Jewell Ridge Pipeline Company LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Jewell Ridge Pipeline Project and Request for Comments on Environmental Issues, 5994-5996 [E5-449]
Download as PDF
5994
Federal Register / Vol. 70, No. 23 / Friday, February 4, 2005 / Notices
auxiliary facilities on a proposed well
pad site that is owned by Gulf South.
• Approximately 2.37 miles of 16inch storage pipeline to facilitate
injection and withdrawal to and from
the new wells. The new 16-inch
pipeline will connect with the 8-inch
well head lines and will tie in to Gulf
South’s existing 16-inch storage
pipeline.
• One (1) pig receiver and other
appurtenant auxiliary facilities at the
interconnect site for the proposed and
existing 16-inch storage pipelines.
In connection with the drilling of the
new storage wells, the total overall
storage capacity of the Jackson Storage
Field would be increased by
approximately 2.4 billion cubic feet
(Bcf).
The EA has been placed in the public
files of the FERC. A limited number of
copies of the EA are available for
distribution and public inspection at:
Federal Energy Regulatory Commission,
Public Reference Room, 888 First Street,
NE., Room 2A, Washington, DC 20426,
(202) 502–8371.
Copies of the EA have been mailed to
Federal, state and local agencies, public
interest groups, interested individuals,
newspapers, and parties to this
proceeding.
Any person wishing to comment on
the EA may do so. To ensure
consideration prior to a Commission
decision on the proposal, it is important
that we receive your comments before
the date specified below. Please
carefully follow these instructions to
ensure that your comments are received
in time and properly recorded:
• Send an original and two copies of
your comments to: Secretary, Federal
Energy Regulatory Commission, 888
First St., NE., Room 1A, Washington, DC
20426;
• Label one copy of the comments for
the attention of the Gas Branch 2,
PJ11.2.
• Reference Docket No. CP04–366–
000; and
• Mail your comments so that they
will be received in Washington, DC on
or before March 2, 2005.
Please note that we are continuing to
experience delays in mail deliveries
from the U.S. Postal Service. As a result,
we will include all comments that we
receive within a reasonable time frame
in our environmental analysis of this
project. However, the Commission
strongly encourages electronic filing of
any comments or interventions or
protests to this proceeding. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at
https://www.ferc.gov under the ‘‘eFiling’’ link and the link to the User’s
VerDate jul<14>2003
18:52 Feb 03, 2005
Jkt 205001
Guide. Before you can file comments
you will need to create a free account
which can be created by clicking on
‘‘Sign-up.’’
Comments will be considered by the
Commission but will not serve to make
the commentor a party to the
proceeding. Any person seeking to
become a party to the proceeding must
file a motion to intervene pursuant to
Rule 214 of the Commission’s Rules of
Practice and Procedures (18 CFR
385.214).1 Only intervenors have the
right to seek rehearing of the
Commission’s decision.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Magalie R. Salas,
Secretary.
[FR Doc. E5–451 Filed 2–3–05; 8:45 am]
BILLING CODE 6717–01–P
may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
PO 00000
1 Interventions
Frm 00032
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF05–3–000]
Jewell Ridge Pipeline Company LLC;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Jewell Ridge Pipeline
Project and Request for Comments on
Environmental Issues
January 31, 2005.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Jewell Ridge Pipeline Project
involving construction and operation of
facilities by the Jewell Ridge Pipeline
Company, LLC (JRP) in (Tazwell,
Smyth, and Russell counties, VA).1
These facilities would consist of
approximately 30 miles of 20 inch
diameter pipeline and modification to
the existing compressor station facility.
This EA will be used by the
Commission in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
If you are a landowner receiving this
notice, you may be contacted by a
pipeline company representative about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The pipeline
company would seek to negotiate a
mutually acceptable agreement.
However, if the project is approved by
the Commission, that approval conveys
with it the right of eminent domain.
Therefore, if easement negotiations fail
to produce an agreement, the pipeline
company could initiate condemnation
proceedings in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ was attached to the project
notice JRP provided to landowners. This
fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is available for viewing
on the FERC Internet Web site (https://
www.ferc.gov).
Summary of the Proposed Project
JRP wants to expand the capacity of
its facilities in Virginia to transport an
1 JRP is beginning NEPA pre-filing of an
application with the Commission under section 7
of the Natural Gas Act and Part 157 of the
Commission’s regulations.
