Drawbridge Operation Regulations; Port Aransas Channel-Tule Lake, TX, 9532 [05-3761]
Download as PDF
9532
Federal Register / Vol. 70, No. 38 / Monday, February 28, 2005 / Rules and Regulations
the contour line to its intersection with
the eastern boundary of section 27,
T35N/R9W;
(36) Continue generally north along
the 900-meter contour line through
sections 26 and 23, T35N/R9W, cross
onto the Covington Mill, California,
quadrangle map in section 23, T35N/
R9W, and continue northerly along the
contour line to its intersection with
Stoney Creek in the same section;
(37) From Stoney Creek, continue
generally south on the 900-meter
contour line, cross back onto the Trinity
Dam map in section 23, T35N/R9W, and
continue southerly on the contour line
through sections 23, 26, and 35 to the
contour line’s intersection with the
eastern boundary of section 35, T35N/
R9W, near that section’s northeast
corner;
(38) Continue generally northeast on
the meandering 900-meter contour line
over Telephone Ridge, Buck Gulch, and
Buck Ridge; cross onto the Covington
Mill map in section 19, T35N/R8W, and
continue northwesterly along the
contour line across Mule Creek and
Snowslide Gulch in section 13, T35N/
R9W; continue on the contour line,
cross Little Mule Creek in section 18,
T35N/R8W, and continue southeasterly
on the contour line to its intersection
with a line marked ‘‘TRANS LINE
SINGLE WOOD POLES’’ in section 20,
T35N/R8W;
(39) Continue generally northeast
along the 900-meter contour line
through sections 20 and 17, T35N/R8W,
and cross Strope Creek, Mosquito
Gulch, Greenhorn Gulch, Taylor Gulch,
Stuart Fork (in section 5, T35N/R8W),
and Davis Creek; cross onto the Trinity
Center map in section 35, T36/R8W, and
continue on the contour line to its
intersection with the northern boundary
of that section;
(40) Proceed due east along the
northern boundary of sections 35 and
36, T36N/R8W, to the R8W/R7W range
line at the northeast corner of section
36;
(41) Follow the R8W/R7W range line
due north onto the Carrville map and
continue along the range line to its
intersection with township line T38N/
T37N at the northwest corner of section
6, T37N/R7W; and
(42) Proceed due east along township
line T38N/T37N and return to the
beginning point at the northwest corner
of section 5, T37N/R7W.
VerDate jul<14>2003
16:26 Feb 25, 2005
Jkt 205001
Signed: December 28, 2004.
Arthur J. Libertucci,
Administrator.
Dated: January 31, 2005.
Timothy E. Skud,
Deputy Assistant Secretary (Tax, Trade, and
Tariff Policy).
[FR Doc. 05–3714 Filed 2–25–05; 8:45 am]
BILLING CODE 4810–31–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD08–05–011]
Drawbridge Operation Regulations;
Port Aransas Channel—Tule Lake, TX
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
SUMMARY: The Commander, Eighth
Coast Guard District, has issued a
temporary deviation from the regulation
governing the operation of the Tule Lake
Vertical Lift Span Highway and Railroad
Bridge across the Corpus Christi—Port
Aransas Channel, mile 14.0, at Corpus
Christi, Nueces County, Texas. This
deviation allows the bridge to remain
closed to navigation for four hours on
two consecutive days. This temporary
deviation is necessary for the removal of
scaffolding used during the
maintenance of the rope sheaves and for
the cleaning and lubrication of the haul
and counterweight ropes of the
drawbridge.
This deviation is effective from
7 a.m. on Wednesday, March 16, 2005,
through 11 a.m. on Thursday, March 17,
2005.
ADDRESSES: Materials referred to in this
document are available for inspection or
copying at the office of the Eighth Coast
Guard District, Bridge Administration
Branch, Hale Boggs Federal Building,
room 1313, 501 Magazine Street, New
Orleans, Louisiana 70130–3396 between
7 a.m. and 3 p.m., Monday through
Friday, except Federal holidays. The
telephone number is (504) 589–2965.
The Bridge Administration Branch of
the Eighth Coast Guard District
maintains the public docket for this
temporary deviation.
FOR FURTHER INFORMATION CONTACT:
David Frank, Bridge Administration
Branch, telephone (504) 589–2965.
