Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revised Format for Materials Being Incorporated by Reference, 9450-9487 [05-3359]
Download as PDF
9450
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
The supplementary information is
organized in the following order:
ENVIRONMENTAL PROTECTION
AGENCY
I. Background
What a SIP is.
How EPA enforces SIPs.
How the State and EPA updates the SIP.
How EPA compiles the SIPs.
How EPA organizes the SIP compilation.
Where you can find a copy of the SIP
compilation.
The format of the new Identification of
Plan section.
When a SIP revision becomes Federally
enforceable.
The historical record of SIP revision
approvals.
II. What EPA is doing in this action.
III. Statutory and Executive Order Reviews
40 CFR Part 52
[PA200–4200; FRL–7843–2]
Approval and Promulgation of Air
Quality Implementation Plans;
Pennsylvania; Revised Format for
Materials Being Incorporated by
Reference
Environmental Protection
Agency (EPA).
ACTION: Final rule; notice of
administrative change.
AGENCY:
SUMMARY: EPA is revising the format for
materials submitted by Pennsylvania
that are incorporated by reference (IBR)
into its State implementation plan (SIP).
The regulations affected by this format
change have all been previously
submitted by Pennsylvania and
approved by EPA. This format revision
will primarily affect the ‘‘Identification
of plan’’ section, as well as the format
of the SIP materials that will be
available for public inspection at the
National Archives and Records
Administration (NARA), the Air and
Radiation Docket and Information
Center located at EPA Headquarters in
Washington, D.C., and the EPA Region
III Office. EPA is also adding a table in
the ‘‘Identification of plan’’ section
which summarizes the approval actions
that EPA has taken on the nonregulatory and quasi-regulatory portions
of the Pennsylvania SIP.
DATES: Effective Date: This final rule is
effective on February 25, 2005.
ADDRESSES: SIP materials which are
incorporated by reference into 40 CFR
part 52 are available for public
inspection during normal business
hours at the Air Protection Division,
U.S. Environmental Protection Agency,
Region III, 1650 Arch Street,
Philadelphia, Pennsylvania 19103; the
Air and Radiation Docket and
Information Center, U.S. Environmental
Protection Agency, 1301 Constitution
Avenue, NW., Room B108, Washington,
DC 20460; or the National Archives and
Records Administration (NARA). For
information on the availability of this
material at NARA, call (202) 741–6030,
or go to: https://www.archives.gov/
federal_register/
code_of_federal_regulations/
ibr_locations.html.
FOR FURTHER INFORMATION CONTACT:
Harold A. Frankford, (215) 814–2108 or
by e-mail at
frankford.harold@epamail.epa.gov.
SUPPLEMENTARY INFORMATION:
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
I. Background
What a SIP is—Each state has a SIP
containing the control measures and
strategies used to attain and maintain
the national ambient air quality
standards (NAAQS). The SIP is
extensive, containing such elements as
air pollution control regulations,
emission inventories, monitoring
network, attainment demonstrations,
and enforcement mechanisms.
How EPA enforces SIPs—Each state
must formally adopt the control
measures and strategies in the SIP after
the public has had an opportunity to
comment on them. They are then
submitted to EPA as SIP revisions on
which EPA must formally act.
Once these control measures and
strategies are approved by EPA, after
notice and comment, they are
incorporated into the Federallyapproved SIP and are identified in part
52 (Approval and Promulgation of
Implementation Plans), title 40 of the
Code of Federal Regulations (40 CFR
part 52). The actual state regulations
approved by EPA are not reproduced in
their entirety in 40 CFR part 52, but are
‘‘incorporated by reference’’ (IBR’d)
which means that EPA has approved a
given state regulation with a specific
effective date. This format allows both
EPA and the public to know which
measures are contained in a given SIP
and ensures that the state is enforcing
the regulations. It also allows EPA and
the public to take enforcement action,
should a state not enforce its SIPapproved regulations.
How the State and EPA updates the
SIP—The SIP is a living document
which the state can revise as necessary
to address the unique air pollution
problems in the state. Therefore, EPA
must, from time to time, take action on
SIP revisions containing new and/or
revised regulations in order to make
them part of the SIP. On May 22, 1997
(62 FR 27968), EPA revised the
procedures for IBR’ing Federally-
PO 00000
Frm 00002
Fmt 4701
Sfmt 4700
approved SIPs, as a result of
consultations between EPA and the
Office of the Federal Register (OFR).
EPA began the process of developing:
(1) A revised SIP document for each
state that would be IBR under the
provisions of title 1 CFR part 51; (2) a
revised mechanism for announcing EPA
approval of revisions to an applicable
SIP and updating both the IBR
document and the CFR; and (3) a
revised format of the ‘‘Identification of
Plan’’ sections for each applicable
subpart to reflect these revised IBR
procedures. The description of the
revised SIP document, IBR procedures,
and ‘‘Identification of Plan’’ format are
discussed in further detail in the May
22, 1997, Federal Register document.
How EPA compiles the SIPs—The
Federally-approved regulations, sourcespecific permits, and nonregulatory
provisions (entirely or portions of)
submitted by each state agency have
been compiled by EPA into a ‘‘SIP
compilation.’’ The SIP compilation
contains the updated regulations,
source-specific permits, and
nonregulatory provisions approved by
EPA through previous rulemaking
actions in the Federal Register.
How EPA organizes the SIP
compilation—Each compilation
contains three parts. Part one contains
the regulations, part two contains the
source-specific requirements that have
been approved as part of the SIP and
part three contains nonregulatory
provisions that have been EPA
approved. Each part consists of a table
of identifying information for each SIPapproved regulation, each SIP-approved
source-specific permit, and each
nonregulatory SIP provision. In this
action, EPA is publishing the tables
summarizing the applicable SIP
requirements for the Commonwealth of
Pennsylvania, Allegheny County, and
Philadelphia County. The EPA Regional
Offices have the primary responsibility
for updating the compilations and
ensuring their accuracy.
Where you can find a copy of the SIP
compilation—EPA Region III developed
and will maintain the compilation for
Pennsylvania, including Allegheny and
Philadelphia Counties. A copy of the
full text of regulatory and sourcespecific SIP compilations for these three
jurisdictions will also be maintained at
NARA and EPA’s Air Docket and
Information Center.
The format of the new Identification
of Plan section—In order to better serve
the public, EPA revised the organization
of the ‘‘Identification of Plan’’ section
and included additional information to
clarify the enforceable elements of the
E:\FR\FM\25FER2.SGM
25FER2
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
SIP. The revised Identification of Plan
section contains five subsections:
1. Purpose and scope.
2. Incorporation by reference.
3. EPA-approved regulations.
4. EPA-approved source-specific
requirements.
5. EPA-approved nonregulatory and
quasi-regulatory provisions such as air
quality attainment plans, rate of
progress plans, maintenance plans,
monitoring networks, and small
business assistance programs.
When a SIP revision becomes
Federally enforceable—All revisions to
the applicable SIP become Federally
enforceable as of the effective date of the
revisions to paragraphs (c), (d), or (e) of
the applicable Identification of Plan
section found in each subpart of 40 CFR
part 52. In general, SIP revisions become
effective 30 to 60 days after publication
of EPA’s SIP approval action in the
Federal Register. In specific cases, a SIP
revision action may become effective
less than 30 days or greater than 60 days
after the Federal Register publication
date. In order to determine the effective
date for a specific Pennsylvania,
Allegheny County, or Philadelphia
County SIP provision that is listed in
paragraphs § 52.2020(c), (d), or (e),
consult the Federal Register date,
volume and page cited in the ‘‘EPA
approval date’’ column for that
particular SIP provision.
The historical record of SIP revision
approvals—To facilitate enforcement of
previously approved SIP provisions and
provide a smooth transition to the new
SIP processing system, EPA retains the
original Identification of Plan section,
previously appearing in the CFR as the
first or second section of part 52 for
each state subpart. After an initial twoyear period, EPA will review its
experience with the new system and
enforceability of previously approved
SIP measures and will decide whether
or not to retain the Identification of Plan
appendices for some further period.
II. What EPA Is Doing in This Action
Today’s rule constitutes a
‘‘housekeeping’’ exercise to ensure that
all revisions to the state programs that
have occurred are accurately reflected in
40 CFR part 52. State SIP revisions are
controlled by EPA regulations at 40 CFR
part 51. When EPA receives a formal SIP
revision request, the Agency must
publish the proposed revision in the
Federal Register and provide for public
comment before approval.
EPA has determined that today’s rule
falls under the ‘‘good cause’’ exemption
in Section 553(b)(3)(B) of the
Administrative Procedures Act (APA)
which, upon finding ‘‘good cause,’’
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
authorizes agencies to dispense with
public participation and Section
553(d)(3) which allows an agency to
make a rule effective immediately
(thereby avoiding the 30-day delayed
effective date otherwise provided for in
the APA). Today’s rule simply codifies
provisions which are already in effect as
a matter of law in Federal and approved
state programs. Under Section 553 of the
APA, an agency may find good cause
where procedures are ‘‘impractical,
unnecessary, or contrary to the public
interest.’’ Public comment is
‘‘unnecessary’’ and ‘‘contrary to the
public interest’’ since the codification
only reflects existing law. Immediate
notice in the CFR benefits the public by
removing outdated citations.
III. Statutory and Executive Order
Reviews
A. General Requirements
Under Executive Order 12866 (58 FR
51735, October 4, 1993), this action is
not a ‘‘significant regulatory action’’ and
is therefore not subject to review by the
Office of Management and Budget. This
rule is not subject to Executive Order
13211, ‘‘Actions Concerning Regulations
That Significantly Affect Energy Supply,
Distribution, or Use’’ (66 FR 28355, May
22, 2001) because it is not a significant
regulatory action under Executive Order
12866. Because the agency has made a
‘‘good cause’’ finding that this action is
not subject to notice-and-comment
requirements under the Administrative
Procedure Act or any other statute as
indicated in the Supplementary
Information section above, it is not
subject to the regulatory flexibility
provisions of the Regulatory Flexibility
Act (5 U.S.C 601 et seq.), or to sections
202 and 205 of the Unfunded Mandates
Reform Act of 1995 (UMRA) (Pub. L.
104–4). In addition, this action does not
significantly or uniquely affect small
governments or impose a significant
intergovernmental mandate, as
described in sections 203 and 204 of
UMRA. This rule also does not have a
substantial direct effect on one or more
Indian tribes, on the relationship
between the Federal government and
Indian tribes, or on the distribution of
power and responsibilities between the
Federal government and Indian tribes,
as specified by Executive Order 13175
(65 FR 67249, November 9, 2000), nor
will it have substantial direct effects on
the States, on the relationship between
the national government and the States,
or on the distribution of power and
responsibilities among the various
levels of government, as specified in
Executive Order 13132 (64 FR 43255,
August 10, 1999). This rule also is not
PO 00000
Frm 00003
Fmt 4701
Sfmt 4700
9451
subject to Executive Order 13045 (62 FR
19885, April 23, 1997), because it is not
economically significant. This rule does
not involve technical standards; thus
the requirements of section 12(d) of the
National Technology Transfer and
Advancement Act of 1995 (15 U.S.C.
272 note) do not apply. The rule also
does not involve special consideration
of environmental justice related issues
as required by Executive Order 12898
(59 FR 7629, February 16, 1994). In
issuing this rule, EPA has taken the
necessary steps to eliminate drafting
errors and ambiguity, minimize
potential litigation, and provide a clear
legal standard for affected conduct, as
required by section 3 of Executive Order
12988 (61 FR 4729, February 7, 1996).
EPA has complied with Executive Order
12630 (53 FR 8859, March 15, 1998) by
examining the takings implications of
the rule in accordance with the
‘‘Attorney General’s Supplemental
Guidelines for the Evaluation of Risk
and Avoidance of Unanticipated
Takings’’ issued under the executive
order. This rule does not impose an
information collection burden under the
Paperwork Reduction Act of 1995 (44
U.S.C. 3501 et seq.). EPA’s compliance
with these statutes and Executive
Orders for the underlying rules are
discussed in previous actions taken on
the State’s rules.
B. Submission to Congress and the
Comptroller General
The Congressional Review Act (5
U.S.C. 801 et seq.), as added by the
Small Business Regulatory Enforcement
Fairness Act of 1996, generally provides
that before a rule may take effect, the
agency promulgating the rule must
submit a rule report, which includes a
copy of the rule, to each House of the
Congress and to the Comptroller General
of the United States. Section 808 allows
the issuing agency to make a rule
effective sooner than otherwise
provided by the CRA if the agency
makes a good cause finding that notice
and public procedure is impracticable,
unnecessary or contrary to the public
interest. Today’s action simply codifies
provisions which are already in effect as
a matter of law in Federal and approved
State programs. 5 U.S.C. 808(2). As
stated previously, EPA has made such a
good cause finding, including the
reasons therefore, and established an
effective date of February 25, 2005. EPA
will submit a report containing this rule
and other required information to the
U.S. Senate, the U.S. House of
Representatives, and the Comptroller
General of the United States prior to
publication of the rule in the Federal
E:\FR\FM\25FER2.SGM
25FER2
9452
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
Register. This rule is not a ‘‘major rule’’
as defined by 5 U.S.C. 804(2).
C. Petitions for Judicial Review
EPA has also determined that the
provisions of section 307(b)(1) of the
Clean Air Act pertaining to petitions for
judicial review are not applicable to this
action. Prior EPA rulemaking actions for
each individual component of the
Pennsylvania SIP compilations had
previously afforded interested parties
the opportunity to file a petition for
judicial review in the United States
Court of Appeals for the appropriate
circuit within 60 days of such
rulemaking action. Thus, EPA sees no
need in this action to reopen the 60-day
period for filing such petitions for
judicial review for these ‘‘Identification
of plan’’ reorganization actions for
Pennsylvania.
List of Subjects in 40 CFR Part 52
Environmental protection, Air
pollution control, Carbon monoxide,
Incorporation by reference,
Intergovernmental relations, Nitrogen
dioxide, Ozone, Particulate matter,
Reporting and recordkeeping
requirements, Sulfur oxides, Volatile
organic compounds.
Dated: November 17, 2004.
Thomas Voltaggio,
Acting Regional Administrator, Region III.
For the reasons set forth in the
preamble, 40 CFR part 52 is amended as
follows:
I
PART 52—[AMENDED]
1. The authority citation for part 52
continues to read as follows:
I
Authority: 42 U.S.C. 7401 et seq.
Subpart NN—Pennsylvania
2. Section 52.2020 is redesignated as
Section 52.2063 and the heading and
paragraph (a) are revised to read as
follows:
I
§ 52.2063
section.
Original identification of plan
(a) This section identifies the original
‘‘Air Implementation Plan for the
Commonwealth of Pennsylvania’’ and
all revisions submitted by Pennsylvania
that were federally approved prior to
February 10, 2005.
*
*
*
*
*
I 3. A new Section 52.2020 is added to
read as follows:
§ 52.2020
Identification of plan.
(a) Purpose and scope. This section
sets forth the applicable State
implementation plan for Pennsylvania
under section 110 of the Clean Air Act,
42 U.S.C. 7410, and 40 CFR part 51 to
meet national ambient air quality
standards.
(b) Incorporation by reference. (1)
Material listed as incorporated by
reference in paragraphs (c) and (d) was
approved for incorporation by reference
by the Director of the Federal Register
in accordance with 5 U.S.C. 552(a) and
1 CFR part 51. Material incorporated as
it exists on the date of the approval, and
notice of any change in the material will
be published in the Federal Register.
Entries in paragraphs (c) and (d) of this
section with EPA approval dates on or
after February 10, 2005, will be
incorporated by reference in the next
update to the SIP compilation.
(2) EPA Region III certifies that the
rules/regulations provided by EPA at
the addresses in paragraph (b)(3) of this
section are an exact duplicate of the
officially promulgated State rules/
regulations which have been approved
as part of the State implementation plan
as of February 10, 2005.
(3) Copies of the materials
incorporated by reference may be
inspected at the EPA Region III Office at
1650 Arch Street, Philadelphia, PA
19103; the EPA, Air and Radiation
Docket and Information Center, Air
Docket (6102), 1301 Constitution
Avenue, NW., Room B108, Washington,
DC 20460; or at the National Archives
and Records Administration (NARA).
For information on the availability of
this material at NARA, call (202) 741–
6030, or go to: https://www.archives.gov/
federal_register/
code_of_federal_regulations/
ibr_locations.html.
(c) EPA-Approved Regulations.
(1) EPA-APPROVED PENNSYLVANIA REGULATIONS
State citation
State
effective
date
Title subject
EPA approval date
Additional explanation/
§ 52.2063 citation
Title 25. Environmental Protection Article III. Air Resources
Chapter 121
Section
Section
Section
Section
121.1
121.2
121.3
121.4
...........
...........
...........
...........
General Provisions
12/27/97
3/20/72
3/20/72
5/23/92
2/25/03; 68 FR 8723 ..............
5/31/72; 37 FR 10842 ............
5/31/72; 37 FR 10842 ............
12/22/94; 59 FR 65971 ..........
(c)(197).
(c)(1).
(c)(1).
(c)(94).
Section 121.7 ...........
Section 121.8 ...........
Definitions ...............................................
Purpose ...................................................
Applicability .............................................
Regional Organization of the Department.
Prohibition of Air Pollution ......................
Compliance responsibilities ....................
3/20/72
8/13/77
5/31/72; 37 FR 10842 ............
12/17/79; 44 FR 73031 ..........
Section 121.9 ...........
Section 121.10 .........
Section 121.11 .........
Circumvention .........................................
Existing orders ........................................
Severability clause ..................................
3/20/72
3/20/72
3/20/72
5/31/72; 37 FR 10842 ............
5/31/72; 37 FR 10842 ............
5/31/72; 37 FR 10842 ............
(c)(1).
(c)(21); correction published 8/
22/80 (45 FR 56060).
(c)(1).
(c)(1).
(c)(1); no longer in PA DEP
rules.
Chapter 123
Standards for Contaminants
Fugitive Emissions
Section 123.1(a)
through (c).
Section 123.2 ...........
VerDate jul<14>2003
Prohibition of certain fugitive emissions
8/29/77
12/17/79; 44 FR 73031 ..........
Fugitive particulate matter ......................
8/13/83
7/27/84; 49 FR 30183 ............
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00004
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
25FER2
(c)(21); Paragraph 123.1(d) is
not in the SIP.
(c)(60).
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9453
(1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued
State citation
State
effective
date
Title subject
EPA approval date
Additional explanation/
§ 52.2063 citation
Particulate Matter Emissions
Section 123.11 .........
Appendix A [Graph]
Section 123.12 .........
Section 123.13(a)
through (c).
Appendix B [Graph]
Appendix C [Graph]
Combusion units .....................................
Particulate Matter-Combustion Units ......
Incinerators .............................................
Processes ...............................................
3/20/72
3/20/72
3/20/72
8/27/80
5/31/72; 37 FR 10842 ............
5/31/72; 37 FR 10842 ............
5/31/72; 37 FR 10842 ............
11/13/81; 46 FR 55971 ..........
Particulate Matter-Processes Listed in
Table 1.
Particulate Matter-Processes Not Listed
in Table 1.
3/20/72
5/31/72; 37 FR 10842 ............
(c)(1).
(c)(1).
(c)(1).
(c)(39) paragraph 123.13(d) is
not in the SIP.
(c)(1).
3/20/72
5/31/72; 37 FR 10842 ............
(c)(1).
Sulfur Compound Emissions
Section 123.21 .........
Section 123.22 .........
3/20/72
3/20/72
5/31/72; 37 FR 10842 ............
5/31/72; 37 FR 10842 ............
(c)(1).
(c)(1).
Section 123.22(a) ....
General ...................................................
Combustion units. [General provisions—
air basins and non-air basins].
Combustion units—non Air basins .........
8/1/79
8/18/81; 46 FR 43423 ............
Section 123.22(b) ....
Combustion units—Erie Air Basin ..........
8/1/79
8/8/79; 44 FR 46465 ..............
Section 123.22(c) .....
Combustion units—Southeast PA Air
Basin.
Combustion units—Upper Beaver Valley
Air Basin.
Combustion units—Lower Beaver Valley
Air Basin.
Sulfur Oxides—Combustion Units ..........
Primary zinc smelters .............................
Monitoring requirements .........................
10/1/78
6/4/79; 44 FR 31980 ..............
(c)(36); approved as part of
the control strategy for the
Armstrong County sulfur dioxide nonattainment area.
(c)(20); correction published 1/
23/80 (45 FR 5303).
(c)(18).
8/21/82
7/5/83; 48 FR 30630 ..............
(c)(53).
1/1/81
12/16/81; 46 FR 61267 ..........
(c)(40).
3/20/72
8/11/75
10/27/90
5/31/72; 37 FR 10842 ............
4/30/76; 41 FR 18077 ............
6/30/93; 58 FR 34911 ............
(c)(1).
(c)(14).
(c)(81).
5/31/72; 37 FR 10842 ............
(c)(1); SIP version of Section
123.31 is different from
State version.
Section 123.22(c) .....
Section 123.22(d) ....
Figure 4 [Graph] ......
Section 123.24 .........
Section 123.25 .........
Odor Emissions
Section 123.31 .........
Limitations ...............................................
3/20/72
Visible Emissions
Section 123.41 .........
Section 123.42 (Except paragraph
123.42(4)).
Section 123.43 .........
Section 123.44 .........
Section 123.45 .........
Appendix D [Chart] ..
Section 123.46 .........
Limitations ...............................................
Exceptions ...............................................
3/20/72
3/20/72
5/31/72; 37 FR 10842 ............
5/31/72; 37 FR 10842 ............
Measuring Techniques ............................
Limitations of visible fugitive air contaminants from operation of any coke
oven battery.
Alternative opacity limitations .................
Alternative Opcaity Limitation—Application.
Monitoring requirements .........................
3/20/72
12/27/97
5/31/72; 37 FR 10842 ............
6/11/02; 67 FR 39854 ............
(c)(1).
(c)(1); Paragraph 123.42(4) is
declared not in SIP at
(c)(21).
(c)(1).
(c)(189).
6/20/81
6/20/81
1/19/83; 48 FR 2319 ..............
1/19/83; 48 FR 2319 ..............
(c)(48).
(c)(48).
6/20/81
1/19/83; 48 FR 2319 ..............
(c)(48).
Nitrogen Compound Emissions
Section 123.51 .........
Monitoring requirements .........................
10/20/90
9/23/92; 57 FR 43905 ............
(c)(74).
NOX Allowance Requirements
Section 123.101 .......
Section 123.102 .......
Section 123.103 .......
Section 123.104 .......
Section
Section
Section
Section
123.105
123.106
123.107
123.108
VerDate jul<14>2003
.......
.......
.......
.......
Purpose ...................................................
Source NOX allowance requirements
and NOX allowance control period.
General NOX allowance provisions ........
Source authorized account representative requirements.
NATS provisions .....................................
NOX allowance transfer protocol ............
NOX allowance transfer procedures .......
Source emissions monitoring requirements.
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00005
Fmt 4701
3/11/00
3/11/00
6/6/00; 65 FR 35840 ..............
6/6/00; 65 FR 35840 ..............
(c)(145).
(c)(145).
3/11/00
3/11/00
6/6/00; 65 FR 35840 ..............
6/6/00; 65 FR 35840 ..............
(c)(145).
(c)(145).
3/11/00
3/11/00
3/11/00
3/11/00
6/6/00;
6/6/00;
6/6/00;
6/6/00;
(c)(145).
(c)(145).
(c)(145).
(c)(145).
Sfmt 4700
65
65
65
65
FR
FR
FR
FR
35840
35840
35840
35840
E:\FR\FM\25FER2.SGM
..............
..............
..............
..............
25FER2
9454
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued
State
effective
date
State citation
Title subject
Section 123.109 .......
Source emissions reporting requirements.
Source compliance requirements ...........
Failure to meet source compliance requirements.
Source operating permit provision requirements.
Source recordkeeping requirements .......
General NOX allocation provisions .........
Initial NOX allowance NOX allocations ...
Source opt-in provisions .........................
New NOX affected source provisions .....
Emission reduction credit provisions ......
Bonus NOX allowance awards ...............
Audit ........................................................
Appendix E [NOX Allowances Chart] ......
Section 123.110 .......
Section 123.111 .......
Section 123.112 .......
Section 123.113 .......
Section 123.114 .......
Section 123.115 .......
Section 123.116 .......
Section 123.117 .......
Section 123.118 .......
Section 123.119 .......
Section 123.120 .......
Appendix E [Chart] ..
Additional explanation/
§ 52.2063 citation
EPA approval date
3/11/00
6/6/00; 65 FR 35840 ..............
(c)(145).
3/11/00
3/11/00
6/6/00; 65 FR 35840 ..............
6/6/00; 65 FR 35840 ..............
(c)(145).
(c)(145).
3/11/00
6/6/00; 65 FR 35840 ..............
(c)(145).
3/11/00
3/11/00
3/11/00
3/11/00
3/11/00
3/11/00
3/11/00
3/11/00
3/11/00
6/6/00;
6/6/00;
6/6/00;
6/6/00;
6/6/00;
6/6/00;
6/6/00;
6/6/00;
6/6/00;
(c)(145).
(c)(145).
(c)(145).
(c)(145).
(c)(145).
(c)(145).
(c)(145).
(c)(145).
(c)(145).
65
65
65
65
65
65
65
65
65
FR
FR
FR
FR
FR
FR
FR
FR
FR
35840
35840
35840
35840
35840
35840
35840
35840
35840
..............
..............
..............
..............
..............
..............
..............
..............
..............
Chapter 126 Standard for Motor Fuels
Subchapter A. Oxygenate Content of Gasoline
Section
Section
Section
Section
126.101
126.102
126.103
126.104
.......
.......
.......
.......
General ...................................................
Sampling and testing ..............................
Recordkeeping and reporting .................
Labeling requirements ............................
8/19/95
8/19/95
8/19/95
8/19/95
12/17/99;
12/17/99;
12/17/99;
12/17/99;
64
64
64
64
FR
FR
FR
FR
70589
70589
70589
70589
..........
..........
..........
..........
(c)(142).
(c)(142).
(c)(142).
(c)(142).
Subchapter C. Gasoline Volatility Requirements
Section 126.301 (a)
through (c).
Section 126.302 (Except paragraph
(a)(6) pertaining to
RFG).
Section 126.303(a) ..
Compliant fuel requirement .....................
11/1/97
6/8/98; 63 FR 31116 ..............
(c)(131).
Recordkeeping and reporting .................
11/1/97
6/8/98; 63 FR 31116 ..............
(c)(131).
Compliance and test methods ................
11/1/97
6/8/98; 63 FR 31116 ..............
(c)(131).
Subchapter D. Motor Vehicle Emissions Control Program
General Provisions
Section 126.401 .......
Section 126.402 .......
Purpose ...................................................
NLEV scope and applicability .................
12/5/98
12/5/98
12/28/99; 64 FR 72564 ..........
12/28/99; 64 FR 72564 ..........
(c)(141)(i)(C).
(c)(141)(i)(C).
Pennsylvania Clean Vehicles Program
Section 126.411 .......
Section 126.412 .......
Section 126.413 .......
General Requirements ............................
Emission requirements ...........................
Exemptions .............................................
12/5/98
12/5/98
12/5/98
12/28/99; 64 FR 72564 ..........
12/28/99; 64 FR 72564 ..........
12/28/99; 64 FR 72564 ..........
(c)(141)(i)(C).
(c)(141)(i)(C).
(c)(141)(i)(C).
Applicable Motor Vehicle Testing
Section
Section
Section
Section
Section
126.421
126.422
126.423
126.424
126.425
.......
.......
.......
.......
.......
New motor vehicle certification testing ...
New motor vehicle compliance testing ...
Assembly line testing ..............................
In-use motor vehicle enforcement testing
In-use surveillance testing ......................
12/5/98
12/5/98
12/5/98
12/5/98
12/5/98
12/28/99;
12/28/99;
12/28/99;
12/28/99;
12/28/99,
64
64
64
64
64
FR
FR
FR
FR
FR
72564
72564
72564
72564
72564
..........
..........
..........
..........
..........
(c)(141)(i)(C).
(c)(141)(i)(C).
(c)(141)(i)(C).
(c)(141)(i)(C).
(c)(141)(i)(C).
12/28/99, 64 FR 72564 ..........
12/28/99, 64 FR 72564 ..........
(c)(141)(i)(C).
(c)(141)(i)(C).
Motor Vehicle Manufacturers’ Obligations
Section 126.431 .......
Section 126.432 .......
Warranty and recall .................................
Reporting requirements ..........................
12/5/98
12/5/98
Motor Vehicle Dealer Responsibilities
Section 126.441 .......
Responsibilities of motor-vehicle dealers
12/5/98
12/28/99, 64 FR 72564 ..........
(c)(141)(i)(C).
Chapter 127 Construction, Modification, Reactivation, and Operation of Sources
Subchapter A. General
Section 127.1 ...........
Section 127.3 ...........
VerDate jul<14>2003
Purpose ...................................................
Operational flexibility ...............................
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00006
11/26/94
11/26/94
Fmt 4701
Sfmt 4700
7/30/96, 61 FR 39497 ............
7/30/96, 61 FR 39497 ............
E:\FR\FM\25FER2.SGM
25FER2
(c)(110)(i)(C).
(c)(110)(i)(C).
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9455
(1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued
State citation
State
effective
date
Title subject
EPA approval date
Additional explanation/
§ 52.2063 citation
Subchapter B. Plan Approval Requirements
Section
Section
Section
Section
Section
Section
Section
Section
Section
Section
127.11 .........
127.11a .......
127.12 .........
127.12a .......
127.12b .......
127.12c .......
127.13 .........
127.13a .......
127.13b .......
127.13c .......
Section
Section
Section
Section
127.14
127.25
127.32
127.35
.........
.........
.........
.........
Section 127.36 .........
Section
Section
Section
Section
Section
Section
Section
Section
127.44
127.45
127.46
127.47
127.48
127.49
127.50
127.51
.........
.........
.........
.........
.........
.........
.........
.........
Plan approval requirements ....................
Reactivation of sources ..........................
Content of application .............................
Compliance review ..................................
Plan approval terms and conditions .......
Plan approval reporting requirements ....
Extensions ...............................................
Plan approval changes for cause ...........
Denial of Plan approval application ........
Notice of basis for certain plan approval
decisions.
Exemptions .............................................
Compliance requirement .........................
Transfer of plan approvals ......................
Maximum achievable control technology
standards for hazardous air pollutants.
Health risk-based emission standards
and operating practice requirements.
Public Notice ...........................................
Contents of notice ...................................
Filing protests ..........................................
Consideration of protests ........................
Conferences and hearings ......................
Conference or hearing procedure ...........
Conference or hearing record .................
Plan approval disposition ........................
11/26/94
11/26/94
11/26/94
11/26/94
11/26/94
11/26/94
11/26/94
11/26/94
11/26/94
11/26/94
7/30/96,
7/30/96,
7/30/96,
7/30/96,
7/30/96,
7/30/96,
7/30/96,
7/30/96,
7/30/96,
7/30/96,
61
61
61
61
61
61
61
61
61
61
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
39497
39497
39497
39497
39497
39497
39497
39497
39497
39497
............