E:\FR\FM\04FEN1.SGM
04FEN1
Federal Register / Vol. 70, No. 23 / Friday, February 4, 2005 / Notices
additional 100,000 dekatherms per day
of natural gas to the existing East
Tennessee Gas Pipeline System. JRP
seeks authority to construct and operate:
Facilities (2005/2006)
• Approximately 30 miles of 20-inchdiameter pipeline and associated
facilities; and to
• Modify the existing Jewell Ridge
Compressor Station in Tazewell County,
Virginia; The general location of the
project facilities and alternative routes
under consideration are shown in
Appendix 1.2
Land Requirements for Construction
Construction of the proposed facilities
would require about 363 acres of land.
Following construction, about 120 acres
would be maintained as permanent
Right-Of-Way. The remaining 243 acres
of land would be restored and allowed
to revert to its former use.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping’’. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
Notice of Intent, the Commission staff
requests public comments on the scope
of the issues to address in the EA. All
comments received are considered
during the preparation of the EA. State
and local government representatives
are encouraged to notify their
constituents of this proposed action and
encourage them to comment on their
areas of concern.
In the EA we 3 will discuss impacts
that could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils.
• Land use.
2 The
appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices, other than Appendix 1 (maps), are
available on the Commission’s Web site at the
‘‘eLibrary’’ link, and all appendices, including
Appendix 1are available from the Commission’s
Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502–8371. For
instructions on connecting to eLibrary refer to the
last page of this notice. Copies of the appendices
were sent to all those receiving this notice in the
mail.
3 ’’We’’, ‘‘us’’, and ‘‘our’’ refer to the
environmental staff of the Office of Energy Projects
(OEP).
VerDate jul<14>2003
18:52 Feb 03, 2005
Jkt 205001
• Water resources, fisheries, and
wetlands.
• Cultural resources.
• Vegetation and wildlife.
• Air quality and noise.
• Endangered and threatened species.
• Public safety.
We will also evaluate possible
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Our independent analysis of the
issues will be in the EA. Depending on
the comments received during the
scoping process, the EA may be
published and mailed to federal, state,
and local agencies, public interest
groups, interested individuals, affected
landowners, newspapers, libraries, and
the Commission’s official service list for
this proceeding. A comment period will
be allotted for review if the EA is
published. We will consider all
comments on the EA before we make
our recommendations to the
Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the public participation
section beginning on page 4.
Currently Identified Environmental
Issues
We have already identified several
issues that we think deserve attention
based on a preliminary review of the
proposed facilities and the
environmental information provided by
JRP. This preliminary list of issues may
be changed based on your comments
and our analysis.
• Several federally/State listed
endangered or threatened species may
occur in the project area.
• An un-quantified amount of prime
farmland soils would be impacted
during construction activity.
• Three alternative routes are under
consideration, although JRP has
identified Alternative Route 3 as the
likely preferred alternative (see
Appendix 1).
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
By becoming a commentor, your
concerns will be addressed in the EA
and considered by the Commission. You
should focus on the potential
environmental effects of the proposal,
alternatives to the proposal (including
alternative routes), and measures to
avoid or lessen environmental impact.
The more specific your comments, the
more useful they will be. Please
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
5995
carefully follow these instructions to
ensure that your comments are received
in time and properly recorded:
• Send an original and two copies of
your letter to: Magalie R. Salas,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426.
• Label one copy of the comments for
the attention of Gas Branch 3, DG2E.
• Reference Docket No. PF05–3–000.
• Mail your comments so that they
will be received in Washington, DC on
or before March 4, 2005.
Please note that we are continuing to
experience delays in mail deliveries
from the U.S. Postal Service. As a result,
we will include all comments that we
receive within a reasonable time frame
in our environmental analysis of this
project. However, the Commission
strongly encourages electronic filing of
any comments or interventions or
protests to this proceeding. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at
https://www.ferc.gov under the ‘‘eFiling’’ link and the link to the User’s
Guide. Before you can file comments
you will need to create a free account,
which can be created by clicking on
‘‘Login to File’’ and then ‘‘New User
Account.’’ You will be asked to select
the type of filing you are making. This
filing is considered a ‘‘Comment on
Filing.’’
