Notice of Meeting; Sunshine Act, 7524 [05-2889]
Download as PDF
7524
Federal Register / Vol. 70, No. 29 / Monday, February 14, 2005 / Notices
TABLE 1.—SUMMARY OF POTENTIAL ENVIRONMENTAL IMPACTS OF ALTERNATIVES A, B, AND C—Continued
[Mitigation indicated in footnotes]
Alternative A: Consolidation
Resource 1
A.2.1
NASA Johnson Space
Center
A.2.2
NASA Stennis Space
Center
Biological Resources 14.
Ecological
Resources.
Low to no impact 15.
No impact ....
Low to no impact.
No impact ....
Cultural and
Low to no imHistoric Repact 19.
sources 18.
Environmenta- No adverse
l Justice 23.
impact.
No impact ....
No adverse
impact.
A.4.1
Aerospace
Technology
Park (by
GRC)
Alternative B:
Virtual consolidation
Alternative C:
No action
No impact ......
No impact ....
No impact.
No impact ....
No impact ......
No impact ....
No impact.
Low to no impact 22.
No impact ......
No impact ....
No impact.
No adverse
impact.
No adverse
impact.
No adverse
impact.
No adverse
impact.
A.4.2
Central Florida Research
Park (CFRP)
by KSC)
A.4.3
City Center at
Oyster Point
(by LaRC)
A.4.4
Cummings
Research Park
(CRP) (by
MSFC)
Low to no im- Low to no impact 16.
pact.
Wetlands im- No impact ....
pact to be
mitigated 17.
Low to no im- Low to no impact 20.
pact 21.
No impact ....
No adverse
impact.
No adverse
impact.
1 Alternative A: NASA NSSC Environmental Management System to be developed and full- or part-time NASA NSSC Environmental Manager
to be designated. Alternatives B and C: Current NASA Center EMS would apply.
2 Alternative A: All nominations required consistency with NASA’s sustainable facilities policy.
3 No Level/Phase 1 Site Assessment. Available information does not indicate contamination likely. Confirmatory Environmental Site Assessment for contamination required prior to lease or contract.
4 Center-wide survey completed. No contamination indicated at the proposed site. State of Mississippi concurred.
5 No Level/Phase 1 Site Assessment. Available information does not indicate contamination likely. Confirmatory Environmental Site Assessment for contamination required prior to lease or contract.
6 No LevelPhase 1 Site Assessment. Available information does not indicate contamination likely. Confirmatory Environmental Site Assessment
for contamination required prior to lease or contract.
7 Level/Phase 1 Site Assessment completed. Level 2 Site Assessment not indicated.
8 Level/Phase 1 Site Assessment completed. Level 2 Site Assessment not indicated.
9 Alternative A: NASA NSSC Energy Manager, full- or part-time, to be designated. Alternatives B and C: Current on-site NASA Center Energy
Manager.
10 Noise impacts from adjoining airport to be mitigated in accordance with occupational health and safety regulations and local noise codes.
11 Confirmatory Clean Air Act General Conformity Determination (NO
X and VOCs) may be required; construction scheduling adjustment and
other mitigation may be required if results for relevant emissions exceed de minimus levels. Preliminary analysis indicated that levels would be
well below de minimus levels.
12 State Environmental Resources Permit would be required.
13 State approved stormwater management plan would be required.
14 All: If protected species are subsequently discovered on site or species on site are later designated for protection, NASA will consult with the
U.S. Fish and Wildlife Service.
15 Pre-construction survey required for migratory birds and, if results indicate presence, adjustment of construction schedule may be required.
16 Pre-construction survey required for migratory birds and Indiana bat and if results indicate presence, adjustment of construction schedule
may be required.
17 Clean Water Act sec. 404 wetlands permit from the Army Corps of Engineers required; wetlands mitigation planned off-site.
18 Alternative A: If unanticipated discovery occurs during excavation or construction, consultation with SHPO would be required to development
mitigation plan if needed that may include adjustment of the footprint or construction schedule, data recovery, curation, and public education display.
19 No impact to National Historic Landmarks at JSC. Confirmatory site testing for archeological resources may be required, and if results indicate presence, consultation with SHPO would be required to development mitigation plan if needed that may include adjustment of the footprint
or construction schedule, data recovery, curation, and public education display.
20 Site testing for archeological resources would be required as recommended by SHPO, and if results indicate presence, consultation with
SHPO would be required to development mitigation plan if needed that may include adjustment of the footprint or construction schedule, data recovery, curation, and public education display.
21 Confirmatory site testing for archeological resources may be required, and if results indicate presence, consultation with SHPO would be required to development mitigation plan if needed that may include adjustment of the footprint or construction schedule, data recovery, curation,
and public education display.
22 Confirmatory site testing for archeological resources may be required, and if results indicate presence, consultation with SHPO would be required to development mitigation plan if needed that may include adjustment of the footprint or construction schedule, data recovery, curation,
and public education display.
23 Alternative A: NASA NSSC EJ Strategy would be developed. Alternatives B and C: Current NASA Center EJ Strategy would apply.
[FR Doc. 05–2812 Filed 2–11–05; 8:45 am]
BILLING CODE 7510–13–P
NATIONAL CREDIT UNION
ADMINISTRATION
Notice of Meeting; Sunshine Act
10 a.m., Thursday,
February 17, 2005.
TIME AND DATE:
VerDate jul<14>2003
15:28 Feb 11, 2005
Jkt 205001
Board Room, 7th Floor, Room
7047, 1775 Duke Street, Alexandria, VA
22314–3428.
STATUS: Open.
MATTERS TO BE CONSIDERED:
1. Quarterly Insurance Fund Report.
2. Final Rule: Section 701.21(e), (f),
and (g) of NCUA’s Rules and
Regulations, Loans to Members and
Lines of Credit to Members.
PLACE:
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
FOR FURTHER INFORMATION CONTACT:
Mary Rupp, Secretary of the Board,
telephone: 703–518–6304.
Mary Rupp,
Secretary of the Board.
[FR Doc. 05–2889 Filed 2–10–05; 1:03 pm]
BILLING CODE 7535–01–M
E:\FR\FM\14FEN1.SGM
14FEN1
Agencies
[Federal Register Volume 70, Number 29 (Monday, February 14, 2005)]
[Notices]
[Page 7524]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-2889]
=======================================================================
-----------------------------------------------------------------------
NATIONAL CREDIT UNION ADMINISTRATION
Notice of Meeting; Sunshine Act
Time and Date: 10 a.m., Thursday, February 17, 2005.
Place: Board Room, 7th Floor, Room 7047, 1775 Duke Street, Alexandria,
VA 22314-3428.
Status: Open.
Matters to be Considered:
1. Quarterly Insurance Fund Report.
2. Final Rule: Section 701.21(e), (f), and (g) of NCUA's Rules and
Regulations, Loans to Members and Lines of Credit to Members.
FOR FURTHER INFORMATION CONTACT: Mary Rupp, Secretary of the Board,
telephone: 703-518-6304.
Mary Rupp,
Secretary of the Board.
[FR Doc. 05-2889 Filed 2-10-05; 1:03 pm]
BILLING CODE 7535-01-M