Extension of National Pollutant Discharge Elimination System (NPDES) Permit Deadline for Storm Water Discharges for Oil and Gas Activity That Disturbs One to Five Acres, 11560-11563 [05-4467]
Download as PDF
11560
Federal Register / Vol. 70, No. 45 / Wednesday, March 9, 2005 / Rules and Regulations
ARIZONA—CARBON MONOXIDE—Continued
Designation
Classification
Designated area
Date
Type
Date
Type
25. thence, easterly along the southern boundary of the
Gila River Indian Reservation which is the southern
line of Sections 13, 14, 15, 16, 17, and 18, Township
2 South, Range 1 East, to the boundary between
Maricopa and Pinal Counties as described in Arizona
Revised Statues Section 11–109 and 11–113, which
is the eastern line of Range 1 East, except that portion in the Gila River Indian Reservation;
26. thence, northerly along the eastern boundary of
Range 1 East, which is the common boundary between Maricopa and Pinal Counties, to a point where
the eastern line of Range 1 East intersects the Gila
River, except that portion in the Gila River Indian
Reservation;
27. thence, southerly up the Gila River to a point where
the Gila River intersects with the southern line of
Township 2 South; and
28. thence, easterly along the southern line of Township
2 South to the point of beginning which is a point
where the southern line of Township 2 South intersects with the eastern line Range 7 East, except that
portion in the Gila River Indian Reservation.
*
*
*
*
*
*
*
*
[FR Doc. 05–4585 Filed 3–8–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 122
[OW–2002–0068; FRL–7882–2]
RIN 2040–AE71
Extension of National Pollutant
Discharge Elimination System
(NPDES) Permit Deadline for Storm
Water Discharges for Oil and Gas
Activity That Disturbs One to Five
Acres
Environmental Protection
Agency (EPA).
ACTION: Final rule.
AGENCY:
SUMMARY: Today’s action postpones
until June 12, 2006, the requirement to
obtain National Pollutant Discharge
Elimination System (NPDES) storm
water permit coverage for oil and gas
construction activity that disturbs one to
five acres of land. This is the second
postponement promulgated by EPA for
these activities. This postponement will
allow the Agency additional time to
complete its analysis of the issues raised
by stakeholders about storm water
runoff from construction activities at oil
and gas sites and of practices and
methods for controlling these storm
water discharges to mitigate impacts on
VerDate jul<14>2003
17:19 Mar 08, 2005
Jkt 205001
*
*
water quality, as appropriate. Within six
months of today’s action, EPA intends
to publish a notice of proposed
rulemaking in the Federal Register for
addressing these discharges and to
invite public comments.
DATES: This final rule is effective on
March 9, 2005.
ADDRESSES: EPA has established a
docket for this action under Docket ID
No. OW–2002–0068. All documents in
the docket are listed in the EDOCKET
index at https://www.epa.gov/edocket.
Although listed in the index, some
information is not publicly available,
i.e., confidential business information or
other information whose disclosure is
restricted by statute. Certain other
material, such as copyrighted material,
is not placed on the Internet and will be
publicly available only in hard copy
form. Publicly available docket
materials are available either
electronically in EDOCKET or in hard
copy at the Docket, EPA/DC, EPA West,
Room B102, 1301 Constitution Ave.,
NW., Washington, DC. The Public
Reading Room is open from 8:30 a.m. to
4:30 p.m., Monday through Friday,
excluding legal holidays. The telephone
number for the Public Reading Room is
(202) 566–1744, and the telephone
number for the Water Docket is (202)
566–2426.
FOR FURTHER INFORMATION CONTACT: Jeff
Smith, Office of Wastewater
Management, Office of Water,
Environmental Protection Agency
PO 00000
Frm 00026
Fmt 4700
Sfmt 4700
*
*
(4203M), 1200 Pennsylvania Ave., NW.,
Washington, DC 20460; telephone
number: (202) 564–0652; fax number:
(202) 564–6431; e-mail address:
smith.jeff@epa.gov.
SUPPLEMENTARY INFORMATION:
I. General Information
A. Affected Entities
Entities potentially affected by this
action include operators of construction
activities disturbing at least one acre,
but less than five acres of land at oil and
gas sites, North American Industrial
Classification System (NAICS) codes
and titles: 211—Oil and Gas Extraction,
213111—Drilling Oil and Gas Wells,
and 213112—Support Activities for Oil
and Gas Operations.
This description is not intended to be
exhaustive, but rather provides a guide
for readers regarding entities likely to be
affected by this action. This description
identifies the types of entities that EPA
is now aware could potentially be
affected by this action. Other types of
entities not identified could also be
affected. To determine whether your
facility or company is affected by this
action, you should carefully examine
the applicability criteria in 40 CFR
122.26(b)(15) and (e)(8). If you have
questions regarding the applicability of
this action to a particular entity, consult
the person listed in the preceding FOR
FURTHER INFORMATION CONTACT section.
E:\FR\FM\09MRR1.SGM
09MRR1
Federal Register / Vol. 70, No. 45 / Wednesday, March 9, 2005 / Rules and Regulations
B. When Does This Rule Take Effect?
IV. Today’s Action
Because this rule provides temporary
relief from permitting requirements for
certain dischargers, this rule is not
subject to the general requirement for a
thirty-day waiting period after
publication before a final rule takes
effect. By providing such relief, this rule
‘‘relieves a restriction’’ on these
dischargers. 5 U.S.C. 553(d)(1).
