Environmental Impact Statements and Regulations; Availability of EPA Comments, 12210-12211 [05-4873]

Download as PDF 12210 Federal Register / Vol. 70, No. 47 / Friday, March 11, 2005 / Notices Issued in Washington, DC, on March 7, 2005. David K. Garman, Assistant Secretary, Energy Efficiency and Renewable Energy. effective April 11, 2005. They will remain in effect until further notice. TABLE 1.—REPRESENTATIVE AVERAGE UNIT COSTS OF ENERGY FOR FIVE RESIDENTIAL ENERGY SOURCES (2005) Per million Btu 1 Type of energy Electricity ................................................................... Natural Gas ............................................................... No. 2 Heating Oil ...................................................... Propane ..................................................................... Kerosene ................................................................... $26.55 10.92 12.68 16.94 16.32 In commonly used terms 9.06¢/kWh 2 3 ............................................................. $1.092/therm 4 or $11.23/MCF 5 6 ............................. $1.76/gallon 7 ............................................................ $1.55/gallon 8 ............................................................ $2.20/gallon 9 ............................................................ As required by test procedure $.0906/kWh. .00001092/Btu. .00001268/Btu. .00001694/Btu. .00001632/Btu. 1 Btu stands for British thermal units. stands for kilowatt hour. 3 1 kWh = 3,412 Btu. 4 1 therm = 100,000 Btu. Natural gas prices include taxes. 5 MCF stands for 1,000 cubic feet. 6 For the purposes of this table, one cubic foot of natural gas has an energy equivalence of 1,028 Btu. 7 For the purposes of this table, one gallon of No. 2 heating oil has an energy equivalence of 138,690 Btu. 8 For the purposes of this table, one gallon of liquid propane has an energy equivalence of 91,333 Btu. 9 For the purposes of this table, one gallon of kerosene has an energy equivalence of 135,000 Btu. 2 kWh [FR Doc. 05–4768 Filed 3–10–05; 8:45 am] BILLING CODE 6450–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6661–4] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under Section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at (202) 564–7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in the Federal Register dated April 2, 2004 (69 FR 17403). Draft EISs ERP No. D–AFS–B65011–00 Rating LO, White Mountain National Forest, Propose Land and Resource Management Plan, Forest Plan Revision Implementation, Carroll, Coos and Grafton Counties, NH and Oxford County, ME. Summary: EPA expressed a lack of objection to the project as proposed. Final EIS ERP No. D–COE–F36166–OH Rating EC2, Mill Creek, Ohio Flood Damage Reduction Project, To Reduce Damages to Communities, Hamilton County, OH. Summary: EPA expressed concern because the proposed channel VerDate jul<14>2003 16:40 Mar 10, 2005 Jkt 205001 modification may cause a change to the designated use for Mill Creek, and that the change would require updating and modifying the current Total Maximum Load (TMDL) report and use designation(s) of the stream, and the Draft EIS did not provide detail information regarding the protocols that will be used to determine if the soils to be excavated are contaminated, the method of removal, and the disposal of those soils. ERP No. D–FHW–E40803–TN Rating EC2, TN–397 (Mack Hatcher Parkway Extension) Construction from US–31 (TN–6, Columbia Avenue) South of Franklin to US–341 (TN–106, Hillsboro Road) North of Franklin, Williamson County and the City of Franklin, TN. Summary: EPA expressed concern related to direct and indirect impacts to water quality and historic properties, and recommended mitigation measures and additional monitoring to prevent further degradation of impaired water bodies in the project area. ERP No. D–FRC–B03011–MA Rating EU3, Weaver’s Cove Liquefied Natural Gas (LNG) Project, Construct and Operate Onshore Liquefied Natural Gas Import and Interstate Natural Gas Transmission Facilities, Falls River, Bristol County, MA. Summary: EPA commented