The Detroit Edison Company, et al.; Electric Rate and Corporate Filings, 6434-6436 [E5-453]
Download as PDF
6434
Federal Register / Vol. 70, No. 24 / Monday, February 7, 2005 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL01–51–006, et al.]
The Detroit Edison Company, et al.;
Electric Rate and Corporate Filings
January 31, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
participants, as well as all state
commissions within the region. In
addition, the Midwest ISO states that
the filing has been electronically posted
on the Midwest ISO’s Web site at
https://www.midwestiso.org under the
heading ‘‘Filings to FERC’’ for other
interested parties in this matter. The
Midwest ISO indicates that it will
provide hard copies to any interested
party upon request.
Comment Date: 5 p.m. eastern time on
February 9, 2005.
(KCPL) submitted a compliance filing
pursuant to the Commission’s Order
issued December 28, 2004 in Docket No.
ER05–177–000. KCPL states that this
filing pertains to service schedules for
the City of Salisbury, Missouri.
KCPL states that copies of the filing
were served upon the City of Salisbury,
Missouri as well as the Missouri Public
Service Commission and the Kansas
State Corporation Commission.
Comment Date: 5 p.m. eastern time on
February 15, 2005.
4. Merrill Lynch Commodities, Inc.
8. Kansas City Power & Light Company
1. The Detroit Edison Company
[Docket No. ER04–925–002]
[Docket No. ER05–177–008]
[Docket Nos. EL01–51–006 and ER01–1649–
006]
Take notice that on January 25, 2005,
Merrill Lynch Commodities, Inc. (MLCI)
tendered for filing a non-material
change in characteristics that the
Commission relied upon in granting
MLCI market-based rate authorization
under section 205 of the Federal Power
Act.
Comment Date: 5 p.m. eastern time on
February 15, 2005.
Take notice that on January 25, 2005,
Kansas City Power & Light Company
(KCPL) submitted a compliance filing
pursuant to the Commission’s Order
issued December 28, 2004 in Docket No.
ER05–177–000. KCPL states that this
filing pertains to service schedules for
the City of Osawatomie, Kansas.
KCPL states that copies of the filing
were served upon the City of
Osawatomie, Kansas as well as the
Missouri Public Service Commission
and the Kansas State Corporation
Commission.
Comment Date: 5 p.m. eastern time on
February 15, 2005.
Take notice that on January 21, 2005,
The Detroit Edison Company filed
revised pages of its Distribution
Interconnection Agreement with
Dearborn Industrial Generation, LLC,
pursuant to the Commission’s order in
Detroit Edison Company, 109 FERC
¶ 61,329 (2004).
Comment Date: 5 p.m. eastern time on
February 11, 2005.
2. Condon Wind Power, LLC
[Docket No. ER02–305–004]
Take notice that on January 26, 2005,
Condon Wind Power, LLC (Condon)
tendered for filing its triennial updated
market analysis in compliance with the
Commission’s Order issued on
December 19, 2001 in Docket No. ER02–
305–000.
Comment Date: 5 p.m. eastern time on
February 16, 2005.
3. Midwest Independent Transmission
System Operator, Inc.
[Docket Nos. ER02–2595–007]
Take notice that on January 19, 2005,
the Midwest Independent Transmission
System Operator, Inc. (Midwest ISO)
tendered for filing revisions to
Schedules 16 and 17 of its Open Access
Transmission and Energy Markets
Tariff, FERC Electric Tariff, Third
Revised Volume No. 1.
The Midwest ISO states that the
purpose of the proposed revisions is to
increase the amortization period for
certain schedule 16 and 17 preoperating expenses from five (5) to
seven (7) years. The Midwest ISO
requests an effective date of April 1,
2005.
The Midwest ISO states that it has
electronically served a copy of this
filing, with its attachments, upon all
Midwest ISO members, member
representatives of transmission owners
and non-transmission owners, the
Midwest ISO advisory committee
participants, policy subcommittee
VerDate jul<14>2003
21:04 Feb 04, 2005
Jkt 205001
5. Oregon Electric Utility Company,
Portland General Electric Company,
Portland General Term Power,
Procurement Company
[Docket No. ER04–1206–002]
Take notice that on January 21, 2005,
Oregon Electric Utility Company
(OEUC), Portland General Electric
Company (PGE) and Portland General
Term Power Procurement Company
(PPC), filed a supplement to their
January 18, 2004 filing in Docket No.
