2005 / Notices
Issued in Washington, DC, on March 7,
2005.
David K. Garman,
Assistant Secretary, Energy Efficiency and
Renewable Energy.
effective April 11, 2005. They will
remain in effect until further notice.
TABLE 1.—REPRESENTATIVE AVERAGE UNIT COSTS OF ENERGY FOR FIVE RESIDENTIAL ENERGY SOURCES (2005)
Per million Btu 1
Type of energy
Electricity ...................................................................
Natural Gas ...............................................................
No. 2 Heating Oil ......................................................
Propane .....................................................................
Kerosene ...................................................................
$26.55
10.92
12.68
16.94
16.32
In commonly used terms
9.06¢/kWh 2 3 .............................................................
$1.092/therm 4 or $11.23/MCF 5 6 .............................
$1.76/gallon 7 ............................................................
$1.55/gallon 8 ............................................................
$2.20/gallon 9 ............................................................
As required by
test procedure
$.0906/kWh.
.00001092/Btu.
.00001268/Btu.
.00001694/Btu.
.00001632/Btu.
1 Btu
stands for British thermal units.
stands for kilowatt hour.
3 1 kWh = 3,412 Btu.
4 1 therm = 100,000 Btu. Natural gas prices include taxes.
5 MCF stands for 1,000 cubic feet.
6 For the purposes of this table, one cubic foot of natural gas has an energy equivalence of 1,028 Btu.
7 For the purposes of this table, one gallon of No. 2 heating oil has an energy equivalence of 138,690 Btu.
8 For the purposes of this table, one gallon of liquid propane has an energy equivalence of 91,333 Btu.
9 For the purposes of this table, one gallon of kerosene has an energy equivalence of 135,000 Btu.
2 kWh
[FR Doc. 05–4768 Filed 3–10–05; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6661–4]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under Section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
(202) 564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in the Federal Register dated April 2,
2004 (69 FR 17403).
Draft EISs
ERP No. D–AFS–B65011–00 Rating
LO, White Mountain National Forest,
Propose Land and Resource
Management Plan, Forest Plan Revision
Implementation, Carroll, Coos and
Grafton Counties, NH and Oxford
County, ME.
Summary: EPA expressed a lack of
objection to the project as proposed.
Final EIS
ERP No. D–COE–F36166–OH Rating
EC2, Mill Creek, Ohio Flood Damage
Reduction Project, To Reduce Damages
to Communities, Hamilton County, OH.
Summary: EPA expressed concern
because the proposed channel
VerDate jul<14>2003
16:40 Mar 10, 2005
Jkt 205001
modification may cause a change to the
designated use for Mill Creek, and that
the change would require updating and
modifying the current Total Maximum
Load (TMDL) report and use
designation(s) of the stream, and the
Draft EIS did not provide detail
information regarding the protocols that
will be used to determine if the soils to
be excavated are contaminated, the
method of removal, and the disposal of
those soils.
ERP No. D–FHW–E40803–TN Rating
EC2, TN–397 (Mack Hatcher Parkway
Extension) Construction from US–31
(TN–6, Columbia Avenue) South of
Franklin to US–341 (TN–106, Hillsboro
Road) North of Franklin, Williamson
County and the City of Franklin, TN.
Summary: EPA expressed concern
related to direct and indirect impacts to
water quality and historic properties,
and recommended mitigation measures
and additional monitoring to prevent
further degradation of impaired water
bodies in the project area.
ERP No. D–FRC–B03011–MA Rating
EU3, Weaver’s Cove Liquefied Natural
Gas (LNG) Project, Construct and
Operate Onshore Liquefied Natural Gas
Import and Interstate Natural Gas
Transmission Facilities, Falls River,
Bristol County, MA.
