New England Power Company, et al.; Electric Rate and Corporate Filings, 10390-10391 [E5-835]

Download as PDF 10390 Federal Register / Vol. 70, No. 41 / Thursday, March 3, 2005 / Notices Revised FERC Electric Rate Schedule No. 1. Energy Atlantic requests an effective date of April 18, 2005. Energy Atlantic states that copies of the filing were served on the Maine Public Utilities Commission and the Maine Office of Public Advocate. Comment Date: 5 p.m. eastern time on March 10, 2005. 14. Wayne-White Counties Electric Cooperative [Docket No. ER05–597–000] Take notice that on February 17, 2005, Wayne-White Counties Electric Cooperative (Wayne-White) submitted Wayne-White Counties Electric Cooperative FERC Electric Tariff, First Revised Volume No. 1, proposing rate increases for its Open Access Transmission Tariff for Schedules 7 and 8 and Attachment H and certain nonrate modifications to section 28.5, Schedules 1, 2, and 3 and Attachments E and I. Wayne-White requests an effective date of April 18, 2005. Wayne-White states that copies of the filing were served on Wayne-White’s jurisdictional customers, Illinois Power Company, Constellation Energy Commodities Group and the Illinois Commerce Commission. Comment Date: 5 p.m. eastern time on March 10, 2005. 15. Dartmouth PPA Holdings LLC; Dartmouth Power Associates L.P. [Docket Nos. ER05–598–000, ER05–599–000] Take notice that on February 17, 2005, Dartmouth PPA Holdings LLC (Dartmouth PPA) and Dartmouth Power Associates Limited Partnership (Dartmouth Power) submitted an application for Dartmouth PPA to obtain market-based rate authorization to sell energy, capacity, and ancillary services, and reassign transmission capacity and resell firm transmission rights. Dartmouth PPA also requested the waivers and exemptions typically granted to the holders of market-based rate authorization. Dartmouth Power requested the revision of a provision of Dartmouth Power’s rate schedule which will permit Dartmouth PPA to step into an existing Dartmouth Power electricity sales contract. Dartmouth PPA and Dartmouth Power request a March 23, 2005, effective date. Comment Date: 5 p.m. eastern time on March 10, 2005. 16. Maine Public Service Company [Docket No. ER05–600–000] Take notice that on February 17, 2005, Maine Public Service Company (MPS) filed proposed revisions to its FERC Open Access Transmission Tariff VerDate jul<14>2003 16:38 Mar 02, 2005 Jkt 205001 pursuant to Order No. 2003–B, Standardization of Generator Interconnection Agreements and Procedures, incorporating Order No. 2003–B’s revisions to the Commission’s pro forma Standard Large Generator Interconnection Procedures and Standard Large Generator Interconnection Agreement. MPS requests an effective date of January 19, 2005. MPS states that copies of the filing were served on MPS’s jurisdictional customers, the Maine Public Utilities Commission, and the Maine Public Advocate. Comment Date: 5 p.m. eastern time on March 10, 2005. 17. Fitchburg Gas and Electric Light Company [Docket No. ER05–620–000] Take notice that on February 17, 2005, Fitchburg Gas and Electric Light Company (Fitchburg) submitted an amendment to the agreement for network integration transmission service between Fitchburg and the Massachusetts Bay Transportation Authority under ISO New England, Inc., FERC Electric Tariff No. 3. Fitchburg states that the amendment reflects an extension of the term of the agreement through July 1, 2006, with a one-year automatic renewal each year unless the agreement is terminated by either party by written notice 60 days prior to the date of automatic renewal. Fitchburg states that copies of the filing were served on Massachusetts Bay Transportation Authority and the Massachusetts Department of Telecommunications and Energy. Comment Date: 5 p.m. eastern time on March 9, 2005. 18. Old Dominion Electric Cooperative [Docket No. ES05–18–000] Take notice that on February 9, 2005, Old Dominion Electric Cooperative submitted an application pursuant to section 204 of the Federal Power Act seeking authorization to issue shortterm, secured or unsecured debt in an amount not to exceed $501 million. Comment Date: 5 p.m. eastern time on March 16, 2005. 19. Mid-American Energy Company [Docket No. ES05-19–000] Take notice that on February 10, 2005, Mid-American Energy Company (MidAmerican) submitted an application pursuant to section 204 of the Federal Power Act seeking authorization to issue promissory notes and other evidences of short-term, unsecured indebtedness, in an amount not to exceed $500 million. PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 Comment Date: 5 p.m. eastern time on March 16, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Linda Mitry, Deputy Secretary. [FR Doc. E5–834 Filed 3–2–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER05–529–001, et al.] New England Power Company, et al.; Electric Rate and Corporate Filings February 25, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. E:\FR\FM\03MRN1.SGM 03MRN1 Federal Register / Vol. 70, No. 41 / Thursday, March 3, 2005 / Notices 1. New England Power Company [Docket No. ER05–529–001] Take notice that on February 22, 2005, New England Power Company (NEP) filed an amendment to its January 31, 2005, filing in Docket No. ER05–529– 000. NEP states that the amendment consists of a substitute Second Revised Service Agreement No. 116 for network integration transmission service under NEP’s Open Access Transmission Tariff, Second Revised Volume No. 9 between NEP and USGen New England, Inc. (USGen). NEP request an effective date of January 1, 2005. NEP states that copies of this filing have been served on USGen and regulators in the States of Massachusetts and Rhode Island. Comment Date: 5 p.m. eastern time on March 15, 2005. 