Public Scoping Meeting and Site Visit
In addition to or in lieu of sending
written comments, we invite you to
attend the public scoping meeting we
will conduct in the project area. The
location and time for the meeting is
listed below:
February 22, 2005; 7 p.m. (e.s.t.),
Chilhowie High School,
1160 East Lee Highway,
P.O. Box 2280,
Chilhowie, Virginia 24319.
Phone: (276) 646–8966.
Fax: (276) 646–5951.
Principal—Steve Reedy.
February 23, 2005; 7 p.m. (e.s.t.),
Southwest Virginia Community College,
369 College Road, Route 19,
Richlands, Virginia 24641.
Contact: Pauline Taylor.
(276) 964–7619.
The public scoping meeting is
designed to provide state and local
agencies, interested groups, affected
landowners, and the general public with
more detailed information and another
opportunity to offer your comments on
the proposed project. Interested groups
and individuals are encouraged to
attend the meeting and to present
comments on the environmental issues
E:\FR\FM\04FEN1.SGM
04FEN1
5996
Federal Register / Vol. 70, No. 23 / Friday, February 4, 2005 / Notices
they believe should be addressed in the
EA. A transcript of the meeting will be
made so that your comments will be
accurately recorded.
If you do not want to send comments
at this time but still want to remain on
our mailing list, please return the
Information Request (Appendix 4). If
you do not return the Information
Request, you will be taken off the
mailing list.
We may mail the EA for comment. If
you are interested in receiving it, please
return the Information Request
(Appendix 4). If you do not return the
Information Request, you will be taken
off the mailing list.
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an official party to the
proceeding known as an ‘‘intervenor’’.
Intervenors play a more formal role in
the process. Among other things,
intervenors have the right to receive
copies of case-related Commission
documents and filings by other
intervenors. Likewise, each intervenor
must send one electronic copy (using
the Commission’s eFiling system) or 14
paper copies of its filings to the
Secretary of the Commission and must
send a copy of its filings to all other
parties on the Commission’s service list
for this proceeding. If you want to
become an intervenor you must file a
motion to intervene according to Rule
214 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.214) (see Appendix 2).4 Only
intervenors have the right to seek
rehearing of the Commission’s decision.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
Environmental Mailing List
An effort is being made to send this
notice to all individuals, organizations,
and government entities interested in
and/or potentially affected by the
proposed project. This includes all
landowners who are potential right-ofway grantors, whose property may be
used temporarily for project purposes,
or who own homes within distances
defined in the Commission’s regulations
of certain aboveground facilities. By this
notice we are also asking governmental
agencies, especially those in Appendix
3, to express their interest in becoming
cooperating agencies for the preparation
of the EA.
DEPARTMENT OF ENERGY
Additional Information
Eastern Shore Natural Gas Company;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Eastern Shore Natural Gas
Company’s Amended 2003–2005
Expansion Project and Request for
Comments on Environmental Issues
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an e-mail
to accessibility@ferc.gov or call toll free
(866) 208–3372 (voice) or (202) 208–
1659 (TTY), or send a FAX to (202) 208–
2106 with the required
accommodations.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Magalie R. Salas,
Secretary.
[FR Doc. E5–449 Filed 2–3–05; 8:45 am]
BILLING CODE 6717–01–P
4 Interventions may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
VerDate jul<14>2003
18:52 Feb 03, 2005
Jkt 205001
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. CP03–80–001]
January 31, 2005.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
Eastern Shore Natural Gas Company’s
(ESNG) proposal to amend its certificate
for its 2003–2005 Expansion Project.
ESNG proposes to construct additional
facilities to increase its system’s
capacity by 7,450 Dekatherms per day.
The facilities would consist of four new
pipeline segments on ESNG’s existing
system in Chester County, Pennsylvania
and New Castle, Kent, and Sussex
Counties, Delaware.
This notice announces the opening of
the scoping period that will be used to
gather environmental input from the
public and interested agencies on the
project. Please note that the scoping
period will close on March 2, 2005.
This notice is being sent to potentially
affected landowners; Federal, state, and
local government agencies; elected
officials; environmental and public
interest groups; Native American Tribes,
other interested parties; local libraries
and newspapers. State and local
government representatives are asked to
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
If you are a landowner receiving this
notice, you may be contacted by a
pipeline company representative about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The pipeline
company would seek to negotiate a
mutually acceptable agreement.
