New England Power Company, et al.; Electric Rate and Corporate Filings, 10390-10391 [E5-835]
Download as PDF
10390
Federal Register / Vol. 70, No. 41 / Thursday, March 3, 2005 / Notices
Revised FERC Electric Rate Schedule
No. 1. Energy Atlantic requests an
effective date of April 18, 2005.
Energy Atlantic states that copies of
the filing were served on the Maine
Public Utilities Commission and the
Maine Office of Public Advocate.
Comment Date: 5 p.m. eastern time on
March 10, 2005.
14. Wayne-White Counties Electric
Cooperative
[Docket No. ER05–597–000]
Take notice that on February 17, 2005,
Wayne-White Counties Electric
Cooperative (Wayne-White) submitted
Wayne-White Counties Electric
Cooperative FERC Electric Tariff, First
Revised Volume No. 1, proposing rate
increases for its Open Access
Transmission Tariff for Schedules 7 and
8 and Attachment H and certain nonrate modifications to section 28.5,
Schedules 1, 2, and 3 and Attachments
E and I. Wayne-White requests an
effective date of April 18, 2005.
Wayne-White states that copies of the
filing were served on Wayne-White’s
jurisdictional customers, Illinois Power
Company, Constellation Energy
Commodities Group and the Illinois
Commerce Commission.
Comment Date: 5 p.m. eastern time on
March 10, 2005.
15. Dartmouth PPA Holdings LLC;
Dartmouth Power Associates L.P.
[Docket Nos. ER05–598–000, ER05–599–000]
Take notice that on February 17, 2005,
Dartmouth PPA Holdings LLC
(Dartmouth PPA) and Dartmouth Power
Associates Limited Partnership
(Dartmouth Power) submitted an
application for Dartmouth PPA to obtain
market-based rate authorization to sell
energy, capacity, and ancillary services,
and reassign transmission capacity and
resell firm transmission rights.
Dartmouth PPA also requested the
waivers and exemptions typically
granted to the holders of market-based
rate authorization. Dartmouth Power
requested the revision of a provision of
Dartmouth Power’s rate schedule which
will permit Dartmouth PPA to step into
an existing Dartmouth Power electricity
sales contract. Dartmouth PPA and
Dartmouth Power request a March 23,
2005, effective date.
Comment Date: 5 p.m. eastern time on
March 10, 2005.
16. Maine Public Service Company
[Docket No. ER05–600–000]
Take notice that on February 17, 2005,
Maine Public Service Company (MPS)
filed proposed revisions to its FERC
Open Access Transmission Tariff
VerDate jul<14>2003
16:38 Mar 02, 2005
Jkt 205001
pursuant to Order No. 2003–B,
Standardization of Generator
Interconnection Agreements and
Procedures, incorporating Order No.
2003–B’s revisions to the Commission’s
pro forma Standard Large Generator
Interconnection Procedures and
Standard Large Generator
Interconnection Agreement. MPS
requests an effective date of January 19,
2005.
MPS states that copies of the filing
were served on MPS’s jurisdictional
customers, the Maine Public Utilities
Commission, and the Maine Public
Advocate.
Comment Date: 5 p.m. eastern time on
March 10, 2005.
17. Fitchburg Gas and Electric Light
Company
[Docket No. ER05–620–000]
Take notice that on February 17, 2005,
Fitchburg Gas and Electric Light
Company (Fitchburg) submitted an
amendment to the agreement for
network integration transmission
service between Fitchburg and the
Massachusetts Bay Transportation
Authority under ISO New England, Inc.,
FERC Electric Tariff No. 3. Fitchburg
states that the amendment reflects an
extension of the term of the agreement
through July 1, 2006, with a one-year
automatic renewal each year unless the
agreement is terminated by either party
by written notice 60 days prior to the
date of automatic renewal.
Fitchburg states that copies of the
filing were served on Massachusetts Bay
Transportation Authority and the
Massachusetts Department of
Telecommunications and Energy.
Comment Date: 5 p.m. eastern time on
March 9, 2005.
18. Old Dominion Electric Cooperative
[Docket No. ES05–18–000]
Take notice that on February 9, 2005,
Old Dominion Electric Cooperative
submitted an application pursuant to
section 204 of the Federal Power Act
seeking authorization to issue shortterm, secured or unsecured debt in an
amount not to exceed $501 million.
Comment Date: 5 p.m. eastern time on
March 16, 2005.
19. Mid-American Energy Company
[Docket No. ES05-19–000]
Take notice that on February 10, 2005,
Mid-American Energy Company (MidAmerican) submitted an application
pursuant to section 204 of the Federal
Power Act seeking authorization to
issue promissory notes and other
evidences of short-term, unsecured
indebtedness, in an amount not to
exceed $500 million.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Comment Date: 5 p.m. eastern time on
March 16, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–834 Filed 3–2–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER05–529–001, et al.]
