Environmental Impact Statements; Notice of Availability, 10615 [05-4253]

Download as PDF Federal Register / Vol. 70, No. 42 / Friday, March 4, 2005 / Notices announces the following appointment to the National Environmental Education and Training Foundation, Inc. Board of Trustees. The appointee is Arthur Gibson, Vice President of Environment, Health and Safety for Home Depot. This appointee will join the current Board members which include: • Braden Allenby, Vice President, Environment, Health and Safety, AT&T. • Richard Bartlett, (NEETF Chairman) Vice Chairman, Mary Kay Holding Corporation. • Dorothy Jacobson, Consultant. • Karen Bates Kress, President, KBK Consulting, Inc. • Dorothy McSweeny, (NEETF Vice Chair), Chair, DC Commission on the Arts and Humanities. • Honorable William Sessions, former Director of the Federal Bureau of Investigation. Additional Considerations: Great care has been taken to assure that this new appointee not only has the highest degree of expertise and commitment, but also brings to the Board diverse points of view relating to environmental education and training. This appointment shall be for two consecutive four year terms. FOR FURTHER INFORMATION CONTACT: C. Michael Baker, 202–564–0446, Acting Director, Office of Environmental Education, Office of Public Affairs (1704A) U.S. EPA 1200 Pennsylvania Ave., NW., Washington, DC 20460. Dated: February 18, 2005. Stephen L. Johnson, Acting Administrator. BIO of New Member Arthur J. Gibson, Vice President, Environmental, Health & Safety; The Home Depot, Inc. Arthur J. Gibson is Vice President of Environmental, Health and Safety for Home Depot, Inc. He is responsible for leading the strategy, planning processes, and the day to day functional operations of the Environmental, Health and Safety Organization. Prior to joining The Home Depot, Art served as Senior Vice President of Corporate Environmental, Health, Safety, Security and Workers’ Compensation for the R.R. Donnelley Corporation. Prior to his tenure with R.R. Donnelley, Art was with the Grumman Corporation, where he was the Corporate Director of Environmental, Health, Safety, Medical Services and Energy. Art was also an Aeronautical Design Engineer at Grumman Aerospace Corporation. Mr. Gibson holds Bachelor’s degrees in American Foreign Policy and VerDate jul<14>2003 19:07 Mar 03, 2005 Jkt 205001 Aeronautical Engineering from Cornell University and an MBA in International Finance from Long Island University. Art currently resides in Atlanta, GA with his wife Patricia and their three children, Sarah, Abigail and Matthew. [FR Doc. 05–4264 Filed 3–3–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6661–1] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements filed February 22, 2005, through February 25, 2005, pursuant to 40 CFR 1506.9. EIS No. 050078, Draft EIS, AFS, NE, SD, Black-Tailed Prairie Dog Conservation and Management on the Nebraska National Forest and Associated Units, Implementation, Dawes, Sioux, Blaine, Cherry, Thomas Counties, NE and Custer, Fall River, Jackson, Pennington, Jones, Lyman, Stanley Counties, SD, Comment Period Ends: April 18, 2005, Contact: Jeffery S. Abegglen (308) 432–0300. EIS No. 050079, Final EIS, AFS, CA, Cottonwood Fire Vegetation Management Project, Control Vegetation Competing with Conifer Seedlings, Sierraville Ranger District, Tahoe National Forest, Sierra County, CA, Wait Period Ends: April 4, 2005, Contact: Teri Banka (530) 994–3401. EIS No. 050080, Draft EIS, FRC, TX, Ingleside Energy Center Liquefied Natural Gas (LNG) Import Terminal and San Patricio Pipeline Natural Gas Pipeline, Authorization to Construct, Install and Operate, San Patricio and Nueces Counties, TX, Comment Period Ends: April 18, 2005, Contact: Thomas Russo 1–(866) 208–3372. EIS No. 050081, Draft EIS, AFS, OR, B & B Recovery Project, Proposed Harvest of Fire-Killed Trees, Reduction of Fuels, Planting of Tree, Deschutes National Forest, Sisters Ranger District, Jefferson and Deschutes Counties, OR , Comment Period Ends: April 18, 2005, Contact: Leslie Weldon (541) 549–7743. EIS No. 050082, Draft EIS, FRC, CO, WY, Entrega Pipeline Project, Construction and Operation New Interstate Natural Gas Pipeline System, Right-of-Way Grant Issue by BLM, Meeker Hub and Cheyenne PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 10615 Hub, Rio Blanco and Weld Counties, CO, and Sweetwater County, WY, Comment Period Ends: April 18, 2005, Contact: Thomas Russo 1–(866) 208–3372 Amended Notices EIS No. 050052, Draft EIS, FHW, MI, IN, US–131 Improvement Study, from the Indiana Toll Road (1–80/90) to a Point One Mile North of Cowling Road, U.S. Army COE Section 404 Permit, St. Joseph County, MI and Elkhart County, IN, Comment Period Ends: April 29, 2005, Contact: Abdelmoez A. Abdalla (517) 702–1820. Revision of Federal Register notice published on February 11, 2005: CEQ Comment Period Ending March 28, 2005, has been Extended to April 29, 2005. Dated: March 1, 2005. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 05–4253 Filed 3–3–05; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6661–2] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under Section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act, as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at (202) 564–7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 2, 2004 (69 FR 17403). Draft EISs ERP No. D–AFS–G65095–NM Rating LO, Buckman Water Diversion Project, Proposal to Divert Water from Rio Grande and San Juan-Chama Project, To Meet Water Supply Needs, Sante Fe National Forest and Taos Field Office, Sante Fe County, NM. Summary: EPA does not object to the preferred alternative. ERP No. D–BLM–L65471–ID Rating EC2, Fire, Fuels and Related Vegetation Management Direction Plan Amendment, Upper Snake River District (The District), Amending 12 Existing Land Use Plans, Several Counties, ID. Summary: EPA expressed concerns about air quality and grazing impacts, and requested additional information on E:\FR\FM\04MRN1.SGM 04MRN1