Moreover, pursuant to 5 U.S.C.
553(d)(3), EPA has good cause to make
this rule effective immediately upon
publication. The March 10, 2005,
deadline this action extends is less than
thirty days after the publication of this
rule. Making this action effective as
soon as it is published will help reduce
any confusion by those affected by the
rule regarding the necessity for
obtaining permit coverage. Therefore, a
thirty-day waiting period is unnecessary
and would be contrary to the public
interest.
In today’s action, EPA is extending
until June 12, 2006, the deadline for
obtaining NPDES storm water permits
for oil and gas construction activity that
disturbs at least one acre, but less than
five acres of land and sites disturbing
less than one acre that are a part of a
larger common plan of development or
sale that disturbs between one and five
acres. The text finalized at § 122.26(e)(8)
does not create any duty to apply for an
NPDES permit that did not already exist
as a result of EPA’s Phase II regulations.
Rather, this amendment merely extends
the permitting deadline for a certain
class of dischargers.
During the next fifteen months, EPA
intends to (1) complete the economic
impact analysis; (2) complete the
evaluation of the legal and procedural
implications associated with several
options that the Agency is considering
with regard to regulation of storm water
discharges from oil and gas-related
construction sites; and (3) continue to
evaluate practices and methods
operators may employ to control storm
water discharges from the sites affected
by this rule. One of the issues EPA will
be examining during this period is how
best to resolve questions posed by
outside parties regarding section
402(l)(2) of the Clean Water Act, which
exempts certain storm water discharges
from oil and gas exploration,
production, processing, or treatment
operations or transmission facilities
from NPDES permit requirements. EPA
intends to convene at least one public
meeting with stakeholders for the
purpose of exchanging information on
current industry practices and the
effectiveness of those practices in
protecting water quality and obtaining
input on the appropriate approach for
addressing construction storm water
discharges from this industry. EPA will
publish a separate notice in the Federal
Register with information about this
public meeting. Finally, EPA expects to
propose and take some subsequent final
action based on the Agency’s
conclusions following these activities
prior to June 12, 2006.
II. Background
On January 18, 2005 (70 FR 2832),
EPA proposed a fifteen month
postponement of the permit requirement
for oil and gas construction activity
disturbing one to five acres, from March
10, 2005, to June 12, 2006, to allow time
for EPA to complete its analysis of the
economic impacts and the legal and
procedural implications of the options
that the Agency is considering regarding
the regulation of storm water discharges
from oil and gas-related construction
sites, and to evaluate the practices and
methods operators employ to control
storm water discharges from the sites
affected by this rule. In that proposal,
EPA explained the background of the
NPDES construction permit
requirements, and why EPA believes it
is appropriate to provide an additional
fifteen month postponement of permit
requirements for construction of oil and
gas exploration and production facilities
disturbing one to five acres. When
describing construction activity that
disturbs ‘‘one to five acres’’ or in
discussing ‘‘small’’ construction activity
in this preamble, EPA is referring to
activities covered by 40 CFR
122.26(b)(15).
III. Response to Comments
EPA received a modest number of
comments on its proposal to provide an
additional fifteen month postponement
of permit requirements for discharges
from oil and gas-related construction
activity disturbing one to five acres.
EPA’s responses to all of these
comments may be found in the
Response to Comment document that is
part of the docket for this final rule.
VerDate jul<14>2003
17:19 Mar 08, 2005
Jkt 205001
11561
regulatory action’’ as one that is likely
to result in a rule that may:
(1) Have an annual effect on the
economy of $100 million or more or
adversely affect in a material way the
economy, a sector of the economy,
productivity, competition, jobs, the
environment, public health or safety, or
State, local, or tribal governments or
communities;
(2) Create a serious inconsistency or
otherwise interfere with an action taken
or planned by another agency;
(3) Materially alter the budgetary
impact of entitlements, grants, user fees,
or loan programs or the rights and
obligations of recipients thereof; or
(4) Raise novel legal or policy issues
arising out of legal mandates, the
President’s priorities, or the principles
set forth in the Executive Order.
It has been determined that this rule
is not a ‘‘significant regulatory action’’
under the terms of Executive Order
12866 and is therefore not subject to
OMB review.
A. Executive Order 12866: Regulatory
Planning and Review
B. Paperwork Reduction Act
This action does not impose an
information collection burden under the
provisions of the Paperwork Reduction
Act, 44 U.S.C. 3501 et seq. It merely
postpones implementation of an
existing rule deadline.
Burden means the total time, effort, or
financial resources expended by persons
to generate, maintain, retain, or disclose
or provide information to or for a
Federal agency. This includes the time
needed to review instructions; develop,
acquire, install, and utilize technology
and systems for the purposes of
collecting, validating, and verifying
information; processing and
maintaining information, and disclosing
and providing information; adjust the
existing ways to comply with any
previously applicable instructions and
requirements; train personnel to be able
to respond to a collection of
information; search data sources;
complete and review the collection of
information; and transmit or otherwise
disclose the information.
An Agency may not conduct or
sponsor, and a person is not required to
respond to a collection of information
unless it displays a currently valid OMB
control number. The OMB control
numbers for EPA’s regulations are listed
in 40 CFR part 9.
