Environmental Impact Statements; Notice of Availability, 8363 [05-3187]
Download as PDF
Federal Register / Vol. 70, No. 33 / Friday, February 18, 2005 / Notices
performance measure for OPPT’s New
Chemicals Program.
In accordance with 40 CFR 2.306(j),
EPA has determined that under Deliver
Order Number EP05W001068, Geologics
Corporation will require access to CBI
submitted to EPA under sections 4, 5, 6,
and 8 of TSCA, to perform successfully
the duties specified under the contract.
Geologics personnel will be given
information submitted to EPA under
sections 4, 5, 6, and 8 of TSCA. Some
of the information may be claimed or
determined to be CBI.
EPA is issuing this notice to inform
all submitters of information under
sections 4, 5, 6, and 8 of TSCA, that the
Agency may provide Geologics
Corporation access to these CBI
materials on a need-to-know basis only.
All access to TSCA CBI under this
deliver order will take place at EPA
Headquarters.
Clearance for access to TSCA CBI
under Deliver Order Number
EP05W001068 may continue until
October 31, 2005. Access will
commence no sooner than February 23,
2005.
Geologics personnel have signed nondisclosure agreements and will be
briefed on appropriate security
procedures before they are permitted
access to TSCA CBI.
List of Subjects
Environmental protection,
Confidential business information.
Dated: February 11, 2005.
Vicki A. Simons,
Acting Director, Information Management
Division, Office of Pollution Prevention and
Toxics.
[FR Doc. 05–3060 Filed 2–17–05; 8:45 am]
BILLING CODE 6560–50–S
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6660–6]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed February 7, 2005 Through
February 11, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 050055, Final EIS, AFS, AL,
Longleaf Ecosystem Restoration
Project, Proposes a Five-Year Project
to Begin Restoration of Native
Longleaf, Talladega National Forest,
VerDate jul<14>2003
15:41 Feb 17, 2005
Jkt 205001
Oakmulgee District, Tuscaloosa, Hale,
Bibbs and Perry Counties, AL, Wait
Period Ends: March 21, 2005, Contact:
Jim Shores (205) 926–9765.
EIS No. 050056, Draft EIS, FHW, TX,
Trinity Parkway Project, Construction
of Limited Access Toll Facility from
IH–35 E/TX–183 to U.S. –175/TX 310,
U.S. Army COE Section 10 and 404
Permits, Dallas County, TX, Comment
Period Ends: April 4, 2005, Contact:
Salvador Deocampo (512) 536–5950.
EIS No. 050057, Final EIS, AFS, MT,
Bridger Bowl Ski Area, Permit
Renewal and Master Development
Plan Update, Implementation, Special
Use Permit and COE Section 404
Permit, Gallatin National Forest, in
the City of Bozeman, MT, Wait Period
Ends: March 21, 2005, Contact: Nancy
Halstrom (406) 522–2520.
EIS No. 050058, Final EIS, NAS, HI,
Outrigger Telescopes Project,
Proposed for the W.M. Keck
Observatory Site within the Mauna
Kea Science Reserve, Funding,
Construction, Installation and
Operation, Island of Hawaii, Wait
Period Ends: March 21, 2005, Contact:
Kenneth M. Kumor (202) 358–1112.
EIS No. 050059, Draft EIS, NPS, VA,
Manassas National Battlefield Park
Bypass Study, From US–29 East of
Park Boundary and VA–234 South of
Park Boundary to U.S. 29 West of Park
Boundary and VA–234 North of Park
Boundary, U.S. Army COE Section
404 Permit, Prince William and
Fairfax Counties, VA, Comment
Period Ends: April 4, 2005, Contact:
Jack Van Dop (703) 404–6282. This
document is available on the Internet
at: https://www.battlefiedbypass.com.
EIS No. 050060, Draft EIS, COE, TX,
Cedar Bayou Navigation Channel
(CBNC) Improvements Project,
Implementation, Near Baytown in
Harris and Chambers Counties, TX,
Comment Period Ends: April 4, 2005,
Contact: Dr. Terry Roberts (409) 766–
3035.
EIS No. 050061, Final EIS, FHW, MN,
Ayd Mill Road Corridor,
Improvements from I–35 E to St.
