Baconton Power, LLC, et al.; Electric Rate and Corporate Filings, 7727-7728 [E5-632]
Download as PDF
Federal Register / Vol. 70, No. 30 / Tuesday, February 15, 2005 / Notices
interventions may be filed electronically
via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5–607 Filed 2–14–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER00–2398–006, et al.]
Baconton Power, LLC, et al.; Electric
Rate and Corporate Filings
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Baconton Power LLC
[Docket No. ER00–2398–006]
Take notice that on February 2, 2005,
Baconton Power LLC filed a notice of
change in status relating to the facts
relied upon by the Commission in
approving its application to charge
market-based rates for wholesale sales.
Comment Date: 5 p.m. Eastern Time
on February 23, 2004.
2. Colton Power, L.P.
[Docket No. ER01–2644–006]
Take notice that on February 1, 2005,
Colton Power, L.P. (Colton) tendered for
filing an updated market power analysis
and notice of change in status in
compliance with the Commission order
authorizing Colton to engage in
wholesale sales of electric power at
market-based rates issued January 30,
2002 in Docket No. ER01–2644–000, et
al., 98 FERC ¶ 61,059.
Comment Date: 5 p.m. Eastern Time
on February 22, 2005.
3. Duke Energy Lee, LLC
[Docket No. ER04–641–003]
Take notice that on February 1, 2005,
Duke Energy Lee, LLC (Duke Lee)
submitted its compliance filing in
response to the Commission’s order
issued January 25, 2005 in Docket Nos.
ER05–641–000, 001 and 002, Duke
Energy Lee, LLC, 110 FERC ¶ 61,057
(2005)
Duke Lee states that copies of the
filing were served on parties on the
official service list in the abovecaptioned proceeding.
17:50 Feb 14, 2005
4. NorthWestern Energy
[Docket No. ER04–1106–002]
Take notice that on February 2, 2005,
NorthWestern Energy filed to withdraw
the tariff sheets submitted August 9,
2004, as amended on November 3, 2004,
containing a proposed modification to
Schedule 4 (Energy Imbalance Service)
and a new Schedule 9 (Generation
Imbalance Service), and renewed its
request for acceptance and approval of
proposed Attachment J which contains
the Large Generator Interconnection
Agreement and the Large Generator
Interconnection Procedures.
Comment Date: 5 p.m. Eastern Time
on February 23, 2005.
5. Old Dominion Electric Cooperative
[Docket No. ER05–309–001]
February 8, 2005.
VerDate jul<14>2003
Comment Date: 5 p.m. Eastern Time
on February 22, 2005.
Jkt 205001
Take notice that on February 4, 2005,
Old Dominion Electric Cooperative (Old
Dominion) in response to the
Commission’s deficiency letter order
issued January 27, 2005, filed an
amendment to its December 7, 2004
filing in Docket No. ER05–309–000
Old Dominion states that a copy of the
filing was served upon each of Old
Dominion’s member cooperatives, the
public service commissions in the
Commonwealth of Virginia and the
states of Delaware, Maryland and West
Virginia, and Bear Island Paper
Company, LLC.
Comment Date: 5 p.m. Eastern Time
on February 14, 2005.
6. ISO New England Inc.; Bangor
Hydro-Electric Company; Central
Maine Power Company; NSTAR
Electric & Gas Corporation, on behalf of
its affiliates: Boston Edison Company,
Commonwealth Electric Company,
Cambridge Electric Light Company, and
Canal Electric Company; New England
Power Company; Northeast Utilities
Service Company, on behalf of its
operating company affiliates: The
Connecticut Light and Power Company,
Western Massachusetts Electric
Company, Public Service Company of
New Hampshire and Holyoke Water
Power Company; The United
Illuminating Company; Fitchburg Gas
and Electric Light Company; Unitil
Energy Systems, Inc.; Vermont Electric
Power Company; Central Vermont
Public Service Corporation; Green
Mountain Power Corporation; Vermont
Electric Cooperative; Florida Power &
Light Company—New England Division
[Docket No. ER05–374–002]
Take notice that, on January 28, 2005,
ISO New England Inc. (ISO–NE)
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
7727
submitted a compliance filing pursuant
to the Commission’s order issued
December 30, 2004 in Docket No. ER05–
135–000. ISO–NE states that the filing
amends section IV.B.6 of ISO–NE’s
Transmission, Markets and Services
Tariff, FERC Electric Tariff No. 3 to state
that all quarterly and annual capital
budget and expenditure filings will be
filed pursuant to, and subject to
Commission review under, section 205
of the Federal Power Act.