Under Executive Order 12866, (58 FR
51735 (October 4, 1993)) the Agency
must determine whether the regulatory
action is ‘‘significant’’ and therefore
subject to OMB review and the
requirements of the Executive Order.
The Order defines ‘‘significant
C. Regulatory Flexibility Act
The Regulatory Flexibility Act (RFA),
5 U.S.C. 601 et seq., generally requires
an agency to prepare a regulatory
flexibility analysis of any rule subject to
notice and comment rulemaking
requirements under the Administrative
V. Statutory and Executive Order
Reviews
PO 00000
Frm 00027
Fmt 4700
Sfmt 4700
E:\FR\FM\09MRR1.SGM
09MRR1
11562
Federal Register / Vol. 70, No. 45 / Wednesday, March 9, 2005 / Rules and Regulations
Procedure Act or any other statute
unless the agency certifies that the rule
will not have a significant economic
impact on a substantial number of small
entities. Small entities include small
businesses, small organizations, and
small governmental jurisdictions.
For purposes of assessing the impacts
of today’s final rule on small entities,
small entity is defined as: (1) A small
business based on Small Business
Administration size standards; (2) a
small governmental jurisdiction that is a
government of a city, county, town,
school district or special district with a
population of less than 50,000; and (3)
a small organization that is any not-forprofit enterprise which is independently
owned and operated and is not
dominant in its field.
After considering the economic
impacts of today’s final rule on small
entities, I certify that this action will not
have a significant economic impact on
a substantial number of small entities.
Today’s action merely postpones the
permit authorization deadline for oil
and gas construction activity that
disturb one to five acres. Because EPA
is postponing a deadline for numerous
small entities to comply with NPDES
permit requirements, this final action
will not impose any burden on any
small entity.
D. Unfunded Mandates Reform Act
Title II of the Unfunded Mandates
Reform Act of 1995 (UMRA), Public
Law 104–4, establishes requirements for
Federal agencies to assess the effects of
their regulatory actions on State, local,
and tribal governments and the private
sector. Under section 202 of the UMRA,
EPA generally must prepare a written
statement, including a cost-benefit
analysis, for proposed and final rules
with ‘‘Federal mandates’’ that may
result in expenditures to State, local,
and tribal governments, in the aggregate,
or to the private sector, of $100 million
or more in any one year. Before
promulgating an EPA rule for which a
written statement is needed, section 205
of the UMRA generally requires EPA to
identify and consider a reasonable
number of regulatory alternatives and
adopt the least costly, most costeffective or least burdensome alternative
that achieves the objectives of the rule.
The provisions of section 205 do not
apply when they are inconsistent with
applicable law. Moreover, section 205
allows EPA to adopt an alternative other
than the least costly, most cost-effective
or least burdensome alternative if the
Administrator publishes with the final
rule an explanation why that alternative
was not adopted. Before EPA establishes
any regulatory requirements that may
VerDate jul<14>2003
17:19 Mar 08, 2005
Jkt 205001
significantly or uniquely affect small
governments, including tribal
governments, it must have developed
under section 203 of the UMRA a small
government agency plan. The plan must
provide for notifying potentially
affected small governments, enabling
officials of affected small governments
to have meaningful and timely input in
the development of EPA regulatory
proposals with significant Federal
intergovernmental mandates, and
informing, educating, and advising
small governments on compliance with
the regulatory requirements.
EPA has determined that this rule
does not contain a Federal mandate that
may result in expenditures of $100
million or more for State, local, and
tribal governments, in the aggregate, or
the private sector in any one year. This
rule does not impose any costs. It
merely postpones the permit
authorization deadline for oil and gas
construction activity that disturb one to
five acres. Thus, today’s final rule is not
subject to the requirements of sections
202 and 205 of the UMRA. For the same
reason, EPA has determined that this
rule contains no regulatory
requirements that might significantly or
uniquely affect small governments.
Thus, today’s final rule is not subject to
the requirements of section 203 of
UMRA.
E. Executive Order 13132: Federalism
Executive Order 13132, entitled
‘‘Federalism’’ (64 FR 43255, August 10,
1999), requires EPA to develop an
accountable process to ensure
‘‘meaningful and timely input by State
and local officials in the development of
regulatory policies that have federalism
implications.’’ ‘‘Policies that have
federalism implications’’ is defined in
the Executive Order to include
regulations that have ‘‘substantial direct
effects on the States, on the relationship
between the National Government and
the States, or on the distribution of
power and responsibilities among the
various levels of government.’’
This rule does not have federalism
implications. It will not have substantial
direct effects on the States, on the
relationship between the National
Government and the States, or on the
distribution of power and
responsibilities among the various
levels of government, as specified in
Executive Order 13132. It merely
postpones the permit authorization
deadline for oil and gas construction
activity that disturb one to five acres.
Thus, Executive Order 13132 does not
apply to this rule.
PO 00000
Frm 00028
Fmt 4700
Sfmt 4700
F. Executive Order 13175: Consultation
and Coordination With Indian Tribal
Governments
Executive Order 13175, entitled,
‘‘Consultation and Coordination with
Indian Tribal Governments’’ (65 FR
67249, November 9, 2000), requires EPA
to develop an accountable process to
ensure ‘‘meaningful and timely input by
tribal officials in the development of
regulatory policies that have tribal
implications.’’
