Phelps Dodge Energy Services; Notice of Application for Commission Redetermination of Exempt Wholesale Generator Status, 6853 [E5-519]
Download as PDF
Federal Register / Vol. 70, No. 26 / Wednesday, February 9, 2005 / Notices
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of § 154.210 of the
Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–520 Filed 2–8–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EG05–36–000]
Phelps Dodge Energy Services; Notice
of Application for Commission
Redetermination of Exempt Wholesale
Generator Status
February 2, 2005.
Take notice that on January 31, 2005,
Phelps Dodge Energy Services, LLC
VerDate jul<14>2003
16:49 Feb 08, 2005
Jkt 205001
(PDES) filed an application for
redetermination of exempt wholesale
generator status pursuant to part 365 of
the Commission’s regulations.
PDES states that it operates several
facilities with a capacity of 282 MW
located in Morenci, Arizona and in
Chino and Tyrone, New Mexico.
Additionally, PDES states it has recently
acquired a one-third undivided interest
in a 570 MW gas fired power plan
located in Deming, New Mexico.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant. On
or before the comment date, it is not
necessary to serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on February 22, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5–519 Filed 2–8–05; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
6853
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–167–000]
Pine Needle LNG Company, LLC;
Notice of Proposed Changes in FERC
Gas Tariff
February 2, 2005.
Take notice that on January 28, 2005,
Pine Needle LNG Company, LLC (Pine
Needle) tendered for filing as part of its
FERC Gas Tariff, Original Volume No. 1,
the following tariff sheets, to become
effective February 27, 2005:
Sixth Revised Sheet No. 40
Second Revised Sheet No. 55
Fourth Revised Sheet No. 62
Second Revised Sheet No. 83
Second Revised Sheet No. 90
Pine Needle states that the purpose of
the instant filing is to modify its tariff
to:(1) Clarify section 12 of the General
Terms and Conditions, Pressures; (2)
provide for the posting of any
information required by Order 2004 on
Pine Needle’s Electronic Bulletin Board;
and (3) add a new section 31 to the
General Terms and Conditions,
Extension of Service Agreement.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
E:\FR\FM\09FEN1.SGM
09FEN1
Agencies
[Federal Register Volume 70, Number 26 (Wednesday, February 9, 2005)]
[Notices]
[Page 6853]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-519]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG05-36-000]
Phelps Dodge Energy Services; Notice of Application for
Commission Redetermination of Exempt Wholesale Generator Status
February 2, 2005.
Take notice that on January 31, 2005, Phelps Dodge Energy Services,
LLC (PDES) filed an application for redetermination of exempt wholesale
generator status pursuant to part 365 of the Commission's regulations.
PDES states that it operates several facilities with a capacity of
282 MW located in Morenci, Arizona and in Chino and Tyrone, New Mexico.
Additionally, PDES states it has recently acquired a one-third
undivided interest in a 570 MW gas fired power plan located in Deming,
New Mexico.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant. On or before the comment date, it is
not necessary to serve motions to intervene or protests on persons
other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on February 22, 2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5-519 Filed 2-8-05; 8:45 am]
BILLING CODE 6717-01-P