ER04–1206–002 submitted in response
to the deficiency letter issued December
17, 2004 in Docket Nos. ER04–1206–000
and 001.
Comment Date: 5 p.m. eastern time on
February 10, 2005.
9. City Power Marketing LLC
6. The Union Light, Heat and Power
Company, The Cincinnati Gas &
Electric Company
[Docket No. ER05–482–000]
[Docket No. ER05–330–001]
Take notice that on January 25, 2005,
City Power Marketing LLC, submitted
additional information regarding its
December 14, 2004 filing in Docket No.
ER05–330–000 for acceptance of initial
rate schedule, request for waivers and
blanket authority.
Comment Date: 5 p.m. eastern time on
February 15, 2005.
10. MidAmerican Energy Company
Take notice that on January 26, 2005,
The Union Light, Heat and Power
Company (ULH&P) and The Cincinnati
Gas & Electric Company (CG&E) filed an
amendment to their September 27, 2004
filing in response to the Commission’s
deficiency letter issued on January 11,
2005 in Docket No. ER04–1248–000.
ULH&P and CG&E state that copies of
the filing were served on parties on the
official service list in Docket No. ER04–
1248.
Comment Date: 5 p.m. eastern time on
February 16, 2005.
Take notice that on January 24, 2005,
MidAmerican Energy Company
(MidAmerican) filed with the
Commission an Electric Transmission
Interconnection Agreement between
MidAmerican and Corn Belt Power
Cooperative. MidAmerican requests an
effective date of January 1, 2005 for the
Agreement.
MidAmerican states it has served a
copy of the filing on Corn Belt Power
Cooperative, the Iowa Utilities Board,
the Illinois Commerce Commission and
the South Dakota Public Utilities
Commission.
Comment Date: 5 p.m. eastern time on
February 14, 2005.
7. Kansas City Power & Light Company
11. Union Electric Company
[Docket No. ER05–177–007]
[Docket No. ER05–485–000]
Take notice that on January 25, 2005,
Kansas City Power & Light Company
Take notice that on January 25, 2005,
Union Electric Company d/b/a
[Docket No. ER04–1248–001]
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
E:\FR\FM\07FEN1.SGM
07FEN1
Federal Register / Vol. 70, No. 24 / Monday, February 7, 2005 / Notices
AmerenUE (AmerenUE) filed an
amendment to the Interchange
Agreement between AmerenUE and
Associated Electric Cooperative,
Incorporated (Associated). AmerenUE
requests an effective date of March 26,
2005.
Ameren UE states that copies of the
filing were served on Associated, the
Midwest Independent Transmission
System Operator, Inc. and the Missouri
Public Service Commission.
Comment Date: 5 p.m. eastern time on
February 15, 2005.
12. PJM Interconnection, L.L.C.
Commonwealth Edison Company
[Docket No. ER05–488–000]
Take notice that on January 25, 2005,
Commonwealth Edison Company
(ComEd) and PJM Interconnection,
L.L.C. (PJM) filed a Notice of
Termination of Third Substitute First
Revised Service Agreement No. 1032
under PJM’s Open Access Transmission
Tariff, Sixth Revised Volume No. 1,
Financial Hold Harmless Service
Agreement (Agreement). ComEd and
PJM request that termination of the
Agreement shall be effective once
ComEd makes the payments specified in
the settlement agreements with the
Michigan and Wisconsin Utilities.
Comment Date: 5 p.m. eastern time on
February 15, 2005.
13. Southern California Edison
Company
[Docket No. ER05–489–000]
Take notice that on January 26, 2005,
Southern California Edison Company
(SCE) submitted revised rate sheets to
the Amended and Restated Huntington
Beach Generating Station Radial Lines
Agreement (Agreement) between SCE
and AES Huntington Beach, L.L.C.
(AES). SCE requests an effective date of
April 6, 2001.
SCE states that copies of the filing
were served upon the Public Utilities
Commission of the State of California
and AES.
Comment Date: 5 p.m. eastern time on
February 16, 2005.
Comment Date: 5 p.m. eastern time on
February 16, 2005.