However, if the project is approved by
the Commission, that approval conveys
with it the right of eminent domain.
Therefore, if easement negotiations fail
to produce an agreement, the pipeline
company could initiate condemnation
proceedings in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC Web site (https://
E:\FR\FM\04FEN1.SGM
04FEN1
Agencies
[Federal Register Volume 70, Number 23 (Friday, February 4, 2005)]
[Notices]
[Pages 5994-5996]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-449]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PF05-3-000]
Jewell Ridge Pipeline Company LLC; Notice of Intent To Prepare an
Environmental Assessment for the Proposed Jewell Ridge Pipeline Project
and Request for Comments on Environmental Issues
January 31, 2005.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Jewell Ridge Pipeline Project
involving construction and operation of facilities by the Jewell Ridge
Pipeline Company, LLC (JRP) in (Tazwell, Smyth, and Russell counties,
VA).\1\ These facilities would consist of approximately 30 miles of 20
inch diameter pipeline and modification to the existing compressor
station facility. This EA will be used by the Commission in its
decision-making process to determine whether the project is in the
public convenience and necessity.
---------------------------------------------------------------------------
\1\ JRP is beginning NEPA pre-filing of an application with the
Commission under section 7 of the Natural Gas Act and Part 157 of
the Commission's regulations.
---------------------------------------------------------------------------
If you are a landowner receiving this notice, you may be contacted
by a pipeline company representative about the acquisition of an
easement to construct, operate, and maintain the proposed facilities.
The pipeline company would seek to negotiate a mutually acceptable
agreement. However, if the project is approved by the Commission, that
approval conveys with it the right of eminent domain. Therefore, if
easement negotiations fail to produce an agreement, the pipeline
company could initiate condemnation proceedings in accordance with
state law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' was attached to the
project notice JRP provided to landowners. This fact sheet addresses a
number of typically asked questions, including the use of eminent
domain and how to participate in the Commission's proceedings. It is
available for viewing on the FERC Internet Web site (https://
www.ferc.gov).
Summary of the Proposed Project
JRP wants to expand the capacity of its facilities in Virginia to
transport an
[[Page 5995]]
additional 100,000 dekatherms per day of natural gas to the existing
East Tennessee Gas Pipeline System. JRP seeks authority to construct
and operate:
Facilities (2005/2006)
Approximately 30 miles of 20-inch-diameter pipeline and
associated facilities; and to
Modify the existing Jewell Ridge Compressor Station in
Tazewell County, Virginia; The general location of the project
facilities and alternative routes under consideration are shown in
Appendix 1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices, other
than Appendix 1 (maps), are available on the Commission's Web site
at the ``eLibrary'' link, and all appendices, including Appendix
1are available from the Commission's Public Reference Room, 888
First Street, NE., Washington, DC 20426, or call (202) 502-8371. For
instructions on connecting to eLibrary refer to the last page of
this notice. Copies of the appendices were sent to all those
receiving this notice in the mail.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would require about 363
acres of land. Following construction, about 120 acres would be
maintained as permanent Right-Of-Way. The remaining 243 acres of land
would be restored and allowed to revert to its former use.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
This process is referred to as ``scoping''. The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this Notice of Intent, the Commission staff
requests public comments on the scope of the issues to address in the
EA. All comments received are considered during the preparation of the
EA. State and local government representatives are encouraged to notify
their constituents of this proposed action and encourage them to
comment on their areas of concern.
In the EA we \3\ will discuss impacts that could occur as a result
of the construction and operation of the proposed project under these
general headings:
---------------------------------------------------------------------------
\3\ ''We'', ``us'', and ``our'' refer to the environmental staff
of the Office of Energy Projects (OEP).
---------------------------------------------------------------------------
Geology and soils.
Land use.
Water resources, fisheries, and wetlands.
Cultural resources.
Vegetation and wildlife.
Air quality and noise.
Endangered and threatened species.
Public safety.
We will also evaluate possible alternatives to the proposed project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
our recommendations to the Commission.
To ensure your comments are considered, please carefully follow the
instructions in the public participation section beginning on page 4.
Currently Identified Environmental Issues
We have already identified several issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by JRP. This preliminary list of
issues may be changed based on your comments and our analysis.
Several federally/State listed endangered or threatened
species may occur in the project area.
An un-quantified amount of prime farmland soils would be
impacted during construction activity.