Summary: EPA commented that the
proposed project would have
significant, avoidable, and
unsatisfactory impacts to the resources
and habitats of Mount Hope Bay and the
Taunton River. EPA also recommended
that a supplemental EIS be prepared due
to the inadequate information about the
dredging and disposal program, the
limited scope of alternatives, and an
inadequate analysis of impacts.
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
ERP No. D–FRC–B03012–RI Rating
EC2, KeySpan Liquefied Natural Gas
(LNG) Facility Upgrade Project,
Construction and Operation, and
Algonquin Gas Transmission Project,
Proposal for Site, Construct and Operate
a New Natural Gas Pipeline, Coast
Guard Permit, U.S. Army COE Section
10 and 404 Permits, Providence County,
RI and New England.
Summary: EPA expressed concerns
about the need for additional mitigation
and about the analysis of air quality,
ballast water, cumulative impacts and
environmental justice.
ERP No. D–IBR–K39089–CA Rating
EC2, Folsom Dam Road Access
Restriction Project, Control Access to
Folsom Dam, City of Folsom, CA.
Summary: EPA expressed concerns
about the indirect effects from the
project’s changes in traffic patterns my
result in significant localized impacts in
air quality, environmental justice, and
cultural resources.
ERP No. D–NIH–B81009–MA Rating
EC2, National Emerging Infectious
Diseases Laboratories, Construction of a
National Biocontainment Laboratory,
BioSquare Research Park, Boston
University Medical Center Campus,
Boston, MA.
Summary: EPA expressed concerns
related to air quality issues, cumulative
impacts, and environmental justice.
ERP No. D–NPS–B65012–ME Rating
LO, Schoodic General Management Plan
Amendment, Implementation, Acadia
National Park, ME.
Summary: EPA had no objection to
the proposed project.
ERP No. D–NPS–K65276–AZ Rating
EC2, Chiricahua National Monument
E:\FR\FM\11MRN1.SGM
11MRN1
Federal Register / Vol. 70, No. 47 / Friday, March 11, 2005 / Notices
Fire Management Plan (FMP),
Implementation, AZ.
Summary: EPA expressed concerns
about water quality impacts and
requested additional information on
water quality, mitigation, and
monitoring.
ERP No. D–NRC–B06005–CT Rating
EC2, GENERIC—License Renewal of
Nuclear Plants for the Millstone Power
Station, Units 2 and 3, Supplement 22
to NUREG–1437, Implementation, New
London County, CT.
Summary: EPA expressed concern
about operational and cumulative
impacts, and requested additional
information be prepared in the FEIS to
address these concerns.
ERP No. DC–IBW–K24017–00 Rating
LO, South Bay International Wastewater
Treatment Plan (SBIWTP), To Address
Treatment Alternatives from Tijuana,
Mexico that cross into United States/
Mexico Border in San Diego County,
CA.
Summary: EPA has no objections to
this project and supports continuing
inter-agency coordination to comply
with the Clean Water Act and protect
public health and the environment in
the San Diego border region.
Final EISs
ERP No. F–BLM–K65274–NV, Las
Vegas Valley Disposal Boundary Project,
Disposal and Use of Public Land under
the Management of (BLM),
Implementation, Clark County, NV.
Summary: EPA’s previous issues have
been resolved; therefore, EPA has no
objection to the action as proposed.
ERP No. F–BLM–L65440–OR Upper
Deschutes Resource Management Plan,
Implementation, Deschutes, Klamath,
Jefferson and Cook Counties, OR.
Summary: EPA continues to
recommend that water quality be a focus
in management of the area and that
303(d) listed streams be restored. EPA
supports the flexible management
strategy of the Preferred Alternative and
recommends that degraded allotments
be taken out of use until revegetated.
ERP No. F–FHW–C40159–NJ Penns
Neck Area Transportation Service
Improvements, Phase I Archeological
Survey, US 1, Sections 2S and 3J,
Funding, West Windsor and Princeton
Townships, Mercer County, and
Plainsboro Township, Middlesex
County, NJ.