This rule does not have tribal
implications. It will not have substantial
direct effects on tribal governments, on
the relationship between the Federal
government and Indian tribes, or on the
distribution of power and
responsibilities between the Federal
government and Indian tribes, as
specified in Executive Order 13175. It
merely postpones the permit
authorization deadline for oil and gas
construction activity that disturb one to
five acres. Thus, Executive Order 13175
does not apply to this rule.
G. Executive Order 13045: Protection of
Children From Environmental Health
and Safety Risks
Executive Order 13045: ‘‘Protection of
Children from Environmental Health
Risks and Safety Risks’’ (62 FR 19885,
April 23, 1997) applies to any rule that:
(1) Is determined to be ‘‘economically
significant’’ as defined under Executive
Order 12866, and (2) concerns an
environmental health or safety risk that
EPA has reason to believe may have a
disproportionate effect on children. If
the regulatory action meets both criteria,
the Agency must evaluate the
environmental health or safety effects of
the planned rule on children, and
explain why the planned regulation is
preferable to other potentially effective
and reasonably feasible alternatives
considered by the Agency. This
regulation is not subject to Executive
Order 13045 because it is not
economically significant as defined
under Executive Order 12866.
H. Executive Order 13211: Actions
Concerning Regulations That
Significantly Affect Energy Supply,
Distribution, or Use
This rule is not subject to Executive
Order 13211, ‘‘Actions Concerning
Regulations That Significantly Affect
Energy Supply, Distribution, or Use’’ (66
FR 28355 (May 22, 2001)) because it is
not a significant regulatory action under
Executive Order 12866. The only effect
of this rule is to (1) delay the permit
authorization requirement for affected
small oil and gas operations by an
additional fifteen months and (2) allow
E:\FR\FM\09MRR1.SGM
09MRR1
Federal Register / Vol. 70, No. 45 / Wednesday, March 9, 2005 / Rules and Regulations
EPA time necessary to develop a further
proposal to address storm water
discharges from such activities.
I. National Technology Transfer And
Advancement Act
As noted in the proposed rule, section
12(d) of the National Technology
Transfer and Advancement Act of 1995
(‘‘NTTAA’’), Public Law 104–113,
section 12(d) (15 U.S.C. 272 note)
directs EPA to use voluntary consensus
standards in its regulatory activities
unless to do so would be inconsistent
with applicable law or otherwise
impractical. Voluntary consensus
standards are technical standards (e.g.,
materials specifications, test methods,
sampling procedures, and business
practices) that are developed or adopted
by voluntary consensus standard bodies.
The NTTAA directs EPA to provide
Congress, through OMB, explanations
when the Agency decides not to use
available and applicable voluntary
consensus standards.
This rulemaking does not involve
technical standards. Therefore, EPA did
not consider the use of any voluntary
consensus standards. However, EPA is
exploring the availability and potential
use of voluntary consensus standards
developed consistent with the NTTAA
and the requirements of the CWA as a
means of addressing storm water runoff
from oil and gas construction activities
as part of a future rulemaking.
J. Congressional Review Act
The Congressional Review Act, 5
U.S.C. 801 et seq., as added by the Small
Business Regulatory Enforcement
Fairness Act of 1996, generally provides
that before a rule may take effect, the
agency promulgating the rule must
submit a rule report, which includes a
copy of the rule, to each House of the
Congress and to the Comptroller General
of the United States. EPA will submit a
report containing this rule and other
required information to the U.S. Senate,
the U.S. House of Representatives, and
the Comptroller General of the United
States prior to publication of the rule in
the Federal Register. A major rule
cannot take effect until 60 days after it
is published in the Federal Register.
This action is not a ‘‘major rule’’ as
defined by 5 U.S.C. 804(2). This rule
will be effective March 9, 2005.
List of Subjects in 40 CFR Part 122
Administrative practice and
procedure, Confidential business
information, Environmental protection,
Hazardous substances, Reporting and
recordkeeping requirements, Water
pollution control.
or on grapes and persimmons.
Makhteshim-Agan of North America,
Inc. and the Interregional Research
Project Number 4 (IR-4) requested these
tolerances under the Federal Food,
Drug, and Cosmetic Act (FFDCA), as
amended by the Food Quality Protection
Act of 1996 (FQPA).
Dated: March 3, 2005.
DATES: This regulation is effective
Stephen L. Johnson,
March 9, 2005. Objections and requests
Acting Administrator.
for hearings must be received on or
before May 9, 2005.