............
............
............
............
............
............
............
............
............
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
11/26/94
11/26/94
11/26/94
11/26/94
7/30/96,
7/30/96,
7/30/96,
7/30/96,
61
61
61
61
FR
FR
FR
FR
39497
39497
39497
39497
............
............
............
............
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C)
11/26/94
7/30/96, 61 FR 39497 ............
(c)(110)(i)(C).
11/26/94
11/26/94
8/13/83
11/26/94
8/13/83
11/26/94
11/26/94
11/26/94
7/30/96,
7/30/96,
7/27/84,
7/30/96,
7/27/84,
7/30/96,
7/30/96,
7/30/96,
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(60).
(c)(110)(i)(C).
(c)(60).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
61
61
49
61
49
61
61
61
FR
FR
FR
FR
FR
FR
FR
FR
39497
39497
30183
39497
30183
39497
39497
39497
............
............
............
............
............
............
............
............
Subchapter D. Prevention of Significant Deterioration of Air Quality
Section 127.81 .........
Section 127.82 .........
Section 127.83 .........
Purpose ...................................................
Scope ......................................................
Adoption of Program ...............................
6/18/83
6/18/83
6/18/83
8/21/84, 49 FR 33127 ............
8/21/84, 49 FR 33127 ............
8/21/84, 49 FR 33127 ............
(c)(57).
(c)(57).
(c)(57).
Subchapter E. New Source Review
Section 127.201 .......
Section 127.202 .......
Section 127.203 .......
Section
Section
Section
Section
Section
Section
Section
Section
Section
Section
Section
Section
Section
Section
127.204
127.205
127.206
127.207
127.208
127.209
127.210
127.211
127.212
127.213
127.214
127.215
127.216
127.217
.......
.......
.......
.......
.......
.......
.......
.......
.......
.......
.......
.......
.......
.......
General requirements .............................
Effective date ..........................................
Facilities subject to special permit requirements.
Emissions subject to this subchapter .....
Special permit requirements ...................
ERC general requirements .....................
ERC generation and creation .................
ERC use and transfer requirements .......
ERC registry system ...............................
Offset ratios .............................................
Applicability determination ......................
Portable facilities .....................................
Construction and demolition ...................
Exemption ...............................................
Reactivation ............................................
Circumvention .........................................
Clean Air Act Titles III–V applicability .....
1/15/94
1/15/94
1/15/94
12/9/97, 62 FR 64722 ............
12/9/97, 62 FR 64722 ............
12/9/97, 62 FR 64722 ............
(c)(107).
(c)(107).
(c)(107).
1/15/94
1/15/94
1/15/94
1/15/94
1/15/94
1/15/94
1/15/94
1/15/94
1/15/94
1/15/94
1/15/94
1/15/94
1/15/94
1/15/94
12/9/97,
12/9/97,
12/9/97,
12/9/97,
12/9/97,
12/9/97;
12/9/97;
12/9/97;
12/9/97;
12/9/97;
12/9/97;
12/9/97;
12/9/97;
12/9/97;
(c)(107).
(c)(107).
(c)(107).
(c)(107).
(c)(107).
(c)(107).
(c)(107).
(c)(107).
(c)(107).
(c)(107).
(c)(107).
(c)(107).
(c)(107).
(c)(107).
62
62
62
62
62
62
62
62
62
62
62
62
62
62
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
64722
64722
64722
64722
64722
64722
64722
64722
64722
64722
64722
64722
64722
64722
............
............
............
............
............
............
............
............
............
............
............
............
............
............
Subchapter F. Operating Permit Requirements
General
Section 127.401 .......
Section 127.402 .......
Section 127.403 .......
Section 127.404 .......
Scope ......................................................
General provisions ..................................
Permitting of sources operating lawfully
without a permit.
Compliance schedule for repermitting ....
11/26/94
11/26/94
11/26/94
7/30/96; 61 FR 39497 ............
7/30/96; 61 FR 39497 ............
7/30/96; 61 FR 39497 ............
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
11/26/94
7/30/96; 61 FR 39497 ............
(c)(110)(i)(C).
Permit Applications
Section 127.411 .......
Section 127.412 .......
Section 127.413 .......
VerDate jul<14>2003
Content of applications ...........................
Compliance review forms .......................
Municipal notification ...............................
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00007
11/26/94
11/26/94
11/26/94
Fmt 4701
Sfmt 4700
7/30/96; 61 FR 39497 ............
7/30/96; 61 FR 39497 ............
7/30/96; 61 FR 39497 ............
E:\FR\FM\25FER2.SGM
25FER2
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
9456
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued
State
effective
date
State citation
Title subject
Section 127.414 .......
Supplemental information .......................
11/26/94
EPA approval date
7/30/96; 61 FR 39497 ............
Additional explanation/
§ 52.2063 citation
(c)(110)(i)(C).
Review of Applications
Section 127.421 .......
Section 127.422 .......
Section 127.423 .......
Section
Section
Section
Section
Section
Section
Section
Section
127.424
127.425
127.426
127.427
127.428
127.429
127.430
127.431
.......
.......
.......
.......
.......
.......
.......
.......
Review of Applications ............................
Denial of permits .....................................
Notice of basis for certain operation permit decisions.
Public notice ............................................
Contents of notice ...................................
Filing protests ..........................................
Consideration of protest ..........................
Conferences and hearings ......................
Conference or hearing procedure ...........
Conference or hearing record .................
Operating permit disposition ...................
11/26/94
11/26/94
11/26/94
7/30/96; 61 FR 39497 ............
7/30/96; 61 FR 39497 ............
7/30/96; 61 FR 39497 ............
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
11/26/94
11/26/94
11/26/94
11/26/94
11/26/94
11/26/94
11/26/94
11/26/94
7/30/96;
7/30/96;
7/30/96;
7/30/96;
7/30/96;
7/30/96;
7/30/96;
7/30/96;
61
61
61
61
61
61
61
61
FR
FR
FR
FR
FR
FR
FR
FR
39497
39497
39497
39497
39497
39497
39497
39497
............
............
............
............
............
............
............
............
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
61
61
61
61
61
61
61
61
FR
FR
FR
FR
FR
FR
FR
FR
39497
39497
39497
39497
39497
39497
39497
39497
Operating Permit Conditions
Section
Section
Section
Section
Section
Section
Section
Section
127.441
127.442
127.443
127.444
127.445
127.446
127.447
127.448
.......
.......
.......
.......
.......
.......
.......
.......
Section 127.449 .......
Section 127.450 .......
Operating permit terms and conditions ..
Reporting requirements ..........................
Operating permit requirements ...............
Compliance requirements .......................
Operating permit compliance schedules
Operating permit duration .......................
Alternate operating scenarios .................
Emissions trading at facilities with Federally enforceable emissions cap.
De minimis emission increases ..............
Administrative operating permit amendments.
11/26/94
11/26/94
11/26/94
11/26/94
11/26/94
11/26/94
11/26/94
11/26/94
7/30/96;
7/30/96;
7/30/96;
7/30/96;
7/30/96;
7/30/96;
7/30/96;
7/30/96;
............
............
............
............
............
............
............
............
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
11/26/94
11/26/94
7/30/96; 61 FR 39497 ............
7/30/96; 61 FR 39497 ............
(c)(110)(i)(C).
(c)(110)(i)(C).
Operating Permit Modifications
Section 127.461 .......
Section 127.462 .......
Section 127.463 .......
Section 127.464 .......
Operating permit changes for cause ......
Minor operating permit modifications ......
Operating permit revisions to incorporate
applicable standards.
Transfer of operating permits .................
11/26/94
11/26/94
11/26/94
7/30/96; 61 FR 39497 ............
7/30/96; 61 FR 39497 ............
7/30/96; 61 FR 39497 ............
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
11/26/94
7/30/96; 61 FR 39497 ............
(c)(110)(i)(C).
Subchapter H. General Plan Approvals and Operating Permits
General
Section 127.601 .......
Scope ......................................................
11/26/94
7/30/96; 61 FR 39494 ............
(c)(111).
Issuance of General Plan Approvals and General Operating Permits
Section 127.611 .......
Section 127.612 .......
General plan approvals and general operating permits.
Public notice and review period ..............
11/26/94
7/30/96; 61 FR 39494 ............
(c)(111).
11/26/94
7/30/96; 61 FR 39494 ............
(c)(111).
Use of General Plan Approvals and Permits
Section 127.621 .......
Section 127.622 .......
Application for use of general plan approvals and general operating permits.
Compliance with general plan approvals
and general operating permits.
11/26/94
7/30/96; 61 FR 39494 ............
(c)(111).
11/26/94
7/30/96; 61 FR 39494 ............
(c)(111).
Subchapter I. Plan Approval and Operating Permit Fees
Section 127.701 .......
Section 127.702 .......
Section 127.703 .......
Section 127.707 .......
General provisions ..................................
Plan approval fees ..................................
Operating permit fees under Subchapter
F.
Failure to pay fee ....................................
11/26/94
11/26/94
11/26/94
7/30/96; 61 FR 39497 ............
7/30/96; 61 FR 39497 ............
7/30/96; 61 FR 39497 ............
(c)(110)(i)(C).
(c)(110)(i)(C).
(c)(110)(i)(C).
11/26/94
7/30/96; 61 FR 39497 ............
(c)(110)(i)(C).
Subchapter J. General Conformity
Section 127.801 .......
Section 127.802 .......
VerDate jul<14>2003
Purpose ...................................................
Adoption of Standards ............................
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00008
Fmt 4701
11/9/96
11/9/96
Sfmt 4700
9/29/97; 62 FR 50870 ............
9/29/97; 62 FR 50870 ............
E:\FR\FM\25FER2.SGM
25FER2
(c)(126).
(c)(126).
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9457
(1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued
State citation
State
effective
date
Title subject
EPA approval date
Additional explanation/
§ 52.2063 citation
Chapter 129 Standards for Sources
Miscellaneous Sources
Section 129.11 .........
Section 129.12 .........
Section 129.13 .........
Appendix A ..............
Section 129.14 .........
Section 129.15 .........
Section 129.16 .........
Section 129.18 .........
Nitric acid plants .....................................
Sulfuric acid plants ..................................
Sulfur recovery plants .............................
Allowable emissions, sulfur oxides—sulfur recovery plants.
Open burning operations ........................
Coke pushing operations ........................
Door maintenance, adjustment and replacement practices.
Municipal waste incinerators ...................
3/20/72
3/20/72
3/20/72
4/23/94
5/31/72;
5/31/72;
5/31/72;
3/23/98;
37
37
37
63
FR
FR
FR
FR
10842
10842
10842
13789
............
............
............
............
(c)(1).
(c)(1).
(c)(1).
(c)(129).
8/9/76
8/29/77;
12/31/77
12/12/77
8/19/80; 45 FR 55178 ............
12/17/79; 44 FR 73031 ..........
7/17/79; 44 FR 41429 ............
(c)(33).
(c)(21); correction published 8/
22/80 45 FR 56060.
(c)(19).
10/27/90
6/30/93; 58 FR 34911 ............
(c)(81).
Sources of VOCs
Section 129.51 .........
Section 129.52 .........
Section 129.54 .........
Section 129.55 .........
Section 129.56 .........
Section 129.57 .........
Section
Section
Section
Section
129.58
129.59
129.60
129.61
.........
.........
.........
.........
Section 129.62 .........
Section
Section
Section
Section
129.63
129.64
129.65
129.66
.........
.........
.........
.........
Section 129.67 .........
Section 129.68 .........
Section 129.69 .........
Section 129.71 .........
Section 129.72 .........
Section 129.73 .........
Section 129.75 .........
General ...................................................
Surface coating processes .....................
Seasonal operation of auxiliary incineration equipment.
Petroleum refineries—specific sources ..
Storage tanks greater than 40,000 gallons capacity containing VOCs.
Storage tanks less than or equal to
40,000 gallons capacity containing
VOCs.
Petroleum refineries—fugitive sources ...
Bulk gasoline terminals ...........................
Bulk gasoline plants ................................
Small gasoline storage tank control
(Stage I control).
General standards for bulk gasoline terminals, bulk gasoline plants, and
small gasoline storage tanks.
Degreasing operations ............................
Cutback asphalt paving ..........................
Ethylene production plants .....................
Compliance schedules and final compliance dates.
Graphic arts systems ..............................
Manufacture of synthesized pharmaceutical products.
Manufacture of pneumatic rubber tires ...
Synthetic organic chemical and polymer
manufacturing—fugitive sources.
Manufacture of surface active agents ....
Aerospace manufacturing and rework ....
Mobile equipment repair and refinishing
4/10/99
6/10/00
8/3/91
6/25/01; 66 FR 33645 ............
7/20/01; 66 FR 37908 ............
8/11/92; 57 FR 35777 ............
(c)(155).
(c)(152).
(c)(79).
6/20/81
9/5/98
1/19/83; 48 FR 2319 ..............
7/26/00; 65 FR 45920 ............
(c)(48).
(c)(147).
6/20/81
1/19/83; 48 FR 2319 ..............
(c)(48).
8/13/83
8/3/91
8/3/91
8/3/91
7/27/84;
8/11/92;
8/11/92;
8/11/92;
............
............
............
............
(c)(60).
(c)(79).
(c)(79).
(c)(79).
5/23/94
12/22/94; 59 FR 65971 ..........
(c)(94).
12/22/01
8/13/83
8/1/79
5/23/92
1/16/03; 68 FR 2208 ..............
7/27/84; 49 FR 30183 ............
5/20/80 ....................................
12/22/94; 59 FR 65971 ..........
(c)(195)(i)(B)(2).
(c)(60).
(c)(22).
(c)(94).
9/5/98
8/3/91
7/26/00; 65 FR 45920 ............
8/11/92; 57 FR 35777 ............
(c)(147).
(c)(79).
5/23/92
5/23/92
12/22/94; 59 FR 65971 ..........
12/22/94; 59 FR 65971 ..........
(c)(94).
(c)(94).
5/23/92
4/10/99
11/27/99
12/22/94; 59 FR 65971 ..........
6/25/01; 66 FR 33645 ............
8/14/00; 65 FR 49501 ............
(c)(94).
(c)(155).
(c)(148).
9/28/91
9/28/93; 58 FR 50517 ............
(c)(84).
4/10/99
5/21/01; 66 FR 27875 ............
(c)(153).
49
57
57
57
FR
FR
FR
FR
30183
35777
35777
35777
Mobile Sources
Section 129.81 .........
Section 129.82 .........
Organic liquid cargo vessel loading and
ballasting.
Control of VOCs from gasoline dispensing facilities (Stage II).
Stationary Sources of NOX and VOCs
Section 129.91 .........
Section 129.92 .........
Section 129.93 [Except for
129.93(c)(6 & 7)].
Section 129.94 .........
Section 129.95 .........
VerDate jul<14>2003
Control of major sources of NOX and
VOCs.
RACT proposal requirements .................
Presumptive RAC emission limitations ...
NOX RACT emission averaging general
requirements.
Recordkeeping ........................................
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00009
Fmt 4701
6/10/00
7/20/01; 66 FR 37908 ............
(c)(152).
4/23/94
4/23/94
3/23/98; 63 FR 13789 ............
3/23/98; 63 FR 13789 ............
(c)(129).
(c)(129).
4/23/94
3/23/98; 63 FR 13789 ............
(c)(129).
4/23/94
3/23/98; 63 FR 13789 ............
(c)(129).
Sfmt 4700
E:\FR\FM\25FER2.SGM
25FER2
9458
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued
State citation
State
effective
date
Title subject
EPA approval date
Additional explanation/
§ 52.2063 citation
Wood Furniture Manufacturing Operations
Section
Section
Section
Section
129.101
129.102
129.103
129.104
.......
.......
.......
.......
Section 129.105 .......
Section 129.106 .......
Section 129.107 .......
General provisions and applicability .......
Emission standards .................................
Work practice standards .........................
Compliance procedures and monitoring
requirements.
Recordkeeping requirements ..................
Reporting requirements ..........................
Special provisions for facilities using an
emissions averaging approach.
6/10/00
6/10/00
6/10/00
6/10/00
7/20/01;
7/20/01;
7/20/01;
7/20/01;
66
66
66
66
FR
FR
FR
FR
37908
37908
37908
37908
............
............
............
............
(c)(152).
(c)(152).
(c)(152).
(c)(152).
6/10/00
6/10/00
6/10/00
7/20/01; 66 FR 37908 ............
7/20/01; 66 FR 37908 ............
7/20/01; 66 FR 37908 ............
(c)(152).
(c)(152).
(c)(152).
Chapter 130 Standards for Products
Subchapter A Portable Fuel Containers
Section 130.101 .......
Applicability .............................................
10/5/02
12/8/04; 69 FR 70893 ............
Section 130.102 .......
Definitions ...............................................
10/5/02
12/8/04; 69 FR 70893 ............
Section 130.103 .......
10/5/02
12/8/04; 69 FR 70893 ............
Section 130.104 .......
Performance Standards for portable fuel
containers and spill-proof spouts.
Exemptions .............................................
10/5/02
12/8/04; 69 FR 70893 ............
Section 130.105 .......
Innovative products .................................
10/5/02
12/8/04; 69 FR 70893 ............
Section 130.106 .......
Administrative requirements ...................
10/5.02
12/8/04; 69 FR 70893 ............
Section 130.107 .......
Variances ................................................
10/5/02
12/8/04; 69 FR 70893 ............
Section 130.108 .......
Test procedures ......................................
10/05/02
12/8/04; 69 FR 70893 ............
(c)(229); The SIP-effective
date is 2/7/05.
(c)(229); The SIP-effective
date is 2/7/05.
(c)(229); The SIP-effective
date is 2/7/05.
(c)(229); The SIP-effective
date is 2/7/05.
(c)(229); The SIP-effective
date is 2/7/05.
(c)(229); The SIP-effective
date is 2/7/05.
(c)(229); The SIP-effective
date is 2/7/05.
(c)(229); The SIP-effective
date is 2/7/05.
Subchapter B. Consumer Products
General Provisions
Section 130.201 .......
Applicability .............................................
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.202 .......
Definitions ...............................................
10/5/02
12/8/04, 69 FR 70895 ............
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
Standard
Section 130.211 .......
Table of standards ..................................
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.212 .......
Products diluted prior to use ...................
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.213 .......
Products registered under FIFRA ...........
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.214 .......
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.215 .......
Requirements for charcoal lighter materials.
Requirements for aerosol adhesives ......
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.216 .......
Requirements for floor wax strippers ......
10/5/02
12/8/04, 69 FR 70895 ............
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
Exemptions
Section 130.331 .......
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.332 .......
Products for shipment and use outside
this Commonwealth.
Antiperspirants and deodorants ..............
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.333 .......
LVP–VOC ................................................
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.334 .......
Products registered under FIFRA ...........
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.335 .......
Air fresheners ..........................................
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.336 .......
Adhesives ................................................
10/5/02
12/8/04, 69 FR 70895 ............
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00010
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
25FER2
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9459
(1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued
State
effective
date
State citation
Title subject
Section 130.337 .......
Bait station insecticides ..........................
10/5/02
EPA approval date
12/8/04, 69 FR 70895 ............
Additional explanation/
§ 52.2063 citation
(c)(230); The SIP-effective
date is 2/7/05.
Innovative Products
Section 130.351 .......
Innovative products exemption ...............
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.352 .......
Request for exemption ............................
10/5/02
12/8/04, 69 FR 70895 ............
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
Administrative Requirements
Section 130.371 .......
Code-dating .............................................
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.372 .......
Most restrictive limit ................................
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.373 .......
Additional labeling requirements for aerosol adhesives.
10/5/02
12/8/04, 69 FR 70895 ............
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
Reporting Requirements
Section 130.391 .......
Section 130.392 .......
Required reporting of information to the
Department.
Confidentiality ..........................................
10/5/02
12/8/04, 69 FR 70895 ............
10/5/02
12/8/04, 69 FR 70895 ............
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
Variances
Section 130.411 .......
Application for variance ..........................
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.412 .......
Variance orders .......................................
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.413 .......
Termination of variance ..........................
10/5/02
12/8/04, 69 FR 70895 ............
Section 130.414 .......
Modification of variance ..........................
10/5/02
12/8/04; 69 FR 70895 ............
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
Test Methods
Section 130.431 .......
Testing for compliance ............................
10/5/02
12/8/04; 69 FR 70895 ............
(c)(230); The SIP-effective
date is 2/7/05.
ACP for Consumer Products
Section 130.451 .......
Alternative methods of compliance .........
10/5/02
12/8/04; 69 FR 70895 ............
Section 130.452 .......
Exemption ...............................................
10/5/02
12/8/04; 69 FR 70895 ............
Section 130.453 .......
Request for exemption ............................
10/5/02
12/8/04; 69 FR 70895 ............
Section 130.454 .......
Application for an ACP ...........................
10/5/02
12/8/04; 69 FR 70895 ............
Section 130.455 .......
Recordkeeping and availability of requested information.
Surplus reductions and surplus trading ..
10/5/02
12/8/04; 69 FR 70895 ............
10/5/02
12/8/04; 69 FR 70895 ............
Limited-use surplus reduction credits for
early reformulations of ACP products.
Reconciliation of shortfalls ......................
10/5/02
12/8/04; 69 FR 70895 ............
10/5/02
12/8/04; 69 FR 70895 ............
Notification of modifications to an ACP
by the responsible ACP party.
Modifications that require Department
preapproval.
Other modifications .................................
10/5/02
12/8/04; 69 FR 70895 ............
10/5/02
12/8/04; 69 FR 70895 ............
10/5/02
12/8/04; 69 FR 70895 ............
Modification of an ACP by the Department.
Cancellation of an ACP ..........................
10/5/02
12/8/04; 69 FR 70895 ............
10/5/02
12/8/04; 69 FR 70895 ............
Section 130.456 .......
Section 130.457 .......
Section 130.458 .......
Section 130.459 .......
Section 130.460 .......
Section 130.461 .......
Section 130.462 .......
Section 130.463 .......
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00011
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
25FER2
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
9460
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued
State
effective
date
State citation
Title subject
EPA approval date
Section 130.464 .......
Treatment of information .........................
10/5/02
12/8/04; 69 FR 70895 ............
Section 130.465 .......
Other applicable requirements ................
10/5/02
12/8/04; 69 FR 70895 ............
Additional explanation/
§ 52.2063 citation
(c)(230); The SIP-effective
date is 2/7/05.
(c)(230); The SIP-effective
date is 2/7/05.
Public Hearing Requirements
Section 130.471 .......
Public hearings .......................................
Subchapter C
Section
Section
Section
Section
Section
Section
Section
Section
Section
130.601
130.602
130.603
130.604
130.605
130.606
130.607
130.608
130.609
.......
.......
.......
.......
.......
.......
.......
.......
.......
Section 130.610 .......
Section 130.611 .......
10/5/02
12/8/04; 69 FR 70895 ............
Architectural and Industrial Maintenance Coatings
Applicability .............................................
Definitions ...............................................
Standards ................................................
Container labeling requirements .............
Reporting requirements ..........................
Application for variance ..........................
Variance orders .......................................
Termination of variance ..........................
Extension, modification or revocation of
variance.
Public hearings .......................................
Compliance provisions and test methods
Chapter 131
10/25/03
10/25/03
10/25/03
10/25/03
10/25/03
10/25/03
10/25/03
10/25/03
10/25/03
11/23/04;
11/23/04;
11/23/04;
11/23/04;
11/23/04;
11/23/04;
11/23/04;
11/23/04;
11/23/04;
69
69
69
69
69
69
69
69
69
FR
FR
FR
FR
FR
FR
FR
FR
FR
68080
68080
68080
68080
68080
68080
68080
68080
68080
..........
..........
..........
..........
..........
..........
..........
..........
..........
(c)(227).
(c)(227).
(c)(227).
(c)(227).
(c)(227).
(c)(227).
(c)(227).
(c)(227).
(c)(227).
10/25/03
10/25/03
11/23/04; 69 FR 68080 ..........
11/23/04; 69 FR 68080 ..........
(c)(227).
(c)(227).
Ambient Air Quality Standards
Section 131.1 ...........
Section 131.2 ...........
Section 131.3 ...........
Purpose ...................................................
National Ambient Air Quality Standards
Ambient air quality standards .................
3/20/72
3/20/72
8/13/83
5/31/72; 37 FR 10842 ............
5/31/72; 37 FR 10842 ............
7/27/84; 49 FR 30183 ............
Section 131.4 ...........
Application for ambient air quality standards.
3/20/72
5/31/72; 37 FR 10842 ............
Chapter 135
Section
Section
Section
Section
Section
135.1
135.2
135.3
135.4
135.5
...........
...........
...........
...........
...........
(c)(230); The SIP-effective
date is 2/7/05.
Defintions ................................................
Applicability [of sources] .........................
Reporting .................................................
Reporting forms and guides ...................
Recordkeeping ........................................
(c)(1).
(c)(1).
(c)(60); Amendment removed
a lead standard provision.
The remaining standards
are not SIP-related.
(c)(1).
Reporting of Sources
General
3/20/72
3/20/72
3/20/72
3/20/72
10/10/92
5/31/72;
5/31/72;
5/31/72;
5/31/72;
1/12/95;
37
37
37
37
60
FR
FR
FR
FR
FR
10842 ............
10842 ............
10842 ............
10842 ............
2081 ..............
(c)(1).
(c)(1).
(c)(1).
(c)(1).
(c)(96).
1.12.95; 60 FR 2081 ..............
(c)(96).
Emission Statements
Section 135.21 .........
Emission statements ...............................
10/10/92
Chapter 137
Section
Section
Section
Section
Section
137.1
137.2
137.3
137.4
137.5
...........
...........
...........
...........
...........
Purpose ...................................................
Monitoring facilities .................................
Episode criteria .......................................
Standby plans .........................................
Implementation of emission reduction
procedures.
Air Pollution Episodes
General
1/28/72
1/28/72
6/9/90
12/27/97
1/28/72
5.31.72;
5.31.72;
6/16/93;
6/11/02;
5/31/72;
37
37
58
67
37
FR
FR
FR
FR
FR
10842
10842
33203
39854
10842
............
............
............
............
............
(c)(1).
(c)(1).
(c)(75).
(c)(189).
(c)(1).
5/31/72;
5/31/72;
5/31/72;
5/31/72;
37
37
37
37
FR
FR
FR
FR
10842
10842
10842
10842
............
............
............
............
(c)(1).
(c)(1).
(c)(1).
(c)(1).
Level Actions
Section
Section
Section
Section
137.11
137.12
137.13
137.14
.........
.........
.........
.........
Forecast level actions .............................
Alert level actions ....................................
Warning level actions ..............................
Emergency level actions .........................
1/28/72
1/28/72
1/28/72
1/28/72
Chapter 139 Sampling and Testing
Subchapter A. Sampling and Testing Methods and Procedures
General
Section 139.1 ...........
VerDate jul<14>2003
Sampling by facilities ..............................
20:37 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00012
Fmt 4701
3/20/72
Sfmt 4700
5/31/72; 37 FR 10842 ............
E:\FR\FM\25FER2.SGM
25FER2
(c)(1).
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9461
(1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued
State
effective
date
State citation
Title subject
EPA approval date
Section 139.2 ...........
Section 139.3 ...........
Sampling by others .................................
General requirements .............................
3/20/72
8/1/79
5/31/72; 37 FR 10842 ............
8/8/79; 44 FR 46465 ..............
Section 139.4 ...........
Section 139.5 ...........
References ..............................................
Revisions to the source testing manual
and continuous source monitoring
manual.
6/10/00
11/26/94
7/20/01; 66 FR 37908 ............
7/30/96; 61 FR 39497 ............
Additional explanation/
§ 52.2063 citation
(c)(1).
(c)(20); Correction published
1/23/80 (45 FR 5303).
(c)(152).
(c)(110)(i)(D).
Stationary Sources
Section 139.11 .........
Section 139.12 .........
Section 139.13 (Except Provisions applicable to H2S
and TRS).
Section 139.14 .........
Section 139.16 .........
Section 139.17 .........
Section 139.18 .........
General requirements .............................
Emissions of particulate matter ..............
Emissions of SO2, H2S, TRS and NO2 ...
3/20/72
3/7/98
11/26/94
Emissions of VOCs .................................
Sulfur in fuel oil .......................................
General requirements .............................
Calculation of alternative opacity limitations.
6/10/00
8/13/83
6/20/81
6/20/81
5/31/72; 37 FR 10842 ............
6/11/02; 67 FR 39854 ............
7/30/96; 61 FR 39497 ............
(c)(1).
(c)(189).
(c)(110)(i)(D).
7/20/01;
7/27/84;
1/19/83;
1/19/83;
(c)(152).
(c)(60).
(c)(48).
(c)(48).
66
49
48
48
FR
FR
FR
FR
37908 ............
30183 ............
2319 ..............
2319 ..............
Ambient Levels of Air Contaminants
Section 139.31 .........
Section 139.32 .........
Section 139.33 .........
General ...................................................
Sampling and analytical procedures .......
Incorporation of Federal procedures ......
3/20/72
11/26/94
3/20/72
5/31/72; 37 FR 10842 ............
7/30/96; 61 FR 39497 ............
5/31/72; 37 FR 10842 ............
(c)(1).
(c)(110)(i)(D).
(c)(1).
Subchapter B. Monitoring Duties of Certain Sources
General
Section 139.51 .........
Section 139.52 .........
Section 139.53 .........
Purpose ...................................................
Monitoring methods and techniques .......
Filing monitoring reports .........................
8/29/77
8/29/77
8/31/83
7/17/79; 44 FR 41429 ............
7/17/79; 44 FR 41429 ............
7/27/84; 49 FR 30183 ............
(c)(19).
(c)(19).
(c)(60).
Subchapter C. Requirements for Continuous In-Stack Monitoring for Stationary Sources
Section
Section
Section
Section
139.101
139.102
139.103
139.111
.......
.......
.......
.......
General Requirements ............................
References ..............................................
Opacity monitoring requirements ............
Waste incinerator monitoring requirements.
3/7/98
11/26/94
11/26/94
12/27/97
Chapter 141
Section 141.1 ...........
6/11/02;
7/30/96;
7/30/96;
6/11/02;
67
61
61
67
FR
FR
FR
FR
39854
39497
39497
39854
............
............
............
............
(c)(189).
(c)(110)(i)(D).
(c)(110)(i)(D).
(c)(189).
Alternate Standards
Imposing alternate standards authorized
5/14/88
9/17/92; 57 FR 42894 ............
(c)(73).
Chapter 145 Interstate Pollution Transport Reduction
Subchapter A. NOX Budget Trading Program
General Provisions
Section 145.1 ...........
Section 145.2 ...........
Section 145.3 ...........
Section
Section
Section
Section
145.4
145.5
145.6
145.7
...........
...........
...........
...........
Purpose ...................................................
Definitions ...............................................
Measurements, abbreviations and acronyms.
Applicability .............................................
Retired unit exemption ............................
Standard requirements ...........................