ISO–NE states that copies of the filing
were served on parties on the official
service list in the above-captioned
proceeding, as well as to the NEPOOL
Participants and the New England state
governors and regulatory commissions.
Comment Date: 5 p.m. Eastern Time
on February 18, 2005.
7. ISO New England Inc.; Bangor
Hydro-Electric Company; Central
Maine Power Company; NSTAR
Electric & Gas Corporation, on behalf of
its affiliates: Boston Edison Company,
Commonwealth Electric Company,
Cambridge Electric Light Company, and
Canal Electric Company; New England
Power Company; Northeast Utilities
Service Company, on behalf of its
operating company affiliates: The
Connecticut Light and Power Company,
Western Massachusetts Electric
Company, Public Service Company of
New Hampshire and Holyoke Water
Power Company; The United
Illuminating Company; Fitchburg Gas
and Electric Light Company; Unitil
Energy Systems, Inc.; Vermont Electric
Power Company; Central Vermont
Public Service Corporation; Green
Mountain Power Corporation; Vermont
Electric Cooperative; Florida Power &
Light Company—New England Division
[Docket No. ER05–374–003]
Take notice that, on January 28, 2005,
ISO New England Inc. (ISO–NE)
submitted a compliance filing pursuant
to the Commission’s order issued
December 30, 2004 in Docket No. ER05–
134–000 to remove Schedule 5 from
Section IV.A of ISO–NE’s Transmission,
Markets and Services Tariff, FERC
Electric Tariff No. 3. ISO–NE states that
Schedule 5 would have served as a
placeholder to allow a Regional State
Committee to submit, justify, and collect
its administrative costs should such a
committee be formed in the context of
the regional transmission organization.
ISO–NE states that copies of the filing
were served on parties on the official
service list in the above-captioned
proceeding, as well as the NEPOOL
Participants and the New England state
governors and regulatory commissions.
Comment Date: 5 p.m. Eastern Time
on February 18, 2005.
E:\FR\FM\15FEN1.SGM
15FEN1
7728
Federal Register / Vol. 70, No. 30 / Tuesday, February 15, 2005 / Notices
8. Eastern Desert Power LLC
11. PacifiCorp
[Docket No. ER05–534–000]
[Docket No. ER05–537–000]
Take notice that on February 1, 2005,
Eastern Desert Power LLC (Eastern
Desert) submitted an application for
authorization to sell energy, capacity
and ancillary services at market-based
rates. Eastern Desert states that it is
developing and will own and operate an
approximately 51-megawatt wind
energy facility (the Facility) in San
Bernardino County, California. Eastern
Desert requests that the Commission
grant waivers and blanket approvals
provided to applicants that receive
authority for market-based rates.
Comment Date: 5 p.m. Eastern Time
on February 22, 2005.
Take notice that on February 2, 2005,
PacifiCorp tendered for filing
Amendment No. 3 to the June 1, 1994
AC Intertie Agreement between
PacifiCorp and Bonneville Power
Administration (PacifiCorp’s First
Revised Rate Schedule FERC No 368).
PacifiCorp states that copies of this
filing were supplied to the Public Utility
Commission of Oregon, the Washington
Utilities and Transportation
Commission, and Bonneville Power
Administration.
Comment Date: 5 p.m. Eastern Time
on February 23, 2005.
9. Xcel Energy Services Inc.
12. PSI Energy, Inc., Northern Indiana
Public Service Company
[Docket No. ER05–535–000]
[Docket No. ER05–538–000]
Take notice that on February 1, 2005,
Xcel Energy Services Inc. (XES), on
behalf of the Xcel Energy Operating
Companies (Northern States Power
Company, Northern States Power
Company (Wisconsin), Public Service
Company of Colorado, and
Southwestern Public Service Company),
submitted revised tariff sheets to the
Xcel Energy Operating Companies openaccess transmission tariff (Xcel Energy
OATT). XES states that the purpose of
this filing is to remove Cheyenne Light,
Fuel and Power Company as one of the
Xcel Energy Operating Companies
offering transmission service under the
Xcel Energy OATT.