Summary: EPA’s previous concerns
have been resolved; therefore, EPA has
no objection to the proposed action.
ERP No. FA–FTA–C40046–NY Erie
Canal Harbor Project (formerly known
as the Buffalo Inner Harbor
Development Project) Updated
VerDate jul<14>2003
16:40 Mar 10, 2005
Jkt 205001
Information on the Original Project, City
of Buffalo, Erie County, NY.
Summary: EPA had no objection to
the project.
ERP No. F1–FHW–F40356–WI US 10
Highway Improvements between
Marshfield and Appleton, Trestik
Road—CTH‘‘K’’ (Stevens Point Bypass),
Funding and COE Section 404 Permit,
Portage County, WI.
Summary: EPA continues to express
concern about wetlands mitigation and
the need to provide additional
cumulative impact analysis.
Dated: March 8, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–4873 Filed 3–10–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6661–3]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/
Weekly receipt of Environmental Impact
Statements
Filed February 28, 2005 Through March
4, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 050083, Final EIS, NPS, VA,
Petersburg National Battlefield
General Management Plan,
Implementation, Petersburg, VA, Wait
Period Ends: April 11, 2005, Contact:
Bob Kirby (804) 732–3571.
EIS No. 050084, Draft EIS, FRC, WA,
Capacity Replacement Project,
Construction and Operation of 79.5
miles Pipeline; Modify 5 Existing
Compressor Stations, U.S. Army COE
10 and 404 Permits, Whatcom, Skagit,
Snohomish, King, Pierce and
Thurston Counties, WA, Comment
Period Ends: April 25, 2005, Contact:
Thomas Russo 1–866 208–3372.
EIS No. 050085, Final EIS, FRC, CA,
Stanislaus Rivers Projects, Relicensing
of Hydroelectric Projects: Spring GapStanislaus FERC No. 2130; Beardsley/
Donnells FERC No. 2005; Tulloch
FERC No. 2067; and Donnells-Curtis
Transmission Line FERC No. 2118,
Tuolumne and Calaveras Counties,
CA, Wait Period Ends: April 11, 2005,
Contact: Susan O’Brien (202) 502–
8449.
EIS No. 050086, Draft EIS, AFS, WY,
Dean Project Area, Proposes to
Implement Multiple Resource
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
12211
Management Actions, Black Hills
National Forest, Bearlodge Ranger
District, Sundance, Crook County,
WA, Comment Period Ends: April 25,
2005, Contact: Steve Kozel (307) 283–
1361.
EIS No. 050087, Draft Supplement,
BLM, NV, Ruby Hill Mine
Expansion—East Archimedes Project,
Extension of Existing Open Pit,
Expansion of Two Existing Waste
Rock Disposal Areas, Plan-ofOperations Permit, Eureka County,
NV, Comment Period Ends: April 25,
2005, Contact: Caleb Hiner (775) 635–
4052.
EIS No. 050088, Final EIS, NOA, Reef
Fish Fishery Management Plan (FMP)
Amendment 23, To Set Vermilion
Snapper Sustainable Fisheries Act
Targets and Thresholds and to
Establish a Plan to End Overfishing
and Rebuild the Stock,
Implementation, Gulf of Mexico, Wait
Period Ends: April 11, 2005, Contact:
Dr. Roy E. Crabtree (727) 570–5305.
EIS No. 050089, Draft EIS, FHW, CA,
Los Banos Bypass Project, Construct
from CA–152 in Merced County
beginning near Volta Road west of Los
Banos, bypassing Los Banos, ending
near the Santa Fe Grade Road, U.S.
Army COE Section 404 Permit,
Merced County, CA, Comment Period
Ends: May 6, 2005, Contact: Mahfoud
Licha (916) 498–5866.
