Diablo Winds, LLC; Notice of Issuance of Order, 5985 [E5-420]
Download as PDF
Federal Register / Vol. 70, No. 23 / Friday, February 4, 2005 / Notices
Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5–421 Filed 2–3–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER05–222–000]
Diablo Winds, LLC; Notice of Issuance
of Order
January 27, 2005.
Diablo Winds, LLC (Diablo) filed an
application for market-based rate
authority, with an accompanying tariff.
The proposed tariff provides for
wholesale sales of energy, capacity and
ancillary services at market-based rates.
Diablo also requested waiver of various
Commission regulations. In particular,
Diablo requested that the Commission
grant blanket approval under 18 CFR
part 34 of all future issuances of
securities and assumptions of liability
by Diablo.
On January 21, 2005, the Commission
granted the request for blanket approval
under part 34, subject to the following:
Any person desiring to be heard or to
protest the blanket approval of
issuances of securities or assumptions of
liability by Diablo should file a motion
to intervene or protest with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest, is February 22, 2005.
Absent a request to be heard in
opposition by the deadline above,
Diablo is authorized to issue securities
and assume obligations or liabilities as
a guarantor, indorser, surety, or
otherwise in respect of any security of
another person; provided that such
issuance or assumption is for some
lawful object within the corporate
purposes of Diablo, compatible with the
public interest, and is reasonably
necessary or appropriate for such
purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approval of Diablo’s issuances of
securities or assumptions of liability.
Copies of the full text of the
Commission’s Order are available from
VerDate jul<14>2003
18:52 Feb 03, 2005
Jkt 205001
the Commission’s Public Reference
Room, 888 First Street, NE.,
Washington, DC 20426.
The Order may also be viewed on the
Commission’s Web site at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5–420 Filed 2–3–05; 8:45 am]
BILLING CODE 6717–01–P
5985
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E5–424 Filed 2–3–05; 8:45 am]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Docket No. RP04–110–004]
DEPARTMENT OF ENERGY
El Paso Natural Gas Company; Notice
of Compliance Filing
Federal Energy Regulatory
Commission
January 27, 2005.
[Docket No. RP05–160–000]
Take notice that on January 21, 2005,
El Paso tendered for filing as part of its
FERC Gas Tariff, Second Revised
Volume No. 1A, the following tariff
sheets to become effective March 1
2005:
Third Revised Sheet No. 287A,
Third Revised Sheet No. 354.
El Paso states that the tariff sheets
comply with the Commission’s
December 22 Order addressing El Paso’s
proposed procedures for re-designating
primary point rights.
El Paso states that copies of the filing
were served on parties on the official
service list in the above-captioned
proceeding.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
Section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
El Paso Natural Gas Company; Notice
of Proposed Changes in FERC Gas
Tariff
January 28, 2005.
Take notice that on January 25, 2005,
El Paso Natural Gas Company (El Paso)
tendered for filing as part of its FERC
Gas Tariff, Second Revised Volume No.
1A, Original Sheet No. 290B, to become
effective February 24, 2005.
El Paso states that the tariff sheet
specifies a timeline for the sale of
available firm capacity.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of § 154.210 of the
Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
E:\FR\FM\04FEN1.SGM
04FEN1
Agencies
[Federal Register Volume 70, Number 23 (Friday, February 4, 2005)]
[Notices]
[Page 5985]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-420]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER05-222-000]
Diablo Winds, LLC; Notice of Issuance of Order
January 27, 2005.
Diablo Winds, LLC (Diablo) filed an application for market-based
rate authority, with an accompanying tariff. The proposed tariff
provides for wholesale sales of energy, capacity and ancillary services
at market-based rates. Diablo also requested waiver of various
Commission regulations. In particular, Diablo requested that the
Commission grant blanket approval under 18 CFR part 34 of all future
issuances of securities and assumptions of liability by Diablo.
On January 21, 2005, the Commission granted the request for blanket
approval under part 34, subject to the following:
Any person desiring to be heard or to protest the blanket approval
of issuances of securities or assumptions of liability by Diablo should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure. 18 CFR 385.211, 385.214 (2004).
Notice is hereby given that the deadline for filing motions to
intervene or protest, is February 22, 2005.
Absent a request to be heard in opposition by the deadline above,
Diablo is authorized to issue securities and assume obligations or
liabilities as a guarantor, indorser, surety, or otherwise in respect
of any security of another person; provided that such issuance or
assumption is for some lawful object within the corporate purposes of
Diablo, compatible with the public interest, and is reasonably
necessary or appropriate for such purposes.
The Commission reserves the right to require a further showing that
neither public nor private interests will be adversely affected by
continued approval of Diablo's issuances of securities or assumptions
of liability.
Copies of the full text of the Commission's Order are available
from the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426.
The Order may also be viewed on the Commission's Web site at http:/
/www.ferc.gov, using the eLibrary link. Enter the docket number
excluding the last three digits in the docket number filed to access
the document. Comments, protests, and interventions may be filed
electronically via the Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E5-420 Filed 2-3-05; 8:45 am]
BILLING CODE 6717-01-P