XEL states that copies of the filing
were served upon XES’s state public
service commissions. XES requests
waiver of further service requirements
as no third party has taken service
under this tariff on the facilities of
Cheyenne Light, Fuel and Power
Company.
Comment Date: 5 p.m. Eastern Time
on February 22, 2005.
Take notice that on February 2, 2005,
PSI Energy, Inc. (PSI) and Northern
Indiana Public Service Company
(NIPSCO) tendered for filing an
Amended and Restated Facilities
Agreement between PSI and NIPSCO.
PSI and NIPSCO request an effective
date of May 18, 2004.
PSI and NIPSCO state that copies of
this filing have been served on the
Indiana Utility Regulatory Commission.
Comment Date: 5 p.m. Eastern Time
on February 23, 2005.
10. AEP Texas Central Company
[Docket No. ER05–536–000]
Take notice that on February 2, 2005,
American Electric Power Service
Corporation (AEPSC), as agent for AEP
Texas Central Company (AEPTCC)
formerly called Central Power and Light
Company, submitted for filing an
interconnection agreement between
AEPTCC and LCRA Transmission
Services Corporation (LCRA). AEPTCC
requests an effective date of January 11,
2005.
AEPSC states that it has served copies
of the filing on LCRA and the Public
Utility Commission of Texas.
Comment Date: 5 p.m. Eastern Time
on February 23, 2005.
VerDate jul<14>2003
17:50 Feb 14, 2005
Jkt 205001
13. PacifiCorp
[Docket No. ER05–539–000]
Take notice that on February 3, 2005,
PacifiCorp tendered for filing Order
2003–B revisions to its open access
transmission tariff (OATT). PacifiCorp
states that these revisions change
portions of the pro forma Large
Generator Interconnection Procedures
and Large Generator Interconnection
Agreement in PacifiCorp’s OATT.
PacifiCorp requests an effective date of
January 19, 2005.
PacifiCorp states that copies of this
filing were supplied to the Public Utility
Commission of Oregon and the
Washington Utilities and Transportation
Commission. In addition, PacifiCorp’s
existing transmission customers were
notified by e-mail.
Comment Date: 5 p.m. Eastern Time
on February 24, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–632 Filed 2–14–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP05–15–000]
Caledonia Energy Partners, L.L.C.;
Notice of Availability of the
Environmental Assessment for the
Proposed Caledonia Storage Project
February 9, 2005.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) on the
natural gas pipeline facilities proposed
by Caledonia Energy Partners, L.L.C.
(Caledonia) in the above-referenced
docket.
The EA was prepared to satisfy the
requirements of the National
Environmental Policy Act. The staff
concludes that approval of the proposed
project, with appropriate mitigating
measures, would not constitute a major
federal action significantly affecting the
quality of the human environment.
E:\FR\FM\15FEN1.SGM
15FEN1
Agencies
[Federal Register Volume 70, Number 30 (Tuesday, February 15, 2005)]
[Notices]
[Pages 7727-7728]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-632]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER00-2398-006, et al.]
Baconton Power, LLC, et al.; Electric Rate and Corporate Filings
February 8, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Baconton Power LLC
[Docket No. ER00-2398-006]
Take notice that on February 2, 2005, Baconton Power LLC filed a
notice of change in status relating to the facts relied upon by the
Commission in approving its application to charge market-based rates
for wholesale sales.
Comment Date: 5 p.m. Eastern Time on February 23, 2004.
2. Colton Power, L.P.
[Docket No. ER01-2644-006]
Take notice that on February 1, 2005, Colton Power, L.P. (Colton)
tendered for filing an updated market power analysis and notice of
change in status in compliance with the Commission order authorizing
Colton to engage in wholesale sales of electric power at market-based
rates issued January 30, 2002 in Docket No. ER01-2644-000, et al., 98
FERC ] 61,059.
Comment Date: 5 p.m. Eastern Time on February 22, 2005.
3. Duke Energy Lee, LLC
[Docket No. ER04-641-003]
Take notice that on February 1, 2005, Duke Energy Lee, LLC (Duke
Lee) submitted its compliance filing in response to the Commission's
order issued January 25, 2005 in Docket Nos. ER05-641-000, 001 and 002,
Duke Energy Lee, LLC, 110 FERC ] 61,057 (2005)
Duke Lee states that copies of the filing were served on parties on
the official service list in the above-captioned proceeding.