Computation of time ................................
9/23/00
9/23/00
9/23/00
8/21/01; 66 FR 43795 ............
8/21/01; 66 FR 43795 ............
8/21/01; 66 FR 43795 ............
(c)(168).
(c)(168).
(c)(168).
9/23/00
9/23/00
9/23/00
9/23/00
8/21/01;
8/21/01;
8/21/01;
8/21/01;
............
............
............
............
(c)(168).
(c)(168).
(c)(168).
(c)(168).
9/23/00
8/21/01; 66 FR 43795 ............
(c)(168).
9/23/00
8/21/01; 66 FR 43795 ............
(c)(168).
66
66
66
66
FR
FR
FR
FR
43795
43795
43795
43795
NOx Account
Section 145.10 .........
Section 145.11 .........
VerDate jul<14>2003
Authorization and responsibilities of the
NOX authorized account representative.
Alternate NOX authorized account representative.
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00013
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
25FER2
9462
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued
State
effective
date
State citation
Title subject
Section 145.12 .........
Changing the NOX authorized account
representative; and changes in the Alternate NOX authorized account representative; changes in the owners
and operators.
Account certificate of representation ......
Objections concerning the NOX authorized account representative.
Section 145.13 .........
Section 145.14 .........
EPA approval date
Additional explanation/
§ 52.2063 citation
9/23/00
8/21/01; 66 FR 43795 ............
(c)(168).
9/23/00
9/23/00
8/21/01; 66 FR 43795 ............
8/21/01; 66 FR 43795 ............
(c)(168).
(c)(168).
Compliance Certification
Section 145.30 .........
Section 145.31 .........
Compliance certification report ...............
Department’s action on compliance certifications.
9/23/00
9/23/00
8/21/01; 66 FR 43795 ............
8/21/01; 66 FR 43795 ............
(c)(168).
(c)(168).
NOx Allowance Allocations
Section 145.40 .........
Section 145.41 .........
Section 145.42 .........
Section 145.43 .........
State Trading Program budget ...............
Timing Requirements for NOX allowance
allocations.
NOX Allowance allocations .....................
Compliance supplement pool .................
9/23/00
9/23/00
8/21/01; 66 FR 43795 ............
8/21/01; 66 FR 43795 ............
(c)(168).
(c)(168).
9/23/00
9/23/00
8/21/01; 66 FR 43795 ............
8/21/01; 66 FR 43795 ............
(c)(168).
(c)(168).
Accounting Process for Deposit Use and Transfer of Allowances
Section 145.50 .........
Section 145.51 .........
Section 145.52 .........
Section 145.53 .........
Section
Section
Section
Section
145.54
145.55
145.56
145.57
.........
.........
.........
.........
NOX Allowance Tracking System accounts.
Establishment of accounts ......................
NOX Allowance Tracking System responsibilities of NOX authorized account representative.
Recordation of NOX allowance allocations.
Compliance .............................................
Banking ...................................................
Account error ..........................................
Closing of general accounts ...................
9/23/00
8/21/01; 66 FR 43795 ............
(c)(168).
9/23/00
9/23/00
8/21/01; 66 FR 43795 ............
8/21/01; 66 FR 43795 ............
(c)(168).
(c)(168).
9/23/00
8/21/01; 66 FR 43795 ............
(c)(168).
9/23/00
9/23/00
9/23/00
9/23/00
8/21/01;
8/21/01;
8/21/01;
8/21/01;
............
............
............
............
(c)(168).
(c)(168).
(c)(168).
(c)(168).
8/21/01; 66 FR 43795 ............
8/21/01; 66 FR 43795 ............
8/21/01; 66 FR 43795 ............
(c)(168).
(c)(168).
(c)(168).
66
66
66
66
FR
FR
FR
FR
43795
43795
43795
43795
NOX Allowance Transfers
Section 145.60 .........
Section 145.61 .........
Section 145.62 .........
Submission of NOX allowance transfers
NOX transfer recordation ........................
Notification ..............................................
9/23/00
9/23/00
9/23/00
Recording and Recordkeeping Requirements
Section 145.70 .........
Section 145.71 .........
Section
Section
Section
Section
Section
145.72
145.73
145.74
145.75
145.76
.........
.........
.........
.........
.........
General monitoring requirements ...........
Initial certification and recertification procedures.
Out of control periods .............................
Notifications .............................................
Recordkeeping and reporting .................
Petitions ..................................................
Additional requirements to provide heat
input data.
9/23/00
9/23/00
8/21/01; 66 FR 43795 ............
8/21/01; 66 FR 43795 ............
(c)(168).
(c)(168).
9/23/00
9/23/00
9/23/00
9/23/00
9/23/00
8/21/01;
8/21/01;
8/21/01;
8/21/01;
8/21/01;
............
............
............
............
............
(c)(168).
(c)(168).
(c)(168).
(c)(168).
(c)(168).
9/23/00
9/23/00
9/23/00
8/21/01; 66 FR 43795 ............
8/21/01; 66 FR 43795 ............
8/21/01; 66 FR 43795 ............
(c)(168).
(c)(168).
(c)(168).
9/23/00
8/21/01; 66 FR 43795 ............
(c)(168).
9/23/00
9/23/00
9/23/00
8/21/01; 66 FR 43795 ............
8/21/01; 66 FR 43795 ............
8/21/01; 66 FR 43795 ............
(c)(168).
(c)(168).
(c)(168).
9/23/00
8/21/01; 66 FR 43795 ............
(c)(168).
66
66
66
66
66
FR
FR
FR
FR
FR
43795
43795
43795
43795
43795
OPT-In Process
Section 145.80 .........
Section 145.81 .........
Section 145.82 .........
Section 145.83 .........
Section 145.84 .........
Section 145.85 .........
Section 145.86 .........
Section 145.87 .........
VerDate jul<14>2003
Applicability for opt-in sources ................
Opt-in source general provisions ............
NOX authorized account representatives
for opt-in sources.
Applying for a NOX budget opt-in approval.
Opt-in process .........................................
NOX budget opt-in application contents
Opt-in source withdrawal from NOX
Budget Trading Program.
Opt-in unit change in regulatory status ..
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00014
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
25FER2
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9463
(1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued
State
effective
date
State citation
Title subject
Section 145.88 .........
NOX allowance allocations to opt-in
units.
9/23/00
EPA approval date
8/21/01; 66 FR 43795 ............
Additional explanation/
§ 52.2063 citation
(c)(168).
Emission Reduction Credit Provisions
Section 145.90 .........
Emission reduction credit provisions ......
9/23/00
8/21/01; 66 FR 43795 ............
(c)(168).
Interstate Pollution Transport Reduction Requirements
Section 145.100 .......
Applicability to upwind states ..................
9/23/00
8/21/01; 66 FR 43795 ............
(c)(168).
Title 67. Transportation
Part I. Department of Transportation
Subpart A. Vehicle Code Provisions
Article VII. Vehicle Characteristics
Chapter 175 Vehicle Equipment and Inspection
Subchapter A. General Provisions
175.2 ........................
Definitions ...............................................
9/27/97
6/17/99; 64 FR 32411 ............
175.11 ......................
Coordination of safety and emission inspection.
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139); Definition of ‘‘Temporary inspection approval
indicator’’.
(c)(139).
Subchapter B. Official Inspection Stations
175.29(f)(4) ..............
Obligations and responsibilities of stations.
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
Subchapter C. Certificate of Inspection
175.41(a), (b)(3), (c),
(d)(2)(ii), (d)(2)(iii),
(e)(5), (f)(4).
175.42 ......................
175.43 ......................
175.44 ......................
175.45 ......................
Procedure ................................................
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
Recording inspection ..............................
Security ...................................................
Ordering certificates of inspection ..........
Violation of use of certificate of inspection.
9/27/97
9/27/97
9/27/97
9/27/97
6/17/99;
6/17/99;
6/17/99;
6/17/99;
............
............
............
............
(c)(139).
(c)(139).
(c)(139).
(c)(139).
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
(c)(139).
(c)(139).
(c)(139).
64
64
64
64
FR
FR
FR
FR
32411
32411
32411
32411
Chapter 177 Enhanced Emission Inspection Program
Subchapter A. General Provisions
177.1 ........................
177.2 ........................
177.3 ........................
Purpose ...................................................
Application of equipment rules ...............
Definitions ...............................................
10/1/97
10/1/97
9/27/97
Implementation of Enhanced Emission Inspection Program
177.21 ......................
177.22 ......................
177.23 ......................
177.24 ......................
Cessation of current vehicle emission inspection program.
Commencement date ..............................
Notification of requirement for emission
inspection.
Program evaluation .................................
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
9/27/97
9/27/97
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
(c)(139).
(c)(139).
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
(c)(139).
(c)(139).
(c)(139).
I/M Program
177.51 ......................
177.52 ......................
177.53 ......................
Program requirements ............................
Emission inspection prerequisites ..........
Vehicle inspection process .....................
9/27/97
9/27/97
10/1/97
Subchapter B. Subject Vehicles
177.101 ....................
177.102 ....................
177.103 ....................
177.104 ....................
VerDate jul<14>2003
Subject vehicles ......................................
Inspection of vehicles reentering this
Commonwealth.
Used vehicles after sale or resale ..........
Vehicles registered in nondesignated
areas or other states.
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00015
Fmt 4701
10/1/97
9/27/97
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
(c)(139).
(c)(139).
9/27/97
9/27/97
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
(c)(139).
(c)(139).
Sfmt 4700
E:\FR\FM\25FER2.SGM
25FER2
9464
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued
State
effective
date
State citation
Title subject
177.105 ....................
Vehicles requiring emission inspection
due to change of address.
Repair technician training and certification.
177.106 ....................
EPA approval date
Additional explanation/
§ 52.2063 citation
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
Subchapter C. Emission Test Procedures and Emission Standards
General
177.201
177.202
177.203
177.204
....................
....................
....................
....................
General requirements .............................
Emission test equipment .........................
Test procedures ......................................
Emission standards .................................
9/27/97
9/27/97
9/27/97
9/27/97
6/17/99;
6/17/99;
6/17/99;
6/17/99;
64
64
64
64
FR
FR
FR
FR
32411
32411
32411
32411
............
............
............
............
(c)(139).
(c)(139).
(c)(139).
(c)(139).
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
9/27/97
9/27/97
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
(c)(139).
(c)(139).
Recall Provisions
177.231 ....................
177.232 ....................
177.233 ....................
requirements regarding manufacturer recall notices.
Compliance with recall notices ...............
Failure to comply ....................................
Emission Inspection Test Report
177.251 ....................
177.252 ....................
177.253 ....................
Record of test results ..............................
Emission inspection test report ...............
Responsibility of the station owner for
vehicles which fail the I/M test.
9/27/97
9/27/97
9/27/97
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
(c)(139).
(c)(139).
(c)(139).
6/17/99;
6/17/99;
6/17/99;
6/17/99;
............
............
............
............
(c)(139).
(c)(139).
(c)(139).
(c)(139).
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
(c)(139).
(c)(139).
Retest
177.271
177.272
177.273
177.274
....................
....................
....................
....................
Procedure ................................................
Prerequisites ...........................................
Content of repair data form ....................
Retest fees ..............................................
9/27/97
9/27/97
9/27/97
9/27/97
64
64
64
64
FR
FR
FR
FR
32411
32411
32411
32411
Issuance of Waiver
177.281 ....................
177.282 ....................
Issuance of waiver ..................................
Annual adjustment of minimum waiver
expenditure for enhanced emission inspection areas.
9/27/97
9/27/97
Certificates of Emission Inspection Procedures
177.291 ....................
177.292 ....................
Certificates of emission inspection procedures.
Recording inspection ..............................
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
9/27/97
9/27/97
9/27/97
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
(c)(139).
(c)(139).
(c)(139).
On-Road Testing
177.301 ....................
177.302 ....................
177.304 ....................
177.305 ....................
Authorization to conduct on-road emission testing.
On-road testing devices ..........................
Failure of on-road emission test .............
Failure to produce proof of correction of
on-road emission test failure.
Subchapter D. Official Emission Inspection Station Requirements
General
177.401
177.402
177.403
177.404
177.405
177.406
177.407
177.408
....................
....................
....................
....................
....................
....................
....................
....................
VerDate jul<14>2003
Appointment ............................................
Application ...............................................
Approval of emission inspection station
Required certificates and station signs ...
Emission inspection areas ......................
Tools and equipment ..............................
Hours of operation ..................................
Certified emission inspectors ..................
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00016
Fmt 4701
9/27/97
9/27/97
9/27/97
9/27/97
9/27/97
9/27/97
9/27/97
9/27/97
Sfmt 4700
6/17/99;
6/17/99;
6/17/99;
6/17/99;
6/17/99;
6/17/99;
6/17/99;
6/17/99;
64
64
64
64
64
64
64
64
FR
FR
FR
FR
FR
FR
FR
FR
32411
32411
32411
32411
32411
32411
32411
32411
E:\FR\FM\25FER2.SGM
............
............
............
............
............
............
............
............
25FER2
(c)(139).
(c)(139).
(c)(139).
(c)(139).
(c)(139).
(c)(139).
(c)(139).
(c)(139).
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9465
(1) EPA-APPROVED PENNSYLVANIA REGULATIONS—Continued
State citation
State
effective
date
Title subject
EPA approval date
Additional explanation/
§ 52.2063 citation
Obligations and Responsibilities of Station Owners/Agents
177.421 ....................
177.422 ....................
177.423 ....................
177.424 ....................
177.425 ....................
177.426 ....................
177.427 ....................
Obligations and responsibilities of station owners/agents.
Commonwealth basic and enhanced
emission inspection stations.
Fleet basic and enhanced emission inspection stations.
General emission inspection stations .....
Security ...................................................
Ordering certificates of emission inspection.
Violations of use of certificate of emission inspection.
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
9/27/97
9/27/97
9/27/97
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
(c)(139).
(c)(139).
(c)(139).
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
Quality Assurance
177.431 ....................
Quality assurance ...................................
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
Subchapter E. Equipment Manufacturers’ and Contractors’ Requirements and Obligations
Equipment Manufacturers’ Requirements
177.501
177.502
177.503
177.504
....................
....................
....................
....................
Equipment approval procedures .............
Service commitment ...............................
Performance commitment .......................
Revocation of approval ...........................
9/27/97
9/27/97
9/27/97
9/27/97
6/17/99;
6/17/99;
6/17/99;
6/17/99;
64
64
64
64
FR
FR
FR
FR
32411
32411
32411
32411
............
............
............
............
(c)(139).
(c)(139).
(c)(139).
(c)(139).
6/17/99; 64 FR 32411 ............
(c)(139).
Contractor Obligations
177.521 ....................
Contractor obligations and responsibilities.
9/27/97
Subchapter F. Schedule of Penalties and Hearing Procedure
Schedule of Penalties and Suspensions
177.602 ....................
177.603 ....................
Schedule of penalties for emission inspection stations.
Schedule of penalties for emission inspectors.
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
Schedule of Penalties for Certified Repair Technicians
177.605 ....................
177.606 ....................
Subsequent violations .............................
Multiple violations ....................................
9/27/97
9/27/97
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
(c)(139).
(c)(139).
Departmental Hearing Procedure
177.651 ....................
177.652 ....................
Notice of alleged violation and opportunity for a Department hearing.
Official documents ..................................
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
Restoration After Suspension
177.671 ....................
177.672 ....................
177.673 ....................
Restoration of certification of an emission inspector after suspension.
Restoration of certification of an emission inspection station after suspension.
Restoration of certification of certified repair technician after suspension.
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
Registration Recall Procedure for Violation of §§ 177.301–177.305 (Relating to On-Road Resting)
177.691 ....................
Appendix A ..............
Appendix B ..............
VerDate jul<14>2003
Registration Recall Committee ...............
Acceleration Simulation Mode: Pennsylvania Procedures, Standards, Equipment Specifications and Quality Control Requirements.
Department Procedures and Specifications.
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00017
Fmt 4701
9/27/97
9/27/97
6/17/99; 64 FR 32411 ............
6/17/99; 64 FR 32411 ............
(c)(139).
(c)(139).
9/27/97
6/17/99; 64 FR 32411 ............
(c)(139).
Sfmt 4700
E:\FR\FM\25FER2.SGM
25FER2
9466
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(2) EPA-APPROVED ALLEGHENY COUNTY HEALTH DEPARTMENT (ACHD) REGULATIONS
Article XX or XXI citation
Effective
date
Title/subject
EPA approval date
Additional explanation/
§ 52.2063 citation
Part A—General
2101.01 ....................
Short Titles ..............................................
10/20/95
11/14/02; 67 FR 68935 ..........
2101.02.a, .02.c .......
2101.03 ....................
Declaration of Policy and Purpose .........
Effective Date and Repealer ...................
10/20/95
10/20/95
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
2101.04 ....................
2101.05 ....................
2101.06 ....................
2101.07 (Except
paragraphs .07.c.2
and c.8).
2101.10 ....................
Existing Orders .......................................
Existing Permits and Licenses ................
Construction and Interpretation ..............
Administration and Organization .............
10/20/95
3/31/98
10/20/95
10/20/95
11/14/02; 67 FR 68935 ..........
8/30/04; 69 FR 52831 ............
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
In SIP at 52.2020(c)(92); citation change only at (c)(192).
(c)(192).
In SIP at (c)(92); citation
change only at (c)(192).
(c)(192).
52.2420(c)(209).
(c)(192).
(c)(192).
Ambient Air Quality Standards (Except:
PM10-County & Free silica portion; Pb
(1-hr & 8-hr avg.); settled particulates,
beryllium, sulfates, fluorides, and hydrogen sulfide).
Prohibition of Air Pollution ......................
Interstate Air Pollution .............................
Nuisances ...............................................
Circumvention .........................................
Definitions ...............................................
Definitions related to gasoline volatility ..
10/20/95
11/14/02; 67 FR 68935 ..........
(c)(192).
10/20/95
10/20/95
10/20/95
10/20/95
10/20/95
5/15/98
9/1/99
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
4/17/01; 66 FR 19724 ............
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(151).
2101.11
2101.12
2101.13
2101.14
2101.20
2101.20
....................
....................
....................
....................
....................
....................
Part B—Permits Generally
2102.01 ....................
2102.02 ....................
2102.03.a through .k
2102.04 ....................
2102.05 ....................
2102.06 ....................
2102.08 ....................
2102.10 ....................
Certification .............................................
Applicability .............................................
Permits Generally ...................................
Installation Permits ..................................
Installation Permits for New and Modified Major Sources.
Major Sources Locating in or Impacting
a Nonattainment Area.
Emission Offset Registration ..................
Installation Permit Application and Administration Fees.
10/20/95
10/20/95
10/20/95
10/20/95
10/20/95
11/14/02;
11/14/02;
11/14/02;
11/14/02;
11/14/02;
67
67
67
67
67
FR
FR
FR
FR
FR
68935
68935
68935
68935
68935
..........
..........
..........
..........
..........
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(192).
10/20/95
11/14/02; 67 FR 68935 ..........
(c)(192).
10/20/95
10/20/95
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
(c)(192).
(c)(192).
Part C—Operating Permits
2103.01 ....................
Transition ................................................
10/20/95
8/30/04; 69 FR 52831 ............
(c)(209).
Subpart 1—Operating Permits (All Major and Minor Permits)
2103.10.a.,b .............
2103.11 ....................
2103.12 ....................
2103.13 ....................
2103.14 ....................
2103.15 ....................
Applicability, Prohibitions, Records .........
Applications .............................................
Issuance, Standard Conditions ...............
Expiration, Renewals, Reactivation ........
Revisions, Amendments, Modifications ..
Reopenings, Revocations .......................
10/20/95
10/20/95
3/31/98
10/20/95
1/12/01
10/20/95
11/14/02; 67 FR 68935 ..........
8/30/04; 69 FR 52831 ............
8/30/04; 69 FR 52831 ............
8/30/04; 69 FR 52831 ............
8/30/04; 69 FR 52831 ............
8/30/04; 69 FR 52831 ............
(c)(192).
(c)(209).
(c)(209).
(c)(209).
(c)(209).
(c)(209).
Subpart 2—Additional Requirements for Major Permits
2103.20.b.4 ..............
Applicability, Prohibitions, Records .........
10/20/95
11/14/02; 67 FR 68935 ..........
(c)(192).
Part D—Pollutant Emission Standards
2104.01 ....................
2104.02 ....................
Visible Emissions ....................................
Particulate Mass Emissions ....................
10/20/95
8/15/97
11/14/02; 67 FR 68935 ..........
6/12/98; 63 FR 32126 ............
2104.03
2104.05
2104.06
2104.07
Sulfur Oxide Emissions ...........................
Materials Handling ..................................
Violations .................................................
Stack Heights ..........................................
7/10/03
10/20/95
10/20/95
10/20/95
7/21/04; 69 FR 43522 ............
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
....................
....................
....................
....................
(c)(192).
(c)(133)(i)(B)(1); Citation
changes approved on 11/
12/02 (67 FR 68935) at
(c)(192).
(c)(216)(i)(C).
(c)(192).
(c)(192).
(c)(192).
Part E—Source Emission and Operating Standards
2105.01 ....................
VerDate jul<14>2003
Equivalent Compliance Techniques .......
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00018
10/20/95
Fmt 4701
Sfmt 4700
11/14/02; 67 FR 68935 ..........
E:\FR\FM\25FER2.SGM
25FER2
(c)(192).
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9467
(2) EPA-APPROVED ALLEGHENY COUNTY HEALTH DEPARTMENT (ACHD) REGULATIONS—Continued
Article XX or XXI citation
Title/subject
2105.02 ....................
2105.03 ....................
2105.04 ....................
Other Requirements Not Affected ..........
Operation and Maintenance ...................
Temporary Shutdown of Incineration
Equipment.
Major Sources of Nitrogen Oxides and
Volatile Organic Compounds.
2105.06 ....................
Effective
date
EPA approval date
Additional explanation/
§ 52.2063 citation
10/20/95
10/20/95
10/20/95
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
(c)(192).
(c)(192).
(c)(192).
10/20/95
10/07/02; 67 FR 62389 ..........
(c)(157).
Subpart 1—VOC Sources
2105.10 ....................
2105.11 ....................
2105.12 ....................
2105.13 ....................
2105.14 ....................
2105.15 ....................
2105.16 ....................
2105.17 ....................
Article XX Section
532.
2105.19 ....................
Surface Coating Processes ....................
Graphic Arts Systems .............................
Volatile Organic Compound Storage
Tanks.
Gasoline Loading Facilities .....................
Gasoline Dispensing Facilities ................
Degreasing Operations ...........................
Cutback Asphalt Paving ..........................
Ethylene Production Processes ..............
Dry Cleaning Facilities ............................
10/20/95
10/20/95
10/20/95
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
(c)(192)
(c)(192)
(c)(192)
10/20/95
10/20/95
10/20/95
10/20/95
10/20/95
1/1/82
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
1/21/83; 48 FR 2768 ..............
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(49).
Synthetic Organic Chemical & Polymer
Manufacturing—Fugitive Sources.
10/20/95
11/14/02; 67 FR 68935 ..........
(c)(192).
Subpart 2—Slag, Coke, and Miscellaneous Sulfur Sources
2105.20 ....................
2105.21 ....................
Slag Quenching ......................................
Coke Ovens and Coke Oven Gas ..........
10/20/95
8/15/97
11/14/02; 67 FR 68935 ..........
6/12/98; 63 FR 32126 ............
2105.22 ....................
Miscellaneous Sulfur Emitting Processes
10/20/95
11/14/02; 67 FR 68935 ..........
(c)(192).
(c)(133); 1. EPA approved revisions effective 7/11/95 on
9/8/98 (63 FR 47434) at
(c)(135). 2. EPA approved
revisions effective 10/20/95
on 11/14/02 (67 FR 68935)
at (c)(192).
(c)(192).
Subpart 3—Incineration and Combustion Sources
2105.30 (except
paragraphs .b.3
and .f).
Incinerators .............................................
10/20/95
11/14/02; 67 FR 68935 ..........
(c)(192); Section 2105.30.f. is
Federally enforceable as
part of the applicable section 111(d) plan.
Subpart 4—Miscellaneous Fugitive Sources
2105.40
2105.41
2105.42
2105.43
2105.44
2105.45
2105.46
2105.47
2105.48
....................
....................
....................
....................
....................
....................
....................
....................
....................
2105.49.a, .b ............
Permit Source Premises .........................
Non-Permit Premises ..............................
Parking Lots and Roadways ...................
Permit Source Transport .........................
Non-Permit Source Transport .................
Construction and Land Clearing .............
Mining ......................................................
Demolition ...............................................
Areas Subject to Sections 2105.40
Through 2105.47.
Fugitive Emissions ..................................
10/20/95
10/20/95
10/20/95
10/20/95
10/20/95
10/20/95
10/20/95
10/20/95
10/20/95
11/14/02;
11/14/02;
11/14/02;
11/14/02;
11/14/02;
11/14/02;
11/14/02;
11/14/02;
11/14/02;
67
67
67
67
67
67
67
67
67
FR
FR
FR
FR
FR
FR
FR
FR
FR
68935
68935
68935
68935
68935
68935
68935
68935
68935
..........
..........
..........
..........
..........
..........
..........
..........
..........
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(192).
10/20/95
11/14/02; 67 FR 68935 ..........
(c)(192).
Subpart 5—Open Burning and Abrasive Blasting Sources
2105.50 (except
paragraph .50.d).
Article XX, Section
533.
Open Burning ..........................................
10/20/95
11/14/02; 67 FR 68935 ..........
(c)(192).
Abrasive Blasting ....................................
10/9/86
10/19/87; 51 FR 38758 ..........
(c)(69).
Subpart 7—Miscellaneous VOC Sources
2105.70 ....................
2105.71 ....................
2105.72 ....................
VerDate jul<14>2003
Petroleum Refineries ..............................
Pharmaceutical Products ........................
Manufacturer of Pneumatic Rubber Tires
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00019
10/20/95
10/20/95
10/20/95
Fmt 4701
Sfmt 4700
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
E:\FR\FM\25FER2.SGM
25FER2
(c)(192).
(c)(192).
(c)(192).
9468
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(2) EPA-APPROVED ALLEGHENY COUNTY HEALTH DEPARTMENT (ACHD) REGULATIONS—Continued
Article XX or XXI citation
Effective
date
Title/subject
EPA approval date
Additional explanation/
§ 52.2063 citation
Subpart 9—Transportation Related Sources
2105.90 ....................
Gasoline Volatility ...................................
5/15/98
9/1/99
4/17/01; 66 FR 19724 ............
(c)(151).
Part F—Air Pollution Episodes
2106.01
2106.02
2106.03
2106.04
2106.05
....................
....................
....................
....................
....................
Air Pollution Episode System .................
Air Pollution Source Curtailment Plans ..
Episode Criteria ......................................
Episode Actions ......................................
USX-Clairton Works PM–10 Self Audit
Emergency Action Plan.
10/20/95
10/20/95
10/20/95
10/20/95
8/15/97
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
6/12/98; 63 FR 32126 ............
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(133)(i)(B)(3).
Part G—Methods
2107.01 ....................
2107.02 ....................
2107.03 ....................
2107.04 (except
paragraph .04.h).
2107.05 ....................
2107.06 ....................
2107.07 ....................
2107.08 ....................
2107.10 ....................
2107.11 ....................
2107.15 ....................
2107.20.c, .g through
.j, .m and .n.
General ...................................................
Particulate Matter ....................................
Sulfur Oxides ..........................................
Volatile Organic Compounds ..................
10/20/95
10/20/95
10/20/95
10/20/95
1/14/02; 67 FR 68935 ............
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
(c)(192).
(c)(192).
(c)(192).
(c)(192).
Nitrogen Oxides ......................................
Incinerator Temperatures ........................
Coke Oven Emissions ............................
Coke Oven Gas ......................................
Sulfur Content of Coke ...........................
Visible Emissions ....................................
Gasoline Volatility and RFG ...................
Ambient Measurements ..........................
10/20/95
10/20/95
10/20/95
10/20/95
10/20/95
10/20/95
5/15/98
10/20/95
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
4/17/01; 66 FR 19724 ............
11/14/02; 67 FR 68935 ..........
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(151).
(c)(192).
Part H—Reporting, Testing & Monitoring
2108.01 ....................
2108.01.a. ................
2108.01.b .................
2108.01.c .................
2108.01.d .................
2108.01.e (Except
paragrphs e.1.A &
.B).
2108.01.f ..................
2108.01.g .................
2108.02 ....................
2108.03 ....................
2108.04 ....................
Reports Required ....................................
Termination of Operation ........................
Shutdown of Control Equipment .............
Breakdowns ............................................
Cold Start ................................................
Emissions Inventory Statements ............
10/20/95
10/20/95
10/20/95
10/20/95
10/20/95
10/20/95
11/14/02;
11/14/02;
11/14/02;
11/14/02;
11/14/02;
11/14/02;
67
67
67
67
67
67
FR
FR
FR
FR
FR
FR
68935
68935
68935
68935
68935
68935
..........
..........
..........
..........
..........
..........
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(192).
Orders .....................................................
Violations .................................................
Emissions Testing ...................................
Continuous Emissions Monitoring ..........
Ambient Monitoring .................................
10/20/95
10/20/95
10/20/95
10/20/95
10/20/95
11/14/02;
11/14/02;
11/14/02;
11/14/02;
11/14/02;
67
67
67
67
67
FR
FR
FR
FR
FR
68935
68935
68935
68935
68935
..........
..........
..........
..........
..........
(c)(192).
(c)(192).
(c)(192).
(c)(192).
(c)(192).
Part I—Enforcement
2109.01 ....................
2109.02 (except
paragraph .02.a.7).
2109.03a (introductory sentence), b.
through f..
2109.04 ....................
2109.05 ....................
2109.06 (Except
paragraphs
.06.a.2, .a.3, and
.a.4).
2109.10 ....................
2109.20 ....................
VerDate jul<14>2003
Inspections ..............................................
Remedies ................................................
10/20/95
10/20/95
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
(c)(192).
(c)(192).
Enforcement Orders ................................
10/20/95
11/14/02; 67 FR 68935 ..........
(c)(192).
Orders Establishing an Additional or
More Restrictive Standard.
Emergency Orders ..................................
Civil Proceedings ....................................
10/20/95
11/14/02; 67 FR 68935 ..........
(c)(192).
10/20/95
10/20/95
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
(c)(192).
(c)(192).
Appeals ...................................................
General Federal Conformity ...................
10/20/95
10/20/95
11/14/02; 67 FR 68935 ..........
11/14/02; 67 FR 68935 ..........
(c)(192).
(c)(192).
20:37 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00020
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
25FER2
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9469
(3) EPA-APPROVED PHILADELPHIA AMS REGULATIONS
Rule citation
Title/subject
State effective date
Title 3
Chapter 3–100 ...........
Chapter 3–200 (Except § 3–207(4)).
Chapter 3–300 ...........
EPA approval date
Additional explanation/
§ 52.2063 citation
Air Management Code
General Provisions .........................................
Prohibited Conduct .........................................
10/20/69 .....................