that the proposed project would have significant, avoidable, and unsatisfactory impacts to the resources and habitats of Mount Hope Bay and the Taunton River. EPA also recommended that a supplemental EIS be prepared due to the inadequate information about the dredging and disposal program, the limited scope of alternatives, and an inadequate analysis of impacts. PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 ERP No. D–FRC–B03012–RI Rating EC2, KeySpan Liquefied Natural Gas (LNG) Facility Upgrade Project, Construction and Operation, and Algonquin Gas Transmission Project, Proposal for Site, Construct and Operate a New Natural Gas Pipeline, Coast Guard Permit, U.S. Army COE Section 10 and 404 Permits, Providence County, RI and New England. Summary: EPA expressed concerns about the need for additional mitigation and about the analysis of air quality, ballast water, cumulative impacts and environmental justice. ERP No. D–IBR–K39089–CA Rating EC2, Folsom Dam Road Access Restriction Project, Control Access to Folsom Dam, City of Folsom, CA. Summary: EPA expressed concerns about the indirect effects from the project’s changes in traffic patterns my result in significant localized impacts in air quality, environmental justice, and cultural resources. ERP No. D–NIH–B81009–MA Rating EC2, National Emerging Infectious Diseases Laboratories, Construction of a National Biocontainment Laboratory, BioSquare Research Park, Boston University Medical Center Campus, Boston, MA. Summary: EPA expressed concerns related to air quality issues, cumulative impacts, and environmental justice. ERP No. D–NPS–B65012–ME Rating LO, Schoodic General Management Plan Amendment, Implementation, Acadia National Park, ME. Summary: EPA had no objection to the proposed project. ERP No. D–NPS–K65276–AZ Rating EC2, Chiricahua National Monument E:\FR\FM\11MRN1.SGM 11MRN1 Federal Register / Vol. 70, No. 47 / Friday, March 11, 2005 / Notices Fire Management Plan (FMP), Implementation, AZ. Summary: EPA expressed concerns about water quality impacts and requested additional information on water quality, mitigation, and monitoring. ERP No. D–NRC–B06005–CT Rating EC2, GENERIC—License Renewal of Nuclear Plants for the Millstone Power Station, Units 2 and 3, Supplement 22 to NUREG–1437, Implementation, New London County, CT. Summary: EPA expressed concern about operational and cumulative impacts, and requested additional information be prepared in the FEIS to address these concerns. ERP No. DC–IBW–K24017–00 Rating LO, South Bay International Wastewater Treatment Plan (SBIWTP), To Address Treatment Alternatives from Tijuana, Mexico that cross into United States/ Mexico Border in San Diego County, CA. Summary: EPA has no objections to this project and supports continuing inter-agency coordination to comply with the Clean Water Act and protect public health and the environment in the San Diego border region. Final EISs ERP No. F–BLM–K65274–NV, Las Vegas Valley Disposal Boundary Project, Disposal and Use of Public Land under the Management of (BLM), Implementation, Clark County, NV. Summary: EPA’s previous issues have been resolved; therefore, EPA has no objection to the action as proposed. ERP No. F–BLM–L65440–OR Upper Deschutes Resource Management Plan, Implementation, Deschutes, Klamath, Jefferson and Cook Counties, OR. Summary: EPA continues to recommend that water quality be a focus in management of the area and that 303(d) listed streams be restored. EPA supports the flexible management strategy of the Preferred Alternative and recommends that degraded allotments be taken out of use until revegetated. ERP No. F–FHW–C40159–NJ Penns Neck Area Transportation Service Improvements, Phase I Archeological Survey, US 1, Sections 2S and 3J, Funding, West Windsor and Princeton Townships, Mercer County, and Plainsboro Township, Middlesex County, NJ. Summary: EPA’s previous concerns have been resolved; therefore, EPA has no objection to the proposed action. ERP No. FA–FTA–C40046–NY Erie Canal Harbor Project (formerly known as the Buffalo Inner Harbor Development Project) Updated VerDate jul<14>2003 16:40 Mar 10, 2005 Jkt 205001 Information on the Original Project, City of Buffalo, Erie County, NY. Summary: EPA had no objection to the project. ERP No. F1–FHW–F40356–WI US 10 Highway Improvements between Marshfield and Appleton, Trestik Road—CTH‘‘K’’ (Stevens Point Bypass), Funding and COE Section 404 Permit, Portage County, WI. Summary: EPA continues to express concern about wetlands mitigation and the need to provide additional cumulative impact analysis. Dated: March 8, 2005. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 05–4873 Filed 3–10–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6661–3] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/ Weekly receipt of Environmental Impact Statements Filed February 28, 2005 Through March 4, 2005 Pursuant to 40 CFR 1506.9. EIS No. 050083, Final EIS, NPS, VA, Petersburg National Battlefield General Management Plan, Implementation, Petersburg, VA, Wait Period Ends: April 11, 2005, Contact: Bob Kirby (804) 732–3571. EIS No. 050084, Draft EIS, FRC, WA, Capacity Replacement Project, Construction and Operation of 79.5 miles Pipeline; Modify 5 Existing Compressor Stations, U.S. Army COE 10 and 404 Permits, Whatcom, Skagit, Snohomish, King, Pierce and Thurston Counties, WA, Comment Period Ends: April 25, 2005, Contact: Thomas Russo 1–866 208–3372. EIS No. 050085, Final EIS, FRC, CA, Stanislaus Rivers Projects, Relicensing of Hydroelectric Projects: Spring GapStanislaus FERC No. 2130; Beardsley/ Donnells FERC No. 2005; Tulloch FERC No. 2067; and Donnells-Curtis Transmission Line FERC No. 2118, Tuolumne and Calaveras Counties, CA, Wait Period Ends: April 11, 2005, Contact: Susan O’Brien (202) 502– 8449. EIS No. 050086, Draft EIS, AFS, WY, Dean Project Area, Proposes to Implement Multiple Resource PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 12211 Management Actions, Black Hills National Forest, Bearlodge Ranger District, Sundance, Crook County, WA, Comment Period Ends: April 25, 2005, Contact: Steve Kozel (307) 283– 1361. EIS No. 050087, Draft Supplement, BLM, NV, Ruby Hill Mine Expansion—East Archimedes Project, Extension of Existing Open Pit, Expansion of Two Existing Waste Rock Disposal Areas, Plan-ofOperations Permit, Eureka County, NV, Comment Period Ends: April 25, 2005, Contact: Caleb Hiner (775) 635– 4052. EIS No. 050088, Final EIS, NOA, Reef Fish Fishery Management Plan (FMP) Amendment 23, To Set Vermilion Snapper Sustainable Fisheries Act Targets and Thresholds and to Establish a Plan to End Overfishing and Rebuild the Stock, Implementation, Gulf of Mexico, Wait Period Ends: April 11, 2005, Contact: Dr. Roy E. Crabtree (727) 570–5305. EIS No. 050089, Draft EIS, FHW, CA, Los Banos Bypass Project, Construct from CA–152 in Merced County beginning near Volta Road west of Los Banos, bypassing Los Banos, ending near the Santa Fe Grade Road, U.S. Army COE Section 404 Permit, Merced County, CA, Comment Period Ends: May 6, 2005, Contact: Mahfoud Licha (916) 498–5866. EIS No. 050090, Draft Supplement, IBR, CA, Battle Creek Salmon and Steelhead Restoration Project, To Address New Significant Information, Habitat Restoration in Battle Creek and Tributaries, License Amendment Issuance, Implementation, Tehama and Shasta Counties, CA, Comment Period Ends: April 25, 2005, Contact: Mary Marshall (916) 978–5248. EIS No. 050091, Draft EIS, FRC, TX, LA, Golden Pass Liquefied Natural Gas (LNG) Import Terminal and Natural Gas Pipeline Facilities, Construction and Operation, Jefferson, Orange, Newton Counties, TX and Calcasieu Parish, LA, Comment Period Ends: April 25, 2005, Contact: Thomas Russo 1–866–208–3372. EIS No. 050092, Final EIS, AFS, OR, Lemolo Watershed Projects, Updated and New Information concerning Recommendations Steamed from the Diamond Lake/Lemolo Lake Watershed Analysis, (WA), Implementation, Umpqua National Forest, Diamond Lake Ranger District, Douglas County, OR, Wait Period Ends: April 11, 2005, Contact: Rick Abbott (541) 498–2531. EIS No. 050093, Draft EIS, NOA, CA, Monterey Accelerated Research Systems (MARS) Cabled Observatory, E:\FR\FM\11MRN1.SGM 11MRN1