Comment Date: 5 p.m. Eastern Time on February 22, 2005.
4. NorthWestern Energy
[Docket No. ER04-1106-002]
Take notice that on February 2, 2005, NorthWestern Energy filed to
withdraw the tariff sheets submitted August 9, 2004, as amended on
November 3, 2004, containing a proposed modification to Schedule 4
(Energy Imbalance Service) and a new Schedule 9 (Generation Imbalance
Service), and renewed its request for acceptance and approval of
proposed Attachment J which contains the Large Generator
Interconnection Agreement and the Large Generator Interconnection
Procedures.
Comment Date: 5 p.m. Eastern Time on February 23, 2005.
5. Old Dominion Electric Cooperative
[Docket No. ER05-309-001]
Take notice that on February 4, 2005, Old Dominion Electric
Cooperative (Old Dominion) in response to the Commission's deficiency
letter order issued January 27, 2005, filed an amendment to its
December 7, 2004 filing in Docket No. ER05-309-000
Old Dominion states that a copy of the filing was served upon each
of Old Dominion's member cooperatives, the public service commissions
in the Commonwealth of Virginia and the states of Delaware, Maryland
and West Virginia, and Bear Island Paper Company, LLC.
Comment Date: 5 p.m. Eastern Time on February 14, 2005.
6. ISO New England Inc.; Bangor Hydro-Electric Company; Central Maine
Power Company; NSTAR Electric & Gas Corporation, on behalf of its
affiliates: Boston Edison Company, Commonwealth Electric Company,
Cambridge Electric Light Company, and Canal Electric Company; New
England Power Company; Northeast Utilities Service Company, on behalf
of its operating company affiliates: The Connecticut Light and Power
Company, Western Massachusetts Electric Company, Public Service Company
of New Hampshire and Holyoke Water Power Company; The United
Illuminating Company; Fitchburg Gas and Electric Light Company; Unitil
Energy Systems, Inc.; Vermont Electric Power Company; Central Vermont
Public Service Corporation; Green Mountain Power Corporation; Vermont
Electric Cooperative; Florida Power & Light Company--New England
Division
[Docket No. ER05-374-002]
Take notice that, on January 28, 2005, ISO New England Inc. (ISO-
NE) submitted a compliance filing pursuant to the Commission's order
issued December 30, 2004 in Docket No. ER05-135-000. ISO-NE states that
the filing amends section IV.B.6 of ISO-NE's Transmission, Markets and
Services Tariff, FERC Electric Tariff No. 3 to state that all quarterly
and annual capital budget and expenditure filings will be filed
pursuant to, and subject to Commission review under, section 205 of the
Federal Power Act.
ISO-NE states that copies of the filing were served on parties on
the official service list in the above-captioned proceeding, as well as
to the NEPOOL Participants and the New England state governors and
regulatory commissions.
Comment Date: 5 p.m. Eastern Time on February 18, 2005.
7. ISO New England Inc.; Bangor Hydro-Electric Company; Central Maine
Power Company; NSTAR Electric & Gas Corporation, on behalf of its
affiliates: Boston Edison Company, Commonwealth Electric Company,
Cambridge Electric Light Company, and Canal Electric Company; New
England Power Company; Northeast Utilities Service Company, on behalf
of its operating company affiliates: The Connecticut Light and Power
Company, Western Massachusetts Electric Company, Public Service Company
of New Hampshire and Holyoke Water Power Company; The United
Illuminating Company; Fitchburg Gas and Electric Light Company; Unitil
Energy Systems, Inc.; Vermont Electric Power Company; Central Vermont
Public Service Corporation; Green Mountain Power Corporation; Vermont
Electric Cooperative; Florida Power & Light Company--New England
Division
[Docket No. ER05-374-003]
Take notice that, on January 28, 2005, ISO New England Inc. (ISO-
NE) submitted a compliance filing pursuant to the Commission's order
issued December 30, 2004 in Docket No. ER05-134-000 to remove Schedule
5 from Section IV.A of ISO-NE's Transmission, Markets and Services
Tariff, FERC Electric Tariff No. 3. ISO-NE states that Schedule 5 would
have served as a placeholder to allow a Regional State Committee to
submit, justify, and collect its administrative costs should such a
committee be formed in the context of the regional transmission
organization.