10/4/76 .......................
5/31/72; 37 FR 10842
6/4/79; 44 FR 31980 ..
(c)(1).
(c)(18).
Administrative Provisions ...............................
9/21/72 .......................
3/12/79; 44 FR 13480
(c)(15).
Regulation I—General Provisions
Section I .....................
Section II (Except portions of paragraph
II.B).
Section III ...................
Section IV ..................
Section V ...................
Section VI ..................
Section VII .................
Section VIII ................
Section IX ..................
Section XI.D ...............
Definitions .......................................................
Source Registration and Emission Reporting
4/29/70 .......................
5/4/74 .........................
5/31/72; 37 FR 10842
9/9/75; 40 FR 41787 ..
(c)(1).
(c)(12).
Testing and Test Methods .............................
Availability of Technology ..............................
Improvement and Plan ...................................
Pre-existing Regulations ................................
Circumvention ................................................
Severability .....................................................
Effective Date .................................................
Compliance with Federal Regulations—Stack
Height Regulations.
4/29/70
4/29/70
4/29/70
4/29/70
4/29/70
4/29/70
4/29/70
3/27/86
5/31/72;
5/31/72;
5/31/72;
5/31/72;
5/31/72;
5/31/72;
5/31/72;
1/23/89;
10842
10842
10842
10842
10842
10842
10842
3029 ..
(c)(1).
(c)(1).
(c)(1).
(c)(1).
(c)(1).
(c)(1).
(c)(1).
(c)(70).
4/29/70 .......................
4/29/70 .......................
5/4/74 .........................
8/27/81 .......................
5/31/72; 37 FR 10842
5/31/72; 37 FR 10842
9/9/75; 40 FR 41787 ..
4/16/82; 47 FR 16325
(c)(1).
(c)(1).
(c)(12).
(c)(43).
4/29/70 .......................
5/31/72; 37 FR 10842
(c)(1).
4/29/70 .......................
5/31/72; 37 FR 10842
(c)(1).
4/29/70 .......................
4/29/70 .......................
5/31/72; 37 FR 10842
5/31/72; 37 FR 10842
(c)(1).
(c)(1).
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
37
37
37
37
37
37
37
54
FR
FR
FR
FR
FR
FR
FR
FR
Regulation II—Air Contaminant and Particulate Matter Emissions
Section
Section
Section
Section
I .....................
II ....................
IV ..................
V ...................
Section VI ..................
Section VII .................
Section VIII ................
Table 1 .......................
No Title [General Provisions] .........................
Open Fires .....................................................
Visible Emissions ...........................................
Particulate Matter Emissions from the Burning of Fuels.
Selection of Fuel for Particulate Matter Emission Control.
Particulate Matter Emissions from Chemical,
Metallurgical, Mechanical and Other Processes.
Fugitive Dust ..................................................
No Title [Allowable Process Weight Emissions].
Regulation III—The Control of Emissions of Oxides and Sulfur Compounds
Section I .....................
Section II ....................
Section III ...................
No Title [General Provisions] .........................
Control of Emission of Sulfur Compounds ....
Control of Sulfur in Fuels ...............................
4/29/70 .......................
5/10/80 .......................
8/27/81 .......................
5/31/72; 37 FR 10842
9/17/81; 46 FR 46133
4/16/82; 47 FR 16325
(c)(1).
(c)(37).
(c)(43).
Regulation IV—Governing Air Pollution Control Measures During High Air Pollution Episodes
Section
Section
Section
Section
I .....................
II ....................
III ...................
IV ..................
Section V ...................
Section VI ..................
Section VII .................
Section VIII ................
Table I ........................
Table II .......................
Table III ......................
Table IV .....................
Definitions .......................................................
Declaration of Conditions ...............................
Termination of Conditions ..............................
Alert and Notification System by the Health
Commissioner and the Emergency Coordinator.
Advance Preparation for High Air Pollution
Episodes.
Actions and Restrictions ................................
Severability .....................................................
Effective Date .................................................
Minimum Abatement Strategies for Emission
Reduction Plans—Stage I Condition.
Minimum Abatement Strategies for Emission
Reduction Plans—Stage II Condition.
Minimum Abatement Strategies for Emission
Reduction Plans—Emergency Condition.
Emergency Business and Establishment List
2/5/71
2/5/71
2/5/71
2/5/71
.........................
.........................
.........................
.........................
10842
10842
10842
10842
(c)(1).
(c)(1).
(c)(1).
(c)(1).
2/5/71 .........................
5/31/72; 37 FR 10842
(c)(1).
2/5/71
2/5/71
2/5/71
2/5/71
5/31/72;
5/31/72;
5/31/72;
5/31/72;
10842
10842
10842
10842
(c)(1).
(c)(1).
(c)(1).
(c)(1).
2/5/71 .........................
5/31/72; 37 FR 10842
(c)(1).
2/5/71 .........................
5/31/72; 37 FR 10842
(c)(1).
2/5/71 .........................
5/31/72; 37 FR 10842
(c)(1).
.........................
.........................
.........................
.........................
5/31/72;
5/31/72;
5/31/72;
5/31/72;
37
37
37
37
37
37
37
37
FR
FR
FR
FR
FR
FR
FR
FR
Regulation V—Control of Emissions of Organic Substances From Stationary Sources
Section I (Except for
definitions related to
paragraphs V.C. &
V.D.).
VerDate jul<14>2003
Definitions .......................................................
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00021
Fmt 4701
11/28/86 .....................
Sfmt 4700
6/16/93; 58 FR 33200
E:\FR\FM\25FER2.SGM
25FER2
(c)(83).
9470
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(3) EPA-APPROVED PHILADELPHIA AMS REGULATIONS—Continued
Title/subject
Section I .....................
Section II ....................
Section III ...................
Section IV ..................
Section V (Except
paragraphs V.C and
V.D).
Section VI ..................
Section VII .................
Definitions .......................................................
Storage Tanks ................................................
Oil-Effluent Water Separator ..........................
Pumps and Compressors ..............................
Organic Material Loading ...............................
5/23/88
7/10/71
7/10/71
7/10/71
7/10/71
.......................
.......................
.......................
.......................
.......................
4/6/93; 48 FR 17778 ..
5/31/72; 37 FR 10842
5/31/72; 37 FR 10842
5/31/72; 37 FR 10842
5/31/72; 37 FR 10842
(c)(78).
(c)(1).
(c)(1).
(c)(1).
(c)(1).
7/10/71 .......................
7/10/71 .......................
5/31/72; 37 FR 10842
5/31/72; 37 FR 10842
(c)(1).
(c)(1).
7/10/71 .......................
7/10/71 .......................
11/28/86 .....................
5/31/72; 37 FR 10842
5/31/72; 37 FR 10842
6/16/93; 58 FR 33192
(c)(1).
(c)(1).
(c)(82).
XI ..................
XII .................
XIII ................
XXII ...............
Solvents ..........................................................
Processing of Photochemically Reactive Materials.
Architectural Coatings ....................................
Disposal of Solvents ......................................
Compliance with Pennsylvania Standards for
Volatile Organic Compounds (VOC).
Petroleum Solvent Dry Cleaning ....................
Pharmaceutical Tablet Coating ......................
Process Equipment Leaks .............................
Circumvention ................................................
4/12/93; 58 FR 19066
6/16/93; 58 FR 33200
4/6/93; 58 FR 17778 ..
5/31/72; 37 FR 10842
(c)(77).
(c)(83).
(c)(78).
(c)(1).
Section XXIII ..............
Severability .....................................................
5/31/72; 37 FR 10842
(c)(1).
Section XXIV ..............
Effective Date .................................................
11/28/86 .....................
11/28/86 .....................
5/23/98 .......................
7/10/71; recodified 5/
23/88.
7/10/71; recodified 5/
23/88.
7/10/71; recodified 5/
23/88.
5/31/72; 37 FR 10842
(c)(1).
Section VIII ................
Section IX ..................
Section X ...................
Section
Section
Section
Section
State effective date
Additional explanation/
§ 52.2063 citation
Rule citation
EPA approval date
Regulation VII—Control of Emissions of Nitrogen Oxides From Stationary Sources
Section
Section
Section
Section
Section
Section
Section
I .....................
II ....................
III ...................
IV ..................
V ...................
VI ..................
VII .................
Definitions .......................................................
Fuel Burning Equipment ................................
Nitric Acid Plants ............................................
Emissions Monitoring .....................................
Circumvention ................................................
Severability .....................................................
Effective Date .................................................
7/1/72 .........................
11/20/85 .....................
7/1/72 .........................
7/1/72 .........................
7/1/72 .........................
7/1/72 .........................
7/1/72 .........................
5/14/73;
1/14/87;
5/14/73;
5/14/73;
5/14/73;
5/14/73;
5/14/73;
38
52
38
38
38
38
38
FR
FR
FR
FR
FR
FR
FR
12696
1456 ..
12696
12696
12696
12696
12696
(c)(7).
(c)(65).
(c)(7).
(c)(7).
(c)(7).
(c)(7).
(c)(7).
Regulation VIII—Control of Emissions of Carbon Monoxide From Stationary Sources
Section
Section
Section
Section
Section
Section
I .....................
II ....................
III ...................
IV ..................
V ...................
VI ..................
Definitions .......................................................
General ...........................................................
Emissions Monitoring .....................................
Circumvention ................................................
Severability .....................................................
Effective Date .................................................
8/20/72
8/20/72
8/20/72
8/20/72
8/20/72
8/20/72
.......................
.......................
.......................
.......................
.......................
.......................
5/14/73;
5/14/73;
5/14/73;
5/14/73;
5/14/73;
5/14/73;
38
38
38
38
38
38
FR
FR
FR
FR
FR
FR
12696
12696
12696
12696
12696
12696
(c)(7).
(c)(7).
(c)(7).
(c)(7).
(c)(7).
(c)(7).
Regulation XI—Control of Emissions From Incinerators
Section I .....................
Section II ....................
Section III (Except
paragraph III.E.
(odors)).
Section IV ..................
Section V ...................
Section VI ..................
Section VII .................
Section VIII ................
Section IX ..................
Definitions .......................................................
General Provisions .........................................
Emissions Limitations .....................................
5/4/74 .........................
5/4/74 .........................
5/4/74 .........................
9/9/75; 40 FR 41787 ..
9/9/75; 40 FR 41787 ..
9/9/75; 40 FR 41787 ..
(c)(12).
(c)(12).
(c)(12).
Design ............................................................
Operation ........................................................
Permits and Licenses .....................................
Circumvention ................................................
Severability .....................................................
Effective Date .................................................
5/4/74
5/4/74
5/4/74
5/4/74
5/4/74
5/4/74
9/9/75;
9/9/75;
9/9/75;
9/9/75;
9/9/75;
9/9/75;
(c)(12).
(c)(12).
(c)(12).
(c)(12).
(c)(12).
(c)(12).
.........................
.........................
.........................
.........................
.........................
.........................
40
40
40
40
40
40
FR
FR
FR
FR
FR
FR
41787
41787
41787
41787
41787
41787
..
..
..
..
..
..
Regulation XIII—Construction, Modification, Reactivation and Operation of Sources
Section I .....................
Section II ....................
Introduction .....................................................
Program Adoption ..........................................
10/30/95 .....................
10/30/95 .....................
3/28/03; 68 FR 15059
3/28/03; 68 FR 15059
(d) EPA-approved source-specific
requirements.
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00022
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
25FER2
(c)(203).
(c)(203).
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9471
(1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR
VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)
Name of source
Permit No.
State
effective
date
County
EPA approval date
Additional explanation/§ 52.2063
citation
For exceptions, see the applicable paragraphs in 40 CFR 52.2063(c).
ARCO Chemical Company ....................
04–313–052 ...........
Beaver ...................
12/9/86
IMC Chemical Group ..............................
39–313–014 ...........
Lehigh ....................
12/10/86
Aristech Chemical Corp .........................
86–I–0024–P .........
Allegheny ...............
The Knoll Group .....................................
46–326–001A ........
Montgomery ...........
8/28/86
3/3/87
3/24/93
ESSROC Materials .................................
PA–48–0004A ........
Northampton ..........
12/20/94
Pennsylvania Power and Light Co.
(PP&L)—Brunner Island.
PPG Industries, Inc.—South Middleton
PA–67–2005 ..........
York .......................
12/22/94
OP–21–2002 ..........
Cumberland ...........
12/22/94
Stroehmann Bakeries—Dauphin County
PA–22–2003 ..........
Dauphin .................
12/22/94
General Electric Transportation Systems—Erie.
J.E. Baker Co. (Refractories)—York ......
OP–25–025 ............
Erie ........................
12/21/94
OP–67–2001 ..........
York .......................
12/22/94
Lafarge Corp ..........................................
OP–39–0011 ..........
Lehigh ....................
12/23/94
Lafarge Corp ..........................................
PA–39–0011A ........
Lehigh ....................
12/23/94
West Penn Power—Armstrong ..............
PA–03–000–023 ....
Armstrong ..............
12/29/94
West Penn Power—Armstrong ..............
PA–03–306–004 ....
Armstrong ..............
3/28/94
West Penn Power—Armstrong ..............
PA–03–306–006 ....
Armstrong ..............
11/22/94
Plain and Fancy Kitchens, Inc ...............
PA–38–318–019C
Lebanon .................
12/23/94
Stroehmann Bakeries—Bradford County
PA–08–0001 ..........
Bradford .................
2/9/95
Stroehmann Bakeries—Bradford County
OP–08–0001A .......
Bradford .................
2/9/95
Stroehmann Bakeries—Lycoming County.
Stroehmann Bakeries—Lycoming County.
Philadelphia Electric Co. (PECO)—
Eddystone.
Philadelphia Electric Co. (PECO)—
Eddystone.
Gilberton Power Co.—John Rich Memorial.
Bethlehem Steel—Coke and Chemical
Production.
Bethlehem Steel—Foundry ....................
PA–41–0001 ..........
Lycoming ................
2/9/95
OP–41–0001A .......
Lycoming ...............
2/9/95
OP23–0017 ............
Delaware ................
12/28/94
PA23–0017 ............
Delaware ................
12/28/94
OP–54–0004 ..........
Schuylkill ................
12/20/94
OP–48–0013 ..........
Northampton ..........
12/20/94
OP–48–0014 ..........
Northampton ..........
12/20/94
Bethlehem Steel—Structural Products ...
OP–48–0010 ..........
Northampton ..........
12/20/94
Bethlehem Steel—Forging .....................
OP–48–0015 ..........
Northampton ..........
12/20/94
Westwood Energy Properties, Inc. (CRS
Sirrine, Inc.).
PECO Energy Co.—Front Street ...........
OP–54–000–6 ........
Schuylkill ................
12/27/94
OP–46–0045 ..........
Montgomery ...........
3/31/95
Crawford
Furniture
Manufacturing
Corp.—Clarion County.
Schuylkill Energy Resources ..................
OP–16–021 ............
Clarion ...................
3/27/95
OP–54–0003 ..........
Schuylkill ................
5/19/95
Columbia Gas Transmission Corp.—Milford Compressor Station.
Texas Eastern Transmission Corp.—
Entriken Compressor Station.
OP–52–0001 ..........
Pike ........................
4/21/95
OP–31–2003 ..........
Huntingdon ............
5/16/95
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00023
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
5/16/90; 55 FR
20267.
5/16/90; 55 FR
20267.
6/16/93; 58 FR
33197.
10/19/93; 58 FR
53885.
08/08/95; 60 FR
40292.
08/08/95; 60 FR
40292.
08/08/95; 60 FR
40292.
08/08/95; 60 FR
40292.
08/08/95; 60 FR
40292.
08/08/95; 60 FR
40292.
08/08/95; 60 FR
40292.
08/08/95; 60 FR
40292.
08/08/95; 60 FR
40292.
08/08/95; 60 FR
40292.
08/08/95; 60 FR
40292.
08/08/95; 60 FR
40292.
08/10/95; 60 FR
40758.
08/10/95; 60 FR
40758.
08/10/95; 60 FR
40758.
08/10/95; 60 FR
40758.
09/08/95; 60 FR
46768.
09/08/95; 60 FR
46768.
09/08/95; 60 FR
46768.
09/08/95; 60 FR
46768.
09/08/95; 60 FR
46768.
09/08/95; 60 FR
46768.
09/08/95; 60 FR
46768.
09/08/95; 60 FR
46768.
09/08/95; 60 FR
46768.
09/08/95; 60 FR
46768.
09/08/95; 60 FR
46768.
09/08/95; 60 FR
46768.
09/08/95; 60 FR
46768.
25FER2
(c)(71).
(c)(72).
(c)(80).
(c)(87).
(c)(98)(i)(B)(1).
(c)(98)(i)(B)(2).
(c)(98)(i)(B)(3).
(c)(98)(i)(B)(4).
(c)(98)(i)(B)(5).
(c)(98)(i)(B)(6).
(c)(98)(i)(B)(7).
(c)(98)(i)(B)(7).
(c)(98)(i)(B)(8).
(c)(98)(i)(B)(8).
(c)(98)(i)(B)(8).
(c)(98)(i)(B)(9).
(c)(101)(i)(B).
(c)(101)(i)(B).
(c)(101)(i)(B).
(c)(101)(i)(B).
(c)(102)(i)(B)(1).
(c)(102)(i)(B)(1).
(c)(102)(i)(B)(2).
(c)(102)(i)(B)(3).
(c)(102)(i)(B)(3).
(c)(102)(i)(B)(3).
(c)(102)(i)(B)(3).
(c)(102)(i)(B)(4).
(c)(102)(i)(B)(5).
(c)(102)(i)(B)(6).
(c)(102)(i)(B)(7).
(c)(102)(i)(B)(9).
(c)(102)(i)(B)(10).
9472
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR
VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued
State
effective
date
Name of source
Permit No.
County
Columbia Gas Transmission Corp.—
Greencastle Compressor Station.
Lord Corporation—Aerospace Div .........
OP–28–2003 ..........
Franklin ..................
4/21/95
OP–25–095 ............
Erie ........................
3/30/95
Tennessee Gas Pipeline Co. (TENNECO)—Station 313.
PA–53–0001; OP–
53–0001; CP–
53–0001.
OP–14–0003 ..........
Potter .....................
11/27/95
Centre ....................
12/27/94
OP–14–309–009C
Centre ....................
5/5/94
OP–14–309–010A
Centre ....................
8/18/94
OP–14–309–037A
Centre ....................
5/5/94
OP–48–0001; PA–
48–0001A.
OP–05–2007 ..........
Northampton ..........
5/19/95
Bedford ..................
5/16/94
PA–36–2025 ..........
Lancaster ...............
5/16/95
PA–48–0005; PA–
48–0005A.
OP–48–0007 ..........
Northampton ..........
12/23/94
Northampton ..........
12/29/94
PA–47–0001; 47–
0001A.
PA–17–0001 ..........
Montour ..................
12/27/94
Clearfield ................
12/27/94
OP–04–000–044 ....
Beaver ...................
12/29/94
The Procter and Gamble Paper Products Company Mehoopany.
Columbia Gas Transmission Corp.—
Union City Compressor Station.
James River Corp.—Chambersburg ......
OP–66–0001; PA–
66–0001A.
OP–25–892 ............
Wyoming ................
12/20/94
Erie ........................
4/11/95
OP–28–2006 ..........
Franklin ..................
6/14/95
Appleton Papers, Inc.—Harrisburg ........
OP–21–2004 ..........
Cumberland ...........
5/24/95
Air Products and Chemicals, Inc.—Corporate R & D.
Elf Atochem North America, Inc.—King
of Prussia.
York City Sewer Authority (Wastewater
Treatment Plant).
Glasgow, Inc.—Ivy Rock ........................
OP–39–0008 ..........
Lehigh ....................
5/25/95
OP–46–0022 ..........
Montgomery ...........
6/27/95
OP–67–2013 ..........
York .......................
3/1/95
OP–46–0043 ..........
Montgomery ...........
6/7/95
Glasgow, Inc.—Spring House ................
OP–46–0029 ..........
Montgomery ...........
6/7/95
Glasgow, Inc.—Catanach .......................
OP–15–0021 ..........
Chester ..................
6/7/95
Glasgow, Inc.—Freeborn .......................
OP–23–0026 ..........
Delaware ................
6/7/95
UGI Utilities—Hunlock Creek .................
OP–40–0005; PA–
40–0005A.
PA–67–2009 ..........
Luzerne ..................
12/20/94
York .......................
8/17/95
CP–67–2009 ..........
York .......................
8/17/95
OP–18–0001; PA–
18–0001.
OP–53–0007 PA–
53–0007A.
PA–67–2006 ..........
Clinton ....................
7/18/95
Potter .....................
7/17/95
York .......................
8/25/95
PA–06–1036 ..........
Berks ......................
5/12/95
PA–06–315–001 ....
Berks ......................
6/4/92
Corning Asahi Video Products—State
College.
Corning Asahi Video Products—State
College.
Corning Asahi Video Products—State
College.
Corning Asahi Video Products—State
College.
Columbia Gas Transmission Corp.—
Easton Compressor Station.
Texas Eastern Transmission Corp.—
Bedford Compressor Station.
Texas Eastern Transmission Corp.—
Marietta Compressor Station.
Hercules Cement Co ..............................
ESSROC (formerly Lone Star Industries, Inc.).
Pennsylvania Power and Light Co.
(PP&L)—Montour.
Pennsylvania Electric Co. (PENELEC)—
Shawville.
Zinc Corp. of America—Potter Twp .......
Solar Turbines, Inc. (York Cogeneration
Facility).
Solar Turbines, Inc. (York Cogeneration
Facility).
Columbia Gas Transmission Corp.—
Renovo Compressor Station.
National Fuel Gas Supply Corp.—East
Fork Compressor Station.
York County Solid Waste & Refuse Authority (Y.C.R.R.C.).
W. R. Grace and Co.—FORMPAC Div.
W. R. Grace and Co.—Reading Plant ...
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00024
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
EPA approval date
09/08/95; 60 FR
46768.
09/08/95; 60 FR
46768.
04/09/96; 61 FR
15709.
04/09/96;
15709.
04/09/96;
15709.
04/09/96;
15709.
04/09/96;
15709.
04/09/96;
15709.
04/09/96;
15709.
04/09/96;
15709.
04/09/96;
15709.
04/09/96;
15709.
04/09/96;
15709.
04/09/96;
15709.
04/09/96;
15709.
04/09/96;
15709.
04/09/96;
15709.
02/12/96;
05303.
02/12/96;
05303.
02/12/96;
05303.
02/12/96;
05303.
02/12/96;
05303.
02/12/96;
05303.
02/12/96;
05303.
02/12/96;
05303.
02/12/96;
05303.
05/16/96;
24706.
05/16/96;
24706.
05/16/96;
24706.
05/16/96;
24706.
05/16/96;
24706.
05/16/96;
24706.
05/16/96;
24706.
05/16/96;
24706.
25FER2
Additional explanation/§ 52.2063
citation
(c)(102)(i)(B)(11).
(c)(102)(i)(B)(12).
(c)(103)(i)(B)(1).
61 FR
(c)(103)(i)(B)(2).
61 FR
(c)(103)(i)(B)(2).
61 FR
(c)(103)(i)(B)(2).
61 FR
(c)(103)(i)(B)(2).
61 FR
(c)(103)(i)(B)(3).
61 FR
(c)(103)(i)(B)(4).
61 FR
(c)(103)(i)(B)(5).
61 FR
(c)(103)(i)(B)(6).
61 FR
(c)(103)(i)(B)(7).
61 FR
(c)(103)(i)(B)(8).
61 FR
(c)(103)(i)(B)(9).
61 FR
(c)(103)(i)(B)(10).
61 FR
(c)(103)(i)(B)(11).
61 FR
(c)(103)(i)(B)(12).
61 FR
(c)(104)(i)(C)(1).
61 FR
(c)(104)(i)(C)(2).
61 FR
(c)(104)(i)(C)(3).
61 FR
(c)(104)(i)(C)(4).
61 FR
(c)(104)(i)(C)(5).
61 FR
(c)(104)(i)(C)(6).
61 FR
(c)(104)(i)(C)(7).
61 FR
(c)(104)(i)(C)(8).
61 FR
(c)(104)(i)(C)(9).
61 FR
(c)(108)(i)(B)(1).
61 FR
(c)(108)(i)(B)(2).
61 FR
(c)(108)(i)(B)(2).
61 FR
(c)(108)(i)(B)(3).
61 FR
(c)(108)(i)(B)(4).
61 FR
(c)(108)(i)(B)(5).
61 FR
(c)(108)(i)(B)(6).
61 FR
(c)(108)(i)(B)(6).
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9473
(1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR
VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued
State
effective
date
Name of source
Permit No.
County
CNG Transmission Corp.—Cherry Tree
Sta..
EPC Power Corp. of Bethlehem (Crozer
Chester CoGen).
C–P Converters, Inc.—York ...................
PA–32–000–303 ....
Indiana ...................
7/5/95
OP–23–0007 ..........
Delaware ................
6/8/95
OP–67–2030 ..........
York .......................
8/30/95
Fisher Scientific Co. International—Indiana.
Adelphi Kitchens, Inc.—Robesonia Factory.
Birchcraft Kitchens, Inc.—Reading Factory.
Glasgow, Inc.—Bridgeport Asphalt Plant
OP–32–000–100 ....
Indiana ...................
7/18/95
OP–06–1001 ..........
Berks ......................
4/4/95
OP–06–1005 ..........
Berks ......................
4/4/95
OP–46–0044 ..........
Montgomery ...........
6/7/95
Caparo Steel Co.—Farrell ......................
OP–43–285 ............
Mercer ....................
11/3/95
Sharon Steel Corp.—Farrell ...................
OP–43–017 ............
Mercer ....................
11/3/95
DMi Furniture, Inc.—Timely Plant #7
(Gettysburg).
R.R. Donnelley and Sons Co.—Lancaster West Plant.
International
Paper
Company—
Hammermill Papers Division.
Lucent Technology (formerly AT&T
Corp.)—Reading.
Garden State Tanning, Inc.—Fleetwood
Plant.
Glidden Co., The—Reading ...................
OP–01–2001 ..........
Adams ....................
6/13/95
OP–36–2026 ..........
Lancaster ...............
7/14/95
OP–18–0005 ..........
Clinton ....................
12/27/94
PA–06–1003 ..........
Berks ......................
6/26/95
PA–06–1014 ..........
Berks ......................
6/21/95
OP–06–1035 ..........
Berks ......................
2/15/96
Maier’s Bakery—Reading Plant .............
PA–06–1023 ..........
Berks ......................
9/20/95
Morgan Corp.—Morgantown Plant .........
OP–06–1025 ..........
Berks ......................
8/31/95
Allentown Cement Co., Inc.—Evansville
Plant.
Quaker
Maid
(Schrock
Cabinet
Group)—Leesport.
Brentwood Industries, Inc.—Reading
Plant.
Metropolitan Edison Co. (MetEd)—Titus
Station.
ICI Fluoropolymers—Downingtown ........
PA–06–1002 ..........
Berks ......................
10/11/95
OP–06–1028 ..........
Berks ......................
10/27/95
PA–06–1006 ..........
Berks ......................
2/12/96
PA–06–1024 ..........
Berks ......................
3/9/95
PA–15–0009; CP–
15–0009.
PA–39–0007A ........
Chester ..................
10/3/95
Lehigh ....................
8/10/95
Bird-in-Hand Woodwork, Inc. (Childcraft
Education Corp.).
Heinz Pet Products—Bloomsburg ..........
OP–36–2022 ..........
Lancaster ...............
9/27/95
OP–19–0003 ..........
Columbia ................
11/27/95
Graco Children’s Products, Inc.—
Elverson.
Texas Eastern Transmission Corp.—
Bernville.
Texas Eastern Transmission Corp.—
Bechtelsville.
Carpenter Technology Corp.—Reading
Plant.
North American Fluoropolymers Co.
(NAFCO).
CNG Transmission Corp.—Ellisburg
Compressor Station.
CNG Transmission Corp.—Ellisburg
Compressor Station.
CNG Transmission Corp.—Ellisburg
Compressor Station.
CNG Transmission Corp.—Greenlick
Compressor Station.
OP–15–0006 ..........
Chester ..................
11/30/95
OP–06–1033 ..........
Berks ......................
1/31/97
OP–06–1034 ..........
Berks ......................
1/31/97
OP–06–1007 ..........
Berks ......................
9/27/96
06–1026; CP–06–
1026.
PA–53–0004A ........
Berks ......................
Potter .....................
4/19/95
6/1/95
2/29/96
OP–53–0004A .......
Potter .....................
2/29/96
CP–53–0004A .......
Potter .....................
2/29/96
PA–53–0003A ........
Potter .....................
12/18/95
Synthetic Thread Co., Inc.—Bethlehem
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00025
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
EPA approval date
05/16/96;
24706.
05/16/96;
24706.
05/16/96;
24706.
05/16/96;
24706.
05/16/96;
24706.
05/16/96;
24706.
05/16/96;
24706.
12/20/96;
67229.
12/20/96;
67229.
03/12/97;
11079.
03/12/97;
11079.
01/29/97;
04167.
04/18/97;
19051.
04/18/97;
19051.
04/18/97;
19051.
04/18/97;
19047.
04/18/97;
19047.
04/18/97;
19047.
04/18/97;
19047.
04/18/97;
19047.
04/18/97;
19047.
04/18/97;
19047.
04/18/97;
19047.
04/18/97;
19047.
08/21/97;
44413.
08/21/97;
44413.
04/18/97;
19049.
04/18/97;
19049.
04/18/97;
19049.
04/18/97;
19049.
06/11/97;
31732.
06/11/97;
31732.
06/11/97;
31732.
06/11/97;
31732.
25FER2
Additional explanation/§ 52.2063
citation
61 FR
(c)(108)(i)(B)(7)
61 FR
(c)(108)(i)(B)(8).
61 FR
(c)(108)(i)(B)(9).
61 FR
(c)(108)(i)(B)(10).
61 FR
(c)(108)(i)(B)(11).
61 FR
(c)(108)(i)(B)(12).
61 FR
(c)(108)(i)(B)(13).
61 FR
62 FR
(c)(113)(i)(B)(1);
52.2037(g).
(c)(113)(i)(B)(2);
52.2036(f);
52.2037(e).
(c)(114)(i)(B)(1).
62 FR
(c)(114)(i)(B)(2).
62 FR
(c)(115)(i)(B).
62 FR
(c)(117)(i)(B)(1).
62 FR
(c)(117)(i)(B)(2).
62 FR
(c)(117)(i)(B)(3).
62 FR
(c)(118)(i)(B)(1).
62 FR
(c)(118)(i)(B)(2).
62 FR
(c)(118)(i)(B)(3).
62 FR
(c)(118)(i)(B)(4).
62 FR
(c)(118)(i)(B)(5).
62 FR
(c)(118)(i)(B)(6).
62 FR
(c)(118)(i)(B)(7).
62 FR
(c)(118)(i)(B)(8).
62 FR
(c)(118)(i)(B)(9).
62 FR
(c)(119)(i)(B)(1).
62 FR
(c)(119)(i)(B)(2).
