Environmental Impact Statements; Notice of Availability, 10615 [05-4253]
Download as PDF
Federal Register / Vol. 70, No. 42 / Friday, March 4, 2005 / Notices
announces the following appointment to
the National Environmental Education
and Training Foundation, Inc. Board of
Trustees. The appointee is Arthur
Gibson, Vice President of Environment,
Health and Safety for Home Depot. This
appointee will join the current Board
members which include:
• Braden Allenby, Vice President,
Environment, Health and Safety, AT&T.
• Richard Bartlett, (NEETF Chairman)
Vice Chairman, Mary Kay Holding
Corporation.
• Dorothy Jacobson, Consultant.
• Karen Bates Kress, President, KBK
Consulting, Inc.
• Dorothy McSweeny, (NEETF Vice
Chair), Chair, DC Commission on the
Arts and Humanities.
• Honorable William Sessions, former
Director of the Federal Bureau of
Investigation.
Additional Considerations: Great care
has been taken to assure that this new
appointee not only has the highest
degree of expertise and commitment,
but also brings to the Board diverse
points of view relating to environmental
education and training.
This appointment shall be for two
consecutive four year terms.
FOR FURTHER INFORMATION CONTACT: C.
Michael Baker, 202–564–0446, Acting
Director, Office of Environmental
Education, Office of Public Affairs
(1704A) U.S. EPA 1200 Pennsylvania
Ave., NW., Washington, DC 20460.
Dated: February 18, 2005.
Stephen L. Johnson,
Acting Administrator.
BIO of New Member
Arthur J. Gibson, Vice President,
Environmental, Health & Safety; The
Home Depot, Inc.
Arthur J. Gibson is Vice President of
Environmental, Health and Safety for
Home Depot, Inc.
He is responsible for leading the
strategy, planning processes, and the
day to day functional operations of the
Environmental, Health and Safety
Organization.
Prior to joining The Home Depot, Art
served as Senior Vice President of
Corporate Environmental, Health,
Safety, Security and Workers’
Compensation for the R.R. Donnelley
Corporation. Prior to his tenure with
R.R. Donnelley, Art was with the
Grumman Corporation, where he was
the Corporate Director of
Environmental, Health, Safety, Medical
Services and Energy. Art was also an
Aeronautical Design Engineer at
Grumman Aerospace Corporation.
Mr. Gibson holds Bachelor’s degrees
in American Foreign Policy and
VerDate jul<14>2003
19:07 Mar 03, 2005
Jkt 205001
Aeronautical Engineering from Cornell
University and an MBA in International
Finance from Long Island University.
Art currently resides in Atlanta, GA
with his wife Patricia and their three
children, Sarah, Abigail and Matthew.
[FR Doc. 05–4264 Filed 3–3–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6661–1]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements filed February 22, 2005,
through February 25, 2005, pursuant
to 40 CFR 1506.9.
EIS No. 050078, Draft EIS, AFS, NE, SD,
Black-Tailed Prairie Dog Conservation
and Management on the Nebraska
National Forest and Associated Units,
Implementation, Dawes, Sioux,
Blaine, Cherry, Thomas Counties, NE
and Custer, Fall River, Jackson,
Pennington, Jones, Lyman, Stanley
Counties, SD, Comment Period Ends:
April 18, 2005, Contact: Jeffery S.
Abegglen (308) 432–0300.
EIS No. 050079, Final EIS, AFS, CA,
Cottonwood Fire Vegetation
Management Project, Control
Vegetation Competing with Conifer
Seedlings, Sierraville Ranger District,
Tahoe National Forest, Sierra County,
CA, Wait Period Ends: April 4, 2005,
Contact: Teri Banka (530) 994–3401.
EIS No. 050080, Draft EIS, FRC, TX,
Ingleside Energy Center Liquefied
Natural Gas (LNG) Import Terminal
and San Patricio Pipeline Natural Gas
Pipeline, Authorization to Construct,
Install and Operate, San Patricio and
Nueces Counties, TX, Comment
Period Ends: April 18, 2005, Contact:
Thomas Russo 1–(866) 208–3372.
EIS No. 050081, Draft EIS, AFS, OR, B
& B Recovery Project, Proposed
Harvest of Fire-Killed Trees,
Reduction of Fuels, Planting of Tree,
Deschutes National Forest, Sisters
Ranger District, Jefferson and
Deschutes Counties, OR , Comment
Period Ends: April 18, 2005, Contact:
Leslie Weldon (541) 549–7743.