I For the reasons set forth in the
preamble, chapter I of title 40 of the Code ADDRESSES: To submit a written
of Federal Regulations is amended as
objection or hearing request, follow the
follows:
detailed instructions as provided in
Unit VI of the SUPPLEMENTARY
PART 122—EPA ADMINISTERED
INFORMATION. EPA has established a
PERMIT PROGRAMS: THE NATIONAL
docket for this action under Docket
POLLUTANT DISCHARGE
identification (ID) number OPP–2005–
ELIMINATION SYSTEM
0022. All documents in the docket are
listed in the EDOCKET index at http:/
I 1. The authority citation for part 122
/www.epa.gov/edocket. Although listed
continues to read as follows:
in the index, some information is not
Authority: The Clean Water Act, 33 U.S.C.
publicly available, i.e., CBI or other
1251 et seq.
information whose disclosure is
restricted by statute. Certain other
Subpart B—[Amended]
material, such as copyrighted material,
is not placed on the Internet and will be
I 2. Revise § 122.26(e)(8) to read as
publicly available only in hard copy
follows:
form. Publicly available docket
§ 122.26 Storm water discharges
materials are available either
(applicable to State NPDES programs, see
electronically in EDOCKET or in hard
§ 123.25).
copy at the Public Information and
*
*
*
*
*
Records Integrity Branch (PIRIB), Room
(e) * * *
119, Crystal Mall #2, 1801 S. Bell Street,
(8) For any storm water discharge
Arlington, VA 22202–4501. This docket
associated with small construction
facility is open from 8:30 a.m. to 4 p.m.,
activity identified in paragraph (b)(15)(i) Monday through Friday, excluding legal
of this section, see § 122.21(c)(1).
holidays. The docket telephone number
Discharges from these sources, other
is (703) 305–5805.
than discharges associated with small
FOR FURTHER INFORMATION CONTACT:
construction activity at oil and gas
Carmen Rodia, Registration Division
exploration, production, processing, and (7505C), Office of Pesticide Programs,
treatment operations or transmission
Environmental Protection Agency, 1200
facilities, require permit authorization
Pennsylvania Avenue, NW.,
by March 10, 2003, unless designated
Washington, DC 20460–0001; telephone
for coverage before then. Discharges
number: (703) 306–0327; fax number:
associated with small construction
(703) 305–6596; e-mail address:
activity at such oil and gas sites require
rodia.carmen@epa.gov.
permit authorization by June 12, 2006.
SUPPLEMENTARY INFORMATION:
*
*
*
*
*
I. General Information
[FR Doc. 05–4467 Filed 3–8–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 180
[OPP–2005–0022; FRL–7699–8]
K. Petitions for Judicial Review
Clofentezine; Pesticide Tolerance
Under section 509(b)(1) of the Clean
Water Act, judicial review of this action
may only be had by filing a petition for
review in the United States Court of
Appeals within 120 days after March 9,
2005.
AGENCY:
VerDate jul<14>2003
17:19 Mar 08, 2005
Jkt 205001
11563
Environmental Protection
Agency (EPA).
ACTION: Final rule.
SUMMARY: This regulation establishes
tolerances for residues of clofentezine in
PO 00000
Frm 00029
Fmt 4700
Sfmt 4700
A. Does this Action Apply to Me?
You may be potentially affected by
this action if you are an agricultural
producer, food manufacturer, or
pesticide manufacturer. Potentially
affected entities may include, but are
not limited to:
• Crop production (NAICS 111), e.g.,
agricultural workers; greenhouse,
nursery, and floriculture workers;
farmers.
• Animal production (NAICS 112),
e.g., cattle ranchers and farmers, dairy
cattle farmers, livestock farmers.
• Food manufacturing (NAICS 311),
e.g., agricultural workers; farmers;
E:\FR\FM\09MRR1.SGM
09MRR1
Agencies
[Federal Register Volume 70, Number 45 (Wednesday, March 9, 2005)]
[Rules and Regulations]
[Pages 11560-11563]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-4467]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 122
[OW-2002-0068; FRL-7882-2]
RIN 2040-AE71
Extension of National Pollutant Discharge Elimination System
(NPDES) Permit Deadline for Storm Water Discharges for Oil and Gas
Activity That Disturbs One to Five Acres
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: Today's action postpones until June 12, 2006, the requirement
to obtain National Pollutant Discharge Elimination System (NPDES) storm
water permit coverage for oil and gas construction activity that
disturbs one to five acres of land. This is the second postponement
promulgated by EPA for these activities. This postponement will allow
the Agency additional time to complete its analysis of the issues
raised by stakeholders about storm water runoff from construction
activities at oil and gas sites and of practices and methods for
controlling these storm water discharges to mitigate impacts on water
quality, as appropriate. Within six months of today's action, EPA
intends to publish a notice of proposed rulemaking in the Federal
Register for addressing these discharges and to invite public comments.
DATES: This final rule is effective on March 9, 2005.
ADDRESSES: EPA has established a docket for this action under Docket ID
No. OW-2002-0068. All documents in the docket are listed in the EDOCKET
index at https://www.epa.gov/edocket. Although listed in the index, some
information is not publicly available, i.e., confidential business
information or other information whose disclosure is restricted by
statute. Certain other material, such as copyrighted material, is not
placed on the Internet and will be publicly available only in hard copy
form. Publicly available docket materials are available either
electronically in EDOCKET or in hard copy at the Docket, EPA/DC, EPA
West, Room B102, 1301 Constitution Ave., NW., Washington, DC. The
Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through
Friday, excluding legal holidays. The telephone number for the Public
Reading Room is (202) 566-1744, and the telephone number for the Water
Docket is (202) 566-2426.
FOR FURTHER INFORMATION CONTACT: Jeff Smith, Office of Wastewater
Management, Office of Water, Environmental Protection Agency (4203M),
1200 Pennsylvania Ave., NW., Washington, DC 20460; telephone number:
(202) 564-0652; fax number: (202) 564-6431; e-mail address:
smith.jeff@epa.gov.