EIS No. 050090, Draft Supplement, IBR,
CA, Battle Creek Salmon and
Steelhead Restoration Project, To
Address New Significant Information,
Habitat Restoration in Battle Creek
and Tributaries, License Amendment
Issuance, Implementation, Tehama
and Shasta Counties, CA, Comment
Period Ends: April 25, 2005, Contact:
Mary Marshall (916) 978–5248.
EIS No. 050091, Draft EIS, FRC, TX, LA,
Golden Pass Liquefied Natural Gas
(LNG) Import Terminal and Natural
Gas Pipeline Facilities, Construction
and Operation, Jefferson, Orange,
Newton Counties, TX and Calcasieu
Parish, LA, Comment Period Ends:
April 25, 2005, Contact: Thomas
Russo 1–866–208–3372.
EIS No. 050092, Final EIS, AFS, OR,
Lemolo Watershed Projects, Updated
and New Information concerning
Recommendations Steamed from the
Diamond Lake/Lemolo Lake
Watershed Analysis, (WA),
Implementation, Umpqua National
Forest, Diamond Lake Ranger District,
Douglas County, OR, Wait Period
Ends: April 11, 2005, Contact: Rick
Abbott (541) 498–2531.
EIS No. 050093, Draft EIS, NOA, CA,
Monterey Accelerated Research
Systems (MARS) Cabled Observatory,
E:\FR\FM\11MRN1.SGM
11MRN1
Agencies
[Federal Register Volume 70, Number 47 (Friday, March 11, 2005)]
[Notices]
[Pages 12210-12211]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-4873]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6661-4]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under Section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at (202) 564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in the Federal Register dated April 2, 2004 (69 FR 17403).
Draft EISs
ERP No. D-AFS-B65011-00 Rating LO, White Mountain National Forest,
Propose Land and Resource Management Plan, Forest Plan Revision
Implementation, Carroll, Coos and Grafton Counties, NH and Oxford
County, ME.
Summary: EPA expressed a lack of objection to the project as
proposed.
Final EIS
ERP No. D-COE-F36166-OH Rating EC2, Mill Creek, Ohio Flood Damage
Reduction Project, To Reduce Damages to Communities, Hamilton County,
OH.
Summary: EPA expressed concern because the proposed channel
modification may cause a change to the designated use for Mill Creek,
and that the change would require updating and modifying the current
Total Maximum Load (TMDL) report and use designation(s) of the stream,
and the Draft EIS did not provide detail information regarding the
protocols that will be used to determine if the soils to be excavated
are contaminated, the method of removal, and the disposal of those
soils.
ERP No. D-FHW-E40803-TN Rating EC2, TN-397 (Mack Hatcher Parkway
Extension) Construction from US-31 (TN-6, Columbia Avenue) South of
Franklin to US-341 (TN-106, Hillsboro Road) North of Franklin,
Williamson County and the City of Franklin, TN.
Summary: EPA expressed concern related to direct and indirect
impacts to water quality and historic properties, and recommended
mitigation measures and additional monitoring to prevent further
degradation of impaired water bodies in the project area.
ERP No. D-FRC-B03011-MA Rating EU3, Weaver's Cove Liquefied Natural
Gas (LNG) Project, Construct and Operate Onshore Liquefied Natural Gas
Import and Interstate Natural Gas Transmission Facilities, Falls River,
Bristol County, MA.
Summary: EPA commented that the proposed project would have
significant, avoidable, and unsatisfactory impacts to the resources and
habitats of Mount Hope Bay and the Taunton River. EPA also recommended
that a supplemental EIS be prepared due to the inadequate information
about the dredging and disposal program, the limited scope of
alternatives, and an inadequate analysis of impacts.
ERP No. D-FRC-B03012-RI Rating EC2, KeySpan Liquefied Natural Gas
(LNG) Facility Upgrade Project, Construction and Operation, and
Algonquin Gas Transmission Project, Proposal for Site, Construct and
Operate a New Natural Gas Pipeline, Coast Guard Permit, U.S. Army COE
Section 10 and 404 Permits, Providence County, RI and New England.