2. MidAmerican Energy Company [Docket No. ER05–624–000] Take notice that on February 22, 2005, MidAmerican Energy Company (MidAmerican), refiled with the Commission an amended Network Integration Transmission Service Agreement between MidAmerican and the City of Sergeant Bluff, Iowa, dated December 13, 2004, to correct a typographical error in the header of the agreement. MidAmerican has served a copy of the filing on Sergeant Bluff, the Iowa Utilities Board, the Illinois Commerce Commission and the South Dakota Public Utilities Commission. Comment Date: 5 p.m. eastern time on March 7, 2005. 3. Texas-New Mexico Power Company [Docket No. ER05–625–000] Take notice that on February 22, 2005, Texas-New Mexico Power Company (TNMP) filed new and revised tariff sheets to its open access transmission tariff (OATT) incorporating the changes directed by the Commission in Order No. 2003–B, Standardization of Generator Interconnection Agreements and Procedures, 109 FERC¶ 61,287 (2004). TNMP states that a copy of the filing has been mailed to its OATT customers as well as the New Mexico Public Regulation Commission. Comment Date: 5 p.m. eastern time on March 15, 2005. 4. Cogentrix Lawrence County, LLC [Docket No. ER05–630–000] Take notice that on February 22, 2005, Cogentrix Lawrence County, LLC (Cogentrix Lawrence) filed a Notice of Cancellation of its market-based rate electric tariff, FERC Electric Tariff, VerDate jul<14>2003 16:38 Mar 02, 2005 Jkt 205001 Original Volume No. 1, effective February 22, 2005. Comment Date: 5 p.m. eastern time on March 15, 2005. 5. Pataula Electric Membership Corporation [Docket No. ER05–631–000] Take notice that on February 22, 2005, Pataula Electric Membership Corporation (Pataula) submitted for filing with the Federal Energy Regulatory Commission a petition for authority to sell power at market-based rates, acceptance of proposed rate schedule, and granting of certain waivers. Pataula requests an effective date for its proposed rate schedule that would be 60 days from the date of filing of the petition or the date of the order accepting Pataula’s rate schedule for filing. Comment Date: 5 p.m. eastern time on March 15, 2005. 6. Complete Energy Services, Inc. [Docket No. ER05–632–000] Take notice that on February 22, 2005, Complete Energy Services, Inc. tendered for filing a Notice of Cancellation of market-based rate authority, Rate Schedule FERC No. 1 as authorized in Docket No. ER99–3033–000 on August 5, 1999. Comment Date: 5 p.m. eastern time on March 15, 2005. 10391 appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Linda Mitry, Deputy Secretary. [FR Doc. E5–835 Filed 3–2–05; 8:45 am] BILLING CODE 6717–01–P 7. The Dayton Power and Light Company; DPL Energy, Inc. DEPARTMENT OF ENERGY [Docket Nos. ER05–633–000, ER96–2602– 008, and ER96–2601–019] Federal Energy Regulatory Commission Take notice that, on February 22, 2005, The Dayton Power and Light Company and DPL Energy, Inc. (collectively, Dayton) submitted a compliance filing pursuant to the Commission’s Order in Dayton Power and Light Company, 109 FERC ¶ 61,268 (2004). Dayton states that copies of the filing were served on parties on the official service list in the above-captioned dockets. Comment Date: 5 p.m. eastern time on March 15, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 [Docket No. EL02–23–006, et al.] Consolidated Edison Company of New York Inc., et al.; Electric Rate and Corporate Filings February 24, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. Consolidated Edison Company of New York Inc. [Docket No. EL02–23–006] Take notice that on February 18, 2005, the New York Independent System Operator, Inc., PJM Interconnection, L.L.C. and Public Service Electric and Gas Company (Filing Parties) submitted a joint compliance filing pursuant to the Commission’s August 2, 2004, Opinion No. 476 in Docket No. EL02–23–000 and the Presiding Administrative Law Judge’s January 24, 2005, Order Establishing Procedures, in Docket No. El02–23–003. E:\FR\FM\03MRN1.SGM 03MRN1

Agencies

[Federal Register Volume 70, Number 41 (Thursday, March 3, 2005)]
[Notices]
[Pages 10390-10391]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-835]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER05-529-001, et al.]