Agencies

[Federal Register Volume 70, Number 47 (Friday, March 11, 2005)]
[Notices]
[Pages 12210-12211]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-4873]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6661-4]


Environmental Impact Statements and Regulations; Availability of 
EPA Comments

    Availability of EPA comments prepared pursuant to the Environmental 
Review Process (ERP), under Section 309 of the Clean Air Act and 
Section 102(2)(c) of the National Environmental Policy Act as amended. 
Requests for copies of EPA comments can be directed to the Office of 
Federal Activities at (202) 564-7167. An explanation of the ratings 
assigned to draft environmental impact statements (EISs) was published 
in the Federal Register dated April 2, 2004 (69 FR 17403).

Draft EISs

    ERP No. D-AFS-B65011-00 Rating LO, White Mountain National Forest, 
Propose Land and Resource Management Plan, Forest Plan Revision 
Implementation, Carroll, Coos and Grafton Counties, NH and Oxford 
County, ME.
    Summary: EPA expressed a lack of objection to the project as 
proposed.

Final EIS

    ERP No. D-COE-F36166-OH Rating EC2, Mill Creek, Ohio Flood Damage 
Reduction Project, To Reduce Damages to Communities, Hamilton County, 
OH.
    Summary: EPA expressed concern because the proposed channel 
modification may cause a change to the designated use for Mill Creek, 
and that the change would require updating and modifying the current 
Total Maximum Load (TMDL) report and use designation(s) of the stream, 
and the Draft EIS did not provide detail information regarding the 
protocols that will be used to determine if the soils to be excavated 
are contaminated, the method of removal, and the disposal of those 
soils.
    ERP No. D-FHW-E40803-TN Rating EC2, TN-397 (Mack Hatcher Parkway 
Extension) Construction from US-31 (TN-6, Columbia Avenue) South of 
Franklin to US-341 (TN-106, Hillsboro Road) North of Franklin, 
Williamson County and the City of Franklin, TN.
    Summary: EPA expressed concern related to direct and indirect 
impacts to water quality and historic properties, and recommended 
mitigation measures and additional monitoring to prevent further 
degradation of impaired water bodies in the project area.
    ERP No. D-FRC-B03011-MA Rating EU3, Weaver's Cove Liquefied Natural 
Gas (LNG) Project, Construct and Operate Onshore Liquefied Natural Gas 
Import and Interstate Natural Gas Transmission Facilities, Falls River, 
Bristol County, MA.
    Summary: EPA commented that the proposed project would have 
significant, avoidable, and unsatisfactory impacts to the resources and 
habitats of Mount Hope Bay and the Taunton River. EPA also recommended 
that a supplemental EIS be prepared due to the inadequate information 
about the dredging and disposal program, the limited scope of 
alternatives, and an inadequate analysis of impacts.
    ERP No. D-FRC-B03012-RI Rating EC2, KeySpan Liquefied Natural Gas 
(LNG) Facility Upgrade Project, Construction and Operation, and 
Algonquin Gas Transmission Project, Proposal for Site, Construct and 
Operate a New Natural Gas Pipeline, Coast Guard Permit, U.S. Army COE 
Section 10 and 404 Permits, Providence County, RI and New England.
    Summary: EPA expressed concerns about the need for additional 
mitigation and about the analysis of air quality, ballast water, 
cumulative impacts and environmental justice.
    ERP No. D-IBR-K39089-CA Rating EC2, Folsom Dam Road Access 
Restriction Project, Control Access to Folsom Dam, City of Folsom, CA.
    Summary: EPA expressed concerns about the indirect effects from the 
project's changes in traffic patterns my result in significant 
localized impacts in air quality, environmental justice, and cultural 
resources.
    ERP No. D-NIH-B81009-MA Rating EC2, National Emerging Infectious 
Diseases Laboratories, Construction of a National Biocontainment 
Laboratory, BioSquare Research Park, Boston University Medical Center 
Campus, Boston, MA.
    Summary: EPA expressed concerns related to air quality issues, 
cumulative impacts, and environmental justice.
    ERP No. D-NPS-B65012-ME Rating LO, Schoodic General Management Plan 
Amendment, Implementation, Acadia National Park, ME.
    Summary: EPA had no objection to the proposed project.
    ERP No. D-NPS-K65276-AZ Rating EC2, Chiricahua National Monument

