Download as PDF 8792 Federal Register / Vol. 70, No. 35 / Wednesday, February 23, 2005 / Notices an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2090 has been issued to Green Mountain Power Corporation for a period effective September 1, 2001, through August 31, 2002. This license was effective until the issuance of a new license for the project or other disposition under the FPA. Because issuance of a new license (or other disposition) did not take place on or before September 1, 2002, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Green Mountain Power Corporation is authorized to continue operation of the Waterbury Project No. 2090 until such time as the Commission acts on its application for subsequent license. Magalie R. Salas, Secretary. [FR Doc. E5–721 Filed 2–22–05; 8:45 am] BILLING CODE 6717–01–P VerDate jul<14>2003 16:28 Feb 22, 2005 Jkt 205001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP05–179–000] Northwest Pipeline Corporation; Notice of Proposed Changes in FERC Gas Tariff February 15, 2005. Take notice that on February 7, 2005, Northwest Pipeline Corporation (Northwest) tendered for filing as part of its FERC Gas Tariff the following tariff sheets, to be effective April 1, 2005: Third Revised Volume No. 1 Twenty-Fifth Revised Sheet No. 14 Seventh Revised Sheet No. 231-B Second Revised Sheet No. 231-C Original Volume No. 2 Fortieth Revised Sheet No. 2.1 Frm 00031 Fmt 4703 Sfmt 4703 Magalie R. Salas, Secretary. [FR Doc. E5–732 Filed 2–22–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP05–176–000] Panhandle Eastern Pipe Line Company, LP; Notice of Tariff Filing February 15, 2005. Northwest states that a copy of this filing has been served upon Northwest’s customers and interested state regulatory commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to PO 00000 receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Take notice that on February 4, 2005, Panhandle Eastern Pipe Line Company, LP (Panhandle) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, First Revised Sheet No. 264, to become effective March 7, 2005. Panhandle states that this filing is being made to replace the index price under section 12.11(c) of the General Terms and Conditions with an updated index location that meets the Commission guidelines for jurisdictional tariffs. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the E:\FR\FM\23FEN1.SGM 23FEN1 Federal Register / Vol. 70, No. 35 / Wednesday, February 23, 2005 / Notices Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–729 Filed 2–22–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER05–305–000 and ER05–305– 001] Pinelawn Power, LLC; Notice of Issuance of Order February 16, 2005. Pinelawn Power, LLC (Pinelawn Power) filed an application for marketbased rate authority, with an accompanying rate schedule. The proposed rate schedule provides for wholesale sales of energy, capacity and ancillary services at market-based rates. Pinelawn Power also requested waiver of various Commission regulations. In particular, Pinelawn Power requested that the Commission grant blanket approval under 18 CFR part 34 of all future issuances of securities and assumptions of liability by Pinelawn Power. On February 15, 2005, the Commission granted the request for blanket approval under part 34, subject to the following: Any person desiring to be heard or to protest the blanket approval of issuances of securities or assumptions of liability by Pinelawn Power should file a motion to intervene or protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR 385.211, 385.214 (2004). Notice is hereby given that the deadline for filing motions to intervene or protest, is March 17, 2005. Absent a request to be heard in opposition by the deadline above, VerDate jul<14>2003 16:28 Feb 22, 2005 Jkt 205001 Pinelawn Power is authorized to issue securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of Pinelawn Power, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approval of Pinelawn Power’s issuances of securities or assumptions of liability. Copies of the full text of the Commission’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https://www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Magalie R. Salas, Secretary. [FR Doc. E5–706 Filed 2–22–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER04–457–001, ER04–457– 002, and EL05–60–000] PJM Interconnection, L.L.C.; Notice of Institution of Proceeding and Refund Effective Date February 15, 2005. On February 10, 2005, the Commission issued an order in the above-referenced dockets initiating a proceeding in Docket No. EL05–60–000 under section 206 of the Federal Power Act, and directing PJM to explain, within 30 days from the date of issuance of the Commission’s order, the restudy procedures for generation and transmission interconnection projects. 110 FERC ¶ 61,099 (2005). The refund effective date in Docket No. EL05–60–000, established pursuant to section 206 of the Federal Power Act, PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 8793 will be 60 days following publication of this notice in the Federal Register. Magalie R. Salas, Secretary. [FR Doc. E5–720 Filed 2–22–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. RP03–542–003 and RP04–129– 001, and RP04–359–001] Texas Eastern Transmission, LP; Notice of Compliance Filing February 15, 2005. Take notice that on February 2, 2005, Texas Eastern Transmission, LP (Texas Eastern) tendered for filing an explanation in compliance with the January 26, 2005, Order in the captioned dockets, in which the Commission accepted an uncontested Joint Offer of Settlement. Texas Eastern explains that the January 26, 2005, Order directed Texas Eastern to file revised tariff sheets reflecting the settlement rates within 15 days of the date of the Order. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed on or before the date as indicated below. Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call E:\FR\FM\23FEN1.SGM 23FEN1

Agencies

[Federal Register Volume 70, Number 35 (Wednesday, February 23, 2005)]
[Notices]
[Pages 8792-8793]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-729]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP05-176-000]


Panhandle Eastern Pipe Line Company, LP; Notice of Tariff Filing

February 15, 2005.
    Take notice that on February 4, 2005, Panhandle Eastern Pipe Line 
Company, LP (Panhandle) tendered for filing as part of its FERC Gas 
Tariff, Third Revised Volume No. 1, First Revised Sheet No. 264, to 
become effective March 7, 2005.
    Panhandle states that this filing is being made to replace the 
index price under section 12.11(c) of the General Terms and Conditions 
with an updated index location that meets the Commission guidelines for 
jurisdictional tariffs.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the

[[Page 8793]]

Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
 [FR Doc. E5-729 Filed 2-22-05; 8:45 am]