Comment Date: 5 p.m. eastern time on
February 16, 2005.
15. ISO New England Inc. and New
England Power Pool
19. K2 Development LLC
[Docket No. ER05–492–000]
Take notice that on January 26, 2005,
K2 Development LLC submitted a
Notice of Cancellation of its Rate
Schedule FERC No. 1.
Comment Date: 5 p.m. eastern time on
February 16, 2005.
Take notice that on January 26, 2005,
ISO New England Inc.(ISO) and the New
England Power Pool (NEPOOL)
Participants Committee filed an
amendment to NEPOOL Market Rule 1,
section 7.3.5, and the same amendment
to section III.7.3.5 of the Transmission,
Markets and Service Tariff of ISO New
England Inc., FERC Electric Tariff No. 3.
ISO and NEPOOL state that the
amendments permit negative Financial
Transmission Rights bids in the New
England market.
ISO and NEPOOL state that copies of
the filing were sent to the New England
state governors and regulatory agencies
and the participants in NEPOOL.
Comment Date: 5 p.m. eastern time on
February 16, 2005.
16. Saracen Energy LP
[Docket No. ER05–493–000]
Take notice that on January 26, 2005,
Saracen Energy LP submitted an
application for Commission
authorization to engage in wholesale
sale of electricity at market-based rates,
Commission acceptance of its Rate
Schedule FERC No. 1, the granting of
certain blanket approvals, and the
waiver of certain of the Commission’s
Regulations.
Comment Date: 5 p.m. eastern time on
February 16, 2005.
17. Saracen Energy Power Advisors LP
[Docket No. ER05–494–000]
14. Southwest Power Pool, Inc.
Take notice that on January 26, 2005,
Saracen Energy Power Advisors LP
submitted an application for
Commission authorization to engage in
wholesale sale of electricity at marketbased rates, Commission acceptance of
its Rate Schedule FERC
No. 1, the granting of certain blanket
approvals, and the waiver of certain of
the Commission’s Regulations.
Comment Date: 5 p.m. eastern time on
February 16, 2005.
[Docket No. ER05–490–000]
18. Saracen Merchant Energy LP
Take notice that on January 26, 2005,
Southwest Power Pool, Inc. (SPP)
submitted for filing an executed service
agreement for Firm Point-To-Point
Transmission Service with
Southwestern Public Service Company
(Southwestern). SPP seeks an effective
date of January 1, 2005 for the service
agreement.
SPP states that Southwestern was
served with a copy of this filing.
[Docket No. ER05–495–000]
VerDate jul<14>2003
21:04 Feb 04, 2005
Jkt 205001
6435
Take notice that on January 26, 2005,
Saracen Merchant Energy LP submitted
an application for Commission
authorization to engage in wholesale
sale of electricity at market-based rates,
Commission acceptance of its Rate
Schedule FERC No. 1, the granting of
certain blanket approvals, and the
waiver of certain of the Commission’s
Regulations.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
[Docket No. ER05–496–000]
20. United States Department of Energy
Western Area Power Administration
[Docket No. NJ05–1–000]
Take notice that on January 26, 2005,
the United States Department of
Energy—Western Area Power
Administration (western), filed a nonjurisdictional modification to its Open
Access Transmission Tariff (OATT),
including Large Generator
Interconnection Procedures and Large
Generator Interconnection Agreement.
Western has requested an effective date
of February 25, 2005.
Comment Date: 5 p.m. eastern time on
February 16, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
E:\FR\FM\07FEN1.SGM
07FEN1
6436
Federal Register / Vol. 70, No. 24 / Monday, February 7, 2005 / Notices
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–453 Filed 2–4–05; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–7870–1]
Science Advisory Board Staff Office
Notification of an Upcoming Meeting of
the Science Advisory Board;
Superfund Benefits Analysis Advisory
Panel
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: The EPA Science Advisory
Board (SAB) Staff Office announces two
public meetings of the SAB Superfund
Benefits Analysis Advisory Panel.
DATES: February 11, 2005. A public
teleconference of the SAB Superfund
Benefits Analysis Advisory Panel will
be held from 2 p.m. to 4 p.m. Eastern
time on February 11, 2005.
February 24–25, 2005. A public
meeting of the Superfund Benefits
Analysis Advisory Panel will be held on
February 24–25, 2005 in the SAB
Conference Center at 1025 F Street,
NW., Washington, DC 20004.