[[Page 12211]]

Fire Management Plan (FMP), Implementation, AZ.
    Summary: EPA expressed concerns about water quality impacts and 
requested additional information on water quality, mitigation, and 
monitoring.
    ERP No. D-NRC-B06005-CT Rating EC2, GENERIC--License Renewal of 
Nuclear Plants for the Millstone Power Station, Units 2 and 3, 
Supplement 22 to NUREG-1437, Implementation, New London County, CT.
    Summary: EPA expressed concern about operational and cumulative 
impacts, and requested additional information be prepared in the FEIS 
to address these concerns.
    ERP No. DC-IBW-K24017-00 Rating LO, South Bay International 
Wastewater Treatment Plan (SBIWTP), To Address Treatment Alternatives 
from Tijuana, Mexico that cross into United States/Mexico Border in San 
Diego County, CA.
    Summary: EPA has no objections to this project and supports 
continuing inter-agency coordination to comply with the Clean Water Act 
and protect public health and the environment in the San Diego border 
region.

Final EISs

    ERP No. F-BLM-K65274-NV, Las Vegas Valley Disposal Boundary 
Project, Disposal and Use of Public Land under the Management of (BLM), 
Implementation, Clark County, NV.
    Summary: EPA's previous issues have been resolved; therefore, EPA 
has no objection to the action as proposed.
    ERP No. F-BLM-L65440-OR Upper Deschutes Resource Management Plan, 
Implementation, Deschutes, Klamath, Jefferson and Cook Counties, OR.
    Summary: EPA continues to recommend that water quality be a focus 
in management of the area and that 303(d) listed streams be restored. 
EPA supports the flexible management strategy of the Preferred 
Alternative and recommends that degraded allotments be taken out of use 
until revegetated.
    ERP No. F-FHW-C40159-NJ Penns Neck Area Transportation Service 
Improvements, Phase I Archeological Survey, US 1, Sections 2S and 3J, 
Funding, West Windsor and Princeton Townships, Mercer County, and 
Plainsboro Township, Middlesex County, NJ.
    Summary: EPA's previous concerns have been resolved; therefore, EPA 
has no objection to the proposed action.
    ERP No. FA-FTA-C40046-NY Erie Canal Harbor Project (formerly known 
as the Buffalo Inner Harbor Development Project) Updated Information on 
the Original Project, City of Buffalo, Erie County, NY.
    Summary: EPA had no objection to the project.
    ERP No. F1-FHW-F40356-WI US 10 Highway Improvements between 
Marshfield and Appleton, Trestik Road--CTH``K'' (Stevens Point Bypass), 
Funding and COE Section 404 Permit, Portage County, WI.
    Summary: EPA continues to express concern about wetlands mitigation 
and the need to provide additional cumulative impact analysis.

    Dated: March 8, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-4873 Filed 3-10-05; 8:45 am]