ISO-NE states that copies of the filing were served on parties on
the official service list in the above-captioned proceeding, as well as
the NEPOOL Participants and the New England state governors and
regulatory commissions.
Comment Date: 5 p.m. Eastern Time on February 18, 2005.
[[Page 7728]]
8. Eastern Desert Power LLC
[Docket No. ER05-534-000]
Take notice that on February 1, 2005, Eastern Desert Power LLC
(Eastern Desert) submitted an application for authorization to sell
energy, capacity and ancillary services at market-based rates. Eastern
Desert states that it is developing and will own and operate an
approximately 51-megawatt wind energy facility (the Facility) in San
Bernardino County, California. Eastern Desert requests that the
Commission grant waivers and blanket approvals provided to applicants
that receive authority for market-based rates.
Comment Date: 5 p.m. Eastern Time on February 22, 2005.
9. Xcel Energy Services Inc.
[Docket No. ER05-535-000]
Take notice that on February 1, 2005, Xcel Energy Services Inc.
(XES), on behalf of the Xcel Energy Operating Companies (Northern
States Power Company, Northern States Power Company (Wisconsin), Public
Service Company of Colorado, and Southwestern Public Service Company),
submitted revised tariff sheets to the Xcel Energy Operating Companies
open-access transmission tariff (Xcel Energy OATT). XES states that the
purpose of this filing is to remove Cheyenne Light, Fuel and Power
Company as one of the Xcel Energy Operating Companies offering
transmission service under the Xcel Energy OATT.
XEL states that copies of the filing were served upon XES's state
public service commissions. XES requests waiver of further service
requirements as no third party has taken service under this tariff on
the facilities of Cheyenne Light, Fuel and Power Company.
Comment Date: 5 p.m. Eastern Time on February 22, 2005.
10. AEP Texas Central Company
[Docket No. ER05-536-000]
Take notice that on February 2, 2005, American Electric Power
Service Corporation (AEPSC), as agent for AEP Texas Central Company
(AEPTCC) formerly called Central Power and Light Company, submitted for
filing an interconnection agreement between AEPTCC and LCRA
Transmission Services Corporation (LCRA). AEPTCC requests an effective
date of January 11, 2005.
AEPSC states that it has served copies of the filing on LCRA and
the Public Utility Commission of Texas.
Comment Date: 5 p.m. Eastern Time on February 23, 2005.
11. PacifiCorp
[Docket No. ER05-537-000]
Take notice that on February 2, 2005, PacifiCorp tendered for
filing Amendment No. 3 to the June 1, 1994 AC Intertie Agreement
between PacifiCorp and Bonneville Power Administration (PacifiCorp's
First Revised Rate Schedule FERC No 368).
PacifiCorp states that copies of this filing were supplied to the
Public Utility Commission of Oregon, the Washington Utilities and
Transportation Commission, and Bonneville Power Administration.
Comment Date: 5 p.m. Eastern Time on February 23, 2005.
12. PSI Energy, Inc., Northern Indiana Public Service Company
[Docket No. ER05-538-000]
Take notice that on February 2, 2005, PSI Energy, Inc. (PSI) and
Northern Indiana Public Service Company (NIPSCO) tendered for filing an
Amended and Restated Facilities Agreement between PSI and NIPSCO. PSI
and NIPSCO request an effective date of May 18, 2004.
PSI and NIPSCO state that copies of this filing have been served on
the Indiana Utility Regulatory Commission.
Comment Date: 5 p.m. Eastern Time on February 23, 2005.
13. PacifiCorp
[Docket No. ER05-539-000]
Take notice that on February 3, 2005, PacifiCorp tendered for
filing Order 2003-B revisions to its open access transmission tariff
(OATT). PacifiCorp states that these revisions change portions of the
pro forma Large Generator Interconnection Procedures and Large
Generator Interconnection Agreement in PacifiCorp's OATT. PacifiCorp
requests an effective date of January 19, 2005.
PacifiCorp states that copies of this filing were supplied to the
Public Utility Commission of Oregon and the Washington Utilities and
Transportation Commission. In addition, PacifiCorp's existing
transmission customers were notified by e-mail.
Comment Date: 5 p.m. Eastern Time on February 24, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-632 Filed 2-14-05; 8:45 am]