EIS No. 050082, Draft EIS, FRC, CO,
WY, Entrega Pipeline Project,
Construction and Operation New
Interstate Natural Gas Pipeline
System, Right-of-Way Grant Issue by
BLM, Meeker Hub and Cheyenne
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
10615
Hub, Rio Blanco and Weld Counties,
CO, and Sweetwater County, WY,
Comment Period Ends: April 18,
2005, Contact: Thomas Russo 1–(866)
208–3372
Amended Notices
EIS No. 050052, Draft EIS, FHW, MI, IN,
US–131 Improvement Study, from the
Indiana Toll Road (1–80/90) to a Point
One Mile North of Cowling Road, U.S.
Army COE Section 404 Permit, St.
Joseph County, MI and Elkhart
County, IN, Comment Period Ends:
April 29, 2005, Contact: Abdelmoez
A. Abdalla (517) 702–1820. Revision
of Federal Register notice published
on February 11, 2005: CEQ Comment
Period Ending March 28, 2005, has
been Extended to April 29, 2005.
Dated: March 1, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–4253 Filed 3–3–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6661–2]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under Section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act, as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
(202) 564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 2, 2004 (69 FR 17403).
Draft EISs
ERP No. D–AFS–G65095–NM Rating
LO, Buckman Water Diversion Project,
Proposal to Divert Water from Rio
Grande and San Juan-Chama Project, To
Meet Water Supply Needs, Sante Fe
National Forest and Taos Field Office,
Sante Fe County, NM.
Summary: EPA does not object to the
preferred alternative.
ERP No. D–BLM–L65471–ID Rating
EC2, Fire, Fuels and Related Vegetation
Management Direction Plan
Amendment, Upper Snake River District
(The District), Amending 12 Existing
Land Use Plans, Several Counties, ID.
Summary: EPA expressed concerns
about air quality and grazing impacts,
and requested additional information on
E:\FR\FM\04MRN1.SGM
04MRN1
Agencies
[Federal Register Volume 70, Number 42 (Friday, March 4, 2005)]
[Notices]
[Page 10615]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-4253]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6661-1]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements filed February 22,
2005, through February 25, 2005, pursuant to 40 CFR 1506.9.
EIS No. 050078, Draft EIS, AFS, NE, SD, Black-Tailed Prairie Dog
Conservation and Management on the Nebraska National Forest and
Associated Units, Implementation, Dawes, Sioux, Blaine, Cherry, Thomas
Counties, NE and Custer, Fall River, Jackson, Pennington, Jones, Lyman,
Stanley Counties, SD, Comment Period Ends: April 18, 2005, Contact:
Jeffery S. Abegglen (308) 432-0300.
EIS No. 050079, Final EIS, AFS, CA, Cottonwood Fire Vegetation
Management Project, Control Vegetation Competing with Conifer
Seedlings, Sierraville Ranger District, Tahoe National Forest, Sierra
County, CA, Wait Period Ends: April 4, 2005, Contact: Teri Banka (530)
994-3401.
EIS No. 050080, Draft EIS, FRC, TX, Ingleside Energy Center Liquefied
Natural Gas (LNG) Import Terminal and San Patricio Pipeline Natural Gas
Pipeline, Authorization to Construct, Install and Operate, San Patricio
and Nueces Counties, TX, Comment Period Ends: April 18, 2005, Contact:
Thomas Russo 1-(866) 208-3372.
EIS No. 050081, Draft EIS, AFS, OR, B & B Recovery Project, Proposed
Harvest of Fire-Killed Trees, Reduction of Fuels, Planting of Tree,
Deschutes National Forest, Sisters Ranger District, Jefferson and
Deschutes Counties, OR , Comment Period Ends: April 18, 2005, Contact:
Leslie Weldon (541) 549-7743.
EIS No. 050082, Draft EIS, FRC, CO, WY, Entrega Pipeline Project,
Construction and Operation New Interstate Natural Gas Pipeline System,
Right-of-Way Grant Issue by BLM, Meeker Hub and Cheyenne Hub, Rio
Blanco and Weld Counties, CO, and Sweetwater County, WY, Comment Period
Ends: April 18, 2005, Contact: Thomas Russo 1-(866) 208-3372
Amended Notices
EIS No. 050052, Draft EIS, FHW, MI, IN, US-131 Improvement Study, from
the Indiana Toll Road (1-80/90) to a Point One Mile North of Cowling
Road, U.S. Army COE Section 404 Permit, St. Joseph County, MI and
Elkhart County, IN, Comment Period Ends: April 29, 2005, Contact:
Abdelmoez A. Abdalla (517) 702-1820. Revision of Federal Register
notice published on February 11, 2005: CEQ Comment Period Ending March
28, 2005, has been Extended to April 29, 2005.
Dated: March 1, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-4253 Filed 3-3-05; 8:45 am]
BILLING CODE 6560-50-P