Erie Boulevard Hydropower, L.P.; Notice of Scoping and Soliciting Scoping Comments, 6648 [E5-505]
Download as PDF
6648
Federal Register / Vol. 70, No. 25 / Tuesday, February 8, 2005 / Notices
accordance with the National
Environmental Policy Act. The EA will
consider both site-specific and
cumulative environmental impacts and
reasonable alternatives to the proposed
action.
Commission staff does not propose to
conduct any on-site scoping meetings at
this time. Instead, we will solicit
comments, recommendations,
information, and alternatives in the
Scoping Document (SD).
Copies of the SD outlining the subject
areas to be addressed in the EA were
distributed to the parties on the
Commission’s mailing list. Copies of the
SD may be viewed on the Web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call 1–866–
208–3676 or for TTY, (202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–504 Filed 2–7–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7321–018]
Erie Boulevard Hydropower, L.P.;
Notice of Scoping and Soliciting
Scoping Comments
February 1, 2005.
a. Type of Application: Subsequent
license.
b. Project No.: 7321–018.
c. Date Filed: November 26, 2004.
d. Applicant: Erie Boulevard
Hydropower, L.P.
e. Name of Project: Macomb Project.
f. Location: On the Salmon River in
Franklin County, New York. This
project does not occupy federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Jerry L.
Sabattis, Erie Boulevard Hydropower,
L.P., 225 Greenfield Parkway, Suite 201,
Liverpool, NY 13088, (315) 413–2787.
i. FERC Contact: John Smith,
telephone (202) 502–8972, e-mail
john.smith@ferc.gov.
j. Deadline for Filing Scoping
Comments: March 2, 2005.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Scoping comments may be filed
electronically via the Internet in lieu of
VerDate jul<14>2003
18:12 Feb 07, 2005
Jkt 205001
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the
‘‘Filing’’ link.
k. The existing Macomb Project
consists of: (1) A 106-foot-long, 32-foothigh concrete gravity overflow-type dam
having a spillway crest elevation of
570.7 feet above mean sea level; (2) a 38foot-long, 25-foot-high intake structure
along each bank; (3) a 6-foot-diameter,
60-foot-long, riveted-steel, gated waste
tube along each bank; (4) a 14-acre
reservoir with a net storage capacity of
14 acre-feet at the spillway crest
elevation; (5) a 6.5-foot-diameter, 60foot-long, riveted-steel, concreteencased, gated pipeline along the left
(south) bank; (6) a powerhouse
containing one 1,000-kilowatt
horizontal Francis turbine; (7) a 370foot-long, 34.5-kilovolt transmission
line; and (8) appurtenant facilities. The
applicant estimates that the total
average annual generation would be
5,660 megawatthours.
l. A copy of the application is on file
with the Commission and is available
for public inspection. This filing may
also be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’
link—select ‘‘Docket #’’ and follow the
instructions. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
You may also register online at http:/
/www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
m. Scoping Process. Scoping is
intended to advise all parties regarding
the proposed scope of the
environmental analysis and to seek
additional information pertinent to this
analysis. The Commission staff intends
to prepare an environmental assessment
(EA) on the project in accordance with
the National Environmental Policy Act.
The EA will consider both site-specific
and cumulative environmental impacts
and reasonable alternatives to the
proposed action.
At this time, the Commission staff
does not propose to conduct any formal
public or agency meetings or an on-site
visit. Instead we will solicit comments,
recommendations, information, and
alternatives by conducting paper
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
scoping through issuing this scoping
document.
Copies of the scoping document
outlining the subject areas to be
addressed in the EA were distributed to
the parties on the Commission’s mailing
list. Copies of the scoping document are
available for review at the Commission
or may be viewed on the Commission’s
Web site at https://www.ferc.gov, using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (806) 208–3676, or for TTY,
contact (202) 502–8659.
As part of scoping, the staff will: (1)
Summarize the environmental issues
tentatively identified for analysis in the
EA; (2) solicit from comments all
available information, especially
quantifiable data, on the resources at
issue; (3) encourage statements from
experts and the public on issues that
should be analyzed in the EA, including
viewpoints in opposition to, or in
support of, the staff’s preliminary views;
(4) determine the resource issues to be
addressed in the EA; and (5) identify
those issues that require a detailed
analysis, as well as those issues that do
not require a detailed analysis.
Consequently, interested entities are
requested to file with the Commission
any data and information concerning
environmental resources and land uses
in the project area and the subject
project’s impacts to the aforementioned.
n. The revised schedule for processing
the Macomb Project license application
is:
Major milestone
Notice of application is ready
for environmental analysis.