New England Power Company, et al.;
Electric Rate and Corporate Filings
February 25, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
E:\FR\FM\03MRN1.SGM
03MRN1
Federal Register / Vol. 70, No. 41 / Thursday, March 3, 2005 / Notices
1. New England Power Company
[Docket No. ER05–529–001]
Take notice that on February 22, 2005,
New England Power Company (NEP)
filed an amendment to its January 31,
2005, filing in Docket No. ER05–529–
000. NEP states that the amendment
consists of a substitute Second Revised
Service Agreement No. 116 for network
integration transmission service under
NEP’s Open Access Transmission Tariff,
Second Revised Volume No. 9 between
NEP and USGen New England, Inc.
(USGen). NEP request an effective date
of January 1, 2005.
NEP states that copies of this filing
have been served on USGen and
regulators in the States of Massachusetts
and Rhode Island.
Comment Date: 5 p.m. eastern time on
March 15, 2005.
2. MidAmerican Energy Company
[Docket No. ER05–624–000]
Take notice that on February 22, 2005,
MidAmerican Energy Company
(MidAmerican), refiled with the
Commission an amended Network
Integration Transmission Service
Agreement between MidAmerican and
the City of Sergeant Bluff, Iowa, dated
December 13, 2004, to correct a
typographical error in the header of the
agreement.
MidAmerican has served a copy of the
filing on Sergeant Bluff, the Iowa
Utilities Board, the Illinois Commerce
Commission and the South Dakota
Public Utilities Commission.
Comment Date: 5 p.m. eastern time on
March 7, 2005.
3. Texas-New Mexico Power Company
[Docket No. ER05–625–000]
Take notice that on February 22, 2005,
Texas-New Mexico Power Company
(TNMP) filed new and revised tariff
sheets to its open access transmission
tariff (OATT) incorporating the changes
directed by the Commission in Order
No. 2003–B, Standardization of
Generator Interconnection Agreements
and Procedures, 109 FERC¶ 61,287
(2004).
TNMP states that a copy of the filing
has been mailed to its OATT customers
as well as the New Mexico Public
Regulation Commission.
Comment Date: 5 p.m. eastern time on
March 15, 2005.
4. Cogentrix Lawrence County, LLC
[Docket No. ER05–630–000]
Take notice that on February 22, 2005,
Cogentrix Lawrence County, LLC
(Cogentrix Lawrence) filed a Notice of
Cancellation of its market-based rate
electric tariff, FERC Electric Tariff,
VerDate jul<14>2003
16:38 Mar 02, 2005
Jkt 205001
Original Volume No. 1, effective
February 22, 2005.
Comment Date: 5 p.m. eastern time on
March 15, 2005.
5. Pataula Electric Membership
Corporation
[Docket No. ER05–631–000]
Take notice that on February 22, 2005,
Pataula Electric Membership
Corporation (Pataula) submitted for
filing with the Federal Energy
Regulatory Commission a petition for
authority to sell power at market-based
rates, acceptance of proposed rate
schedule, and granting of certain
waivers. Pataula requests an effective
date for its proposed rate schedule that
would be 60 days from the date of filing
of the petition or the date of the order
accepting Pataula’s rate schedule for
filing.
Comment Date: 5 p.m. eastern time on
March 15, 2005.
6. Complete Energy Services, Inc.
[Docket No. ER05–632–000]
Take notice that on February 22, 2005,
Complete Energy Services, Inc. tendered
for filing a Notice of Cancellation of
market-based rate authority, Rate
Schedule FERC No. 1 as authorized in
Docket No. ER99–3033–000 on August
5, 1999.
Comment Date: 5 p.m. eastern time on
March 15, 2005.
10391
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–835 Filed 3–2–05; 8:45 am]
BILLING CODE 6717–01–P
7. The Dayton Power and Light
Company; DPL Energy, Inc.
DEPARTMENT OF ENERGY
[Docket Nos. ER05–633–000, ER96–2602–
008, and ER96–2601–019]
Federal Energy Regulatory
Commission
Take notice that, on February 22,
2005, The Dayton Power and Light
Company and DPL Energy, Inc.
(collectively, Dayton) submitted a
compliance filing pursuant to the
Commission’s Order in Dayton Power
and Light Company, 109 FERC ¶ 61,268
(2004).
Dayton states that copies of the filing
were served on parties on the official
service list in the above-captioned
dockets.
Comment Date: 5 p.m. eastern time on
March 15, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
[Docket No. EL02–23–006, et al.]
Consolidated Edison Company of New
York Inc., et al.; Electric Rate and
Corporate Filings
February 24, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Consolidated Edison Company of
New York Inc.