New England Power Company, et al.; Electric Rate and Corporate 
Filings

February 25, 2005.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

[[Page 10391]]

1. New England Power Company

[Docket No. ER05-529-001]

    Take notice that on February 22, 2005, New England Power Company 
(NEP) filed an amendment to its January 31, 2005, filing in Docket No. 
ER05-529-000. NEP states that the amendment consists of a substitute 
Second Revised Service Agreement No. 116 for network integration 
transmission service under NEP's Open Access Transmission Tariff, 
Second Revised Volume No. 9 between NEP and USGen New England, Inc. 
(USGen). NEP request an effective date of January 1, 2005.
    NEP states that copies of this filing have been served on USGen and 
regulators in the States of Massachusetts and Rhode Island.
    Comment Date: 5 p.m. eastern time on March 15, 2005.

2. MidAmerican Energy Company

[Docket No. ER05-624-000]

    Take notice that on February 22, 2005, MidAmerican Energy Company 
(MidAmerican), refiled with the Commission an amended Network 
Integration Transmission Service Agreement between MidAmerican and the 
City of Sergeant Bluff, Iowa, dated December 13, 2004, to correct a 
typographical error in the header of the agreement.
    MidAmerican has served a copy of the filing on Sergeant Bluff, the 
Iowa Utilities Board, the Illinois Commerce Commission and the South 
Dakota Public Utilities Commission.
    Comment Date: 5 p.m. eastern time on March 7, 2005.

3. Texas-New Mexico Power Company

[Docket No. ER05-625-000]

    Take notice that on February 22, 2005, Texas-New Mexico Power 
Company (TNMP) filed new and revised tariff sheets to its open access 
transmission tariff (OATT) incorporating the changes directed by the 
Commission in Order No. 2003-B, Standardization of Generator 
Interconnection Agreements and Procedures, 109 FERC] 61,287 (2004).
    TNMP states that a copy of the filing has been mailed to its OATT 
customers as well as the New Mexico Public Regulation Commission.
    Comment Date: 5 p.m. eastern time on March 15, 2005.

4. Cogentrix Lawrence County, LLC

[Docket No. ER05-630-000]

    Take notice that on February 22, 2005, Cogentrix Lawrence County, 
LLC (Cogentrix Lawrence) filed a Notice of Cancellation of its market-
based rate electric tariff, FERC Electric Tariff, Original Volume No. 
1, effective February 22, 2005.
    Comment Date: 5 p.m. eastern time on March 15, 2005.

5. Pataula Electric Membership Corporation

[Docket No. ER05-631-000]

    Take notice that on February 22, 2005, Pataula Electric Membership 
Corporation (Pataula) submitted for filing with the Federal Energy 
Regulatory Commission a petition for authority to sell power at market-
based rates, acceptance of proposed rate schedule, and granting of 
certain waivers. Pataula requests an effective date for its proposed 
rate schedule that would be 60 days from the date of filing of the 
petition or the date of the order accepting Pataula's rate schedule for 
filing.
    Comment Date: 5 p.m. eastern time on March 15, 2005.

6. Complete Energy Services, Inc.

[Docket No. ER05-632-000]

    Take notice that on February 22, 2005, Complete Energy Services, 
Inc. tendered for filing a Notice of Cancellation of market-based rate 
authority, Rate Schedule FERC No. 1 as authorized in Docket No. ER99-
3033-000 on August 5, 1999.
    Comment Date: 5 p.m. eastern time on March 15, 2005.

7. The Dayton Power and Light Company; DPL Energy, Inc.

[Docket Nos. ER05-633-000, ER96-2602-008, and ER96-2601-019]

    Take notice that, on February 22, 2005, The Dayton Power and Light 
Company and DPL Energy, Inc. (collectively, Dayton) submitted a 
compliance filing pursuant to the Commission's Order in Dayton Power 
and Light Company, 109 FERC ] 61,268 (2004).
    Dayton states that copies of the filing were served on parties on 
the official service list in the above-captioned dockets.
    Comment Date: 5 p.m. eastern time on March 15, 2005.

Standard Paragraph

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all parties to this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Linda Mitry,
Deputy Secretary.
[FR Doc. E5-835 Filed 3-2-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.