FOR FURTHER INFORMATION CONTACT:
Members of the public who wish to
submit written or brief oral comments
(five minutes or less) must contact Dr.
Holly Stallworth, Designated Federal
Officer, at telephone: (202) 343–9867 or
via e-mail at: stallworth.holly@epa.govs.
Requests to provide oral comments must
be in writing (e-mail, fax or mail) and
received by Dr. Stallworth no later than
five business days prior to the meeting
in order to reserve time on the meeting
agenda. It is the policy of the EPA
Science Advisory Board Staff Office to
accept written public comments of any
length, and to accommodate oral public
comments whenever possible. Any
member of the public wishing further
information regarding the SAB or the
Superfund Benefits Analysis Advisory
Panel may also contact Dr. Stallworth,
or visit the SAB Web site at: https://
www.epa.gov/sab/.
Technical Contact: The technical
contact in EPA’s Office of Solid Waste
and Emergency Response for the
Superfund Benefits Analysis is Ms.
Melissa Friedland who can be reached
at (703) 603–8864 or
friedland.melissa@epa.gov.
VerDate jul<14>2003
21:04 Feb 04, 2005
Jkt 205001
SUPPLEMENTARY INFORMATION:
Background: The Office of Solid
Waste and Emergency Response
(OSWER) has issued a draft study of the
benefits of the Superfund program. This
draft study is entitled Superfund
Benefits Analysis and may be found at:
https://www.epa.gov/superfund/news/
benefits.htm. OSWER has requested the
SAB for advice on its Superfund
Benefits Analysis. A ‘‘widecast’’
soliciting expertise for the Superfund
Benefits Analysis Advisory Panel was
published in a Notice on July 30, 2004
(69 FR 45705–45706).
On February 11, 2005, the SAB Panel
will discuss charge questions and
general plans for the advisory meeting
that will follow. The charge questions to
this Panel will be posted at the SAB
Web site at: https://www.epa.gov/sab/
panels/sba_adv_panel.htm prior to the
meeting. On February 24–25, panelists
will review the EPA’s draft Superfund
Benefits Analysis and discuss responses
to charge questions. Meeting materials
and agendas for the February 11, 2005
teleconference and for the face-to-face
meeting of February 24–25, 2005 will be
posted on the SAB Web site prior to
each meeting.
Procedures for Providing Public
Comment: It is the policy of the SAB
Staff Office to accept written public
comments of any length, and to
accommodate oral public comments
whenever possible. The SAB Staff Office
expects that public statements presented
at the Panel’s meetings will not be
repetitive of previously submitted oral
or written statements. Oral Comments:
Requests to provide oral comments must
be in writing (e-mail, fax or mail) and
received by Dr. Stallworth no later than
five business days prior to the
teleconference in order to reserve time
on the meeting agenda. For
teleconferences, opportunities for oral
comment will usually be limited to no
more than three minutes per speaker
and no more than fifteen minutes total.
Written Comments: Although written
comments are accepted until the date of
the meeting (unless otherwise stated),
written comments should be received in
the SAB Staff Office at least five
business days prior to the meeting date
so that the comments may be made
available to the committee for their
consideration. Comments should be
supplied to the DFO at the address/
contact information noted above in the
following formats: one hard copy with
original signature, and one electronic
copy via e-mail (acceptable file format:
Adobe Acrobat, WordPerfect, Word, or
Rich Text files (in IBM-PC/Windows 98/
2000/XP format).
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Meeting Accommodations:
Individuals requiring special
accommodation to access these
meetings, should contact Dr. Stallworth
at least five business days prior to the
meeting so that appropriate
arrangements can be made.
Dated: January 25, 2005.
Vanessa T. Vu,
Director, EPA Science Advisory Board Staff
Office.
[FR Doc. 05–2307 Filed 2–4–05; 8:45 am]
BILLING CODE 6560–50–P
FEDERAL COMMUNICATIONS
COMMISSION.
[Report No. AUC–05–60 (Auction No. 60);
DA 05–171]
Auction of Lower 700 MHZ Band
Licenses Scheduled for July 20, 2005
Comment Sought On Reserve Prices
OR Minimum Opening Bids and Other
Procedures for Auction No. 60
Federal Communications
Commission.