Three alternative routes are under consideration, although
JRP has identified Alternative Route 3 as the likely preferred
alternative (see Appendix 1).
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA and considered by the Commission.
You should focus on the potential environmental effects of the
proposal, alternatives to the proposal (including alternative routes),
and measures to avoid or lessen environmental impact. The more specific
your comments, the more useful they will be. Please carefully follow
these instructions to ensure that your comments are received in time
and properly recorded:
Send an original and two copies of your letter to: Magalie
R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First
St., NE., Room 1A, Washington, DC 20426.
Label one copy of the comments for the attention of Gas
Branch 3, DG2E.
Reference Docket No. PF05-3-000.
Mail your comments so that they will be received in
Washington, DC on or before March 4, 2005.
Please note that we are continuing to experience delays in mail
deliveries from the U.S. Postal Service. As a result, we will include
all comments that we receive within a reasonable time frame in our
environmental analysis of this project. However, the Commission
strongly encourages electronic filing of any comments or interventions
or protests to this proceeding. See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site at https://www.ferc.gov under
the ``e-Filing'' link and the link to the User's Guide. Before you can
file comments you will need to create a free account, which can be
created by clicking on ``Login to File'' and then ``New User Account.''
You will be asked to select the type of filing you are making. This
filing is considered a ``Comment on Filing.''
Public Scoping Meeting and Site Visit
In addition to or in lieu of sending written comments, we invite
you to attend the public scoping meeting we will conduct in the project
area. The location and time for the meeting is listed below:
February 22, 2005; 7 p.m. (e.s.t.),
Chilhowie High School,
1160 East Lee Highway,
P.O. Box 2280,
Chilhowie, Virginia 24319.
Phone: (276) 646-8966.
Fax: (276) 646-5951.
Principal--Steve Reedy.
February 23, 2005; 7 p.m. (e.s.t.),
Southwest Virginia Community College,
369 College Road, Route 19,
Richlands, Virginia 24641.
Contact: Pauline Taylor.
(276) 964-7619.
The public scoping meeting is designed to provide state and local
agencies, interested groups, affected landowners, and the general
public with more detailed information and another opportunity to offer
your comments on the proposed project. Interested groups and
individuals are encouraged to attend the meeting and to present
comments on the environmental issues
[[Page 5996]]
they believe should be addressed in the EA. A transcript of the meeting
will be made so that your comments will be accurately recorded.
If you do not want to send comments at this time but still want to
remain on our mailing list, please return the Information Request
(Appendix 4). If you do not return the Information Request, you will be
taken off the mailing list.
We may mail the EA for comment. If you are interested in receiving
it, please return the Information Request (Appendix 4). If you do not
return the Information Request, you will be taken off the mailing list.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding known as an
``intervenor''. Intervenors play a more formal role in the process.
Among other things, intervenors have the right to receive copies of
case-related Commission documents and filings by other intervenors.
Likewise, each intervenor must send one electronic copy (using the
Commission's eFiling system) or 14 paper copies of its filings to the
Secretary of the Commission and must send a copy of its filings to all
other parties on the Commission's service list for this proceeding. If
you want to become an intervenor you must file a motion to intervene
according to Rule 214 of the Commission's Rules of Practice and
Procedure (18 CFR 385.214) (see Appendix 2).\4\ Only intervenors have
the right to seek rehearing of the Commission's decision.
---------------------------------------------------------------------------
\4\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Environmental Mailing List
An effort is being made to send this notice to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project. This includes all landowners who are
potential right-of-way grantors, whose property may be used temporarily
for project purposes, or who own homes within distances defined in the
Commission's regulations of certain aboveground facilities. By this
notice we are also asking governmental agencies, especially those in
Appendix 3, to express their interest in becoming cooperating agencies
for the preparation of the EA.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (https://www.ferc.gov) using the eLibrary link.
Click on the eLibrary link, click on ``General Search'' and enter the
docket number excluding the last three digits in the Docket Number
field. Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
FERC conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations please
send an e-mail to accessibility@ferc.gov or call toll free (866) 208-
3372 (voice) or (202) 208-1659 (TTY), or send a FAX to (202) 208-2106
with the required accommodations.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related information.
Magalie R. Salas,
Secretary.
[FR Doc. E5-449 Filed 2-3-05; 8:45 am]