Summary: EPA expressed concerns about the need for additional
mitigation and about the analysis of air quality, ballast water,
cumulative impacts and environmental justice.
ERP No. D-IBR-K39089-CA Rating EC2, Folsom Dam Road Access
Restriction Project, Control Access to Folsom Dam, City of Folsom, CA.
Summary: EPA expressed concerns about the indirect effects from the
project's changes in traffic patterns my result in significant
localized impacts in air quality, environmental justice, and cultural
resources.
ERP No. D-NIH-B81009-MA Rating EC2, National Emerging Infectious
Diseases Laboratories, Construction of a National Biocontainment
Laboratory, BioSquare Research Park, Boston University Medical Center
Campus, Boston, MA.
Summary: EPA expressed concerns related to air quality issues,
cumulative impacts, and environmental justice.
ERP No. D-NPS-B65012-ME Rating LO, Schoodic General Management Plan
Amendment, Implementation, Acadia National Park, ME.
Summary: EPA had no objection to the proposed project.
ERP No. D-NPS-K65276-AZ Rating EC2, Chiricahua National Monument
[[Page 12211]]
Fire Management Plan (FMP), Implementation, AZ.
Summary: EPA expressed concerns about water quality impacts and
requested additional information on water quality, mitigation, and
monitoring.
ERP No. D-NRC-B06005-CT Rating EC2, GENERIC--License Renewal of
Nuclear Plants for the Millstone Power Station, Units 2 and 3,
Supplement 22 to NUREG-1437, Implementation, New London County, CT.
Summary: EPA expressed concern about operational and cumulative
impacts, and requested additional information be prepared in the FEIS
to address these concerns.
ERP No. DC-IBW-K24017-00 Rating LO, South Bay International
Wastewater Treatment Plan (SBIWTP), To Address Treatment Alternatives
from Tijuana, Mexico that cross into United States/Mexico Border in San
Diego County, CA.
Summary: EPA has no objections to this project and supports
continuing inter-agency coordination to comply with the Clean Water Act
and protect public health and the environment in the San Diego border
region.
Final EISs
ERP No. F-BLM-K65274-NV, Las Vegas Valley Disposal Boundary
Project, Disposal and Use of Public Land under the Management of (BLM),
Implementation, Clark County, NV.
Summary: EPA's previous issues have been resolved; therefore, EPA
has no objection to the action as proposed.
ERP No. F-BLM-L65440-OR Upper Deschutes Resource Management Plan,
Implementation, Deschutes, Klamath, Jefferson and Cook Counties, OR.
Summary: EPA continues to recommend that water quality be a focus
in management of the area and that 303(d) listed streams be restored.
EPA supports the flexible management strategy of the Preferred
Alternative and recommends that degraded allotments be taken out of use
until revegetated.
ERP No. F-FHW-C40159-NJ Penns Neck Area Transportation Service
Improvements, Phase I Archeological Survey, US 1, Sections 2S and 3J,
Funding, West Windsor and Princeton Townships, Mercer County, and
Plainsboro Township, Middlesex County, NJ.
Summary: EPA's previous concerns have been resolved; therefore, EPA
has no objection to the proposed action.
ERP No. FA-FTA-C40046-NY Erie Canal Harbor Project (formerly known
as the Buffalo Inner Harbor Development Project) Updated Information on
the Original Project, City of Buffalo, Erie County, NY.
Summary: EPA had no objection to the project.
ERP No. F1-FHW-F40356-WI US 10 Highway Improvements between
Marshfield and Appleton, Trestik Road--CTH``K'' (Stevens Point Bypass),
Funding and COE Section 404 Permit, Portage County, WI.
Summary: EPA continues to express concern about wetlands mitigation
and the need to provide additional cumulative impact analysis.
Dated: March 8, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-4873 Filed 3-10-05; 8:45 am]
BILLING CODE 6560-50-P