ACTION: Notice.
AGENCY:
SUMMARY: This document announces the
auction of five licenses in the lower 700
MHz band C Block (710–716/740–746
MHz) licenses scheduled to commence
on July 20, 2005 (Auction No. 60). This
document also seeks comment on
reserve prices or minimum opening bids
and other procedures for Auction No.
60.
Comments are due on or before
February 11, 2005, and reply comments
are due on or before February 18, 2005.
ADDRESSES: Comments and reply
comments must be sent by electronic
mail to the following address: auction60
@fcc.gov.
FOR FURTHER INFORMATION CONTACT: For
legal questions: Howard Davenport
(202) 418–0660. For general auction
questions: Roy Knowles or Lisa Stover
at (717) 338–2888. For service rule
questions, contact the Mobility Division,
Wireless Telecommunications Bureau,
as follows: Erin McGrath, Keith Harper,
or JoAnn Epps at (202) 418–0620.
SUPPLEMENTARY INFORMATION: This is a
summary of the Commission’s Public
Notice released January 26, 2005
Auction No. 60 Comment Public Notice.
The complete text of the Auction No. 60
Comment Public Notice, including
attachments and any related
Commission documents is available for
public inspection and copying during
regular business hours at the FCC
Reference Information Center, Portals II,
445 12th Street, SW., Room CY–A257,
DATES:
E:\FR\FM\07FEN1.SGM
07FEN1
Agencies
[Federal Register Volume 70, Number 24 (Monday, February 7, 2005)]
[Notices]
[Pages 6434-6436]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-453]
[[Page 6434]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL01-51-006, et al.]
The Detroit Edison Company, et al.; Electric Rate and Corporate
Filings
January 31, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. The Detroit Edison Company
[Docket Nos. EL01-51-006 and ER01-1649-006]
Take notice that on January 21, 2005, The Detroit Edison Company
filed revised pages of its Distribution Interconnection Agreement with
Dearborn Industrial Generation, LLC, pursuant to the Commission's order
in Detroit Edison Company, 109 FERC ] 61,329 (2004).
Comment Date: 5 p.m. eastern time on February 11, 2005.
2. Condon Wind Power, LLC
[Docket No. ER02-305-004]
Take notice that on January 26, 2005, Condon Wind Power, LLC
(Condon) tendered for filing its triennial updated market analysis in
compliance with the Commission's Order issued on December 19, 2001 in
Docket No. ER02-305-000.
Comment Date: 5 p.m. eastern time on February 16, 2005.
3. Midwest Independent Transmission System Operator, Inc.
[Docket Nos. ER02-2595-007]
Take notice that on January 19, 2005, the Midwest Independent
Transmission System Operator, Inc. (Midwest ISO) tendered for filing
revisions to Schedules 16 and 17 of its Open Access Transmission and
Energy Markets Tariff, FERC Electric Tariff, Third Revised Volume No.
1.
The Midwest ISO states that the purpose of the proposed revisions
is to increase the amortization period for certain schedule 16 and 17
pre-operating expenses from five (5) to seven (7) years. The Midwest
ISO requests an effective date of April 1, 2005.
The Midwest ISO states that it has electronically served a copy of
this filing, with its attachments, upon all Midwest ISO members, member
representatives of transmission owners and non-transmission owners, the
Midwest ISO advisory committee participants, policy subcommittee
participants, as well as all state commissions within the region. In
addition, the Midwest ISO states that the filing has been
electronically posted on the Midwest ISO's Web site at https://
www.midwestiso.org under the heading ``Filings to FERC'' for other
interested parties in this matter. The Midwest ISO indicates that it
will provide hard copies to any interested party upon request.
Comment Date: 5 p.m. eastern time on February 9, 2005.
4. Merrill Lynch Commodities, Inc.
[Docket No. ER04-925-002]
Take notice that on January 25, 2005, Merrill Lynch Commodities,
Inc. (MLCI) tendered for filing a non-material change in
characteristics that the Commission relied upon in granting MLCI
market-based rate authorization under section 205 of the Federal Power
Act.
Comment Date: 5 p.m. eastern time on February 15, 2005.