Anthony Avenue (I–94) 2.6 kilometer
(1.6 miles), Funding, City of Saint
Paul, Ramsey County, MN, Wait
Period Ends: March 21, 2005, Contact:
Cheryl Martin (651) 291–6120.
EIS No. 050062, Draft EIS, COE, NC,
Fort Bragg Headquarters for XVIII
Airborne Corps and Army Special
Operations Command, To Determine
the Level of Training on the Overhills
Tract Program, Cumberland and
Harnett Counties, NC, Comment
Period Ends: April 4, 2005, Contact:
David A. Heinz (910) 396–8207.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
8363
EIS No. 050063, Final EIS, AFS, UT,
Monticello and Blanding Municipal
Watershed Improvement Projects,
Implementation, Manti-La Sal
National Forest, Monticello Ranger
District, San Juan County, UT, Wait
Period Ends: March 21, 2005, Contact:
Elton Chang (503) 587–4710.
EIS No. 050064, Final EIS, NIH, TX,
Galveston National Laboratory for
Biodefense and Emerging Infectious
Diseases Research Facility at the
University of Texas Medical Branch,
Construction, Partial Funding, Grant,
Galveston, TX, Wait Period Ends:
March 22, 2005, Contact: Valerie
Nottingham (301) 496–7775.
Amended Notices
EIS No. 040504, Draft EIS, SFW, CA,
Coachella Valley Multiple Species
Habitat Conservation Plan (MSHCP),
Santa Rosa and San Jacinto Mountains
Trails Plan, Issuance of Incidental
Take Permits, Riverside County, CA,
Comment Period Ends: March 7, 2005,
Contact: Julie Concannon (503) 231–
6747. Revision of FR Notice Published
on 11/05/04: CEQ Comment Period
Ending 02/2/2005 has been Extended
to 03/07/2005.
EIS No. 050000, Draft EIS, AFS, UT,
Ogden Ranger District Travel Plan, To
Update the Travel Management Plan,
Wasatch-Cache National Plan, Ogden
Ranger District, Box Elder, Cache,
Morgan, Weber and Rich Counties,
UT, Comment Period Ends: March 30,
2005, Contact: Rick Vallejos (801)
625–5112. Revision of FR Notice
Published on 01/14/2005: CEQ
Comment Period Ending on 2/28/2005
has been Extended to 03/30/2005.
EIS No. 050004, Final EIS, SFW, WA, ID,
OR, CA, Caspian Tern (sterna caspia)
Management to Reduce Predation of
Juvenile Salmonids in the Columbia
River Esturary, To Comply with the
2002 Settlement Agreement,
Endangered Species Act
(ESA), Columbia River, WA, OR, ID and
CA, Wait Period Ends: February 14,
2005, Contact: Nanette Seto (503)
231–6164. Revision of FR Notice
Published on 01/14/2005: Time
Extended Put in by Error the Wait
Ends on 2/14/2005.
Dated: February 15, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–3187 Filed 2–17–05; 8:45 am]
BILLING CODE 6560–50–U
E:\FR\FM\18FEN1.SGM
18FEN1
Agencies
[Federal Register Volume 70, Number 33 (Friday, February 18, 2005)]
[Notices]
[Page 8363]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-3187]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6660-6]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed February 7, 2005 Through February 11, 2005
Pursuant to 40 CFR 1506.9.
EIS No. 050055, Final EIS, AFS, AL, Longleaf Ecosystem Restoration
Project, Proposes a Five-Year Project to Begin Restoration of Native
Longleaf, Talladega National Forest, Oakmulgee District, Tuscaloosa,
Hale, Bibbs and Perry Counties, AL, Wait Period Ends: March 21, 2005,
Contact: Jim Shores (205) 926-9765.
EIS No. 050056, Draft EIS, FHW, TX, Trinity Parkway Project,
Construction of Limited Access Toll Facility from IH-35 E/TX-183 to
U.S. -175/TX 310, U.S. Army COE Section 10 and 404 Permits, Dallas
County, TX, Comment Period Ends: April 4, 2005, Contact: Salvador
Deocampo (512) 536-5950.
EIS No. 050057, Final EIS, AFS, MT, Bridger Bowl Ski Area, Permit
Renewal and Master Development Plan Update, Implementation, Special Use
Permit and COE Section 404 Permit, Gallatin National Forest, in the
City of Bozeman, MT, Wait Period Ends: March 21, 2005, Contact: Nancy
Halstrom (406) 522-2520.