SUPPLEMENTARY INFORMATION: The Port
of Corpus Christi Authority has
requested a temporary deviation in
DATES:
PO 00000
Frm 00032
Fmt 4700
Sfmt 4700
order to remove scaffolding from the
bridge that was required to perform
scheduled maintenance on the Tule
Lake vertical lift span bridge across
Corpus Christi—Port Aransas Channel,
mile 14.0 at Corpus Christi, Nueces
County, Texas. This temporary
deviation will allow the bridge to
remain in the closed-to-navigation
position from 7 a.m. to 11 a.m. on
Wednesday, March 16, 2005, and from
7 a.m. to 11 a.m. on Thursday, March
17, 2005.
The vertical lift span bridge has a
vertical clearance of 9.0 feet above mean
high water, elevation 1.0 feet Mean Sea
Level and 11.0 feet above mean low
water, elevation -1.0 Mean Sea Level in
the closed-to-navigation position.
Navigation at the site of the bridge
consists mainly of oil tankers and tows
with barges. There is no recreational
pleasure craft usage at the bridge site.
Due to prior experience, as well as
coordination with waterway users, it
has been determined that this two-day
partial closure will not have a
significant effect on these vessels. The
bridge normally opens to pass
navigation an average of 850 times per
month. The bridge opens on signal as
required by 33 CFR 117.5. The bridge
will be able to open for emergencies
during the closure period. Alternate
routes are not available.
In accordance with 33 CFR 117.35(c),
this work will be performed with all due
speed in order to return the bridge to
normal operation as soon as possible.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: February 15, 2005.
Marcus Redford,
Bridge Administrator.
[FR Doc. 05–3761 Filed 2–25–05; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD01–05–017]
Drawbridge Operation Regulations:
Harlem River, NY
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the drawbridge operation
regulations for the Triborough 125th
E:\FR\FM\28FER1.SGM
28FER1
Agencies
[Federal Register Volume 70, Number 38 (Monday, February 28, 2005)]
[Rules and Regulations]
[Page 9532]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-3761]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD08-05-011]
Drawbridge Operation Regulations; Port Aransas Channel--Tule
Lake, TX
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Eighth Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Tule Lake Vertical Lift Span Highway and Railroad Bridge across the
Corpus Christi--Port Aransas Channel, mile 14.0, at Corpus Christi,
Nueces County, Texas. This deviation allows the bridge to remain closed
to navigation for four hours on two consecutive days. This temporary
deviation is necessary for the removal of scaffolding used during the
maintenance of the rope sheaves and for the cleaning and lubrication of
the haul and counterweight ropes of the drawbridge.
DATES: This deviation is effective from 7 a.m. on Wednesday, March 16,
2005, through 11 a.m. on Thursday, March 17, 2005.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at the office of the Eighth Coast Guard District,
Bridge Administration Branch, Hale Boggs Federal Building, room 1313,
501 Magazine Street, New Orleans, Louisiana 70130-3396 between 7 a.m.
and 3 p.m., Monday through Friday, except Federal holidays. The
telephone number is (504) 589-2965. The Bridge Administration Branch of
the Eighth Coast Guard District maintains the public docket for this
temporary deviation.
FOR FURTHER INFORMATION CONTACT: David Frank, Bridge Administration
Branch, telephone (504) 589-2965.
SUPPLEMENTARY INFORMATION: The Port of Corpus Christi Authority has
requested a temporary deviation in order to remove scaffolding from the
bridge that was required to perform scheduled maintenance on the Tule
Lake vertical lift span bridge across Corpus Christi--Port Aransas
Channel, mile 14.0 at Corpus Christi, Nueces County, Texas. This
temporary deviation will allow the bridge to remain in the closed-to-
navigation position from 7 a.m. to 11 a.m. on Wednesday, March 16,
2005, and from 7 a.m. to 11 a.m. on Thursday, March 17, 2005.
The vertical lift span bridge has a vertical clearance of 9.0 feet
above mean high water, elevation 1.0 feet Mean Sea Level and 11.0 feet
above mean low water, elevation -1.0 Mean Sea Level in the closed-to-
navigation position. Navigation at the site of the bridge consists
mainly of oil tankers and tows with barges. There is no recreational
pleasure craft usage at the bridge site. Due to prior experience, as
well as coordination with waterway users, it has been determined that
this two-day partial closure will not have a significant effect on
these vessels. The bridge normally opens to pass navigation an average
of 850 times per month. The bridge opens on signal as required by 33
CFR 117.5. The bridge will be able to open for emergencies during the
closure period. Alternate routes are not available.
In accordance with 33 CFR 117.35(c), this work will be performed
with all due speed in order to return the bridge to normal operation as
soon as possible. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: February 15, 2005.
Marcus Redford,
Bridge Administrator.
[FR Doc. 05-3761 Filed 2-25-05; 8:45 am]