Drawbridge Operation Regulations: Long Island, New York Inland Waterway From East Rockaway Inlet to Shinnecock Canal, NY, 7024 [05-2557]
Download as PDF
7024
Federal Register / Vol. 70, No. 27 / Thursday, February 10, 2005 / Rules and Regulations
ways to enhance the quality, utility, and
clarity of the information to be
collected; and ways to minimize the
burden of the collection of information,
including through the use of automated
collection techniques or other forms of
information technology. Send comments
or any other aspects of the collections of
information to NMFS (see ADDRESSES).
Notwithstanding any other provisions
of the law, no person is required to
respond to, and no person shall be
subject to penalty for failure to comply
with, a collection of information subject
to the requirements of the PRA, unless
that collection of information displays a
currently valid OMB control number.
Small Entity Compliance Guide
Section 212 of the Small Business
Regulatory Enforcement Fairness Act of
1996 states that for each rule or group
of related rules for which an agency is
required to prepare a FRFA, the agency
shall publish one or more guides to
assist small entities in complying with
the rule, and shall designated such
publications as ‘‘small entity
compliance guides.’’ The agency shall
explain the actions a small entity is
required to take to comply with a rule
or group of rules. As part of this
rulemaking process, a small entity
compliance guide was prepared for the
HMS FMP final rule. This guide will be
posted on the NMFS SWR website
(https://swr.nmfs.noaa.gov) and a hard
copy will be sent to all interested parties
upon request (see FOR FURTHER
INFORMATION CONTACT).
2. In § 902.1, the table in paragraph (b)
under 50 CFR is amended by adding in
numerical order entries for § § 660.707,
660.708, and 660.712(d) and (f) as
follows:
I
§ 902.1 OMB Control numbers assigned
pursuant to the Paperwork Reduction Act.
*
*
*
(b)* * *
*
*
CFR part or section where the
information collection requirement is located
*
Current
OMB control number (All
numbers
begin with
0648–)
*
*
*
*
50 CFR
*
*
*
*
*
660.707
660.708
660.712(d) and (f)
*
*
*
*
–0204
–0498
–0498
*
[FR Doc. 05–2531 Filed 2–9–05; 8:45 am]
BILLING CODE 3510–22–S
15 CFR Part 902
Reporting and recordkeeping
requirements.
DEPARTMENT OF HOMELAND
SECURITY
33 CFR Part 117
[CGD01–05–008]
Coast Guard, DHS.
Notice of temporary deviation.
AGENCY:
ACTION:
Permits and Reporting and
recordkeeping requirements.
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the drawbridge operation
regulations governing the operation of
the Long Beach Bridge, at mile 4.7,
across Reynolds Channel New York.
This temporary deviation allows the
bridge to remain in the closed position
from February 21, 2005 through
February 27, 2005. This temporary
deviation is necessary to facilitate
scheduled bridge maintenance.
DATES: This temporary deviation is
effective from February 21, 2005
through February 27, 2005.
FOR FURTHER INFORMATION CONTACT: Judy
Leung-Yee, Project Officer, First Coast
Guard District, at (212) 668–7165.
SUPPLEMENTARY INFORMATION: The Long
Beach Bridge has a vertical clearance of
For the reasons set out in the preamble,
15 CFR chapter IX, Part 902, is amended
as follows:
I
15 CFR Chapter IX
PART 902—NOAA INFORMATION
COLLECTION REQUIREMENTS UNDER
THE PAPERWORK REDUCTION ACT:
OMB CONTROL NUMBERS
1. The authority citation for part 902
continues to read as follows:
I
Authority: 44 U.S.C. 3501 et seq.
VerDate jul<14>2003
16:15 Feb 09, 2005
Jkt 205001
BILLING CODE 4910–15–P
ENVIRONMENTAL PROTECTION
AGENCY
PO 00000
Frm 00026
Fmt 4700
[WV100–6030; FRL–7861–3]
Approval and Promulgation of Air
Quality Implementation Plans; West
Virginia; Revised Format of 40 CFR
Part 52 for Materials Being
Incorporated by Reference
Coast Guard
50 CFR Part 660
Dated: February 4, 2005.
Rebecca Lent,
Deputy Assistant Administrator or Regulatory
Programs, National Marine Fisheries Service.
Dated: January 31, 2005.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 05–2557 Filed 2–9–05; 8:45 am]
40 CFR Part 52
Drawbridge Operation Regulations:
Long Island, New York Inland
Waterway From East Rockaway Inlet to
Shinnecock Canal, NY
List of Subjects
20 feet at mean high water and 24 feet
at mean low water. The existing
regulations are listed at 33 CFR
117.799(g).
The bridge owner, Nassau County
Department of Public Works, requested
a temporary deviation for the Long
Beach Bridge to facilitate scheduled
maintenance repairs, gear rack repairs,
at the bridge.
Under this temporary deviation the
Long Beach Bridge need not open for
vessel traffic from February 21, 2005
through February 27, 2005.
This deviation from the operating
regulations is authorized under 33 CFR
117.35, and will be performed with all
due speed in order to return the bridge
to normal operation as soon as possible.
Sfmt 4700
Environmental Protection
Agency (EPA).
ACTION: Final rule; notice of
administrative change.
AGENCY:
SUMMARY: EPA is revising the format for
materials submitted by West Virginia
that are incorporated by reference (IBR)
into its State implementation plan (SIP).
The regulations affected by this format
change have all been previously
submitted by West Virginia and
approved by EPA. This format revision
will primarily affect the ‘‘Identification
of plan’’ section, as well as the format
of the SIP materials that will be
available for public inspection at the
National Archives and Records
Administration (NARA), the Air and
Radiation Docket and Information
Center located at EPA Headquarters in
Washington, DC, and the EPA Regional
Office. EPA is also adding a table in the
‘‘Identification of plan’’ section which
summarizes the approval actions that
EPA has taken on the non-regulatory
and quasi-regulatory portions of the
West Virginia SIP.
E:\FR\FM\10FER1.SGM
10FER1
Agencies
[Federal Register Volume 70, Number 27 (Thursday, February 10, 2005)]
[Rules and Regulations]
[Page 7024]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-2557]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD01-05-008]
Drawbridge Operation Regulations: Long Island, New York Inland
Waterway From East Rockaway Inlet to Shinnecock Canal, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the drawbridge operation regulations governing
the operation of the Long Beach Bridge, at mile 4.7, across Reynolds
Channel New York. This temporary deviation allows the bridge to remain
in the closed position from February 21, 2005 through February 27,
2005. This temporary deviation is necessary to facilitate scheduled
bridge maintenance.
DATES: This temporary deviation is effective from February 21, 2005
through February 27, 2005.
FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First
Coast Guard District, at (212) 668-7165.
SUPPLEMENTARY INFORMATION: The Long Beach Bridge has a vertical
clearance of 20 feet at mean high water and 24 feet at mean low water.
The existing regulations are listed at 33 CFR 117.799(g).
The bridge owner, Nassau County Department of Public Works,
requested a temporary deviation for the Long Beach Bridge to facilitate
scheduled maintenance repairs, gear rack repairs, at the bridge.
Under this temporary deviation the Long Beach Bridge need not open
for vessel traffic from February 21, 2005 through February 27, 2005.
This deviation from the operating regulations is authorized under
33 CFR 117.35, and will be performed with all due speed in order to
return the bridge to normal operation as soon as possible.
Dated: January 31, 2005.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 05-2557 Filed 2-9-05; 8:45 am]
BILLING CODE 4910-15-P