62 FR
(c)(120)(i)(B)(1).
62 FR
(c)(120)(i)(B)(2).
62 FR
62 FR
(c)(120)(i)(B)(3),
(ii)(B).
(c)(120)(i)(B)(4),
(ii)(B).
(c)(121)(i)(B)(1).
62 FR
(c)(121)(i)(B)(1).
62 FR
(c)(121)(i)(B)(1).
62 FR
(c)(121)(i)(B)(2).
61 FR
62 FR
9474
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR
VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued
State
effective
date
Name of source
Permit No.
County
CNG Transmission Corp.—Greenlick
Compressor Station.
CNG Transmission Corp.—Greenlick
Compressor Station.
CNG Transmission Corp.—Crayne Station.
CNG Transmission Corp.—State Line
Station.
CNG Transmission Corp.—Big Run Station.
Medusa Cement Company ....................
CP–53–0003A .......
Potter .....................
12/18/95
OP–53–0003A .......
Potter .....................
12/18/95
30–000–089 ...........
Greene ...................
12/22/95
OP–53–0003A .......
Potter .....................
1/10/96
PA–33–147 ............
Jefferson ................
6/27/95
OP–37–013 ............
Lawrence ...............
7/27/95
Keystone Cement Co. ............................
OP–48–0003 ..........
Northampton ..........
5/25/95
Lehigh Portland Cement Company ........
OP–67–2024 ..........
York .......................
5/26/95
Mercer Lime and Stone Company .........
OP–10–023 ............
Butler .....................
5/31/95
Con-Lime, Inc. ........................................
OP–14–0001 ..........
Centre ....................
6/30/95
Pennzoil Products Co.—Rouseville .......
PA–61–016 ............
Venango ................
9/8/95
R.R. Donnelley&Sons Co.—Lancaster
East Plant.
Panther Creek Partners .........................
OP–36–2027 ..........
Lancaster ...............
7/14/95
OP–13–0003 ..........
Carbon ...................
12/2/96
Allegro Microsystems, W.G., Inc.—Willow Grove.
Hale Products, Inc.—Conshohocken .....
OP–46–0006 ..........
Montgomery ...........
12/19/97
OP–46–0057 ..........
Montgomery ...........
11/21/97
Con-Lime, Inc.—Bellefonte ....................
OP–14–0001 ..........
Centre ....................
1/7/98
Coastal Aluminum Rolling Mills. Inc.—
Williamsport.
ABP/International Envelope Co. .............
OP–41–0007 ..........
Lycoming ...............
11/21/97
OP–15–0023 ..........
Chester ..................
11/2/95
Brown Printing Company .......................
CP–46–0018 ..........
Montgomery ...........
Fibre-Metal Products Company .............
OP–23–0025 ..........
Delaware ................
9/26/96
10/27/97
2/20/98
Finnaren & Haley, Inc. ...........................
OP–46–0070 ..........
Montgomery ...........
3/5/98
Fres-co System USA, Inc. ......................
OP–09–0027 ..........
Bucks .....................
3/5/98
Graphic Packaging Corporation .............
OP–15–0013 ..........
Chester ..................
2/28/98
Montour Oil Service Company, a division of Sun Company, Inc..
Atlantic Refining and Marketing Corp.
(Sun Co., Inc. (R & M)).
Transwall Corporation ............................
OP–41–0013 ..........
Lycoming ...............
3/19/98
OP–49–0015 ..........
Northampton ..........
3/19/98
OP–15–0025 ..........
Chester ..................
3/10/98
Tavo Packaging (formerly Mead Packaging Company).
CNG Transmission Corp.—Harrison
Compressor Station.
CNG Transmission Corp.—Harrison
Compressor Station.
CNG Transmission Corp.—Harrison
Compressor Station.
CNG Transmission Corp.—Leidy Station
OP–09–0008 ..........
Bucks .....................
11/8/95
PA–53–0005A ........
Potter .....................
4/16/96
OP–53–0005A .......
Potter .....................
4/16/96
CP–53–0005A .......
Potter .....................
4/16/96
PA–18–0004A ........
Clinton ....................
3/25/96
CNG Transmission Corp.—Leidy Compressor Station.
CNG Transmission Corp.—Leidy Station
OP–18–0004 ..........
Clinton ....................
2/29/96
CP–18–0004A .......
Clinton ....................
3/25/96
CNG Transmission Corp.—Sabinsville
Compressor Station.
PA–59–0002A ........
Tioga ......................
12/18/95
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00026
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
EPA approval date
06/11/97;
31732.
06/11/97;
31732.
06/11/97;
31732.
06/11/97;
31732.
06/11/97;
31732.
06/03/97;
30250.
06/03/97;
30250.
06/03/97;
30250.
06/03/97;
30250.
06/03/97;
30250.
06/11/97;
31738.
07/21/97;
33891.
09/29/97;
50871.
03/09/98;
11370.
03/09/98;
11370.
03/09/98;
11370.
03/09/98;
11370.
03/09/98;
11370.
03/09/98;
11370.
06/29/98;
35145.
06/29/98;
35145.
06/29/98;
35145.
06/29/98;
35145.
06/29/98;
35145.
06/29/98;
35145.
06/29/98;
35145.
06/29/98;
35145.
10/08/98;
54050.
10/08/98;
54050.
10/08/98;
54050.
10/08/98;
54050.
10/08/98;
54050.
10/08/98;
54050.
10/08/98;
54050.
25FER2
Additional explanation/§ 52.2063
citation
62 FR
(c)(121)(i)(B)(2).
62 FR
(c)(121)(i)(B)(2).
62 FR
(c)(121)(i)(B)(3).
62 FR
(c)(121)(i)(B)(4).
62 FR
(c)(121)(i)(B)(5).
62 FR
(c)(122)(i)(B)(1).
62 FR
(c)(122)(i)(B)(2).
62 FR
(c)(122)(i)(B)(3).
62 FR
(c)(122)(i)(B)(4).
62 FR
(c)(122)(i)(B)(5).
62 FR
(c)(124)(i)(B).
62 FR
62 FR
(c)(125)(i)(B);
52.2036j.
(c)(128)(i)(B).
63 FR
(c)(130)(i)(B)(1).
63 FR
(c)(130)(i)(B)(2).
63 FR
(c)(130)(i)(B)(3).
63 FR
(c)(130)(i)(B)(4).
63 FR
(c)(130)(i)(B)(5).
63 FR
(c)(130)(i)(B)(6).
63 FR
(c)(132)(i)(B)(1).
63 FR
(c)(132)(i)(B)(2).
63 FR
(c)(132)(i)(B)(3).
63 FR
(c)(132)(i)(B)(4).
63 FR
(c)(132)(i)(B)(5).
63 FR
(c)(132)(i)(B)(6).
63 FR
(c)(132)(i)(B)(7).
63 FR
(c)(132)(i)(B)(8).
63 FR
(c)(134)(i)(B)(1).
63 FR
(c)(134)(i)(B)(1).
63 FR
(c)(134)(i)(B)(1).
63 FR
(c)(134)(i)(B)(2).
63 FR
(c)(134)(i)(B)(2).
63 FR
(c)(134)(i)(B)(2).
63 FR
(c)(134)(i)(B)(3).
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9475
(1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR
VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued
State
effective
date
Name of source
Permit No.
County
CNG Transmission Corp.—Sabinsville
Compressor Station.
CNG Transmission Corp.—Sabinsville
Station.
CNG Transmission Corp.—Tioga Station.
Eldorado
Properties
Corp.—Northumberland Terminal.
Endura Products, Inc. .............................
OP–59–0002 ..........
Tioga ......................
12/18/95
CP–59–0002A .......
Tioga ......................
12/18/95
OP–59–0006 ..........
Tioga ......................
1/16/96
OP–49–0016 ..........
Northumberland .....
5/1/98
OP–09–0028 ..........
Bucks .....................
5/13/98
Ford Electronics & Refrigeration Company.
H & N Packaging., Inc. (formerly Paramount Packaging Corp.).
Lancaster County Solid Waste Management Authority.
Monsey Products Co.—Kimberton .........
OP–46–0036 ..........
Montgomery ...........
4/30/98
OP–09–0038 ..........
Bucks .....................
6/8/98
36–02013 ...............
Lancaster ...............
6/3/98
OP–15–0031 ..........
Chester ..................
6/4/98
Ortho-McNeil Pharamaceutical—Spring
House.
Piccari Press, Inc. ..................................
OP–46–0027 ..........
Montgomery ...........
6/4/98
OP–09–0040 ..........
Bucks .....................
4/29/98
Pierce and Stevens Corp.—Kimberton ..
OP–15–0011 ..........
Chester ..................
3/27/98
PQ Corporation—Chester ......................
OP–23–0016 ..........
Delaware ................
6/16/98
Reynolds Metals Company Downington
OP–15–0004 ..........
Chester ..................
5/8/98
Rhone-Poulenc Rorer Pharmaceutical,
Inc.
Superior Tube Company ........................
OP–46–0048B .......
Montgomery ...........
4/2/98
OP–46–0020 ..........
Montgomery ...........
4/17/98
Uniform Tubes Inc ..................................
OP–46–0046A .......
Montgomery ...........
3/26/98
U.S. Air Force—Willow Grove Air Reserve Station.
Naval Air Station, Joint Reserve Base—
Willow Grove.
Columbia Gas Transmission Corp.—
Artemas Compressor Station.
Columbia Gas Transmission Corp.—
Donegal Compressor Station.
Columbia Gas Transmission Corp.—
Gettysburg Compressor Station.
Columbia Gas Transmission Corp.—
Eagle Compressor Station.
Columbia Gas Transmission Corp.—
Downingtown.
GKN Sinter Metals, Inc. .........................
OP–46–0072 ..........
Montgomery ...........
5/1/98
OP–46–0079 ..........
Montgomery ...........
5/4/98
05–2006 .................
Bedford ..................
4/19/95
63–000–631 ...........
Washington ............
7/10/95
01–2003 .................
Adams ....................
4/21/95
OP–15–0022 ..........
Chester ..................
2/1/96
CP–15–0020 ..........
Chester ..................
9/15/95
OP–12–0002 ..........
Cameron ................
10/30/98
Cabinet Industries, Inc.—Water Street
Plant.
Springs Window Fashions Division, Inc.
OP–47–0005 ..........
Montour ..................
9/21/98
OP–41–0014 ..........
Lycoming ................
9/29/98
Centennial Printing Corp. .......................
OP–46–0068 ..........
Montgomery ...........
Strick Corp.—Danville ............................
OP–47–0002 ..........
Montour ..................
10/31/96
5/11/98
8/28/96
Handy and Harmon Tube Co.—Norristown.
Boeing Defense & Space Group—Helicopters Div.
Delaware County Regional Authority’s
Western Regional Treatment Plant
(DELCORA WRTP).
Delbar Products, Inc.—Perkasie ............
OP–46–0016 ..........
Montgomery ...........
9/25/95
CP–23–0009 ..........
Delaware ................
9/3/97
OP–23–0032 ..........
Delware ..................
3/12/97
5/16/97
OP–09–0025 ..........
Bucks .....................
2/1/96
Department of Public Welfare (NSH)—
Norristown.
OP–46–0060 ..........
Montgomery ...........
1/21/98
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00027
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
EPA approval date
10/08/98;
54050.
10/08/98;
54050.
10/08/98;
54050.
11/06/98;
59884.
11/06/98;
59884.
11/06/98;
59884.
11/06/98;
59884.
11/06/98;
59884.
11/06/98;
59884.
11/06/98;
59884.
11/06/98;
59884.
11/06/98;
59884.
11/06/98;
59884.
11/06/98;
59884.
11/06/98;
59884.
11/06/98;
59884.
11/06/98;
59884.
11/06/98;
59884.
11/06/98;
59884.
12/03/98;
66755.
12/03/98;
66755.
12/03/98;
66755.
12/03/98;
66755.
12/03/98;
66755.
04/16/99;
18821.
04/16/99;
18821.
04/16/99;
18821.
04/16/99;
18821.
04/16/99;
18821.
04/16/99;
18821.
12/15/00;
78418.
12/15/00;
78418.
Additional explanation/§ 52.2063
citation
63 FR
(c)(134)(i)(B)(3).
63 FR
(c)(134)(i)(B)(3).
63 FR
(c)(134)(i)(B)(4).
63 FR
(c)(136)(i)(B)(1).
63 FR
(c)(136)(i)(B)(2).
63 FR
(c)(136)(i)(B)(3).
63 FR
(c)(136)(i)(B)(4).
63 FR
(c)(136)(i)(B)(5).
63 FR
(c)(136)(i)(B)(6).
63 FR
(c)(136)(i)(B)(7).
63 FR
(c)(136)(i)(B)(8).
63 FR
(c)(136)(i)(B)(9).
63 FR
(c)(136)(i)(B)(10).
63 FR
(c)(136)(i)(B)(11).
63 FR
(c)(136)(i)(B)(12).
63 FR
(c)(136)(i)(B)(13).
63 FR
(c)(136)(i)(B)(14).
63 FR
(c)(136)(i)(B)(15).
63 FR
(c)(136)(i)(B)(16).
63 FR
(c)(137)(i)(B)(1).
63 FR
(c)(137)(i)(B)(2).
63 FR
(c)(137)(i)(B)(3).
63 FR
(c)(137)(i)(B)(4).
63 FR
(c)(137)(i)(B)(5).
64 FR
(c)(138)(i)(B)(1).
64 FR
(c)(138)(i)(B)(2).
64 FR
(c)(138)(i)(B)(3).
64 FR
(c)(138)(i)(B)(4).
64 FR
(c)(138)(i)(B)(5).
64 FR
(c)(138)(i)(B)(6).
65 FR
(c)(143)(i)(B)(1).
65 FR
(c)(143)(i)(B)(2).
12/15/00; 65 FR
78418.
12/15/00; 65 FR
78418.
(c)(143)(i)(B)(3).
25FER2
(c)(143)(i)(B)(4).
9476
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR
VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued
State
effective
date
Name of source
Permit No.
County
Dopaco, Inc.—Downingtown ..................
CP–15–0029 ..........
Chester ..................
3/6/96
Garlock, Inc. (Plastomer Products) ........
PA–09–0035 ..........
Bucks .....................
3/12/97
Interstate Brands Corporation (formerly,
Continental Baking Company).
J. B. Slevin Company Inc.—Lansdowne
PLID (51–)5811 .....
Philadelphia ...........
4/10/95
OP–23–0013 ..........
Delaware ................
9/3/96
Laclede Steel Co.—Fairless Hills ...........
OP–09–0023 ..........
Bucks .....................
7/17/95
LNP
Engineering
Plastics,
Inc.—
Thorndale.
Lukens Steel Co.—Coatesville ...............
OP–15–0035 ..........
Chester ..................
10/31/97
OP–15–0010 ..........
Chester ..................
5/6/99
Nabisco Biscuit Co. ................................
PLID (51–)3201 .....
Philadelphia ...........
4/10/95
PECO Energy Co.—Croydon Generating Station.
PECO Energy Co.—Limerick Generating Station.
PECO Energy Co.—USX Fairless
Works Powerhouse.
PECO Energy Co.—West Conshocken
Plant.
Pennsylvania Electric Co.—Front Street
Station.
American Inks and Coatings Corp.—
Valley Forge.
Avery Dennison Co. (Fasson Roll Division)—Quakertown.
Cabot
Performance
Materials—
Boyertown.
Cleveland Steel Container Corp.—
Quakertown.
CMS Gilbreth Packaging Systems—
Bristol.
CMS Gilbreth Packaging Systems—
Bensalem.
Congoleum Corp.—Marcus Hook ..........
OP–09–0016A .......
Bucks .....................
12/20/96
OP–46–0038 ..........
Montgomery ...........
7/25/95
OP–09–0066 ..........
Bucks .....................
OP–46–0045A .......
Montgomery ...........
12/31/98
4/6/99
12/4/97
25–0041 .................
Erie ........................
2/25/99
OP–15–0026A .......
Chester ..................
1/10/97
OP–09–0001A .......
Bucks .....................
10/2/97
OP–46–0037 ..........
Montgomery ...........
4/13/99
OP–09–0022 ..........
Bucks .....................
9/30/96
OP–09–0036 ..........
Bucks .....................
1/7/97
OP–09–0037 ..........
Bucks .....................
4/10/97
OP–23–0021 ..........
Delaware ................
12/31/98
Epsilon Products Co.—Marcus Hook .....
OP–23–0012 ..........
Delaware ................
2/15/96
Foamex International, Inc.—Eddystone
OP–23–0006A .......
Delaware ................
3/30/99
Forms, Inc., Spectra Graphics—Willow
Grove.
Global Packaging, Inc. (formerly BG
Packaging—Oaks).
Jefferson Smurfit Corp. (Container
Corp. of Amer.)—Oaks.
Jefferson Smurfit Corp. (Container
Corp. of Amer.)—North Wales.
Lonza, Inc.—Conshohocken ..................
OP–46–0023 ..........
Montgomery ...........
OP–46–0026 ..........
Montgomery ...........
OP–46–0041 ..........
Montgomery ...........
11/9/95/
3/25//98
8/30/96
12/24/97
4/18/97
OP–46–0062 ..........
Montgomery ...........
7/15/96
OP–46–0025 ..........
Montgomery ...........
Markel Corporation .................................
OP–46–0081 ..........
Montgomery ...........
4/22/97
6/16/98
4/9/99
McCorquodale Security Cards, Inc.—
West Whiteland.
Mike—Rich, Inc. (MRI)—Newtown .........
OP–15–0037 ..........
Chester ..................
9/3/96
OP–09–0021 ..........
Bucks .....................
12/20/96
Minnesota Mining and Manufacturing
(3M) Company—Bristol.
MM Biogas Power LLC (formerly
O’Brien Environmental Energy, Inc.).
Norwood Industries, Inc.—Frazer ..........
CP–09–0005 ..........
Bucks .....................
8/8/96
CP–46–0067 ..........
Montgomery ...........
10/31/97
OP–15–0014A .......
Chester ..................
NVF Company ........................................
OP–15–0030 ..........
Chester ..................
12/20/96
12/2/99
4/13/99
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00028
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
EPA approval date
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
25FER2
Additional explanation/§ 52.2063
citation
65 FR
(c)(143)(i)(B)(5).
65 FR
(c)(143)(i)(B)(6).
65 FR
(c)(143)(i)(B)(7).
65 FR
(c)(143)(i)(B)(8).
65 FR
(c)(143)(i)(B)(9).
65 FR
(c)(143)(i)(B)(10).
65 FR
(c)(143)(i)(B)(11).
65 FR
(c)(143)(i)(B)(12).
65 FR
(c)(143)(i)(B)(13).
65 FR
(c)(143)(i)(B)(14).
65 FR
(c)(143)(i)(B)(15).
65 FR
(c)(143)(i)(B)(16).
65 FR
(c)(143)(i)(B)(17).
65 FR
(c)(143)(i)(B)(18).
65 FR
(c)(143)(i)(B)(19).
65 FR
(c)(143)(i)(B)(20).
65 FR
(c)(143)(i)(B)(21).
65 FR
(c)(143)(i)(B)(22).
65 FR
(c)(143)(i)(B)(23).
65 FR
(c)(143)(i)(B)(24).
65 FR
(c)(143)(i)(B)(25).
65 FR
(c)(143)(i)(B)(26).
65 FR
(c)(143)(i)(B)(27).
65 FR
(c)(143)(i)(B)(28).
65 FR
(c)(143)(i)(B)(29).
65 FR
(c)(143)(i)(B)(30).
65 FR
(c)(143)(i)(B)(31).
65 FR
(c)(143)(i)(B)(32).
65 FR
(c)(143)(i)(B)(33).
65 FR
(c)(143)(i)(B)(34).
65 FR
(c)(143)(i)(B)(35).
65 FR
(c)(143)(i)(B)(36).
65 FR
(c)(143)(i)(B)(37).
65 FR
(c)(143)(i)(B)(38).
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9477
(1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR
VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued
State
effective
date
Name of source
Permit No.
County
Occidental Chemical Corp. (Vinyls
Div.)—Pottstown.
Philadelphia Newspapers, Inc. (Schuylkill Printing Plant).
The Proctor and Gamble Paper Products Co..
Quebecor Printing Atglen, Inc.—Atglen
OP–46–0015 ..........
Montgomery ...........
11/7/96
OP–46–0012 ..........
Montgomery ...........
OP–66–0001 ..........
Wyoming ................
8/30/96
3/15/00
4/4/97
OP–15–0002 ..........
Chester ..................
12/10/96
Sartomer Company, Inc .........................
OP–15–0015 ..........
Chester ..................
Siberline Manufacturing Co. ...................
OP–54-0041 ..........
Schuylkill ................
1/17/96
3/25/98
4/19/99
SmithKline Beecham Research Co. (formerly Sterling Winthrop, Inc.).
Sullivan Graphics, Inc.—York ................
OP–46–0031 ..........
Montgomery ...........
OP–67–2023 ..........
York .......................
10/31/97
5/1/98
8/22/95
Sun Company, Inc (R&M) (formerly
Chevron USA)—Tinicum.
Sun Company, Inc (R&M) (formerly
Chevron USA)—Darby.
Universal Packaging Corporation ...........
OP–23–0010 ..........
Delaware ................
10/31/96
OP–23–0011 ..........
Delaware ................
10/31/96
OP–46–0156 ..........
Montgomery ...........
4/8/99
Zenith Products Corp.—Aston ...............
OP–23–0008 ..........
Delaware ................
4/7/97
Budd Company .......................................
PLID 51–1564 ........
Philadelphia ...........
12/28/95
Bellevue Cogeneration Plant ..................
PLID (51–) 6513 ....
Philadelphia ...........
4/10/95
MSC Pre-Finish Metals, Inc.—Morrisville
OP–09–0030 ..........
Bucks .....................
Temple University, Health Sciences
Center.
TRIGEN—Schuylkill Station ...................
PLID (51–) 8906 ....
Philadelphia ...........
11/7/96
3/31/98
5/27/95
PLID (51–)4942 .....
Philadelphia ...........
5/29/95
TRIGEN—Edison Station .......................
PLID (51–)4902 .....
Philadelphia ...........
5/29/95
Advanced Glassfiber Yarns LLC (formerly Owens Corning)—Huntingdon.
Armstrong World Industries, Inc.—
Beech Creek.
Bemis Company, Film Division ..............
OP–31–02002 ........
Huntingdon ............
4/13/99
OP–18–0002 ..........
Clinton ....................
7/6/95
OP–40–0007A .......
Luzerne ..................
10/10/95
Brentwood Industries, Inc .......................
PA–06–1006A ........
Berks ......................
6/3/99
Certainteed Corp.—Mountaintop ............
OP–40–0010 ..........
Luzerne ..................
5/31/96
CNG Transmission Corp.—Ardell Station.
CNG Transmission Corp.—Finnefrock
Station.
Consol Pennsylvania Coal Company—
Bailey Prep Plant.
Consolidated Rail Corp. (CONRAIL)—
Hollidaysburg Car Shop.
Consolidated Rail Corp. (CONRAIL)—
Juniata.
Containment Solutions, Inc. (formerly
called Fluid Containment—Mt. Union).
Cooper Energy Systems, Grove City .....
OP–24–120 ............
Elk ..........................
9/30/95
PA–18–0003A ........
Clinton ....................
2/29/96
OP–30–000–072 ....
Greene ...................
3/23/99
OP–07–2002 ..........
Blair ........................
8/29/95
OP–07–2003 ..........
Blair ........................
8/29/95
OP– 31–02005 ......
Huntingdon ............
4/9/99
OP– 43–003 ..........
Mercer ....................
7/25/96
Cyprus Cumberland Resources Corp ....
OP–30–000–040 ....
Greene ...................
3/26/99
Defense Distribution—Susquehanna .....
OP–67–02041 ........
York .......................
2/1/00
EMI Company .........................................
OP–25–070 ............
Erie ........................
10/24/96
Empire Sanitary Landfill, Inc. .................
OP–35–0009 ..........
Lackawanna ...........
10/17/96
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00029
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
EPA approval date
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
12/15/00;
78418.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
25FER2
Additional explanation/§ 52.2063
citation
65 FR
(c)(143)(i)(B)(39).
65 FR
(c)(143)(i)(B)(40).
65 FR
(c)(143)(i)(B)(41).
65 FR
(c)(143)(i)(B)(42).
65 FR
(c)(143)(i)(B)(43).
65 FR
(c)(143)(i)(B)(44).
65 FR
(c)(143)(i)(B)(45).
65 FR
(c)(143)(i)(B)(46).
65 FR
(c)(143)(i)(B)(47).
65 FR
(c)(143)(i)(B)(48).
65 FR
(c)(143)(i)(B)(49).
65 FR
(c)(143)(i)(B)(50).
65 FR
(c)(143)(i)(B)(51).
65 FR
(c)(143)(i)(B)(52).
65 FR
(c)(143)(i)(B)(53).
65 FR
(c)(143)(i)(B)(54).
65 FR
(c)(143)(i)(B)(55).
65 FR
(c)(143)(i)(B)(56).
66 FR
(c)(149)(i)(B)(1).
66 FR
(c)(149)(i)(B)(2).
66 FR
(c)(149)(i)(B)(3).
66 FR
(c)(149)(i)(B)(4).
66 FR
(c)(149)(i)(B)(5).
66 FR
(c)(149)(i)(B)(6).
66 FR
(c)(149)(i)(B)(7).
66 FR
(c)(149)(i)(B)(8).
66 FR
(c)(149)(i)(B)(9).
66 FR
(c)(149)(i)(B)(10).
66 FR
(c)(149)(i)(B)(11).
66 FR
(c)(149)(i)(B)(12).
66 FR
(c)(149)(i)(B)(13).
66 FR
(c)(149)(i)(B)(14).
66 FR
(c)(149)(i)(B)(15).
66 FR
(c)(149)(i)(B)(16).
9478
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR
VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued
State
effective
date
Name of source
Permit No.
County
Equitrans, Inc.—Rogersville Station .......
(OP)30–000–109 ...
Greene ...................
7/10/95
Equitrans, Inc.—Pratt Station .................
(OP)30–000–110 ...
Greene ...................
7/10/95
Erie Coke Corporation—Erie ..................
OP–25–029 ............
Erie ........................
6/27/95
Fleetwood Folding Trailers, Inc.—Somerset.
Gichner Systems Group, Inc ..................
(OP)56–000–151 ...
Somerset ................
2/28/96
(OP)67–2033 .........
York .......................
8/5/97
Offset Paperback Manufacturers, Inc.—
Dallas.
Overhead Door Corporation—Mifflin
County.
SANYO Audio Manufacturing (USA)
Corp.
Stroehmann Bakeries—Luzerne County
(OP)40–0008 .........
Luzerne ..................
4/16/99
(OP)44–2011 .........
Mifflin .....................
6/4/97
(OP)44–2003 .........
Mifflin .....................
6/30/95
(OP)40–0014A .......
Luzerne ..................
5/30/95
Merck and Co., Inc.—West Point Facility.
Amerada Hess Corp ...............................
OP–46–0005 ..........
Montgomery ...........
PA–PLID (51–)5009
Philadelphia ...........
1/13/97
6/23/00
5/29/95
Amoco Oil Company ..............................
PA–PLID (51–)5011
Philadelphia ...........
5/29/95
Cartex Corporation .................................
OP–09–0076 ..........
Bucks .....................
4/9/99
Exxon Company, USA ...........................
PA–PLID (51–)5008
Philadelphia ...........
5/29/95
GATX Terminals Corporation .................
PA–PLID (51–)5003
Philadelphia ...........
5/29/95
Hatfield Quality Meats, Inc.—Hatfield ....
OP–46–0013A .......
Montgomery ...........
J. L. Clark, Inc ........................................
OP–36–02009 ........
Lancaster ...............
1/9/97
10/1/98
4/16/99
Johnson Matthey, Inc.—Wayne .............
OP–15–0027 ..........
Chester ..................
Kurz Hastings, Inc. .................................
PA–PLID (51–)1585
Philadelphia ...........
8/3/98
4/15/99
5/29/95
Lawrence McFadden, Inc. ......................
PA–PLID (51–)2074
Philadelphia ...........
6/11/97
Philadelphia Baking Company ...............
PA–PLID (51–)3048
Philadelphia ...........
4/10/95
Philadelphia Gas Works—Passyunk ......
PA–PLID (51–)4921
Philadelphia ...........
5/29/95
PPG Industries, Inc. (BASF) ..................
OP–23–0005 ..........
Delaware ................
6/4/97
SmithKline Beecham Pharmaceuticals ..
OP–46–0035 ..........
Montgomery ...........
Teva Pharmaceuticals USA (formerly
Lemmon company).
The Philadelphian Condominium Building.
Warner Company ...................................
OP–09–0010 ..........
Bucks .....................
3/27/97
10/20/98
4/9/99
PA–PLID (51–)6512
Philadelphia ...........
5/29/95
OP–15–0001 ..........
Chester ..................
7/17/95
Webcraft Technologies, Inc ....................
OP–09–0009 ..........
Bucks .....................
Latrobe Steel Company—Latrobe ..........
OP– 65–000–016 ..
Westmoreland ........
4/18/96
10/15/98
12/22/95
Allegheny
Ludlum
Corporation—
Brackenridge.
Kosmos Cement Co.—Neville Island
Facility.
Armstrong Cement and Supply Company.—Cabot.
Duquesne Light Company—Cheswick
Power Station.
Duquesne Light Company—Elrama
Plant.
CO–260 .................
Allegheny ...............
12/19/96
EO–208 ..................
Allegheny ...............
12/19/96
OP–10–028 ............
Butler .....................
3/31/99
CO–217 .................
Allegheny ...............
3/8/96
(PA)63–000–014 ....
Washington ............
12/29/94
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00030
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
EPA approval date
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
08/06/01;
40891.
04/18/01;
19858.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/31/01;
54936.
10/16/01;
52517.
10/18/01;
52851.
10/18/01;
52857.
10/18/01;
52857.
10/18/01;
52867.
10/18/01;
52867.
25FER2
Additional explanation/§ 52.2063
citation
66 FR
(c)(149)(i)(B)(17).
66 FR
(c)(149)(i)(B)(18).
66 FR
(c)(149)(i)(B)(19).
66 FR
(c)(149)(i)(B)(20).
66 FR
(c)(149)(i)(B)(21).
66 FR
(c)(149)(i)(B)(22).
66 FR
(c)(149)(i)(B)(23).
66 FR
(c)(149)(i)(B)(24).
66 FR
(c)(149)(i)(B)(25).
66 FR
(c)(154)(i)(D).
66 FR
(c)(156)(i)(B)(1).
66 FR
(c)(156)(i)(B)(2).
66 FR
(c)(156)(i)(B)(3).
66 FR
(c)(156)(i)(B)(4).
66 FR
(c)(156)(i)(B)(5).
66 FR
(c)(156)(i)(B)(6).
66 FR
(c)(156)(i)(B)(7).
66 FR
(c)(156)(i)(B)(8).
66 FR
(c)(156)(i)(B)(9).
66 FR
(c)(156)(i)(B)(10).