Notice of the availability of
the EA.
Ready for Commission’s decision on the application.
Target date
April 2005.
October 2005.
November
2005.
Magalie R. Salas,
Secretary.
[FR Doc. E5–505 Filed 2–7–05; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\08FEN1.SGM
08FEN1
Agencies
[Federal Register Volume 70, Number 25 (Tuesday, February 8, 2005)]
[Notices]
[Page 6648]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-505]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7321-018]
Erie Boulevard Hydropower, L.P.; Notice of Scoping and Soliciting
Scoping Comments
February 1, 2005.
a. Type of Application: Subsequent license.
b. Project No.: 7321-018.
c. Date Filed: November 26, 2004.
d. Applicant: Erie Boulevard Hydropower, L.P.
e. Name of Project: Macomb Project.
f. Location: On the Salmon River in Franklin County, New York. This
project does not occupy federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Mr. Jerry L. Sabattis, Erie Boulevard
Hydropower, L.P., 225 Greenfield Parkway, Suite 201, Liverpool, NY
13088, (315) 413-2787.
i. FERC Contact: John Smith, telephone (202) 502-8972, e-mail
john.smith@ferc.gov.
j. Deadline for Filing Scoping Comments: March 2, 2005.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Scoping comments may be filed electronically via the Internet in
lieu of paper. The Commission strongly encourages electronic filings.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site (https://www.ferc.gov) under the ``Filing'' link.
k. The existing Macomb Project consists of: (1) A 106-foot-long,
32-foot-high concrete gravity overflow-type dam having a spillway crest
elevation of 570.7 feet above mean sea level; (2) a 38-foot-long, 25-
foot-high intake structure along each bank; (3) a 6-foot-diameter, 60-
foot-long, riveted-steel, gated waste tube along each bank; (4) a 14-
acre reservoir with a net storage capacity of 14 acre-feet at the
spillway crest elevation; (5) a 6.5-foot-diameter, 60-foot-long,
riveted-steel, concrete-encased, gated pipeline along the left (south)
bank; (6) a powerhouse containing one 1,000-kilowatt horizontal Francis
turbine; (7) a 370-foot-long, 34.5-kilovolt transmission line; and (8)
appurtenant facilities. The applicant estimates that the total average
annual generation would be 5,660 megawatthours.
l. A copy of the application is on file with the Commission and is
available for public inspection. This filing may also be viewed on the
Web at https://www.ferc.gov using the ``eLibrary'' link--select ``Docket
'' and follow the instructions. For assistance, please contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866)
208-3676, or for TTY, contact (202) 502-8659. A copy is also available
for inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
m. Scoping Process. Scoping is intended to advise all parties
regarding the proposed scope of the environmental analysis and to seek
additional information pertinent to this analysis. The Commission staff
intends to prepare an environmental assessment (EA) on the project in
accordance with the National Environmental Policy Act. The EA will
consider both site-specific and cumulative environmental impacts and
reasonable alternatives to the proposed action.
At this time, the Commission staff does not propose to conduct any
formal public or agency meetings or an on-site visit. Instead we will
solicit comments, recommendations, information, and alternatives by
conducting paper scoping through issuing this scoping document.
Copies of the scoping document outlining the subject areas to be
addressed in the EA were distributed to the parties on the Commission's
mailing list. Copies of the scoping document are available for review
at the Commission or may be viewed on the Commission's Web site at
https://www.ferc.gov, using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at (806) 208-3676, or for TTY,
contact (202) 502-8659.
As part of scoping, the staff will: (1) Summarize the environmental
issues tentatively identified for analysis in the EA; (2) solicit from
comments all available information, especially quantifiable data, on
the resources at issue; (3) encourage statements from experts and the
public on issues that should be analyzed in the EA, including
viewpoints in opposition to, or in support of, the staff's preliminary
views; (4) determine the resource issues to be addressed in the EA; and
(5) identify those issues that require a detailed analysis, as well as
those issues that do not require a detailed analysis. Consequently,
interested entities are requested to file with the Commission any data
and information concerning environmental resources and land uses in the
project area and the subject project's impacts to the aforementioned.
n. The revised schedule for processing the Macomb Project license
application is:
------------------------------------------------------------------------
Major milestone Target date
------------------------------------------------------------------------
Notice of application is ready for April 2005.
environmental analysis.
Notice of the availability of the EA...... October 2005.
Ready for Commission's decision on the November 2005.
application.
------------------------------------------------------------------------
Magalie R. Salas,
Secretary.
[FR Doc. E5-505 Filed 2-7-05; 8:45 am]