SUPPLEMENTARY INFORMATION:
I. General Information
A. Affected Entities
Entities potentially affected by this action include operators of
construction activities disturbing at least one acre, but less than
five acres of land at oil and gas sites, North American Industrial
Classification System (NAICS) codes and titles: 211--Oil and Gas
Extraction, 213111--Drilling Oil and Gas Wells, and 213112--Support
Activities for Oil and Gas Operations.
This description is not intended to be exhaustive, but rather
provides a guide for readers regarding entities likely to be affected
by this action. This description identifies the types of entities that
EPA is now aware could potentially be affected by this action. Other
types of entities not identified could also be affected. To determine
whether your facility or company is affected by this action, you should
carefully examine the applicability criteria in 40 CFR 122.26(b)(15)
and (e)(8). If you have questions regarding the applicability of this
action to a particular entity, consult the person listed in the
preceding FOR FURTHER INFORMATION CONTACT section.
[[Page 11561]]
B. When Does This Rule Take Effect?
Because this rule provides temporary relief from permitting
requirements for certain dischargers, this rule is not subject to the
general requirement for a thirty-day waiting period after publication
before a final rule takes effect. By providing such relief, this rule
``relieves a restriction'' on these dischargers. 5 U.S.C. 553(d)(1).
Moreover, pursuant to 5 U.S.C. 553(d)(3), EPA has good cause to make
this rule effective immediately upon publication. The March 10, 2005,
deadline this action extends is less than thirty days after the
publication of this rule. Making this action effective as soon as it is
published will help reduce any confusion by those affected by the rule
regarding the necessity for obtaining permit coverage. Therefore, a
thirty-day waiting period is unnecessary and would be contrary to the
public interest.
II. Background
On January 18, 2005 (70 FR 2832), EPA proposed a fifteen month
postponement of the permit requirement for oil and gas construction
activity disturbing one to five acres, from March 10, 2005, to June 12,
2006, to allow time for EPA to complete its analysis of the economic
impacts and the legal and procedural implications of the options that
the Agency is considering regarding the regulation of storm water
discharges from oil and gas-related construction sites, and to evaluate
the practices and methods operators employ to control storm water
discharges from the sites affected by this rule. In that proposal, EPA
explained the background of the NPDES construction permit requirements,
and why EPA believes it is appropriate to provide an additional fifteen
month postponement of permit requirements for construction of oil and
gas exploration and production facilities disturbing one to five acres.
When describing construction activity that disturbs ``one to five
acres'' or in discussing ``small'' construction activity in this
preamble, EPA is referring to activities covered by 40 CFR
122.26(b)(15).
III. Response to Comments
EPA received a modest number of comments on its proposal to provide
an additional fifteen month postponement of permit requirements for
discharges from oil and gas-related construction activity disturbing
one to five acres. EPA's responses to all of these comments may be
found in the Response to Comment document that is part of the docket
for this final rule.
IV. Today's Action
In today's action, EPA is extending until June 12, 2006, the
deadline for obtaining NPDES storm water permits for oil and gas
construction activity that disturbs at least one acre, but less than
five acres of land and sites disturbing less than one acre that are a
part of a larger common plan of development or sale that disturbs
between one and five acres. The text finalized at Sec. 122.26(e)(8)
does not create any duty to apply for an NPDES permit that did not
already exist as a result of EPA's Phase II regulations. Rather, this
amendment merely extends the permitting deadline for a certain class of
dischargers.
During the next fifteen months, EPA intends to (1) complete the
economic impact analysis; (2) complete the evaluation of the legal and
procedural implications associated with several options that the Agency
is considering with regard to regulation of storm water discharges from
oil and gas-related construction sites; and (3) continue to evaluate
practices and methods operators may employ to control storm water
discharges from the sites affected by this rule. One of the issues EPA
will be examining during this period is how best to resolve questions
posed by outside parties regarding section 402(l)(2) of the Clean Water
Act, which exempts certain storm water discharges from oil and gas
exploration, production, processing, or treatment operations or
transmission facilities from NPDES permit requirements. EPA intends to
convene at least one public meeting with stakeholders for the purpose
of exchanging information on current industry practices and the
effectiveness of those practices in protecting water quality and
obtaining input on the appropriate approach for addressing construction
storm water discharges from this industry. EPA will publish a separate
notice in the Federal Register with information about this public
meeting. Finally, EPA expects to propose and take some subsequent final
action based on the Agency's conclusions following these activities
prior to June 12, 2006.
V. Statutory and Executive Order Reviews
A. Executive Order 12866: Regulatory Planning and Review
Under Executive Order 12866, (58 FR 51735 (October 4, 1993)) the
Agency must determine whether the regulatory action is ``significant''
and therefore subject to OMB review and the requirements of the
Executive Order. The Order defines ``significant regulatory action'' as
one that is likely to result in a rule that may:
(1) Have an annual effect on the economy of $100 million or more or
adversely affect in a material way the economy, a sector of the
economy, productivity, competition, jobs, the environment, public
health or safety, or State, local, or tribal governments or
communities;
(2) Create a serious inconsistency or otherwise interfere with an
action taken or planned by another agency;
(3) Materially alter the budgetary impact of entitlements, grants,
user fees, or loan programs or the rights and obligations of recipients
thereof; or
(4) Raise novel legal or policy issues arising out of legal
mandates, the President's priorities, or the principles set forth in
the Executive Order.