5. Oregon Electric Utility Company, Portland General Electric Company,
Portland General Term Power, Procurement Company
[Docket No. ER04-1206-002]
Take notice that on January 21, 2005, Oregon Electric Utility
Company (OEUC), Portland General Electric Company (PGE) and Portland
General Term Power Procurement Company (PPC), filed a supplement to
their January 18, 2004 filing in Docket No. ER04-1206-002 submitted in
response to the deficiency letter issued December 17, 2004 in Docket
Nos. ER04-1206-000 and 001.
Comment Date: 5 p.m. eastern time on February 10, 2005.
6. The Union Light, Heat and Power Company, The Cincinnati Gas &
Electric Company
[Docket No. ER04-1248-001]
Take notice that on January 26, 2005, The Union Light, Heat and
Power Company (ULH&P) and The Cincinnati Gas & Electric Company (CG&E)
filed an amendment to their September 27, 2004 filing in response to
the Commission's deficiency letter issued on January 11, 2005 in Docket
No. ER04-1248-000.
ULH&P and CG&E state that copies of the filing were served on
parties on the official service list in Docket No. ER04-1248.
Comment Date: 5 p.m. eastern time on February 16, 2005.
7. Kansas City Power & Light Company
[Docket No. ER05-177-007]
Take notice that on January 25, 2005, Kansas City Power & Light
Company (KCPL) submitted a compliance filing pursuant to the
Commission's Order issued December 28, 2004 in Docket No. ER05-177-000.
KCPL states that this filing pertains to service schedules for the City
of Salisbury, Missouri.
KCPL states that copies of the filing were served upon the City of
Salisbury, Missouri as well as the Missouri Public Service Commission
and the Kansas State Corporation Commission.
Comment Date: 5 p.m. eastern time on February 15, 2005.
8. Kansas City Power & Light Company
[Docket No. ER05-177-008]
Take notice that on January 25, 2005, Kansas City Power & Light
Company (KCPL) submitted a compliance filing pursuant to the
Commission's Order issued December 28, 2004 in Docket No. ER05-177-000.
KCPL states that this filing pertains to service schedules for the City
of Osawatomie, Kansas.
KCPL states that copies of the filing were served upon the City of
Osawatomie, Kansas as well as the Missouri Public Service Commission
and the Kansas State Corporation Commission.
Comment Date: 5 p.m. eastern time on February 15, 2005.
9. City Power Marketing LLC
[Docket No. ER05-330-001]
Take notice that on January 25, 2005, City Power Marketing LLC,
submitted additional information regarding its December 14, 2004 filing
in Docket No. ER05-330-000 for acceptance of initial rate schedule,
request for waivers and blanket authority.
Comment Date: 5 p.m. eastern time on February 15, 2005.
10. MidAmerican Energy Company
[Docket No. ER05-482-000]
Take notice that on January 24, 2005, MidAmerican Energy Company
(MidAmerican) filed with the Commission an Electric Transmission
Interconnection Agreement between MidAmerican and Corn Belt Power
Cooperative. MidAmerican requests an effective date of January 1, 2005
for the Agreement.
MidAmerican states it has served a copy of the filing on Corn Belt
Power Cooperative, the Iowa Utilities Board, the Illinois Commerce
Commission and the South Dakota Public Utilities Commission.
Comment Date: 5 p.m. eastern time on February 14, 2005.
11. Union Electric Company
[Docket No. ER05-485-000]
Take notice that on January 25, 2005, Union Electric Company d/b/a
[[Page 6435]]
AmerenUE (AmerenUE) filed an amendment to the Interchange Agreement
between AmerenUE and Associated Electric Cooperative, Incorporated
(Associated). AmerenUE requests an effective date of March 26, 2005.
Ameren UE states that copies of the filing were served on
Associated, the Midwest Independent Transmission System Operator, Inc.
and the Missouri Public Service Commission.
Comment Date: 5 p.m. eastern time on February 15, 2005.
12. PJM Interconnection, L.L.C. Commonwealth Edison Company
[Docket No. ER05-488-000]
Take notice that on January 25, 2005, Commonwealth Edison Company
(ComEd) and PJM Interconnection, L.L.C. (PJM) filed a Notice of
Termination of Third Substitute First Revised Service Agreement No.