EIS No. 050058, Final EIS, NAS, HI, Outrigger Telescopes Project,
Proposed for the W.M. Keck Observatory Site within the Mauna Kea
Science Reserve, Funding, Construction, Installation and Operation,
Island of Hawaii, Wait Period Ends: March 21, 2005, Contact: Kenneth M.
Kumor (202) 358-1112.
EIS No. 050059, Draft EIS, NPS, VA, Manassas National Battlefield Park
Bypass Study, From US-29 East of Park Boundary and VA-234 South of Park
Boundary to U.S. 29 West of Park Boundary and VA-234 North of Park
Boundary, U.S. Army COE Section 404 Permit, Prince William and Fairfax
Counties, VA, Comment Period Ends: April 4, 2005, Contact: Jack Van Dop
(703) 404-6282. This document is available on the Internet at: https://
www.battlefiedbypass.com.
EIS No. 050060, Draft EIS, COE, TX, Cedar Bayou Navigation Channel
(CBNC) Improvements Project, Implementation, Near Baytown in Harris and
Chambers Counties, TX, Comment Period Ends: April 4, 2005, Contact: Dr.
Terry Roberts (409) 766-3035.
EIS No. 050061, Final EIS, FHW, MN, Ayd Mill Road Corridor,
Improvements from I-35 E to St. Anthony Avenue (I-94) 2.6 kilometer
(1.6 miles), Funding, City of Saint Paul, Ramsey County, MN, Wait
Period Ends: March 21, 2005, Contact: Cheryl Martin (651) 291-6120.
EIS No. 050062, Draft EIS, COE, NC, Fort Bragg Headquarters for XVIII
Airborne Corps and Army Special Operations Command, To Determine the
Level of Training on the Overhills Tract Program, Cumberland and
Harnett Counties, NC, Comment Period Ends: April 4, 2005, Contact:
David A. Heinz (910) 396-8207.
EIS No. 050063, Final EIS, AFS, UT, Monticello and Blanding Municipal
Watershed Improvement Projects, Implementation, Manti-La Sal National
Forest, Monticello Ranger District, San Juan County, UT, Wait Period
Ends: March 21, 2005, Contact: Elton Chang (503) 587-4710.
EIS No. 050064, Final EIS, NIH, TX, Galveston National Laboratory for
Biodefense and Emerging Infectious Diseases Research Facility at the
University of Texas Medical Branch, Construction, Partial Funding,
Grant, Galveston, TX, Wait Period Ends: March 22, 2005, Contact:
Valerie Nottingham (301) 496-7775.
Amended Notices
EIS No. 040504, Draft EIS, SFW, CA, Coachella Valley Multiple Species
Habitat Conservation Plan (MSHCP), Santa Rosa and San Jacinto Mountains
Trails Plan, Issuance of Incidental Take Permits, Riverside County, CA,
Comment Period Ends: March 7, 2005, Contact: Julie Concannon (503) 231-
6747. Revision of FR Notice Published on 11/05/04: CEQ Comment Period
Ending 02/2/2005 has been Extended to 03/07/2005.
EIS No. 050000, Draft EIS, AFS, UT, Ogden Ranger District Travel Plan,
To Update the Travel Management Plan, Wasatch-Cache National Plan,
Ogden Ranger District, Box Elder, Cache, Morgan, Weber and Rich
Counties, UT, Comment Period Ends: March 30, 2005, Contact: Rick
Vallejos (801) 625-5112. Revision of FR Notice Published on 01/14/2005:
CEQ Comment Period Ending on 2/28/2005 has been Extended to 03/30/2005.
EIS No. 050004, Final EIS, SFW, WA, ID, OR, CA, Caspian Tern (sterna
caspia) Management to Reduce Predation of Juvenile Salmonids in the
Columbia River Esturary, To Comply with the 2002 Settlement Agreement,
Endangered Species Act
(ESA), Columbia River, WA, OR, ID and CA, Wait Period Ends: February
14, 2005, Contact: Nanette Seto (503) 231-6164. Revision of FR Notice
Published on 01/14/2005: Time Extended Put in by Error the Wait Ends on
2/14/2005.
Dated: February 15, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-3187 Filed 2-17-05; 8:45 am]
BILLING CODE 6560-50-U