66 FR
(c)(156)(i)(B)(11).
66 FR
(c)(156)(i)(B)(12).
66 FR
(c)(156)(i)(B)(13).
66 FR
(c)(156)(i)(B)(14).
66 FR
(c)(156)(i)(B)(15).
66 FR
(c)(156)(i)(B)(16).
66 FR
(c)(156)(i)(B)(17).
66 FR
(c)(156)(i)(B)(18).
66 FR
(c)(158)(i)(B).
66 FR
(c)(159)(i)(B).
66 FR
(c)(160)(i)(B)(1).
66 FR
(c)(160)(i)(B)(2).
66 FR
(c)(161)(i)(B)(1).
66 FR
(c)(161)(i)(B)(2).
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9479
(1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR
VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued
State
effective
date
Name of source
Permit No.
County
Pennsylvania Electric Co. (PENELEC)—
Keystone Generating Station.
IDL, Incorporated ....................................
(PA–)03–000–027 ..
Armstrong ..............
12/29/94
CO–225 .................
Allegheny ...............
7/18/96
Oakmont Pharmaceutical, Inc ................
CO–252 .................
Allegheny ...............
12/19/96
U.S. Air, Inc ............................................
CO–255 .................
Allegheny ...............
1/14/97
Lukens Steel Corporation—Houston
Plant.
Allegheny Ludlum Steel Corporation—
West Leechburg Plant.
(Allegheny Ludlum Corporation) Jessop
Steel Company—Washington Plant.
Koppel Steel Corporation—Koppel Plant
(OP)63–000–080 ...
Washington ............
2/22/99
(OP)65–000–183 ...
Westmoreland ........
3/23/99
(OP)63–000–027 ...
Washington ............
3/26/99
(OP)04–000–059 ...
Beaver ...................
3/23/01
Consolidated Natural Gas (CNG) Transmission Corp.—Beaver Station.
Consolidated Natural Gas (CNG) Transmission Corp.—Oakford Compressor
Station.
Consolidated Natural Gas (CNG) Transmission Corp.—South Oakford Station.
Consolidated Natural Gas (CNG) Transmission Corp.—Tonkin Compressor
Station.
Consolidated Natural Gas (CNG) Transmission Corp.—Jeannette Station.
Carnegie Natural Gas Co.—Creighton
Station.
Texas Eastern Transmission Corp.—
Uniontown Station.
Consolidated Natural Gas (CNG) Transmission Corp.—South Bend Station.
Pruett Schaffer Chemical Company .......
OP–04–000–490 ....
Beaver ...................
6/23/95
OP–65–000–837—
Westmoreland ........
10/13/95
(OP)65–000–840 ...
Westmoreland ........
10/13/95
(OP)65–000–634 ...
Westmoreland ........
10/13/95
(OP)65–000–852 ...
Westmoreland ........
10/13/95
EO–213 ..................
Allegheny ...............
5/14/96
(OP)26–000–413 ...
Fayette ...................
12/20/96
OP–03–000–180 ....
Armstrong ..............
12/2/98
CO–266 .................
Allegheny ...............
9/2/98
PPG Industries, Inc.—Spingdale ............
CO–254 .................
Allegheny ...............
12/19/96
Reichhold Chemicals, Inc.—Bridgeville
CO–218 .................
Allegheny ...............
12/19/96
Reichhold Chemicals, Inc.—Bridgeville
CO–219 .................
Allegheny ...............
2/21/96
Valspar Corporation—Pittsburgh ............
CO–209 .................
Allegheny ...............
3/8/96
Ashland Chemical Corporation ..............
CO–227 .................
Allegheny ...............
12/30/96
Hercules, Inc.—West Elizabeth ..............
EO–216 ..................
Allegheny ...............
3/8/96
Hercules, Inc.—West Elizabeth ..............
CO–257 .................
Allegheny ...............
Neville Chemical Company ....................
CO–230 .................
Allegheny ...............
1/14/97
11/1/99
12/13/96
Anchor Glass Container Corp.—Plant 5
(PA)26–000–119 ....
Fayette ...................
12/20/96
Anchor Hocking Specialty Glass Co.—
Phoenix Glass Plant.
Corning Consumer Products Co.—
Charleroi Plant.
.
General Electric Company .....................
(OP)04–000–084 ...
Beaver ...................
10/13/95
(PA)63–000–110 ....
Washington ............
1/4/96
CO–251 .................
Allegheny ...............
12/19/96
Glenshaw Glass Company, Inc ..............
CO–270 .................
Allegheny ...............
3/10/00
Guardian Industries Corp .......................
CO–242 .................
Allegheny ...............
8/27/96
Allegheny County Sanitary Authority .....
CO–222 .................
Allegheny ...............
5/14/96
Browning-Ferris Industries .....................
CO–231A ...............
Allegheny ...............
4/28/97
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00031
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
EPA approval date
10/18/01;
52867.
10/18/01;
52862.
10/18/01;
52862.
10/18/01;
52862.
10/16/01;
52522.
10/16/01;
52522.
10/16/01;
52522.
10/16/01;
52522.
10/12/01;
52055.
10/12/01;
52055.
Additional explanation/§ 52.2063
citation
66 FR
(c)(161)(i)(B)(3).
66 FR
(c)(162)(i)(B)(1).
66 FR
(c)(162)(i)(B)(2).
66 FR
(c)(162)(i)(B)(3).
66 FR
(c)(163)(i)(B)(1).
66 FR
(c)(163)(i)(B)(2).
66 FR
(c)(163)(i)(B)(3).
66 FR
(c)(163)(i)(D).
66 FR
(c)(164)(i)(B)(1).
66 FR
(c)(164)(i)(B)(2).
10/12/01; 66 FR
52055.
10/12/01; 66 FR
52055.
(c)(164)(i)(B)(3).
10/12/01;
52055.
10/12/01;
52055.
10/12/01;
52055.
10/12/01;
52055.
10/12/01;
52050.
10/12/01;
52050.
10/12/01;
52050.
10/12/01;
52050.
10/12/01;
52050.
10/16/01;
52506.
10/16/01;
52506.
10/16/01;
52506.
10/16/01;
52506.
10/16/01;
52527.
10/16/01;
52527.
10/16/01;
52527.
66 FR
(c)(164)(i)(B)(5).
66 FR
(c)(164)(i)(B)(6).
66 FR
(c)(164)(i)(B)(7).
66 FR
(c)(164)(i)(B)(8).
66 FR
(c)(165)(i)(B)(1).
66 FR
(c)(165)(i)(B)(2).
66 FR
66 FR
(c)(165)(i)(B)(3)
[NOX RACT].
(c)(165)(i)(B)(4)
[VOC RACT].
(c)(165)(i)(B)(5).
66 FR
(c)(166)(i)(B)(1).
66 FR
(c)(166)(i)(B)(2).
66 FR
(c)(166)(i)(B)(3).
66 FR
(c)(166)(i)(B)(4).
66 FR
(c)(167)(i)(B)(1).
66 FR
(c)(167)(i)(B)(2).
66 FR
(c)(167)(i)(B)(3).
66 FR
(c)(167)(i)(B)(4).
66 FR
(c)(167)(i)(B)(5).
66 FR
(c)(167)(i)(B)(6).
66 FR
(c)(167)(i)(B)(7).
66 FR
(c)(167)(i)(B)(8).
10/16/01;
52527.
10/16/01;
52527.
10/16/01;
52527.
10/16/01;
52527.
10/16/01;
52527.
25FER2
66 FR
(c)(164)(i)(B)(4).
9480
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR
VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued
State
effective
date
Name of source
Permit No.
County
Chambers Development Company—
Monroeville Borough Landfill.
Kelly Run Sanitation, Forward Township
Landfill.
Stroehmann
Bakeries—Montgomery
County (Norristown).
Schlosser Steel, Inc ...............................
CO–253 .................
Allegheny ...............
12/30/96
CO–236 .................
Allegheny ...............
1/23/97
PA–46–0003 ..........
Montgomery ...........
5/4/95
OP–46–0051 ..........
Montgomery ...........
2/1/96
Perkasie Industries Corp.—Perkasie .....
OP–09–0011 ..........
Bucks .....................
8/14/96
Quaker
Chemical
Corporation—
Conshohocken.
Worthington Steel Company ..................
OP–46–0071 ..........
Montgomery ...........
9/26/96
OP–15–0016 ..........
Chester ..................
7/23/96
Transcontinental Gas Pipeline Corp.—
Sta. 200, Frazer.
Rohm and Haas Company, Bucks
County Plant.
SEPTA-Berridge/Courtland Maintenance
Shop.
Southwest Water Pollution Control
Plant/Biosolids Recycling Center.
Rohm and Haas Company—Philadelphia Plant.
Sunoco Inc. (R&M)—Philadelphia ..........
PA–15–0017 ..........
Chester ..................
6/5/95
OP–09–0015 ..........
Bucks .....................
4/20/99
PA–51–4172 ..........
Philadelphia ...........
7/27/99
PA–51–9515 ..........
Philadelphia ...........
7/27/99
PA–51–1531 ..........
Philadelphia ...........
7/27/99
PA(51–)1501
PA(51–)1517.
PA(51–)2197 ..........
Philadelphia ...........
8/1/00
Philadelphia ...........
7/21/00
PA–(51–)2255 ........
Philadelphia ...........
7/14/00
Tasty Baking Co .....................................
PLID (51–)2054 .....
Philadelphia ...........
4/9/95
Armstrong World Industries, Inc.—Beaver Falls Plant.
Bacharach, Inc .......................................
(OP)04–000–108 ...
Beaver ...................
5/29/96
CO–263 .................
Allegheny ...............
10/10/97
Bakerstown Container Corporation ........
CO–221 .................
Allegheny ...............
5/14/96
Chestnut Ridge Foam, Inc.—Latrobe ....
(OP)65–000–181 ...
Westmoreland ........
12/29/95
Flexsys America LP, Monongahela
Plant.
Haskell of Pittsburgh, Inc .......................
(OP)63–000–015 ...
Washington ............
3/23/01
CO–224 .................
Allegheny ...............
12/19/96
Three Rivers Aluminum Company
(TRACO).
Tuscarora Plastics, Inc ...........................
OP–10–267 ............
Butler .....................
3/1/01
(OP)04–000–497 ...
Beaver ...................
4/3/96
Witco Corporation ...................................
CO–210 .................
Allegheny ...............
5/14/96
GenCorp (Plastic Films Division)—
Jeannette Plant.
CENTRIA—Ambridge Coil Coating Operations Plant.
J & L Structural, Inc.—Aliquippa ............
(OP)65–000–207 ...
Westmoreland ........
1/4/96
(OP)04–000–043 ...
Beaver ...................
5/17/99
OP–04–000–467 ....
Beaver ...................
6/23/95
Universal Stainless & Alloy Products,
Inc.
Shenango, Inc ........................................
CO–241 .................
Allegheny ...............
12/19/96
CO–233 .................
Allegheny ...............
12/30/96
LTV Steel Company ...............................
CO–259 .................
Allegheny ...............
12/30/96
U.S. Steel (USX Corporation.)—Clairton
Works.
USX
Corporation—Edgar
Thomson
Works.
USX, Inc.—Irvin Works ..........................
CO–234 .................
Allegheny ...............
12/30/96
CO–235 .................
Allegheny ...............
12/30/96
CO–258 .................
Allegheny ...............
12/30/96
SBF Communications (owned by Avant
Garde Ent.).
Smith-Edwards-Dunlap Company ..........
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00032
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
EPA approval date
10/16/01;
52527.
10/16/01;
52527.
10/31/01;
54942.
10/31/01;
54942.
10/31/01;
54942.
10/31/01;
54942.
10/31/01;
54942.
10/31/01;
54942.
10/31/01;
54942.
10/31/01;
54942.
10/31/01;
54942.
10/31/01;
54942.
10/31/01;
54942.
10/31/01;
54942.
10/31/01;
54942.
10/31/01;
54942.
10/17/01;
52695.
10/17/01;
52695.
10/17/01;
52695.
10/17/01;
52695.
10/17/01;
52695.
10/17/01;
52695.
10/17/01;
52695.
10/17/01;
52695.
10/17/01;
52695.
10/15/01;
52322.
10/15/01;
52322.
10/16/01;
52511.
10/16/01;
52511.
10/16/01;
52511.
10/16/01;
52511.
10/16/01;
52511.
10/16/01;
52511.
10/16/01;
52511.
25FER2
Additional explanation/§ 52.2063
citation
66 FR
(c)(167)(i)(B)(9).
66 FR
(c)(167)(i)(B)(10).
66 FR
(c)(169)(i)(B)(1).
66 FR
(c)(169)(i)(B)(2).
66 FR
(c)(169)(i)(B)(3).
66 FR
(c)(169)(i)(B)(4).
66 FR
(c)(169)(i)(B)(5).
66 FR
(c)(169)(i)(B)(6).
66 FR
(c)(169)(i)(B)(7).
66 FR
(c)(169)(i)(B)(8).
66 FR
(c)(169)(i)(B)(9).
66 FR
(c)(169)(i)(B)(10).
66 FR
(c)(169)(i)(B)(11).
66 FR
(c)(169)(i)(B)(12).
66 FR
(c)(169)(i)(B)(13).
66 FR
(c)(169)(i)(B)(14).
66 FR
(c)(170)(i)(B)(1).
66 FR
(c)(170)(i)(B)(2).
66 FR
(c)(170)(i)(B)(3).
66 FR
(c)(170)(i)(B)(4).
66 FR
(c)(170)(i)(B)(5).
66 FR
(c)(170)(i)(B)(6).
66 FR
(c)(170)(i)(B)(7).
66 FR
(c)(170)(i)(B)(8).
66 FR
(c)(170)(i)(B)(9).
66 FR
(c)(171)(i)(B).
66 FR
(c)(171)(i)(D).
66 FR
(c)(172)(i)(B)(1).
66 FR
(c)(172)(i)(B)(2).
66 FR
(c)(172)(i)(B)(3).
66 FR
(c)(172)(i)(B)(4).
66 FR
(c)(172)(i)(B)(5).
66 FR
(c)(172)(i)(B)(6).
66 FR
(c)(172)(i)(B)(7).
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9481
(1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR
VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued
State
effective
date
Name of source
Permit No.
County
Wheeling-Pittsburgh Steel Corporation—Allenport Plant.
Koppers—Monessen Coke Plant ...........
(OP)63–000–066 ...
Washington ............
2/8/99
(OP)65–000–853 ...
Westmoreland ........
3/20/98
J & L Specialty Steel, Inc.—Midland Facility.
Washington Steel Corp.—Washington
Plant.
Equitrans, Inc.—Hartson ........................
(OP)04–000–013 ...
Beaver ...................
3/23/01
(OP)63–000–023 ...
Washington ............
9/12/96
(OP)63–000–642 ...
Washington ............
7/10/95
Witco Corp.—Petrolia Facility ................
PA–10–037 ............
Butler .....................
6/27/95
Ranbar Electrical Materials Inc. (formerly Westinghouse Electric Co.
EMD—Manor.
Nova Chemicals, Inc. (formerly Arco
Chemical Co.—Beaver Valley).
BASF Corporation—Monaca Site ..........
(OP)65–000–042 ...
Westmoreland ........
2/22/99
(OP)04–000–033 ...
Beaver ...................
(OP)04–000–306 ...
Beaver ...................
4/16/99
1/24/01
3/23/01
Cardone Industries—Rising Sun Ave ....
PA(51–) PLID 3887
Philadelphia ...........
5/29/95
Cardone Industries—Chew St ................
PA(51–) PLID 2237
Philadelphia ...........
5/29/95
U.S. Navy, Naval Surface Warfare Center—Carderock Division.
Wheelabrator Falls, Inc ..........................
PA(51–)9724 ..........
Philadelphia ...........
12/27/97
OP–09–0013 ..........
Bucks .....................
US Steel Group/USX Corporation—
Fairless Works.
Brown Printing Company .......................
OP–09–0006 ..........
Bucks .....................
1/11/96
5/17/96
4/8/99
OP–46–0018A .......
Montgomery ...........
5/17/00
Sun Chemical—General Printing Ink Division.
Sunoco Chemicals, Frankford Plant ......
PA(51–)2052 ..........
Philadelphia ...........
7/14/00
PA(51–)1551 ..........
Philadelphia ...........
7/27/99
Armco, Inc. Butler Operations Main
Plant.
Armco, Inc. Butler Operations Stainless
Plant.
Pennsylvania Power Co.—Bruce Mansfield Plant.
West Penn Power Co.—Mitchell Station
PA–10–001M .........
Butler .....................
2/23/96
PA–10–001S ..........
Butler .....................
2/23/96
(PA)04–000–235 ....
Beaver ...................
12/29/94
(PA)63–000–016 ....
Washington ............
6/12/95
Carnegie Natural Gas Company—Fisher Station.
Apollo Gas Company—Shoemaker Station.
Texas Eastern Transmission Corp.—
Delmont Station.
The Peoples Natural Gas Co.—Valley
Station.
The Peoples Natural Gas Co.—Girty
Compressor Station.
AES Beaver Valley Partners—Monaca
Plant.
Penreco—Karns City ..............................
(OP)03–000–182 ...
Armstrong ..............
12/2/98
(OP)03–000–183 ...
Armstrong ..............
9/12/96
(OP)65–000–839 ...
Westmoreland ........
1/9/97
(OP)03–000–125 ...
Armstrong ..............
10/31/94
(PA)03–000–076 ....
Armstrong ..............
10/27/95
(OP)04–000–446 ...
Beaver ...................
3/23/01
OP10–0027 ............
Butler .....................
5/31/95
Ashland Petroleum Company ................
CO–256 .................
Allegheny ...............
12/19/96
Bellefield Boiler Plant—Pittsburgh .........
EO–248 ..................
Allegheny ...............
12/19/96
Gulf Oil, L.P ............................................
CO–250 .................
Allegheny ...............
12/19/96
PA Dept. of Corrections .........................
EO–244 ..................
Allegheny ...............
1/23/97
Pittsburgh Thermal Limited Partnership
CO–220 .................
Allegheny ...............
3/4/96
BP Exploration & Oil, Inc.—Greensburg
Terminal.
(OP)65–000–378 ...
Westmoreland ........
3/23/01
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00033
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
EPA approval date
10/16/01;
52511.
10/16/01;
52511.
10/16/01;
52511.
10/16/01;
52511.
10/17/01;
52705.
10/17/01;
52705.
10/17/01;
52705.
10/17/01;
52705.
10/17/01;
52705.
10/30/01;
54710.
10/30/01;
54710.
10/30/01;
54710.
10/30/01;
54710.
10/30/01;
54710.
10/30/01;
54710.
10/30/01;
54710.
10/30/01;
54710.
10/15/01;
52338.
10/15/01;
52338.
10/15/01;
52333.
10/15/01;
52333.
10/15/01;
52333.
10/15/01;
52333.
10/15/01;
52333.
10/15/01;
52333.
10/15/01;
52333.
10/15/01;
52333.
10/12/01;
52044.
10/12/01;
52044.
10/12/01;
52044.
10/12/01;
52044.
10/12/01;
52044.
10/12/01;
52044.
10/12/01;
52044.
25FER2
Additional explanation/§ 52.2063
citation
66 FR
(c)(172)(i)(B)(8).
66 FR
(c)(172)(i)(B)(9).
66 FR
(c)(172)(i)(B)(10).
66 FR
(c)(172)(i)(B)(11).
66 FR
(c)(173)(i)(B)(1).
66 FR
(c)(173)(i)(B)(2).
66 FR
(c)(173)(i)(B)(3).
66 FR
(c)(173)(i)(B)(4).
66 FR
(c)(173)(i)(B)(5).
66 FR
(c)(174)(i)(B)(1).
66 FR
(c)(174)(i)(B)(2).
66 FR
(c)(174)(i)(B)(3).
66 FR
(c)(174)(i)(B)(4).
66 FR
(c)(174)(i)(B)(5).
66 FR
(c)(174)(i)(B)(6).
66 FR
(c)(174)(i)(B)(7).
66 FR
(c)(174)(i)(B)(8).
66 FR
(c)(175)(i)(B).
66 FR
(c)(175)(i)(C).
66 FR
(c)(176)(i)(B)(1).
66 FR
(c)(176)(i)(B)(2).
66 FR
(c)(176)(i)(B)(3).
66 FR
(c)(176)(i)(B)(4).
66 FR
(c)(176)(i)(B)(5).
66 FR
(c)(176)(i)(B)(6).
66 FR
(c)(176)(i)(B)(7).
66 FR
(c)(176)(i)(B)(8).
66 FR
(c)(177)(i)(B)(1).
66 FR
(c)(177)(i)(B)(2).
66 FR
(c)(177)(i)(B)(3).
66 FR
(c)(177)(i)(B)(4).
66 FR
(c)(177)(i)(B)(5).
66 FR
(c)(177)(i)(B)(6).
66 FR
(c)(177)(i)(B)(7).
9482
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR
VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued
State
effective
date
Name of source
Permit No.
County
Pittsburgh Allegheny County Thermal,
Ltd.
Aristech Chemical Corporation ..............
CO–265 .................
Allegheny ...............
11/9/98
CO–232 .................
Allegheny ...............
12/30/96
Heinz U.S.A.—Pittsburgh .......................
EO–211 ..................
Allegheny ...............
3/8/96
Heinz U.S.A.—Pittsburgh .......................
CO–247 .................
Allegheny ...............
10/24/96
Koppers Industries, Inc. (Aristech
Chem. Corp).
Nabisco Biscuit Co .................................
CO–223 .................
Allegheny ...............
8/27/96
CO–246 .................
Allegheny ...............
12/19/96
Pressure Chemical Co ...........................
CO–261 .................
Allegheny ...............
6/11/97
General Carbide Corp ............................
(OP)65–000–622 ...
Westmoreland ........
12/29/95
Fansteel Hydro Carbide .........................
(OP)65–000–860 ...
Westmoreland ........
12/12/97
Carbide Corporation ...............................
(OP)65–000–720 ...
Westmoreland ........
7/31/98
Dyno Nobel Inc—Donora .......................
(OP)63–000–070 ...
Washington ............
3/31/99
Newcomer Products, Inc ........................
(OP)65–000–851 ...
Westmoreland ........
8/7/97
PECO Energy Company—Cromby Generating Station.
Waste Resource Energy, Inc. (Operator); Shawmut Bank, Conn. National
Assoc. (Owner); Delaware County
Resource Recovery Facility.
G-Seven, Ltd ..........................................
OP–15–0019 ..........
Chester ..................
4/28/95
OP–23–0004 ..........
Delaware ................
11/16/95
OP–46–0078 ..........
Montgomery ...........
4/20/99
Leonard Kunkin Associates ....................
OP–09–0073 ..........
Bucks .....................
6/25/01
Kimberly-Clark Corporation ....................
OP–23–0014A .......
Delaware ................
Sunoco, Inc. (R&M); Marcus Hook Plant
CP–23–0001 ..........
Delaware ................
Waste Management Disposal Services
of Pennsylvania, Inc. (GROWS Landfill).
Koppel Steel Corporation—Ambridge
Plant.
General Motors Corporation ...................
OP–09–0007 ..........
Bucks .....................
6/24/98
8/1/01
6/8/95
8/2/01
12/19/97
7/17/01
OP–04–000–227 ....
Beaver ...................
10/12/00
CO–243 .................
Allegheny ...............
8/27/96
Oakmont Steel, Inc .................................
CO–226 .................
Allegheny ...............
5/14/96
The Peoples Natural Gas Co .................
CO–240 .................
Allegheny ...............
8/27/96
U.S. Bureau of Mines .............................
EO–215 ..................
Allegheny ...............
3/8/96
Waste Management Disposal Services
of Pennsylvania (Pottstown Landfill).
FPL Energy MH50, LP (Sunoco, Inc.
(R&M)).
Exelon
Generation
Company—
(PECO)—Richmond Generating Station.
Jefferson Smurfit Corp./Container Corp.
of America.
Maritank Philadelphia, Inc ......................
OP–46–0033 ..........
Montgomery ...........
4/20/99
PA–23–0084 ..........
Delaware ................
7/26/99
PA–51–4903 ..........
Philadelphia ...........
7/11/01
PLID (PA–51–)1566
Philadelphia ...........
4/10/95
PLID (PA–51–)5013
Philadelphia ...........
12/28/95
Moyer Packing Company .......................
OP–46–0001 ..........
Montgomery ...........
3/15/96
Tullytown Resource Recovery Facility
(Waste Management of Pa., Inc.).
SPS Technologies, Inc ...........................
OP–09–0024 ..........
Bucks .....................
7/14/97
OP–46–0032 ..........
Montgomery ...........
10/30/97
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00034
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
EPA approval date
Additional explanation/§ 52.2063
citation
10/12/01;
52044.
10/17/01;
52700.
10/17/01;
52700.
10/17/01;
52700.
10/17/01;
52700.
10/17/01;
52700.
10/17/01;
52700.
10/17/01;
52700.
10/17/01;
52700.
10/17/01;
52700.
10/17/01;
52700.
10/17/01;
52700.
10/30/01;
54699.
10/30/01;
54699.
66 FR
(c)(177)(i)(B)(8).
66 FR
(c)(178)(i)(B)(1).
66 FR
(c)(178)(i)(B)(2).
66 FR
(c)(178)(i)(B)(2).
66 FR
(c)(178)(i)(B)(3).
66 FR
(c)(178)(i)(B)(4).
66 FR
(c)(178)(i)(B)(5).
66 FR
(c)(178)(i)(B)(6).
66 FR
(c)(178)(i)(B)(7).
66 FR
(c)(178)(i)(B)(8).
66 FR
(c)(178)(i)(B)(9).
66 FR
(c)(178)(i)(B)(10).
66 FR
(c)(179)(i)(B)(1).
66 FR
(c)(179)(i)(B)(2).
10/30/01;
54699.
10/30/01;
54699.
10/30/01;
54699.
10/30/01;
54699.
10/30/01;
54699.
66 FR
(c)(179)(i)(B)(3).
66 FR
(c)(179)(i)(B)(4).
66 FR
(c)(179)(i)(B)(5).
66 FR
(c)(179)(i)(B)(6).
66 FR
(c)(179)(i)(B)(7).
66 FR
(c)(180)(i)(B).
66 FR
(c)(181)(i)(B)(1).
66 FR
(c)(181)(i)(B)(2).
66 FR
(c)(181)(i)(B)(3).
66 FR
(c)(181)(i)(B)(4).
66 FR
(c)(182)(i)(B)(1).
66 FR
(c)(182)(i)(B)(2).
66 FR
(c)(182)(i)(B)(3).
66 FR
(c)(184)(i)(B)(1).
66 FR
(c)(184)(i)(B)(2).
66 FR
(c)(184)(i)(B)(3).
66 FR
(c)(184)(i)(B)(4).
66 FR
(c)(184)(i)(B)(5).
10/15/01;
52317.
10/15/01;
52327.
10/15/01;
52327.
10/15/01;
52327.
10/15/01;
52327.
10/30/01;
54704.
10/30/01;
54704.
10/30/01;
54704.
10/31/01;
54947.
10/31/01;
54947.
10/31/01;
54947.
10/31/01;
54947.
10/31/01;
54947.
25FER2
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
9483
(1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR
VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued
State
effective
date
Name of source
Permit No.
County
PECO Energy Company ........................
OP–09–0077 ..........
Bucks .....................
12/19/97
Philadelphia Gas Works—Richmond
Plant.
Exelon Generation Company—Delaware Generating Station.
Exelon Generation Company—Schuylkill
Generating Station.
International Business Systems, Inc ......
PA–51–4922 ..........
Philadelphia ...........
7/27/99
PA–51–4901 ..........
Philadelphia ...........
7/11/01
PA–51–4904 ..........
Philadelphia ...........
7/11/01
OP–46–0049 ..........
Montgomery ...........
10/29/98
Bethlehem Lukens Plate ........................
OP–46–0011 ..........
Montgomery ...........
12/11/98
Montenay Montgomery Limited Partnership.
Northeast Foods, Inc. (Bake Rite Rolls)
OP–46–0010A .......
Montgomery ...........
OP–09–0014 ..........
Bucks .....................
4/20/99
6/20/00
4/9/99
Aldan Rubber Company .........................
PA–(51–)1561 ........
Philadelphia ...........
7/21/00
Braceland Brothers, Inc ..........................
PA–(51–)3679 ........
Philadelphia ...........
7/14/00
Graphic Arts, Incorporated .....................
PA–(51–)2260 ........
Philadelphia ...........
7/14/00
O’Brien (Philadelphia) Cogeneration,
Inc.—Northeast Water Pollution Control Plant.
O’Brien (Philadelphia) Cogeneration,
Inc.—Southwest Water Pollution Control Plant.
Pearl Pressman Liberty ..........................
PA–(51–)1533 ........
Philadelphia ...........
7/21/00
PA–(51–)1534 ........
Philadelphia ...........
PA–(51–)7721 ........
Arbill Industries, Inc ................................
EPA approval date
66 FR
(c)(184)(i)(B)(6).
66 FR
(c)(184)(i)(B)(7).
66 FR
(c)(184)(i)(B)(8).
66 FR
(c)(184)(i)(B)(9).
66 FR
(c)(185)(i)(B)(1).
66 FR
(c)(185)(i)(B)(2).
66 FR
(c)(185)(i)(B)(3).
66 FR
(c)(185)(i)(B)(4).
66 FR
(c)(185)(i)(B)(5).
66 FR
(c)(185)(i)(B)(6).
66 FR
(c)(185)(i)(B)(7).
66 FR
(c)(185)(i)(B)(8).
7/21/00
10/30/01; 66 FR
54691.
(c)(185)(i)(B)(9).
Philadelphia ...........
7/24/00
(c)(185)(i)(B)(10).
PA–51–3811 ..........
Philadelphia ...........
7/27/99
McWhorter Technologies, Inc ................
PA–51–3542 ..........
Philadelphia ...........
7/27/99
Northeast Water Pollution Control Plant
PA–51–9513 ..........
Philadelphia ...........
7/27/99
Newman and Company ..........................
PLID (51–)3489 .....
Philadelphia ...........
6/11/97
Allegheny Ludlum Steel Corporation .....
(OP–)65–000–137
Westmoreland ........
5/17/99
INDSPEC Chemical Corporation ...........
PA10–021 ..............
Butler .....................
10/19/98
Stoney Creek Technologies, L.L.C ........
PA–23–0002 ..........
Delaware ................
2/24/99
Superpac, Inc .........................................
OP–09–0003 ..........
Bucks .....................
3/25/99
Transit America, Inc ...............................
PLID (51–)1563 .....
Philadelphia ...........
6/11/97
American Bank Note Company ..............
OP–46–0075 ..........
Montgomery ...........
Atlas Roofing Corporation—Quakertown
OP–09–0039 ..........
Bucks .....................
5/19/97
8/10/98
3/10/99
Beckett Corporation ................................
OP–15–0040 ..........
Chester ..................
7/8/97
Klearfold, Inc ..........................................
OP–09–0012 ..........
Bucks .....................
4/15/99
National Label Company ........................