It has been determined that this rule is not a ``significant
regulatory action'' under the terms of Executive Order 12866 and is
therefore not subject to OMB review.
B. Paperwork Reduction Act
This action does not impose an information collection burden under
the provisions of the Paperwork Reduction Act, 44 U.S.C. 3501 et seq.
It merely postpones implementation of an existing rule deadline.
Burden means the total time, effort, or financial resources
expended by persons to generate, maintain, retain, or disclose or
provide information to or for a Federal agency. This includes the time
needed to review instructions; develop, acquire, install, and utilize
technology and systems for the purposes of collecting, validating, and
verifying information; processing and maintaining information, and
disclosing and providing information; adjust the existing ways to
comply with any previously applicable instructions and requirements;
train personnel to be able to respond to a collection of information;
search data sources; complete and review the collection of information;
and transmit or otherwise disclose the information.
An Agency may not conduct or sponsor, and a person is not required
to respond to a collection of information unless it displays a
currently valid OMB control number. The OMB control numbers for EPA's
regulations are listed in 40 CFR part 9.
C. Regulatory Flexibility Act
The Regulatory Flexibility Act (RFA), 5 U.S.C. 601 et seq.,
generally requires an agency to prepare a regulatory flexibility
analysis of any rule subject to notice and comment rulemaking
requirements under the Administrative
[[Page 11562]]
Procedure Act or any other statute unless the agency certifies that the
rule will not have a significant economic impact on a substantial
number of small entities. Small entities include small businesses,
small organizations, and small governmental jurisdictions.
For purposes of assessing the impacts of today's final rule on
small entities, small entity is defined as: (1) A small business based
on Small Business Administration size standards; (2) a small
governmental jurisdiction that is a government of a city, county, town,
school district or special district with a population of less than
50,000; and (3) a small organization that is any not-for-profit
enterprise which is independently owned and operated and is not
dominant in its field.
After considering the economic impacts of today's final rule on
small entities, I certify that this action will not have a significant
economic impact on a substantial number of small entities. Today's
action merely postpones the permit authorization deadline for oil and
gas construction activity that disturb one to five acres. Because EPA
is postponing a deadline for numerous small entities to comply with
NPDES permit requirements, this final action will not impose any burden
on any small entity.
D. Unfunded Mandates Reform Act
Title II of the Unfunded Mandates Reform Act of 1995 (UMRA), Public
Law 104-4, establishes requirements for Federal agencies to assess the
effects of their regulatory actions on State, local, and tribal
governments and the private sector. Under section 202 of the UMRA, EPA
generally must prepare a written statement, including a cost-benefit
analysis, for proposed and final rules with ``Federal mandates'' that
may result in expenditures to State, local, and tribal governments, in
the aggregate, or to the private sector, of $100 million or more in any
one year. Before promulgating an EPA rule for which a written statement
is needed, section 205 of the UMRA generally requires EPA to identify
and consider a reasonable number of regulatory alternatives and adopt
the least costly, most cost-effective or least burdensome alternative
that achieves the objectives of the rule. The provisions of section 205
do not apply when they are inconsistent with applicable law. Moreover,
section 205 allows EPA to adopt an alternative other than the least
costly, most cost-effective or least burdensome alternative if the
Administrator publishes with the final rule an explanation why that
alternative was not adopted. Before EPA establishes any regulatory
requirements that may significantly or uniquely affect small
governments, including tribal governments, it must have developed under
section 203 of the UMRA a small government agency plan. The plan must
provide for notifying potentially affected small governments, enabling
officials of affected small governments to have meaningful and timely
input in the development of EPA regulatory proposals with significant
Federal intergovernmental mandates, and informing, educating, and
advising small governments on compliance with the regulatory
requirements.
EPA has determined that this rule does not contain a Federal
mandate that may result in expenditures of $100 million or more for
State, local, and tribal governments, in the aggregate, or the private
sector in any one year. This rule does not impose any costs. It merely
postpones the permit authorization deadline for oil and gas
construction activity that disturb one to five acres. Thus, today's
final rule is not subject to the requirements of sections 202 and 205
of the UMRA. For the same reason, EPA has determined that this rule
contains no regulatory requirements that might significantly or
uniquely affect small governments. Thus, today's final rule is not
subject to the requirements of section 203 of UMRA.
E. Executive Order 13132: Federalism
Executive Order 13132, entitled ``Federalism'' (64 FR 43255, August
10, 1999), requires EPA to develop an accountable process to ensure
``meaningful and timely input by State and local officials in the
development of regulatory policies that have federalism implications.''
``Policies that have federalism implications'' is defined in the
Executive Order to include regulations that have ``substantial direct
effects on the States, on the relationship between the National
Government and the States, or on the distribution of power and
responsibilities among the various levels of government.''
This rule does not have federalism implications. It will not have
substantial direct effects on the States, on the relationship between
the National Government and the States, or on the distribution of power
and responsibilities among the various levels of government, as
specified in Executive Order 13132. It merely postpones the permit
authorization deadline for oil and gas construction activity that
disturb one to five acres. Thus, Executive Order 13132 does not apply
to this rule.