1032 under PJM's Open Access Transmission Tariff, Sixth Revised Volume
No. 1, Financial Hold Harmless Service Agreement (Agreement). ComEd and
PJM request that termination of the Agreement shall be effective once
ComEd makes the payments specified in the settlement agreements with
the Michigan and Wisconsin Utilities.
Comment Date: 5 p.m. eastern time on February 15, 2005.
13. Southern California Edison Company
[Docket No. ER05-489-000]
Take notice that on January 26, 2005, Southern California Edison
Company (SCE) submitted revised rate sheets to the Amended and Restated
Huntington Beach Generating Station Radial Lines Agreement (Agreement)
between SCE and AES Huntington Beach, L.L.C. (AES). SCE requests an
effective date of April 6, 2001.
SCE states that copies of the filing were served upon the Public
Utilities Commission of the State of California and AES.
Comment Date: 5 p.m. eastern time on February 16, 2005.
14. Southwest Power Pool, Inc.
[Docket No. ER05-490-000]
Take notice that on January 26, 2005, Southwest Power Pool, Inc.
(SPP) submitted for filing an executed service agreement for Firm
Point-To-Point Transmission Service with Southwestern Public Service
Company (Southwestern). SPP seeks an effective date of January 1, 2005
for the service agreement.
SPP states that Southwestern was served with a copy of this filing.
Comment Date: 5 p.m. eastern time on February 16, 2005.
15. ISO New England Inc. and New England Power Pool
[Docket No. ER05-492-000]
Take notice that on January 26, 2005, ISO New England Inc.(ISO) and
the New England Power Pool (NEPOOL) Participants Committee filed an
amendment to NEPOOL Market Rule 1, section 7.3.5, and the same
amendment to section III.7.3.5 of the Transmission, Markets and Service
Tariff of ISO New England Inc., FERC Electric Tariff No. 3. ISO and
NEPOOL state that the amendments permit negative Financial Transmission
Rights bids in the New England market.
ISO and NEPOOL state that copies of the filing were sent to the New
England state governors and regulatory agencies and the participants in
NEPOOL.
Comment Date: 5 p.m. eastern time on February 16, 2005.
16. Saracen Energy LP
[Docket No. ER05-493-000]
Take notice that on January 26, 2005, Saracen Energy LP submitted
an application for Commission authorization to engage in wholesale sale
of electricity at market-based rates, Commission acceptance of its Rate
Schedule FERC No. 1, the granting of certain blanket approvals, and the
waiver of certain of the Commission's Regulations.
Comment Date: 5 p.m. eastern time on February 16, 2005.
17. Saracen Energy Power Advisors LP
[Docket No. ER05-494-000]
Take notice that on January 26, 2005, Saracen Energy Power Advisors
LP submitted an application for Commission authorization to engage in
wholesale sale of electricity at market-based rates, Commission
acceptance of its Rate Schedule FERC
No. 1, the granting of certain blanket approvals, and the waiver of
certain of the Commission's Regulations.
Comment Date: 5 p.m. eastern time on February 16, 2005.
18. Saracen Merchant Energy LP
[Docket No. ER05-495-000]
Take notice that on January 26, 2005, Saracen Merchant Energy LP
submitted an application for Commission authorization to engage in
wholesale sale of electricity at market-based rates, Commission
acceptance of its Rate Schedule FERC No. 1, the granting of certain
blanket approvals, and the waiver of certain of the Commission's
Regulations.
Comment Date: 5 p.m. eastern time on February 16, 2005.
19. K2 Development LLC
[Docket No. ER05-496-000]
Take notice that on January 26, 2005, K2 Development LLC submitted
a Notice of Cancellation of its Rate Schedule FERC No. 1.
Comment Date: 5 p.m. eastern time on February 16, 2005.
20. United States Department of Energy Western Area Power
Administration
[Docket No. NJ05-1-000]
Take notice that on January 26, 2005, the United States Department
of Energy--Western Area Power Administration (western), filed a non-
jurisdictional modification to its Open Access Transmission Tariff
(OATT), including Large Generator Interconnection Procedures and Large
Generator Interconnection Agreement. Western has requested an effective
date of February 25, 2005.
Comment Date: 5 p.m. eastern time on February 16, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
[[Page 6436]]
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-453 Filed 2-4-05; 8:45 am]
BILLING CODE 6717-01-P