Panhandle Eastern Pipe Line Company, LP; Notice of Tariff Filing, 8792-8793 [E5-729]
Download as PDF
8792
Federal Register / Vol. 70, No. 35 / Wednesday, February 23, 2005 / Notices
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2090
has been issued to Green Mountain
Power Corporation for a period effective
September 1, 2001, through August 31,
2002. This license was effective until
the issuance of a new license for the
project or other disposition under the
FPA. Because issuance of a new license
(or other disposition) did not take place
on or before September 1, 2002, notice
is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed
automatically without further order or
notice by the Commission, unless the
Commission orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Green Mountain Power Corporation
is authorized to continue operation of
the Waterbury Project No. 2090 until
such time as the Commission acts on its
application for subsequent license.
Magalie R. Salas,
Secretary.
[FR Doc. E5–721 Filed 2–22–05; 8:45 am]
BILLING CODE 6717–01–P
VerDate jul<14>2003
16:28 Feb 22, 2005
Jkt 205001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–179–000]
Northwest Pipeline Corporation; Notice
of Proposed Changes in FERC Gas
Tariff
February 15, 2005.
Take notice that on February 7, 2005,
Northwest Pipeline Corporation
(Northwest) tendered for filing as part of
its FERC Gas Tariff the following tariff
sheets, to be effective April 1, 2005:
Third Revised Volume No. 1
Twenty-Fifth Revised Sheet No. 14
Seventh Revised Sheet No. 231-B
Second Revised Sheet No. 231-C
Original Volume No. 2
Fortieth Revised Sheet No. 2.1
Frm 00031
Fmt 4703
Sfmt 4703
Magalie R. Salas,
Secretary.
[FR Doc. E5–732 Filed 2–22–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–176–000]
Panhandle Eastern Pipe Line
Company, LP; Notice of Tariff Filing
February 15, 2005.
Northwest states that a copy of this
filing has been served upon Northwest’s
customers and interested state
regulatory commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
PO 00000
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Take notice that on February 4, 2005,
Panhandle Eastern Pipe Line Company,
LP (Panhandle) tendered for filing as
part of its FERC Gas Tariff, Third
Revised Volume No. 1, First Revised
Sheet No. 264, to become effective
March 7, 2005.
Panhandle states that this filing is
being made to replace the index price
under section 12.11(c) of the General
Terms and Conditions with an updated
index location that meets the
Commission guidelines for
jurisdictional tariffs.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
E:\FR\FM\23FEN1.SGM
23FEN1
Federal Register / Vol. 70, No. 35 / Wednesday, February 23, 2005 / Notices
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–729 Filed 2–22–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER05–305–000 and ER05–305–
001]
Pinelawn Power, LLC; Notice of
Issuance of Order
February 16, 2005.
Pinelawn Power, LLC (Pinelawn
Power) filed an application for marketbased rate authority, with an
accompanying rate schedule. The
proposed rate schedule provides for
wholesale sales of energy, capacity and
ancillary services at market-based rates.
Pinelawn Power also requested waiver
of various Commission regulations. In
particular, Pinelawn Power requested
that the Commission grant blanket
approval under 18 CFR part 34 of all
future issuances of securities and
assumptions of liability by Pinelawn
Power.
On February 15, 2005, the
Commission granted the request for
blanket approval under part 34, subject
to the following:
Any person desiring to be heard or to
protest the blanket approval of
issuances of securities or assumptions of
liability by Pinelawn Power should file
a motion to intervene or protest with the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure. 18 CFR 385.211,
385.214 (2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest, is March 17, 2005.
Absent a request to be heard in
opposition by the deadline above,
VerDate jul<14>2003
16:28 Feb 22, 2005
Jkt 205001
Pinelawn Power is authorized to issue
securities and assume obligations or
liabilities as a guarantor, indorser,
surety, or otherwise in respect of any
security of another person; provided
that such issuance or assumption is for
some lawful object within the corporate
purposes of Pinelawn Power,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approval of Pinelawn Power’s issuances
of securities or assumptions of liability.
Copies of the full text of the
Commission’s Order are available from
the Commission’s Public Reference
Room, 888 First Street, NE.,
Washington, DC 20426. The Order may
also be viewed on the Commission’s
Web site at https://www.ferc.gov, using
the eLibrary link. Enter the docket
number excluding the last three digits in
the docket number filed to access the
document. Comments, protests, and
interventions may be filed electronically
via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5–706 Filed 2–22–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER04–457–001, ER04–457–
002, and EL05–60–000]
PJM Interconnection, L.L.C.; Notice of
Institution of Proceeding and Refund
Effective Date
February 15, 2005.
On February 10, 2005, the
Commission issued an order in the
above-referenced dockets initiating a
proceeding in Docket No. EL05–60–000
under section 206 of the Federal Power
Act, and directing PJM to explain,
within 30 days from the date of issuance
of the Commission’s order, the restudy
procedures for generation and
transmission interconnection projects.
110 FERC ¶ 61,099 (2005).
The refund effective date in Docket
No. EL05–60–000, established pursuant
to section 206 of the Federal Power Act,
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
8793
will be 60 days following publication of
this notice in the Federal Register.
Magalie R. Salas,
Secretary.
[FR Doc. E5–720 Filed 2–22–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. RP03–542–003 and RP04–129–
001, and RP04–359–001]
Texas Eastern Transmission, LP;
Notice of Compliance Filing
February 15, 2005.
Take notice that on February 2, 2005,
Texas Eastern Transmission, LP (Texas
Eastern) tendered for filing an
explanation in compliance with the
January 26, 2005, Order in the captioned
dockets, in which the Commission
accepted an uncontested Joint Offer of
Settlement.
Texas Eastern explains that the
January 26, 2005, Order directed Texas
Eastern to file revised tariff sheets
reflecting the settlement rates within 15
days of the date of the Order.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
the date as indicated below. Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
E:\FR\FM\23FEN1.SGM
23FEN1
Agencies
[Federal Register Volume 70, Number 35 (Wednesday, February 23, 2005)]
[Notices]
[Pages 8792-8793]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-729]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP05-176-000]
Panhandle Eastern Pipe Line Company, LP; Notice of Tariff Filing
February 15, 2005.
Take notice that on February 4, 2005, Panhandle Eastern Pipe Line
Company, LP (Panhandle) tendered for filing as part of its FERC Gas
Tariff, Third Revised Volume No. 1, First Revised Sheet No. 264, to
become effective March 7, 2005.
Panhandle states that this filing is being made to replace the
index price under section 12.11(c) of the General Terms and Conditions
with an updated index location that meets the Commission guidelines for
jurisdictional tariffs.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the
[[Page 8793]]
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5-729 Filed 2-22-05; 8:45 am]
BILLING CODE 6717-01-P