F. Executive Order 13175: Consultation and Coordination With Indian
Tribal Governments
Executive Order 13175, entitled, ``Consultation and Coordination
with Indian Tribal Governments'' (65 FR 67249, November 9, 2000),
requires EPA to develop an accountable process to ensure ``meaningful
and timely input by tribal officials in the development of regulatory
policies that have tribal implications.''
This rule does not have tribal implications. It will not have
substantial direct effects on tribal governments, on the relationship
between the Federal government and Indian tribes, or on the
distribution of power and responsibilities between the Federal
government and Indian tribes, as specified in Executive Order 13175. It
merely postpones the permit authorization deadline for oil and gas
construction activity that disturb one to five acres. Thus, Executive
Order 13175 does not apply to this rule.
G. Executive Order 13045: Protection of Children From Environmental
Health and Safety Risks
Executive Order 13045: ``Protection of Children from Environmental
Health Risks and Safety Risks'' (62 FR 19885, April 23, 1997) applies
to any rule that: (1) Is determined to be ``economically significant''
as defined under Executive Order 12866, and (2) concerns an
environmental health or safety risk that EPA has reason to believe may
have a disproportionate effect on children. If the regulatory action
meets both criteria, the Agency must evaluate the environmental health
or safety effects of the planned rule on children, and explain why the
planned regulation is preferable to other potentially effective and
reasonably feasible alternatives considered by the Agency. This
regulation is not subject to Executive Order 13045 because it is not
economically significant as defined under Executive Order 12866.
H. Executive Order 13211: Actions Concerning Regulations That
Significantly Affect Energy Supply, Distribution, or Use
This rule is not subject to Executive Order 13211, ``Actions
Concerning Regulations That Significantly Affect Energy Supply,
Distribution, or Use'' (66 FR 28355 (May 22, 2001)) because it is not a
significant regulatory action under Executive Order 12866. The only
effect of this rule is to (1) delay the permit authorization
requirement for affected small oil and gas operations by an additional
fifteen months and (2) allow
[[Page 11563]]
EPA time necessary to develop a further proposal to address storm water
discharges from such activities.
I. National Technology Transfer And Advancement Act
As noted in the proposed rule, section 12(d) of the National
Technology Transfer and Advancement Act of 1995 (``NTTAA''), Public Law
104-113, section 12(d) (15 U.S.C. 272 note) directs EPA to use
voluntary consensus standards in its regulatory activities unless to do
so would be inconsistent with applicable law or otherwise impractical.
Voluntary consensus standards are technical standards (e.g., materials
specifications, test methods, sampling procedures, and business
practices) that are developed or adopted by voluntary consensus
standard bodies. The NTTAA directs EPA to provide Congress, through
OMB, explanations when the Agency decides not to use available and
applicable voluntary consensus standards.
This rulemaking does not involve technical standards. Therefore,
EPA did not consider the use of any voluntary consensus standards.
However, EPA is exploring the availability and potential use of
voluntary consensus standards developed consistent with the NTTAA and
the requirements of the CWA as a means of addressing storm water runoff
from oil and gas construction activities as part of a future
rulemaking.
J. Congressional Review Act
The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the
Small Business Regulatory Enforcement Fairness Act of 1996, generally
provides that before a rule may take effect, the agency promulgating
the rule must submit a rule report, which includes a copy of the rule,
to each House of the Congress and to the Comptroller General of the
United States. EPA will submit a report containing this rule and other
required information to the U.S. Senate, the U.S. House of
Representatives, and the Comptroller General of the United States prior
to publication of the rule in the Federal Register. A major rule cannot
take effect until 60 days after it is published in the Federal
Register. This action is not a ``major rule'' as defined by 5 U.S.C.
804(2). This rule will be effective March 9, 2005.
K. Petitions for Judicial Review
Under section 509(b)(1) of the Clean Water Act, judicial review of
this action may only be had by filing a petition for review in the
United States Court of Appeals within 120 days after March 9, 2005.
List of Subjects in 40 CFR Part 122
Administrative practice and procedure, Confidential business
information, Environmental protection, Hazardous substances, Reporting
and recordkeeping requirements, Water pollution control.
Dated: March 3, 2005.
Stephen L. Johnson,
Acting Administrator.
0
For the reasons set forth in the preamble, chapter I of title 40 of the
Code of Federal Regulations is amended as follows:
PART 122--EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT
DISCHARGE ELIMINATION SYSTEM
0
1. The authority citation for part 122 continues to read as follows:
Authority: The Clean Water Act, 33 U.S.C. 1251 et seq.
Subpart B--[Amended]
0
2. Revise Sec. 122.26(e)(8) to read as follows:
Sec. 122.26 Storm water discharges (applicable to State NPDES
programs, see Sec. 123.25).
* * * * *
(e) * * *
(8) For any storm water discharge associated with small
construction activity identified in paragraph (b)(15)(i) of this
section, see Sec. 122.21(c)(1). Discharges from these sources, other
than discharges associated with small construction activity at oil and
gas exploration, production, processing, and treatment operations or
transmission facilities, require permit authorization by March 10,
2003, unless designated for coverage before then. Discharges associated
with small construction activity at such oil and gas sites require
permit authorization by June 12, 2006.
* * * * *
[FR Doc. 05-4467 Filed 3-8-05; 8:45 am]
BILLING CODE 6560-50-P