OP–46–0040 ..........
Montgomery ...........
7/28/97
Bethlehem Steel Corporation .................
OP–22–02012 ........
Dauphin .................
4/9/99
Hershey Chocolate USA ........................
OP–22–2004A .......
Dauphin .................
1/24/00
Pennsylvania Power Company New
Castle Plant.
Lafarge Corporation ...............................
OP–37–0023 ..........
Lawrence ...............
4/8/99
OP–39–0011B .......
Lehigh ....................
5/19/97
The Peoples Natural Gas Company ......
(OP–)11–000–356
Cambria .................
11/23/94
10/30/01; 66 FR
54691.
10/30/01; 66 FR
54691.
10/30/01; 66 FR
54691.
10/30/01; 66 FR
54691.
10/30/01; 66 FR
54691.
10/19/01; 66 FR
53090.
10/19/01; 66 FR
53090.
11/5/01; 66 FR
55880.
11/5/01; 66 FR
55880.
11/5/01; 66 FR
55880.
11/5/01; 66 FR
55880.
11/5/01; 66 FR
55880.
11/5/01; 66 FR
55880.
11/5/01; 66 FR
55880.
11/5/01; 66 FR
55880.
5/23/02; 67 FR
36108.
6/26/02; 67 FR
43002.
6/26/02; 67 FR
43002.
4/1/03; 68 FR
15661.
4/1/03; 68 FR
15661.
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00035
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
10/31/01;
54947.
10/31/01;
54947.
10/31/01;
54947.
10/31/01;
54947.
10/30/01;
54691.
10/30/01;
54691.
10/30/01;
54691.
10/30/01;
54691.
10/30/01;
54691.
10/30/01;
54691.
10/30/01;
54691.
10/30/01;
54691.
Additional explanation/§ 52.2063
citation
25FER2
(c)(185)(i)(B)(11).
(c)(185)(i)(B)(12).
(c)(185)(i)(B)(13).
(c)(185)(i)(B)(14).
(c)(186)(i)(B)(1).
(c)(186)(i)(B)(2).
(c)(187)(i)(B)(1).
(c)(187)(i)(B)(2).
(c)(187)(i)(B)(3).
(c)(187)(i)(B)(4).
(c)(187)(i)(B)(5).
(c)(187)(i)(B)(6).
(c)(187)(i)(B)(7).
(c)(187)(i)(B)(8).
(c)(191).
(c)(194)(i)(B)(1).
(c)(194)(i)(B)(2).
(c)(196)(i)(B)(1).
(c)(196)(i)(B)(2).
9484
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(1) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR
VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX)—Continued
State
effective
date
Name of source
Permit No.
County
Horsehead
Resource
Development
Company, Inc.
Williams
Generation
Company—
Hazelton.
Pennsylvania Power and Light Company, Holtwood Steam Electric Station.
General Electric Transportation Systems
OP–13–0001 ..........
Carbon ...................
5/16/95
OP–40–0031A .......
Luzerne ..................
3/10/00
PA–36–2016 ..........
Lancaster ...............
5/25/95
OP–25–025A .........
Erie ........................
8/26/02
Bethlehem Structural Products Corporation.
International Paper Company, Erie Mill
OP–48–0013 ..........
Northampton ..........
10/24/96
PA–25–028 ............
Erie ........................
12/21/94
National Fuel Gas Supply—Heath Compressor Station.
PPG Industries, Inc ................................
PA–33–144A ..........
Jefferson ................
10/5/98
OP–20–145 ............
Crawford ................
5/31/95
Dominion Trans., Inc.—Finnefrock Station.
Textron Lycoming—Oliver Street Plant ..
Title V–18–00005 ..
Clinton ....................
2/16/00
Title V–41–00005 ..
Lycoming ...............
1/12/01
Lafayette College, Easton Campus .......
OP–48–0034 ..........
Northampton ..........
8/18/97
Keystone Carbon Company ...................
OP–24–016 ............
Elk ..........................
5/15/95
Mack Trucks, Inc ....................................
OP–39–0004 ..........
Northampton ..........
5/31/95
Owens-Brockway Glass Container, Inc
OP–33–033 ............
Jefferson ................
3/27/95
Resilite Sport Products, Inc ....................
OP–49–0003 ..........
Northumberland .....
12/3/96
Westfield Tanning Company ..................
OP–59–0008 ..........
Tioga ......................
11/27/96
Tarkett, Incorporated ..............................
Hacros Pigments, Inc .............................
OP–39–0002 ..........
OP–48–0018 ..........
Lehigh ....................
Northampton ..........
5/31/95
7/31/96
GPU Generation Corp., Homer City Station.
GPU Generation Corp., Seward Station
(OP–)32–000–055
Indiana ...................
10/29/98
(OP–)32–000–040
Indiana ...................
4/30/98
Ebensburg Power Company, Ebensburg
Cogeneration Plant.
Sithe Pennsylvania Holdings, LLC, Warren Station.
Pennsylvania Power & Light Company,
Sunbury SES.
Lakeview Landfill ....................................
(OP–)11–000–318
Cambria .................
3/28/01
OP–62–012B .........
Warren ...................
1/20/00
OP–55–0001A .......
Snyder ...................
7/7/97
OP–25–920 ............
Erie ........................
5/29/97
National Fuel Gas Supply Corp.—
Roystone Compressor Station.
Crompton Corporation, Fairview Township.
Andritz, Inc .............................................
OP 62–141F ..........
Warren ...................
4/1/0369
OP–10–037 ............
Butler .....................
6/4/03
41–00010C ............
Lycoming ...............
4/30/03
Brodart Company ...................................
18–0007A ..............
Clinton ....................
4/8/03
Erie Sewer Authority ..............................
OP–25–179 ............
Erie ........................
6/5/03
Hercules Cement Company ...................
OP–48–0005A .......
Northampton ..........
4/16/99
Tennessee Gas Pipeline Company, Station 321.
OP 58–00001A ......
Susquehanna .........
4/16/98
Tennessee Gas Pipeline Company, Station 219.
OP 43–0272 ..........
Mercer ....................
4/7/99
VerDate jul<14>2003
19:48 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00036
Fmt 4701
Sfmt 4700
E:\FR\FM\25FER2.SGM
EPA approval date
4/1/03; 68 FR
15661.
4/1/03; 68 FR
15661.
4/1/03; 68 FR
15661.
4/7/03; 68 FR
16724.
5/2/03; 68 FR
23404.
5/2/03; 68 FR
23404.
5/2/03; 68 FR
23404.
3/24/03; 68
FR14154.
5/7/03; 68 FR
24365.
5/7/03; 68 FR
24365.
5/20/03; 68 FR
27471.
10/17/03; 68 FR
59741.
10/17/03; 68 FR
59741.
10/17/03; 68 FR
59741.
10/17/03; 68 FR
59741.
10/17/03; 68 FR
59741.
8/6/03 68 FR 46487
8/6/03; 68 FR
46487.
10/15/03; 68 FR
59321.
10/15/03; 68 FR
59321.
10/15/03; 68 FR
59321.
10/15/03; 68 FR
59321.
10/15/03; 68 FR
59321.
10/15/03; 68 FR
59321.
10/27/04; FR 62583
5/25/04; 69 FR
29444.
10/15/03; 68 FR
59318.
10/15/03; 68 FR
59318.
10/15/03; 68 FR
59318.
11/24/03; 68 FR
65846.
10/27/04; 69 FR
62585.
10/27/04; 69 FR
62585.
25FER2
Additional explanation/§ 52.2063
citation
(c)(196)(i)(B)(3).
(c)(196)(i)(B)(4).
(c)(196)(i)(B)(5).
(c)(198)(i)(B).
(c)(200)(i)(B)(1).
(c)(200)(i)(B)(2).
(c)(200)(i)(B)(3).
(c)(201)(i)(B).
(c)(202)(i)(B)(1).
(c)(202)(i)(B)(2).
(c)(205)(i)(B).
(c)(207)(i)(B)(1).
(c)(207)(i)(B)(1).
(c)(207)(i)(B)(1).
(c)(207)(i)(B)(1).
(c)(207)(i)(B)(1).
(c)(208)(i)(B)(1).
(c)(208)(i)(B)(2).
(c)(212)(i)(B)(1).
(c)(212)(i)(B)(2).
(c)(212)(i)(B)(3).
(c)(212)(i)(B)(4).
(c)(212)(i)(B)(5).
(c)(212)(i)(B)(6).
(c)(213)(i)(B)(1).
(c)(213)(i)(B)(2).
(c)(214)(i)(B)(1).
(c)(214)(i)(B)(2).
(c)(214)(i)(B)(3).
(c)(217)(i)(B).
(c)(218)(i)(B)(1);
The SIP effective
date is 12/27/04.
(c)(218)(i)(B)(2);
The SIP effective
date is 12/27/04.
9485
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(2) EPA-APPROVED VOLATILE ORGANIC COMPOUNDS (VOC) EMISSIONS TRADING PROGRAMS
State
effective
date
Name of source
Permit Number
County
National Can Company Fres-co Systems, USA Inc. Paramount Packaging
Corp.
85–524; 85–525 .....
Bucks .....................
EPA approval date
3/1/85
4/21/88; 53 FR
13121.
Additional
explanation/
§ 52.2063 citation
(c)(68); transfer of
offsets from
NCCo to Fres-co
and Paramount.
(3) EPA-APPROVED SOURCE SPECIFIC SULFUR DIOXIDE (SO2) REQUIREMENTS
State
effective
date
Name of source
Permit Number
County
USX Corporation, Clairton Coke Works
200 .........................
Allegheny ...............
11/17/94
Reliant Energy Mid-Atlantic Power Holdings LLC, Warren Generating Station.
United Refining Company ......................
SO2–62–00012 ......
Warren ...................
11/21/01
SO2–62–017E .......
Warren ...................
6/11/01
Trigen-Philadelphia Energy Corporation
SO2–95–002 ..........
Philadelphia ...........
7/27/00
Grays Ferry Cogeneration Partnership ..
SO2–95–002A .......
Philadelphia ...........
7/27/00
PECO Energy Company, Schuylkill
Generating Station.
Sunoco, Inc. (R&M) Philadelphia Refinery.
SO2–95–006 ..........
Philadelphia ...........
7/27/00
SO2–95–039 ..........
Philadelphia ...........
EPA approval date
7/27/00
8/18/95; 60 FR
43012.
1/17/03; 68 FR
2459.
1/17/03; 68 FR
2459.
9/9/02; 67 FR
57155.
9/9/02; 67 FR
57155.
9/9/02; 67 FR
57155.
9/9/02; 67 FR
57155.
Additional
explanation/
§ 52.2063 citation
(c)(99).
(c)(190)(i)(C)(1).
(c)(190)(i)(C)(2).
(c)(193)(i)(B)(1).
(c)(193)(i)(B)(2).
(c)(193)(i)(B)(3).
(c)(193)(i)(B)(4).
(4) EPA-APPROVED SOURCE SPECIFIC LEAD (PB) REQUIREMENTS
State
effective
date
Name of source
Permit Number
County
East Penn Manufacturing Corp. .............
[None] ....................
Berks ......................
5/29/84
General Battery Corporation ..................
[None] ....................
Berks ......................
5/29/84
Tonolli Corporation (Closed) ..................
[None] ....................
Carbon ...................
5/29/84
Franklin Smelting and Refining Corporation.
MDC Industries, Inc ................................
[None] ....................
Philadelphia ...........
9/21/94
[None] ....................
Philadelphia ...........
9/21/94
Anzon, Inc ..............................................
[None] ....................
Philadelphia ...........
EPA approval date
9/21/94
7/27/84; 49 FR
30179.
7/27/84; 49 FR
30179.
7/27/84; 49 FR
30179.
12/20/96; 61 FR
67275.
12/20/96; 61 FR
67275.
12/20/96; 61 FR
67275.
Additional
explanation/
§ 52.2063 citation
(c)(62).
(c)(62).
(c)(62).
(c)(112).
(c)(112).
(c)(112).
(e) EPA-approved nonregulatory and
quasi-regulatory material.
(1) EPA-APPROVED NONREGULATORY AND QUASI-REGULATORY MATERIAL
State
submittal
date
Name of non-regulatory SIP revision
Applicable geographic area
Sulfur Dioxide Attainment Demonstration
Conewego, Pleasant, and Glade Townships; City of Warren (Warren Co.).
Allegheny County-sulfur dioxide area defined in 40 CFR 81.339.
Philadelphia-Wilmington-Trenton Ozone
Nonattainment Area.
Philadelphia County ................................
Sulfor Dioxide Attainment Demonstration
Photochemical Assessment Monitoring
Stations (PAMS) Program.
1990 Base Year Emission Inventory—
Carbon Monoxide.
1990 Base Year Emission Inventory—
VOC.
VerDate jul<14>2003
20:37 Feb 24, 2005
Jkt 205001
Pittsburgh-Beaver Valley Ozone Nonattainment Area.
PO 00000
Frm 00037
Fmt 4701
Sfmt 4700
8/20/01
8/15/03
9/23/04
9/8/95;
10/30/95
3/22/96;
2/18/97;
7/22/98
EPA approval date
1/17/03; 68 FR
2454.
7/21/04; 69 FR
43522.
9/11/05; 60 FR
47081.
1/30/96; 61 FR
2982.
4/3/01; 66 FR
17634.
E:\FR\FM\25FER2.SGM
25FER2
Additional
explanation
52.2033(b).
52.2033(c).
52.2035.
52.2036(a).
52.2036(d).
9486
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(1) EPA-APPROVED NONREGULATORY AND QUASI-REGULATORY MATERIAL—Continued
State
submittal
date
Name of non-regulatory SIP revision
Applicable geographic area
1990 Base Year Emission Inventory—
VOC, CO, NOX.
1990 Base Year Emission Inventory—
VOC.
1990 Base Year Emission Inventory—
NOX.
1990 Base Year Emission Inventory—
NOX.
1990 Base Year Emission Inventory-Carbon Monoxide.
Post 1996 Rate of Progress Plan ............
Reading Area (Berks County) .................
1/28/97
Philadelphia-Wilmington-Trenton Ozone
Nonattainment Area.
Philadelphia-Wilmington-Trenton Ozone
Nonattainment Area.
Pittsburgh-Beaver Valley Ozone Nonattainment Area.
City of Pittsburgh-CBD & Oakland .........
9/12/96
One-Hour Ozone Attainment Demonstration.
Philadelphia-Wilmington-Trenton Ozone
Nonattainment Area.
Philadelphia-Wilmington-Trenton Ozone
Nonattainment Area.
7/31/98
3/22/96;
2/18/97
11/12/92;
8/17/01
7/31/98;
2/25/00
4/30/98;
8/21/98;
2/25/00;
7/19/01
2/25/00
EPA approval date
5/7/97; 62 FR
24846.
6/9/97; 62 FR
31343.
6/17/99; 64 FR
32422.
10/19/01; 66 FR
53094.
11/12/02; 67 FR
68521.
10/26/01; 66 FR
54143.
10/26/01; 66 FR
54143.
Additional
explanation
52.2036(e).
52.2036(i).
52.2036(l).
52.2036(m).
52.2036(n).
52.2037(i).
52.2037(j).
Mobile Budgets for Post-1996 and 2005
attainment plans.
51% Rate of Progress Plan ......................
Philadelphia-Wilmington-Trenton Ozone
Nonattainment Area.
Pittsburgh-Beaver Valley Ozone Nonattainment Area.
15% Rate of Progress Plan ......................
Philadelphia-Wilmington-Trenton Ozone
Nonattainment Area.
Control of Asphalt Paving Material (Emission offset).
Particulate matter SIP ..............................
Defined 16-county area in Western PA
and Southwestern PA.
Allegheny County-Clairton PM10 .............
3/22/96;
2/18/97;
7/22/98;
9/12/96;
4/10/97;
6/5/98
5/20/77;
7/15/77
1/6/94
Small Business Assistance Program .......
Source Testing Manual ............................
Statewide ................................................
Allegheny County ....................................
2/1/93
9/10/79
Ozone Nonattainment Plan ......................
Statewide ................................................
4/24/79
Non-regulatory measures .........................
Southwest Pa. AQCR .............................
9/17/79
Air Quality Monitoring Network .................
Statewide (except Allegheny County) .....
1/25/80
Attainment plan for sulfur dioxide .............
Armstrong County ...................................
4/9/81
Air Quality Monitoring Network .................
Allegheny County ....................................
12/24/80
Expanded Ridesharing Program ..............
Metro. Philadelphia AQCR ......................
12/9/81
Lead (Pb) SIP ...........................................
Lead (Pb) SIP ...........................................
Allegheny County ....................................
Philadelphia .............................................
Lead (Pb) SIP ...........................................
Ozone and Carbon Monoxide Plan ..........
Statewide (except Philadelphia and Allegheny Counties).
Metro. Philadelphia AQCR ......................
Ozone and Carbon Monoxide Plan ..........
Southwestern Pa. AQCR ........................
Ozone and Carbon Monoxide Plan ..........
Allentown-Bethlehem-Easton Air Basin ..
Carbon Monoxide Maintenance Plan .......
Philadelphia County ................................
Source Testing Manual ............................
Statewide ................................................
9/6/83
8/29/83;
5/15/84
9/30/82;
6/8/84
6/30/82;
10/24/83
6/30/82;
10/24/83
6/30/82;
10/24/83
9/8/95;
10/30/95
11/26/94
Continuous Source Testing Manual .........
Statewide ................................................
11/26/94
7/30/96; 61 FR
39497.
Ozone Maintenance Plan .........................
Reading Area (Berks County) .................
1/28/97
Ozone Maintenance Plan .........................
Pittsburgh-Beaver Valley Ozone Nonattainment Area.
5/21/01
5/7/97; 62 FR
24846.
10/19/01; 66 FR
53094.
8/5/03; 68 FR
46099.
52.2063(c)(110)
(i)(D); cross-referenced in Section 139.5.
52.2063(c)(110)
(i)(D); cross-referenced in Section 139.5.
52.2063(c)(123).
52.2063(c)(188).
4/11/03
VerDate jul<14>2003
20:37 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00038
Fmt 4701
Sfmt 4700
10/26/01; 66 FR
54143.
4/3/01; 66 FR
17634.
52.2038(a).
8/24/01; 66 FR
44547.
52.2038(b).
10/6/77; 42 FR
54417.
9/8/98; 63 FR
47434.
1/6/95; 60 FR 1738
10/21/81; 46 FR
51607.
5/20/80; 46 FR
33607.
5/20/80; 46 FR
33607.
8/5/81; 46 FR
39822.
8/18/81; 46 FR
43423.
9/15/81; 46 FR
45762.
10/7/82; 47 FR
44259.
2/6/84; 49 FR 4379
8/1/84; 49 FR
30696.
7/27/84; 49 FR
30179.
2/26/85; 45 FR
7772.
2/26/85; 45 FR
7772.
2/26/85; 45 FR
7772.
1/30/96; 61 FR
2982.
7/30/96; 61 FR
39497.
52.1120(c)(15) 1;
52.2054.
52.2059.
E:\FR\FM\25FER2.SGM
25FER2
52.2037(k).
52.2060.
52.2063(c)(4).
52.2063(c)(22).
52.2063(c)(30).
52.2063(c)(34).
52.2063(c)(36).
52.2063(c0(38).
52.2063(c)(46).
52.2063(c)(59).
52.2063(c)(61).
52.2063(c)(62).
52.2063(c)(63).
52.2063(c)(63).
52.2063(c)(63).
52.2063(c)(105).
52.2063(c)(210).
9487
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Rules and Regulations
(1) EPA-APPROVED NONREGULATORY AND QUASI-REGULATORY MATERIAL—Continued
Name of non-regulatory SIP revision
State
submittal
date
Applicable geographic area
EPA approval date
4/22/04
12/10/04; 69 FR
71212.
11/12/02; 67 FR
68521.
9/11/03; 68 FR
53515.
7/21/04; 69 FR
43522.
7/1/04; 69 FR
39860.
Carbon Monoxide Maintenance Plan .......
City of Pittsburgh-CBD & Oakland .........
8/17/01
PM10 Maintenance Plan ...........................
Allegheny County-Clairton PM10 nonattainment area.
Allegheny County-sulfur dioxide area defined in 40 CFR 81.339.
Conewego, Pleasant, and Glade Townships; City of Warren (Warren Co.).
9/14/02
Sulfur Dioxide Maintenance Plan .............
Sulfur Dioxide Maintenance Plan .............
8/15/03
5/7/04
Additional
explanation
52.2063(c)(226);
The SIP effective
date is 1/10/05.
52.2063(c)(189).
52.2063(c)(215).
52.2063(c)(216)
(i)(B).
52.2063(c)(224).
1 Because of an editing error, this section was placed in the wrong subpart of 40 CFR part 52 (subpart W instead of subpart NN), and subsequently removed. However, EPA considers this provision to be a current Federally-enforceable portion of the SIP. The ‘‘removed’’ paragraph
reads as follows: ‘‘Pennsylvania Department of Transportation change to section 7.5.9.8 of the Paving Maintenance Manual creditable as emission offsets submitted by the Secretary of the Pennsylvania Department of Environmental Resources on July 15, 1997, as addenda to the Pennsylvania Air Quality Implementation Plan.’’
(2) EPA-APPROVED SOURCE-SPECIFIC REASONABLY AVAILABLE CONTROL TECHNOLOGY (RACT) REQUIREMENTS FOR
VOLATILE ORGANIC COMPOUNDS (VOC) AND OXIDES OF NITROGEN (NOX) NOT INCORPORATED BY REFERENCE
Name of source
Permit No.
County
State submittal date
USX Corp./U.S. Steel Group—
Fairless Hills.
General Glass—Jeannette ...............
09–0006
Bucks .................
65–0675
Westmoreland ....
8/11/95
11/15/95
7/5/95
Sharon Steel Company ....................
43–0017
Mercer ................
12/8/95
R.R. Donnelley and Sons Co.—Lancaster East Plant.
Rockwell Heavy Vehicle, Inc.—New
Castle Forge Plant.
Pennsylvania
Electric
Co.—
(PENELEC)—Williamsburg Station.
Caparo Steel Company ....................
36–2027
Lancaster ...........
9/20/95
37–065
Lawrence ............
4/8/98
07–2006
Blair ....................
8/1/95
43–0285
Mercer ................
12/8/95
Mercerburg Tanning Co. ...................
28–2008
Franklin ..............
4/26/95
Duquesne Light Co.—Brunot Island
Station.
Duquesne Light Co.—Phillips Station
214
Allegheny ...........
3/5/01
212
Allegheny ...........
4/15/99
EPA approval
date
04/09/96;
15709.
05/16/96;
24727.
12/20/96;
67275.
07/21/97;
33891.
04/16/99;
18818.
12/20/96;
67275.
12/20/96;
67275.
03/12/97;
11079.
10/18/01;
52867.
10/18/01;
52867.
61 FR
Additional explanation/
§ 52.2063 citation
61 FR
52.2036(b); 52.2037(c);
shutdown date is 8/1/91.
52.2036(c); 52.2037(d).
61 FR
52.2036(f); 52.2037(e).
62 FR
52.2036(j).
64 FR
52.2036(k); source shutdown date
is 4/1/93.
52.2037(f); 52.2063(c)(113)(i)(A) &
(ii)(A).
52.2037(g).
61 FR
61 FR
62 FR
66 FR
52.2037(h); 52.2063(c)(114)(i)(A)(3)
& (ii)(A).
52.2063(c)(161)(ii)(A).
66 FR
52.2063(c)(161)(ii)(B).
[FR Doc. 05–3359 Filed 2–24–05; 8:45 am]
BILLING CODE 6560–50–P
VerDate jul<14>2003
20:37 Feb 24, 2005
Jkt 205001
PO 00000
Frm 00039
Fmt 4701
Sfmt 4700
source
E:\FR\FM\25FER2.SGM
25FER2
Agencies
[Federal Register Volume 70, Number 37 (Friday, February 25, 2005)]
[Rules and Regulations]
[Pages 9450-9487]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-3359]
[[Page 9449]]
-----------------------------------------------------------------------
Part II
Environmental Protection Agency
-----------------------------------------------------------------------
40 CFR Part 52
Approval and Promulgation of Air Quality Implementation Plans;
Pennsylvania; Revised Format for Materials Being Incorporated by
Reference; Final Rule
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 /
Rules and Regulations
[[Page 9450]]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[PA200-4200; FRL-7843-2]
Approval and Promulgation of Air Quality Implementation Plans;
Pennsylvania; Revised Format for Materials Being Incorporated by
Reference
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule; notice of administrative change.
-----------------------------------------------------------------------
SUMMARY: EPA is revising the format for materials submitted by
Pennsylvania that are incorporated by reference (IBR) into its State
implementation plan (SIP). The regulations affected by this format
change have all been previously submitted by Pennsylvania and approved
by EPA. This format revision will primarily affect the ``Identification
of plan'' section, as well as the format of the SIP materials that will
be available for public inspection at the National Archives and Records
Administration (NARA), the Air and Radiation Docket and Information
Center located at EPA Headquarters in Washington, D.C., and the EPA
Region III Office. EPA is also adding a table in the ``Identification
of plan'' section which summarizes the approval actions that EPA has
taken on the non-regulatory and quasi-regulatory portions of the
Pennsylvania SIP.
DATES: Effective Date: This final rule is effective on February 25,
2005.
ADDRESSES: SIP materials which are incorporated by reference into 40
CFR part 52 are available for public inspection during normal business
hours at the Air Protection Division, U.S. Environmental Protection
Agency, Region III, 1650 Arch Street, Philadelphia, Pennsylvania 19103;
the Air and Radiation Docket and Information Center, U.S. Environmental
Protection Agency, 1301 Constitution Avenue, NW., Room B108,
Washington, DC 20460; or the National Archives and Records
Administration (NARA). For information on the availability of this
material at NARA, call (202) 741-6030, or go to: https://
www.archives.gov/federal_register/code_of_federal_regulations/ibr_
locations.html.
FOR FURTHER INFORMATION CONTACT: Harold A. Frankford, (215) 814-2108 or
by e-mail at frankford.harold@epamail.epa.gov.
SUPPLEMENTARY INFORMATION:
The supplementary information is organized in the following order:
I. Background
What a SIP is.
How EPA enforces SIPs.
How the State and EPA updates the SIP.
How EPA compiles the SIPs.
How EPA organizes the SIP compilation.
Where you can find a copy of the SIP compilation.
The format of the new Identification of Plan section.
When a SIP revision becomes Federally enforceable.
The historical record of SIP revision approvals.
II. What EPA is doing in this action.
III. Statutory and Executive Order Reviews
I. Background
What a SIP is--Each state has a SIP containing the control measures
and strategies used to attain and maintain the national ambient air
quality standards (NAAQS). The SIP is extensive, containing such
elements as air pollution control regulations, emission inventories,
monitoring network, attainment demonstrations, and enforcement
mechanisms.
How EPA enforces SIPs--Each state must formally adopt the control
measures and strategies in the SIP after the public has had an
opportunity to comment on them. They are then submitted to EPA as SIP
revisions on which EPA must formally act.
Once these control measures and strategies are approved by EPA,
after notice and comment, they are incorporated into the Federally-
approved SIP and are identified in part 52 (Approval and Promulgation
of Implementation Plans), title 40 of the Code of Federal Regulations
(40 CFR part 52). The actual state regulations approved by EPA are not
reproduced in their entirety in 40 CFR part 52, but are ``incorporated
by reference'' (IBR'd) which means that EPA has approved a given state
regulation with a specific effective date. This format allows both EPA
and the public to know which measures are contained in a given SIP and
ensures that the state is enforcing the regulations. It also allows EPA
and the public to take enforcement action, should a state not enforce
its SIP-approved regulations.
How the State and EPA updates the SIP--The SIP is a living document
which the state can revise as necessary to address the unique air
pollution problems in the state. Therefore, EPA must, from time to
time, take action on SIP revisions containing new and/or revised
regulations in order to make them part of the SIP. On May 22, 1997 (62
FR 27968), EPA revised the procedures for IBR'ing Federally-approved
SIPs, as a result of consultations between EPA and the Office of the
Federal Register (OFR).
EPA began the process of developing: (1) A revised SIP document for
each state that would be IBR under the provisions of title 1 CFR part
51; (2) a revised mechanism for announcing EPA approval of revisions to
an applicable SIP and updating both the IBR document and the CFR; and
(3) a revised format of the ``Identification of Plan'' sections for
each applicable subpart to reflect these revised IBR procedures. The
description of the revised SIP document, IBR procedures, and
``Identification of Plan'' format are discussed in further detail in
the May 22, 1997, Federal Register document.
How EPA compiles the SIPs--The Federally-approved regulations,
source-specific permits, and nonregulatory provisions (entirely or
portions of) submitted by each state agency have been compiled by EPA
into a ``SIP compilation.'' The SIP compilation contains the updated
regulations, source-specific permits, and nonregulatory provisions
approved by EPA through previous rulemaking actions in the Federal
Register.
How EPA organizes the SIP compilation--Each compilation contains
three parts. Part one contains the regulations, part two contains the
source-specific requirements that have been approved as part of the SIP
and part three contains nonregulatory provisions that have been EPA
approved. Each part consists of a table of identifying information for
each SIP-approved regulation, each SIP-approved source-specific permit,
and each nonregulatory SIP provision. In this action, EPA is publishing
the tables summarizing the applicable SIP requirements for the
Commonwealth of Pennsylvania, Allegheny County, and Philadelphia
County. The EPA Regional Offices have the primary responsibility for
updating the compilations and ensuring their accuracy.
Where you can find a copy of the SIP compilation--EPA Region III
developed and will maintain the compilation for Pennsylvania, including
Allegheny and Philadelphia Counties. A copy of the full text of
regulatory and source-specific SIP compilations for these three
jurisdictions will also be maintained at NARA and EPA's Air Docket and
Information Center.
The format of the new Identification of Plan section--In order to
better serve the public, EPA revised the organization of the
``Identification of Plan'' section and included additional information
to clarify the enforceable elements of the
[[Page 9451]]
SIP. The revised Identification of Plan section contains five
subsections:
1. Purpose and scope.
2. Incorporation by reference.
3. EPA-approved regulations.
4. EPA-approved source-specific requirements.
5. EPA-approved nonregulatory and quasi-regulatory provisions such
as air quality attainment plans, rate of progress plans, maintenance
plans, monitoring networks, and small business assistance programs.
When a SIP revision becomes Federally enforceable--All revisions to
the applicable SIP become Federally enforceable as of the effective
date of the revisions to paragraphs (c), (d), or (e) of the applicable
Identification of Plan section found in each subpart of 40 CFR part 52.
In general, SIP revisions become effective 30 to 60 days after
publication of EPA's SIP approval action in the Federal Register. In
specific cases, a SIP revision action may become effective less than 30
days or greater than 60 days after the Federal Register publication
date. In order to determine the effective date for a specific
Pennsylvania, Allegheny County, or Philadelphia County SIP provision
that is listed in paragraphs Sec. 52.2020(c), (d), or (e), consult the
Federal Register date, volume and page cited in the ``EPA approval
date'' column for that particular SIP provision.
