Phelps Dodge Energy Services; Notice of Application for Commission Redetermination of Exempt Wholesale Generator Status, 6853 [E5-519]

Download as PDF Federal Register / Vol. 70, No. 26 / Wednesday, February 9, 2005 / Notices Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of § 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–520 Filed 2–8–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EG05–36–000] Phelps Dodge Energy Services; Notice of Application for Commission Redetermination of Exempt Wholesale Generator Status February 2, 2005. Take notice that on January 31, 2005, Phelps Dodge Energy Services, LLC VerDate jul<14>2003 16:49 Feb 08, 2005 Jkt 205001 (PDES) filed an application for redetermination of exempt wholesale generator status pursuant to part 365 of the Commission’s regulations. PDES states that it operates several facilities with a capacity of 282 MW located in Morenci, Arizona and in Chino and Tyrone, New Mexico. Additionally, PDES states it has recently acquired a one-third undivided interest in a 570 MW gas fired power plan located in Deming, New Mexico. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on February 22, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–519 Filed 2–8–05; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 6853 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP05–167–000] Pine Needle LNG Company, LLC; Notice of Proposed Changes in FERC Gas Tariff February 2, 2005. Take notice that on January 28, 2005, Pine Needle LNG Company, LLC (Pine Needle) tendered for filing as part of its FERC Gas Tariff, Original Volume No. 1, the following tariff sheets, to become effective February 27, 2005: Sixth Revised Sheet No. 40 Second Revised Sheet No. 55 Fourth Revised Sheet No. 62 Second Revised Sheet No. 83 Second Revised Sheet No. 90 Pine Needle states that the purpose of the instant filing is to modify its tariff to:(1) Clarify section 12 of the General Terms and Conditions, Pressures; (2) provide for the posting of any information required by Order 2004 on Pine Needle’s Electronic Bulletin Board; and (3) add a new section 31 to the General Terms and Conditions, Extension of Service Agreement. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for E:\FR\FM\09FEN1.SGM 09FEN1

Agencies

[Federal Register Volume 70, Number 26 (Wednesday, February 9, 2005)]
[Notices]
[Page 6853]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-519]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EG05-36-000]


Phelps Dodge Energy Services; Notice of Application for 
Commission Redetermination of Exempt Wholesale Generator Status

February 2, 2005.
    Take notice that on January 31, 2005, Phelps Dodge Energy Services, 
LLC (PDES) filed an application for redetermination of exempt wholesale 
generator status pursuant to part 365 of the Commission's regulations.
    PDES states that it operates several facilities with a capacity of 
282 MW located in Morenci, Arizona and in Chino and Tyrone, New Mexico. 
Additionally, PDES states it has recently acquired a one-third 
undivided interest in a 570 MW gas fired power plan located in Deming, 
New Mexico.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant. On or before the comment date, it is 
not necessary to serve motions to intervene or protests on persons 
other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on February 22, 2005.

Magalie R. Salas,
Secretary.
[FR Doc. E5-519 Filed 2-8-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.