[Docket No. EL02–23–006]
Take notice that on February 18, 2005,
the New York Independent System
Operator, Inc., PJM Interconnection,
L.L.C. and Public Service Electric and
Gas Company (Filing Parties) submitted
a joint compliance filing pursuant to the
Commission’s August 2, 2004, Opinion
No. 476 in Docket No. EL02–23–000 and
the Presiding Administrative Law
Judge’s January 24, 2005, Order
Establishing Procedures, in Docket No.
El02–23–003.
E:\FR\FM\03MRN1.SGM
03MRN1
Agencies
[Federal Register Volume 70, Number 41 (Thursday, March 3, 2005)]
[Notices]
[Pages 10390-10391]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-835]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER05-529-001, et al.]
New England Power Company, et al.; Electric Rate and Corporate
Filings
February 25, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
[[Page 10391]]
1. New England Power Company
[Docket No. ER05-529-001]
Take notice that on February 22, 2005, New England Power Company
(NEP) filed an amendment to its January 31, 2005, filing in Docket No.
ER05-529-000. NEP states that the amendment consists of a substitute
Second Revised Service Agreement No. 116 for network integration
transmission service under NEP's Open Access Transmission Tariff,
Second Revised Volume No. 9 between NEP and USGen New England, Inc.
(USGen). NEP request an effective date of January 1, 2005.
NEP states that copies of this filing have been served on USGen and
regulators in the States of Massachusetts and Rhode Island.
Comment Date: 5 p.m. eastern time on March 15, 2005.
2. MidAmerican Energy Company
[Docket No. ER05-624-000]
Take notice that on February 22, 2005, MidAmerican Energy Company
(MidAmerican), refiled with the Commission an amended Network
Integration Transmission Service Agreement between MidAmerican and the
City of Sergeant Bluff, Iowa, dated December 13, 2004, to correct a
typographical error in the header of the agreement.
MidAmerican has served a copy of the filing on Sergeant Bluff, the
Iowa Utilities Board, the Illinois Commerce Commission and the South
Dakota Public Utilities Commission.
Comment Date: 5 p.m. eastern time on March 7, 2005.
3. Texas-New Mexico Power Company
[Docket No. ER05-625-000]
Take notice that on February 22, 2005, Texas-New Mexico Power
Company (TNMP) filed new and revised tariff sheets to its open access
transmission tariff (OATT) incorporating the changes directed by the
Commission in Order No. 2003-B, Standardization of Generator
Interconnection Agreements and Procedures, 109 FERC] 61,287 (2004).
TNMP states that a copy of the filing has been mailed to its OATT
customers as well as the New Mexico Public Regulation Commission.
Comment Date: 5 p.m. eastern time on March 15, 2005.
4. Cogentrix Lawrence County, LLC
[Docket No. ER05-630-000]
Take notice that on February 22, 2005, Cogentrix Lawrence County,
LLC (Cogentrix Lawrence) filed a Notice of Cancellation of its market-
based rate electric tariff, FERC Electric Tariff, Original Volume No.
1, effective February 22, 2005.
Comment Date: 5 p.m. eastern time on March 15, 2005.
5. Pataula Electric Membership Corporation
[Docket No. ER05-631-000]
Take notice that on February 22, 2005, Pataula Electric Membership
Corporation (Pataula) submitted for filing with the Federal Energy
Regulatory Commission a petition for authority to sell power at market-
based rates, acceptance of proposed rate schedule, and granting of
certain waivers. Pataula requests an effective date for its proposed
rate schedule that would be 60 days from the date of filing of the
petition or the date of the order accepting Pataula's rate schedule for
filing.
Comment Date: 5 p.m. eastern time on March 15, 2005.
6. Complete Energy Services, Inc.
[Docket No. ER05-632-000]
Take notice that on February 22, 2005, Complete Energy Services,
Inc. tendered for filing a Notice of Cancellation of market-based rate
authority, Rate Schedule FERC No. 1 as authorized in Docket No. ER99-
3033-000 on August 5, 1999.
Comment Date: 5 p.m. eastern time on March 15, 2005.
7. The Dayton Power and Light Company; DPL Energy, Inc.
[Docket Nos. ER05-633-000, ER96-2602-008, and ER96-2601-019]
Take notice that, on February 22, 2005, The Dayton Power and Light
Company and DPL Energy, Inc. (collectively, Dayton) submitted a
compliance filing pursuant to the Commission's Order in Dayton Power
and Light Company, 109 FERC ] 61,268 (2004).
Dayton states that copies of the filing were served on parties on
the official service list in the above-captioned dockets.
Comment Date: 5 p.m. eastern time on March 15, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-835 Filed 3-2-05; 8:45 am]