The historical record of SIP revision approvals--To facilitate
enforcement of previously approved SIP provisions and provide a smooth
transition to the new SIP processing system, EPA retains the original
Identification of Plan section, previously appearing in the CFR as the
first or second section of part 52 for each state subpart. After an
initial two-year period, EPA will review its experience with the new
system and enforceability of previously approved SIP measures and will
decide whether or not to retain the Identification of Plan appendices
for some further period.
II. What EPA Is Doing in This Action
Today's rule constitutes a ``housekeeping'' exercise to ensure that
all revisions to the state programs that have occurred are accurately
reflected in 40 CFR part 52. State SIP revisions are controlled by EPA
regulations at 40 CFR part 51. When EPA receives a formal SIP revision
request, the Agency must publish the proposed revision in the Federal
Register and provide for public comment before approval.
EPA has determined that today's rule falls under the ``good cause''
exemption in Section 553(b)(3)(B) of the Administrative Procedures Act
(APA) which, upon finding ``good cause,'' authorizes agencies to
dispense with public participation and Section 553(d)(3) which allows
an agency to make a rule effective immediately (thereby avoiding the
30-day delayed effective date otherwise provided for in the APA).
Today's rule simply codifies provisions which are already in effect as
a matter of law in Federal and approved state programs. Under Section
553 of the APA, an agency may find good cause where procedures are
``impractical, unnecessary, or contrary to the public interest.''
Public comment is ``unnecessary'' and ``contrary to the public
interest'' since the codification only reflects existing law. Immediate
notice in the CFR benefits the public by removing outdated citations.
III. Statutory and Executive Order Reviews
A. General Requirements
Under Executive Order 12866 (58 FR 51735, October 4, 1993), this
action is not a ``significant regulatory action'' and is therefore not
subject to review by the Office of Management and Budget. This rule is
not subject to Executive Order 13211, ``Actions Concerning Regulations
That Significantly Affect Energy Supply, Distribution, or Use'' (66 FR
28355, May 22, 2001) because it is not a significant regulatory action
under Executive Order 12866. Because the agency has made a ``good
cause'' finding that this action is not subject to notice-and-comment
requirements under the Administrative Procedure Act or any other
statute as indicated in the Supplementary Information section above, it
is not subject to the regulatory flexibility provisions of the
Regulatory Flexibility Act (5 U.S.C 601 et seq.), or to sections 202
and 205 of the Unfunded Mandates Reform Act of 1995 (UMRA) (Pub. L.
104-4). In addition, this action does not significantly or uniquely
affect small governments or impose a significant intergovernmental
mandate, as described in sections 203 and 204 of UMRA. This rule also
does not have a substantial direct effect on one or more Indian tribes,
on the relationship between the Federal government and Indian tribes,
or on the distribution of power and responsibilities between the
Federal government and Indian tribes, as specified by Executive Order
13175 (65 FR 67249, November 9, 2000), nor will it have substantial
direct effects on the States, on the relationship between the national
government and the States, or on the distribution of power and
responsibilities among the various levels of government, as specified
in Executive Order 13132 (64 FR 43255, August 10, 1999). This rule also
is not subject to Executive Order 13045 (62 FR 19885, April 23, 1997),
because it is not economically significant. This rule does not involve
technical standards; thus the requirements of section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) do not apply. The rule also does not involve special
consideration of environmental justice related issues as required by
Executive Order 12898 (59 FR 7629, February 16, 1994). In issuing this
rule, EPA has taken the necessary steps to eliminate drafting errors
and ambiguity, minimize potential litigation, and provide a clear legal
standard for affected conduct, as required by section 3 of Executive
Order 12988 (61 FR 4729, February 7, 1996). EPA has complied with
Executive Order 12630 (53 FR 8859, March 15, 1998) by examining the
takings implications of the rule in accordance with the ``Attorney
General's Supplemental Guidelines for the Evaluation of Risk and
Avoidance of Unanticipated Takings'' issued under the executive order.
This rule does not impose an information collection burden under the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). EPA's
compliance with these statutes and Executive Orders for the underlying
rules are discussed in previous actions taken on the State's rules.
B. Submission to Congress and the Comptroller General
The Congressional Review Act (5 U.S.C. 801 et seq.), as added by
the Small Business Regulatory Enforcement Fairness Act of 1996,
generally provides that before a rule may take effect, the agency
promulgating the rule must submit a rule report, which includes a copy
of the rule, to each House of the Congress and to the Comptroller
General of the United States. Section 808 allows the issuing agency to
make a rule effective sooner than otherwise provided by the CRA if the
agency makes a good cause finding that notice and public procedure is
impracticable, unnecessary or contrary to the public interest. Today's
action simply codifies provisions which are already in effect as a
matter of law in Federal and approved State programs. 5 U.S.C. 808(2).
As stated previously, EPA has made such a good cause finding, including
the reasons therefore, and established an effective date of February
25, 2005. EPA will submit a report containing this rule and other
required information to the U.S. Senate, the U.S. House of
Representatives, and the Comptroller General of the United States prior
to publication of the rule in the Federal
[[Page 9452]]
Register. This rule is not a ``major rule'' as defined by 5 U.S.C.
804(2).
C. Petitions for Judicial Review
EPA has also determined that the provisions of section 307(b)(1) of
the Clean Air Act pertaining to petitions for judicial review are not
applicable to this action. Prior EPA rulemaking actions for each
individual component of the Pennsylvania SIP compilations had
previously afforded interested parties the opportunity to file a
petition for judicial review in the United States Court of Appeals for
the appropriate circuit within 60 days of such rulemaking action. Thus,
EPA sees no need in this action to reopen the 60-day period for filing
such petitions for judicial review for these ``Identification of plan''
reorganization actions for Pennsylvania.
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Carbon monoxide,
Incorporation by reference, Intergovernmental relations, Nitrogen
dioxide, Ozone, Particulate matter, Reporting and recordkeeping
requirements, Sulfur oxides, Volatile organic compounds.
Dated: November 17, 2004.
Thomas Voltaggio,
Acting Regional Administrator, Region III.
0
For the reasons set forth in the preamble, 40 CFR part 52 is amended as
follows:
PART 52--[AMENDED]
0
1. The authority citation for part 52 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
Subpart NN--Pennsylvania
0
2. Section 52.2020 is redesignated as Section 52.2063 and the heading
and paragraph (a) are revised to read as follows:
Sec. 52.2063 Original identification of plan section.
(a) This section identifies the original ``Air Implementation Plan
for the Commonwealth of Pennsylvania'' and all revisions submitted by
Pennsylvania that were federally approved prior to February 10, 2005.
* * * * *
0
3. A new Section 52.2020 is added to read as follows:
Sec. 52.2020 Identification of plan.
(a) Purpose and scope. This section sets forth the applicable State
implementation plan for Pennsylvania under section 110 of the Clean Air
Act, 42 U.S.C. 7410, and 40 CFR part 51 to meet national ambient air
quality standards.
(b) Incorporation by reference. (1) Material listed as incorporated
by reference in paragraphs (c) and (d) was approved for incorporation
by reference by the Director of the Federal Register in accordance with
5 U.S.C. 552(a) and 1 CFR part 51. Material incorporated as it exists
on the date of the approval, and notice of any change in the material
will be published in the Federal Register. Entries in paragraphs (c)
and (d) of this section with EPA approval dates on or after February
10, 2005, will be incorporated by reference in the next update to the
SIP compilation.
(2) EPA Region III certifies that the rules/regulations provided by
EPA at the addresses in paragraph (b)(3) of this section are an exact
duplicate of the officially promulgated State rules/regulations which
have been approved as part of the State implementation plan as of
February 10, 2005.
(3) Copies of the materials incorporated by reference may be
inspected at the EPA Region III Office at 1650 Arch Street,
Philadelphia, PA 19103; the EPA, Air and Radiation Docket and
Information Center, Air Docket (6102), 1301 Constitution Avenue, NW.,
Room B108, Washington, DC 20460; or at the National Archives and
Records Administration (NARA). For information on the availability of
this material at NARA, call (202) 741-6030, or go to: https://
www.archives.gov/federal_register/code_of_federal_regulations/ibr_
locations.html.
(c) EPA-Approved Regulations.
(1) EPA-Approved Pennsylvania Regulations
----------------------------------------------------------------------------------------------------------------
State Additional
State citation Title subject effective EPA approval date explanation/Sec.
date 52.2063 citation
----------------------------------------------------------------------------------------------------------------
Title 25. Environmental Protection Article III. Air Resources
----------------------------------------------------------------------------------------------------------------
Chapter 121 General Provisions
----------------------------------------------------------------------------------------------------------------
Section 121.1................... Definitions............. 12/27/97 2/25/03; 68 FR 8723 (c)(197).
Section 121.2................... Purpose................. 3/20/72 5/31/72; 37 FR (c)(1).
10842.
Section 121.3................... Applicability........... 3/20/72 5/31/72; 37 FR (c)(1).
10842.
Section 121.4................... Regional Organization of 5/23/92 12/22/94; 59 FR (c)(94).
the Department. 65971.
Section 121.7................... Prohibition of Air 3/20/72 5/31/72; 37 FR (c)(1).
Pollution. 10842.
Section 121.8................... Compliance 8/13/77 12/17/79; 44 FR (c)(21);
responsibilities. 73031. correction
published 8/22/80
(45 FR 56060).
Section 121.9................... Circumvention........... 3/20/72 5/31/72; 37 FR (c)(1).
10842.
Section 121.10.................. Existing orders......... 3/20/72 5/31/72; 37 FR (c)(1).
10842.
Section 121.11.................. Severability clause..... 3/20/72 5/31/72; 37 FR (c)(1); no longer
10842. in PA DEP rules.
---------------------------------
Chapter 123 Standards for Contaminants
----------------------------------------------------------------------------------------------------------------
Fugitive Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.1(a) through (c).... Prohibition of certain 8/29/77 12/17/79; 44 FR (c)(21); Paragraph
fugitive emissions. 73031. 123.1(d) is not
in the SIP.
Section 123.2................... Fugitive particulate 8/13/83 7/27/84; 49 FR (c)(60).
matter. 30183.
---------------------------------
[[Page 9453]]
Particulate Matter Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.11.................. Combusion units......... 3/20/72 5/31/72; 37 FR (c)(1).
10842.
Appendix A [Graph].............. Particulate Matter- 3/20/72 5/31/72; 37 FR (c)(1).
Combustion Units. 10842.
Section 123.12.................. Incinerators............ 3/20/72 5/31/72; 37 FR (c)(1).
10842.
Section 123.13(a) through (c)... Processes............... 8/27/80 11/13/81; 46 FR (c)(39) paragraph
55971. 123.13(d) is not
in the SIP.
Appendix B [Graph].............. Particulate Matter- 3/20/72 5/31/72; 37 FR (c)(1).
Processes Listed in 10842.
Table 1.
Appendix C [Graph].............. Particulate Matter- 3/20/72 5/31/72; 37 FR (c)(1).
Processes Not Listed in 10842.
Table 1.
---------------------------------
Sulfur Compound Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.21.................. General................. 3/20/72 5/31/72; 37 FR (c)(1).
10842.
Section 123.22.................. Combustion units. 3/20/72 5/31/72; 37 FR (c)(1).
[General provisions-- 10842.
air basins and non-air
basins].
Section 123.22(a)............... Combustion units--non 8/1/79 8/18/81; 46 FR (c)(36); approved
Air basins. 43423. as part of the
control strategy
for the Armstrong
County sulfur
dioxide
nonattainment
area.
Section 123.22(b)............... Combustion units--Erie 8/1/79 8/8/79; 44 FR 46465 (c)(20);
Air Basin. correction
published 1/23/80
(45 FR 5303).
Section 123.22(c)............... Combustion units-- 10/1/78 6/4/79; 44 FR 31980 (c)(18).
Southeast PA Air Basin.
Section 123.22(c)............... Combustion units--Upper 8/21/82 7/5/83; 48 FR 30630 (c)(53).
Beaver Valley Air Basin.
Section 123.22(d)............... Combustion units--Lower 1/1/81 12/16/81; 46 FR (c)(40).
Beaver Valley Air Basin. 61267.
Figure 4 [Graph]................ Sulfur Oxides-- 3/20/72 5/31/72; 37 FR (c)(1).
Combustion Units. 10842.
Section 123.24.................. Primary zinc smelters... 8/11/75 4/30/76; 41 FR (c)(14).
18077.
Section 123.25.................. Monitoring requirements. 10/27/90 6/30/93; 58 FR (c)(81).
34911.
---------------------------------
Odor Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.31.................. Limitations............. 3/20/72 5/31/72; 37 FR (c)(1); SIP
10842. version of
Section 123.31 is
different from
State version.
---------------------------------
Visible Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.41.................. Limitations............. 3/20/72 5/31/72; 37 FR (c)(1).
10842.
Section 123.42 (Except paragraph Exceptions.............. 3/20/72 5/31/72; 37 FR (c)(1); Paragraph
123.42(4)). 10842. 123.42(4) is
declared not in
SIP at (c)(21).
Section 123.43.................. Measuring Techniques.... 3/20/72 5/31/72; 37 FR (c)(1).
10842.
Section 123.44.................. Limitations of visible 12/27/97 6/11/02; 67 FR (c)(189).
fugitive air 39854.
contaminants from
operation of any coke
oven battery.
Section 123.45.................. Alternative opacity 6/20/81 1/19/83; 48 FR 2319 (c)(48).
limitations.
Appendix D [Chart].............. Alternative Opcaity 6/20/81 1/19/83; 48 FR 2319 (c)(48).
Limitation--Application.
Section 123.46.................. Monitoring requirements. 6/20/81 1/19/83; 48 FR 2319 (c)(48).
---------------------------------
Nitrogen Compound Emissions
----------------------------------------------------------------------------------------------------------------
Section 123.51.................. Monitoring requirements. 10/20/90 9/23/92; 57 FR (c)(74).
43905.
---------------------------------
NOX Allowance Requirements
----------------------------------------------------------------------------------------------------------------
Section 123.101................. Purpose................. 3/11/00 6/6/00; 65 FR 35840 (c)(145).
Section 123.102................. Source NOX allowance 3/11/00 6/6/00; 65 FR 35840 (c)(145).
requirements and NOX
allowance control
period.
Section 123.103................. General NOX allowance 3/11/00 6/6/00; 65 FR 35840 (c)(145).
provisions.
Section 123.104................. Source authorized 3/11/00 6/6/00; 65 FR 35840 (c)(145).
account representative
requirements.
Section 123.105................. NATS provisions......... 3/11/00 6/6/00; 65 FR 35840 (c)(145).
Section 123.106................. NOX allowance transfer 3/11/00 6/6/00; 65 FR 35840 (c)(145).
protocol.
Section 123.107................. NOX allowance transfer 3/11/00 6/6/00; 65 FR 35840 (c)(145).
procedures.
Section 123.108................. Source emissions 3/11/00 6/6/00; 65 FR 35840 (c)(145).
monitoring requirements.
[[Page 9454]]
Section 123.109................. Source emissions 3/11/00 6/6/00; 65 FR 35840 (c)(145).
reporting requirements.
Section 123.110................. Source compliance 3/11/00 6/6/00; 65 FR 35840 (c)(145).
requirements.
Section 123.111................. Failure to meet source 3/11/00 6/6/00; 65 FR 35840 (c)(145).
compliance requirements.
Section 123.112................. Source operating permit 3/11/00 6/6/00; 65 FR 35840 (c)(145).
provision requirements.
Section 123.113................. Source recordkeeping 3/11/00 6/6/00; 65 FR 35840 (c)(145).
requirements.
Section 123.114................. General NOX allocation 3/11/00 6/6/00; 65 FR 35840 (c)(145).
provisions.
Section 123.115................. Initial NOX allowance 3/11/00 6/6/00; 65 FR 35840 (c)(145).
NOX allocations.
Section 123.116................. Source opt-in provisions 3/11/00 6/6/00; 65 FR 35840 (c)(145).
Section 123.117................. New NOX affected source 3/11/00 6/6/00; 65 FR 35840 (c)(145).
provisions.
Section 123.118................. Emission reduction 3/11/00 6/6/00; 65 FR 35840 (c)(145).
credit provisions.
Section 123.119................. Bonus NOX allowance 3/11/00 6/6/00; 65 FR 35840 (c)(145).
awards.
Section 123.120................. Audit................... 3/11/00 6/6/00; 65 FR 35840 (c)(145).
Appendix E [Chart].............. Appendix E [NOX 3/11/00 6/6/00; 65 FR 35840 (c)(145).
Allowances Chart].
---------------------------------
Chapter 126 Standard for Motor Fuels
Subchapter A. Oxygenate Content of Gasoline
----------------------------------------------------------------------------------------------------------------
Section 126.101................. General................. 8/19/95 12/17/99; 64 FR (c)(142).
70589.
Section 126.102................. Sampling and testing.... 8/19/95 12/17/99; 64 FR (c)(142).
70589.
Section 126.103................. Recordkeeping and 8/19/95 12/17/99; 64 FR (c)(142).
reporting. 70589.
Section 126.104................. Labeling requirements... 8/19/95 12/17/99; 64 FR (c)(142).
70589.
---------------------------------
Subchapter C. Gasoline Volatility Requirements
----------------------------------------------------------------------------------------------------------------
Section 126.301 (a) through (c). Compliant fuel 11/1/97 6/8/98; 63 FR 31116 (c)(131).
requirement.
Section 126.302 (Except Recordkeeping and 11/1/97 6/8/98; 63 FR 31116 (c)(131).
paragraph (a)(6) pertaining to reporting.
RFG).
Section 126.303(a).............. Compliance and test 11/1/97 6/8/98; 63 FR 31116 (c)(131).
methods.
---------------------------------
Subchapter D. Motor Vehicle Emissions Control Program
General Provisions
----------------------------------------------------------------------------------------------------------------
Section 126.401................. Purpose................. 12/5/98 12/28/99; 64 FR (c)(141)(i)(C).
72564.
Section 126.402................. NLEV scope and 12/5/98 12/28/99; 64 FR (c)(141)(i)(C).
applicability. 72564.
---------------------------------
Pennsylvania Clean Vehicles Program
----------------------------------------------------------------------------------------------------------------
Section 126.411................. General Requirements.... 12/5/98 12/28/99; 64 FR (c)(141)(i)(C).
72564.
Section 126.412................. Emission requirements... 12/5/98 12/28/99; 64 FR (c)(141)(i)(C).
72564.
Section 126.413................. Exemptions.............. 12/5/98 12/28/99; 64 FR (c)(141)(i)(C).
72564.
---------------------------------
Applicable Motor Vehicle Testing
----------------------------------------------------------------------------------------------------------------
Section 126.421................. New motor vehicle 12/5/98 12/28/99; 64 FR (c)(141)(i)(C).
certification testing. 72564.
Section 126.422................. New motor vehicle 12/5/98 12/28/99; 64 FR (c)(141)(i)(C).
compliance testing. 72564.
Section 126.423................. Assembly line testing... 12/5/98 12/28/99; 64 FR (c)(141)(i)(C).
72564.
Section 126.424................. In-use motor vehicle 12/5/98 12/28/99; 64 FR (c)(141)(i)(C).
enforcement testing. 72564.
Section 126.425................. In-use surveillance 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
testing. 72564.
---------------------------------
Motor Vehicle Manufacturers' Obligations
----------------------------------------------------------------------------------------------------------------
Section 126.431................. Warranty and recall..... 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
72564.
Section 126.432................. Reporting requirements.. 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
72564.
---------------------------------
Motor Vehicle Dealer Responsibilities
----------------------------------------------------------------------------------------------------------------
Section 126.441................. Responsibilities of 12/5/98 12/28/99, 64 FR (c)(141)(i)(C).
motor-vehicle dealers. 72564.
---------------------------------
Chapter 127 Construction, Modification, Reactivation, and Operation of Sources
Subchapter A. General
----------------------------------------------------------------------------------------------------------------
Section 127.1................... Purpose................. 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.3................... Operational flexibility. 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
---------------------------------
[[Page 9455]]
Subchapter B. Plan Approval Requirements
----------------------------------------------------------------------------------------------------------------
Section 127.11.................. Plan approval 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
requirements. 39497.
Section 127.11a................. Reactivation of sources. 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.12.................. Content of application.. 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.12a................. Compliance review....... 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.12b................. Plan approval terms and 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
conditions. 39497.
Section 127.12c................. Plan approval reporting 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
requirements. 39497.
Section 127.13.................. Extensions.............. 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.13a................. Plan approval changes 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
for cause. 39497.
Section 127.13b................. Denial of Plan approval 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
application. 39497.
Section 127.13c................. Notice of basis for 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
certain plan approval 39497.
decisions.
Section 127.14.................. Exemptions.............. 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.25.................. Compliance requirement.. 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.32.................. Transfer of plan 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
approvals. 39497.
Section 127.35.................. Maximum achievable 11/26/94 7/30/96, 61 FR (c)(110)(i)(C)
control technology 39497.
standards for hazardous
air pollutants.
Section 127.36.................. Health risk-based 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
emission standards and 39497.
operating practice
requirements.
Section 127.44.................. Public Notice........... 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.45.................. Contents of notice...... 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
39497.
Section 127.46.................. Filing protests......... 8/13/83 7/27/84, 49 FR (c)(60).
30183.
Section 127.47.................. Consideration of 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
protests. 39497.
Section 127.48.................. Conferences and hearings 8/13/83 7/27/84, 49 FR (c)(60).
30183.
Section 127.49.................. Conference or hearing 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
procedure. 39497.
Section 127.50.................. Conference or hearing 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
record. 39497.
Section 127.51.................. Plan approval 11/26/94 7/30/96, 61 FR (c)(110)(i)(C).
disposition. 39497.
---------------------------------
Subchapter D. Prevention of Significant Deterioration of Air Quality
----------------------------------------------------------------------------------------------------------------
Section 127.81.................. Purpose................. 6/18/83 8/21/84, 49 FR (c)(57).
33127.
Section 127.82.................. Scope................... 6/18/83 8/21/84, 49 FR (c)(57).
33127.
Section 127.83.................. Adoption of Program..... 6/18/83 8/21/84, 49 FR (c)(57).
33127.
---------------------------------
Subchapter E. New Source Review
----------------------------------------------------------------------------------------------------------------
Section 127.201................. General requirements.... 1/15/94 12/9/97, 62 FR (c)(107).
64722.
Section 127.202................. Effective date.......... 1/15/94 12/9/97, 62 FR (c)(107).
64722.
Section 127.203................. Facilities subject to 1/15/94 12/9/97, 62 FR (c)(107).
special permit 64722.
requirements.
Section 127.204................. Emissions subject to 1/15/94 12/9/97, 62 FR (c)(107).
this subchapter. 64722.
Section 127.205................. Special permit 1/15/94 12/9/97, 62 FR (c)(107).
requirements. 64722.
Section 127.206................. ERC general requirements 1/15/94 12/9/97, 62 FR (c)(107).
64722.
Section 127.207................. ERC generation and 1/15/94 12/9/97, 62 FR (c)(107).
creation. 64722.
Section 127.208................. ERC use and transfer 1/15/94 12/9/97, 62 FR (c)(107).
requirements. 64722.
Section 127.209................. ERC registry system..... 1/15/94 12/9/97; 62 FR (c)(107).
64722.
Section 127.210................. Offset ratios........... 1/15/94 12/9/97; 62 FR (c)(107).
64722.
Section 127.211................. Applicability 1/15/94 12/9/97; 62 FR (c)(107).
determination. 64722.
Section 127.212................. Portable facilities..... 1/15/94 12/9/97; 62 FR (c)(107).
64722.
Section 127.213................. Construction and 1/15/94 12/9/97; 62 FR (c)(107).
demolition. 64722.
Section 127.214................. Exemption............... 1/15/94 12/9/97; 62 FR (c)(107).
64722.
Section 127.215................. Reactivation............ 1/15/94 12/9/97; 62 FR (c)(107).
64722.
Section 127.216................. Circumvention........... 1/15/94 12/9/97; 62 FR (c)(107).
64722.
Section 127.217................. Clean Air Act Titles III- 1/15/94 12/9/97; 62 FR (c)(107).
V applicability. 64722.
---------------------------------
Subchapter F. Operating Permit Requirements
General
----------------------------------------------------------------------------------------------------------------
Section 127.401................. Scope................... 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
Section 127.402................. General provisions...... 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
Section 127.403................. Permitting of sources 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
operating lawfully 39497.
without a permit.
Section 127.404................. Compliance schedule for 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
repermitting. 39497.
---------------------------------
Permit Applications
----------------------------------------------------------------------------------------------------------------
Section 127.411................. Content of applications. 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
Section 127.412................. Compliance review forms. 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
Section 127.413................. Municipal notification.. 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
[[Page 9456]]
Section 127.414................. Supplemental information 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
---------------------------------
Review of Applications
----------------------------------------------------------------------------------------------------------------
Section 127.421................. Review of Applications.. 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
Section 127.422................. Denial of permits....... 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
Section 127.423................. Notice of basis for 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
certain operation 39497.
permit decisions.
Section 127.424................. Public notice........... 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
Section 127.425................. Contents of notice...... 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
Section 127.426................. Filing protests......... 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
Section 127.427................. Consideration of protest 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
Section 127.428................. Conferences and hearings 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
Section 127.429................. Conference or hearing 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
procedure. 39497.
Section 127.430................. Conference or hearing 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
record. 39497.
Section 127.431................. Operating permit 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
disposition. 39497.
---------------------------------
Operating Permit Conditions
----------------------------------------------------------------------------------------------------------------
Section 127.441................. Operating permit terms 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
and conditions. 39497.
Section 127.442................. Reporting requirements.. 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
Section 127.443................. Operating permit 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
requirements. 39497.
Section 127.444................. Compliance requirements. 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
Section 127.445................. Operating permit 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
compliance schedules. 39497.
Section 127.446................. Operating permit 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
duration. 39497.
Section 127.447................. Alternate operating 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
scenarios. 39497.
Section 127.448................. Emissions trading at 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
facilities with 39497.
Federally enforceable
emissions cap.
Section 127.449................. De minimis emission 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
increases. 39497.
Section 127.450................. Administrative operating 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
permit amendments. 39497.
---------------------------------
Operating Permit Modifications
----------------------------------------------------------------------------------------------------------------
Section 127.461................. Operating permit changes 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
for cause. 39497.
Section 127.462................. Minor operating permit 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
modifications. 39497.
Section 127.463................. Operating permit 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
revisions to 39497.
incorporate applicable
standards.
Section 127.464................. Transfer of operating 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
permits. 39497.
---------------------------------
Subchapter H. General Plan Approvals and Operating Permits
General
----------------------------------------------------------------------------------------------------------------
Section 127.601................. Scope................... 11/26/94 7/30/96; 61 FR (c)(111).
39494.
---------------------------------
Issuance of General Plan Approvals and General Operating Permits
----------------------------------------------------------------------------------------------------------------
Section 127.611................. General plan approvals 11/26/94 7/30/96; 61 FR (c)(111).
and general operating 39494.
permits.
Section 127.612................. Public notice and review 11/26/94 7/30/96; 61 FR (c)(111).
period. 39494.
---------------------------------
Use of General Plan Approvals and Permits
----------------------------------------------------------------------------------------------------------------
Section 127.621................. Application for use of 11/26/94 7/30/96; 61 FR (c)(111).
general plan approvals 39494.
and general operating
permits.
Section 127.622................. Compliance with general 11/26/94 7/30/96; 61 FR (c)(111).
plan approvals and 39494.
general operating
permits.
---------------------------------
Subchapter I. Plan Approval and Operating Permit Fees
----------------------------------------------------------------------------------------------------------------
Section 127.701................. General provisions...... 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
Section 127.702................. Plan approval fees...... 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
Section 127.703................. Operating permit fees 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
under Subchapter F. 39497.
Section 127.707................. Failure to pay fee...... 11/26/94 7/30/96; 61 FR (c)(110)(i)(C).
39497.
---------------------------------
Subchapter J. General Conformity
----------------------------------------------------------------------------------------------------------------
Section 127.801................. Purpose................. 11/9/96 9/29/97; 62 FR (c)(126).
50870.
Section 127.802................. Adoption of Standards... 11/9/96 9/29/97; 62 FR (c)(126).
50870.
---------------------------------
[[Page 9457]]
Chapter 129 Standards for Sources
Miscellaneous Sources
----------------------------------------------------------------------------------------------------------------
Section 129.11.................. Nitric acid plants...... 3/20/72 5/31/72; 37 FR (c)(1).
10842.
Section 129.12.................. Sulfuric acid plants.... 3/20/72 5/31/72; 37 FR (c)(1).
10842.
Section 129.13.................. Sulfur recovery plants.. 3/20/72 5/31/72; 37 FR (c)(1).
10842.
Appendix A...................... Allowable emissions, 4/23/94 3/23/98; 63 FR (c)(129).
sulfur oxides--sulfur 13789.
recovery plants.
Section 129.14.................. Open burning operations. 8/9/76 8/19/80; 45 FR (c)(33).
55178.
Section 129.15.................. Coke pushing operations. 8/29/77; 12/17/79; 44 FR (c)(21);
12/31/77 73031. correction
published 8/22/80
45 FR 56060.
Section 129.16.................. Door maintenance, 12/12/77 7/17/79; 44 FR (c)(19).
adjustment and 41429.
replacement practices.
Section 129.18.................. Municipal waste 10/27/90 6/30/93; 58 FR (c)(81).
incinerators. 34911.
---------------------------------
Sources of VOCs
----------------------------------------------------------------------------------------------------------------
Section 129.51.................. General................. 4/10/99 6/25/01; 66 FR (c)(155).
33645.
Section 129.52.................. Surface coating 6/10/00 7/20/01; 66 FR (c)(152).
processes. 37908.
Section 129.54.................. Seasonal operation of 8/3/91 8/11/92; 57 FR (c)(79).
auxiliary incineration 35777.
equipment.
Section 129.55.................. Petroleum refineries-- 6/20/81 1/19/83; 48 FR 2319 (c)(48).
specific sources.
Section 129.56.................. Storage tanks greater 9/5/98 7/26/00; 65 FR (c)(147).
than 40,000 gallons 45920.
capacity containing
VOCs.
Section 129.57.................. Storage tanks less than 6/20/81 1/19/83; 48 FR 2319 (c)(48).
or equal to 40,000
gallons capacity
containing VOCs.
Section 129.58.................. Petroleum refineries-- 8/13/83 7/27/84; 49 FR (c)(60).
fugitive sources. 30183.
Section 129.59.................. Bulk gasoline terminals. 8/3/91 8/11/92; 57 FR (c)(79).
35777.
Section 129.60.................. Bulk gasoline plants.... 8/3/91 8/11/92; 57 FR (c)(79).
35777.
Section 129.61.................. Small gasoline storage 8/3/91 8/11/92; 57 FR (c)(79).
tank control (Stage I 35777.
control).
Section 129.62.................. General standards for 5/23/94 12/22/94; 59 FR (c)(94).
bulk gasoline 65971.
terminals, bulk
gasoline plants, and
small gasoline s