Agencies

[Federal Register Volume 70, Number 42 (Friday, March 4, 2005)]
[Notices]
[Page 10615]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-4253]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6661-1]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements filed February 22, 
2005, through February 25, 2005, pursuant to 40 CFR 1506.9.
EIS No. 050078, Draft EIS, AFS, NE, SD, Black-Tailed Prairie Dog 
Conservation and Management on the Nebraska National Forest and 
Associated Units, Implementation, Dawes, Sioux, Blaine, Cherry, Thomas 
Counties, NE and Custer, Fall River, Jackson, Pennington, Jones, Lyman, 
Stanley Counties, SD, Comment Period Ends: April 18, 2005, Contact: 
Jeffery S. Abegglen (308) 432-0300.
EIS No. 050079, Final EIS, AFS, CA, Cottonwood Fire Vegetation 
Management Project, Control Vegetation Competing with Conifer 
Seedlings, Sierraville Ranger District, Tahoe National Forest, Sierra 
County, CA, Wait Period Ends: April 4, 2005, Contact: Teri Banka (530) 
994-3401.
EIS No. 050080, Draft EIS, FRC, TX, Ingleside Energy Center Liquefied 
Natural Gas (LNG) Import Terminal and San Patricio Pipeline Natural Gas 
Pipeline, Authorization to Construct, Install and Operate, San Patricio 
and Nueces Counties, TX, Comment Period Ends: April 18, 2005, Contact: 
Thomas Russo 1-(866) 208-3372.
EIS No. 050081, Draft EIS, AFS, OR, B & B Recovery Project, Proposed 
Harvest of Fire-Killed Trees, Reduction of Fuels, Planting of Tree, 
Deschutes National Forest, Sisters Ranger District, Jefferson and 
Deschutes Counties, OR , Comment Period Ends: April 18, 2005, Contact: 
Leslie Weldon (541) 549-7743.
EIS No. 050082, Draft EIS, FRC, CO, WY, Entrega Pipeline Project, 
Construction and Operation New Interstate Natural Gas Pipeline System, 
Right-of-Way Grant Issue by BLM, Meeker Hub and Cheyenne Hub, Rio 
Blanco and Weld Counties, CO, and Sweetwater County, WY, Comment Period 
Ends: April 18, 2005, Contact: Thomas Russo 1-(866) 208-3372

Amended Notices

EIS No. 050052, Draft EIS, FHW, MI, IN, US-131 Improvement Study, from 
the Indiana Toll Road (1-80/90) to a Point One Mile North of Cowling 
Road, U.S. Army COE Section 404 Permit, St. Joseph County, MI and 
Elkhart County, IN, Comment Period Ends: April 29, 2005, Contact: 
Abdelmoez A. Abdalla (517) 702-1820. Revision of Federal Register 
notice published on February 11, 2005: CEQ Comment Period Ending March 
28, 2005, has been Extended to April 29, 2005.

    Dated: March 1, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-4253 Filed 3-3-05; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.