The Governors, et al.; Electric Rate and Corporate Filings, 5990-5993 [E5-418]

Download as PDF 5990 Federal Register / Vol. 70, No. 23 / Friday, February 4, 2005 / Notices status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-filing’’ link. The Commission strongly encourages electronic filings. If the Commission decides to set the application for a formal hearing before an Administrative Law Judge, the Commission will issue another notice describing that process. At the end of the Commission’s review process, a final Commission order approving or denying a certificate will be issued. Comment Date: February 18, 2005. Magalie R. Salas, Secretary. [FR Doc. E5–440 Filed 2–3–05; 8:45 am] BILLING CODE 6717–01–P VerDate jul<14>2003 18:52 Feb 03, 2005 Jkt 205001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP05–158–000] Viking Gas Transmission Company; Tariff Filing and Request for Waiver January 27, 2005. Take notice that on January 21, 2005, Viking Gas Transmission Company (Viking) tendered for filing to become part of Viking’s FERC Gas Tariff, First Revised Volume No. 1, the following tariff sheets to become effective February 20, 2005: Eighth Revised Sheet No. 12 Third Revised Sheet No. 41B Fourth Revised Sheet No. 13 Third Revised Sheet No. 15L Eleventh Revised Sheet No. 48 Second Revised Sheet No. 15M.01 Twelfth Revised Sheet No. 49 Second Revised Sheet No. 15N Sixth Revised Sheet No. 21 Tenth Revised Sheet No. 77 Sixth Revised Sheet No. 23 Second Revised Sheet No. 87E First Revised Sheet No. 87H.01 Viking states that this filing is being made to clarify the impact and billing for zero mile transportation transactions in Viking’s Tariff and to make certain housekeeping changes. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E5–426 Filed 2–3–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL04–112–000, et al.] The Governors, et al.; Electric Rate and Corporate Filings January 28, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. The Governors of Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island and Vermont [Docket No. EL04–112–000] On January 11, 2005, the Governors of Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont (New England Governors) filed a motion to lodge amendments to the Joint Petition for Declaratory Order to Form a New England Regional State Committee, filed on June 25, 2004 in the above-docketed proceeding. Comment Date: 5 p.m. eastern time on February 7, 2005. 2. Wisconsin Public Service Corporation, WPS Power Development, Inc., WPS Energy Services, Inc. [Docket Nos. ER95–1528–010 and ER96– 1088–035] Take notice that WPS Resources Corporation (WPSR), on January 24, 2005, tendered for filing its response to the Commission’s January 3, 2005 deficiency letter issued in Docket Nos. ER95–1528–008 and ER96–1088–033 regarding a renewal of the market-based rate authority of WPSR’s subsidiaries. WPSR states that part of this information was submitted on a confidential basis. In addition, WPSR states that it is submitting a market E:\FR\FM\04FEN1.SGM 04FEN1 Federal Register / Vol. 70, No. 23 / Friday, February 4, 2005 / Notices power analyses using the footprint of the Midwest System Independent Transmission System, Inc. as a whole. Comment Date: 5 p.m. eastern time on February 14, 2005. 7. Mystic I, LLC; Mystic Development, LLC; Fore River Development, LLC 10. Kansas City Power & Light Company [Docket Nos. ER04–657–004, ER04–660–004, ER04–659–004] [Docket No. ER05–177–006] 3. Merrill Lynch Capital Services, Inc. Take notice that on January 21, 2005, Mystic I, LLC, Mystic Development, LLC and Fore River Development, LLC submitted an amendment to their September 24, 2004 filing, as supplemented on October 1, 2004, of a joint triennial updated market analysis. Comment Date: 5 p.m. eastern time on February 11, 2005. 5991 [Docket No. ER99–830–009] Take notice that on January 21, 2005, Merrill Lynch Capital Services, Inc. (MLCS) filed a triennial updated market analysis. MLCS states that copies of the filing were served on the parties listed on the official service list in this proceeding. Comment Date: 5 p.m. eastern time on February 11, 2005. 4. Entergy Services, Inc. [Docket No. ER01–2214–005] Take notice that on January 24, 2005, Entergy Services, Inc., (Entergy) filed a refund report in the above captioned docket relating to Entergy’s ancillary services schedules 3–6. Entergy states that a copy of the refund report has been served on all parties to the service lists in the abovereferenced proceedings and State commissions in the Entergy region. Comment Date: 5 p.m. eastern time on February 14, 2005. 5. Commonwealth Edison Company and Commonwealth Edison Company of Indiana, Inc.; PJM Interconnection, LLC and Commonwealth Edison Company and Commonwealth Edison Company of Indiana, Inc. [Docket Nos. ER03–1335–003, ER04–367– 005] Take notice that on January 21, 2005, Commonwealth Edison Company and PJM Interconnection, L.L.C. filed a compliance filing pursuant to the Commission’s Order issued December 22, 2004 in Docket No. ER03–1335–000, et al., 109 FERC ¶ 61,228. Comment Date: 5 p.m. eastern time on February 11, 2005. 6. Pacific Gas and Electric Company [Docket No. ER04–443–005] Take notice that on January 21, 2005, Pacific Gas and Electric Company (PG&E) tendered for filing revisions to its Transmission Owner Tariff, FERC Electric Tariff, Sixth Revisied Volume No. 5. PG&E states that the revisions are intended to comply with Commission Order Nos. 2003 and 2003–A. PG&E requests that the revisions become effective on the same date as companion filings made by the California Independent System Operator Corporation on January 5, 2005, in compliance with Order No. 2003. Comment Date: 5 p.m. eastern time on February 11, 2005. VerDate jul<14>2003 18:52 Feb 03, 2005 Jkt 205001 8. Midwest Independent Transmission System Operator, Inc.; Public Utilities with Grandfathered Agreements in the Midwest ISO Region [Docket Nos. ER04–691–019, EL04–104–018] Take notice that on January 21, 2005, the Midwest Independent Transmission System Operator, Inc. (Midwest ISO) submitted a compliance filing pursuant to the Commission’s August 6, 2004 order, Midwest Independent Transmission System Operator, Inc., et al., 108 FERC ¶ 61,163 (2004) and its December 20, 2004 order, Midwest Independent Transmission System Operator, Inc., et al., 109 FERC ¶ 61,285 (2004). The Midwest ISO states that it has electronically served a copy of this filing, with attachments, upon all Midwest ISO members, member representatives of transmission owners and non-transmission owners, the Midwest ISO advisory committee participants, policy subcommittee participants, as well as all State commissions within the region. In addition, the Midwest ISO states that the filing has been electronically posted on the Midwest ISO’s Web site at https://www.midwestiso.org under the heading ‘‘Filings to FERC’’ for other interested parties in this matter. The Midwest ISO indicates that it will provide hard copies to any interested party upon request. Comment Date: 5 p.m. eastern time on February 11, 2005. 9. Milford Power Company, LLC Take notice that on January 21, 2005, Milford Power Company, LLC (Milford) tendered for filing its responses to the Commission’s deficiency letter issued December 22, 2004 regarding Milford’s November 1, 2004 filing in Docket No. ER05–163–000. Comment Date: 5 p.m. eastern time on February 11, 2005. Frm 00029 Fmt 4703 Sfmt 4703 11. Entergy Louisiana, Inc.; Entergy Services, Inc.; Perryville Energy Partners, LLC. [Docket Nos. ER05–188–001, ER05–189–001, ER05–191–001] Take notice that on January 21, 2005, Perryville Energy Partners, LLC (PEP), Entergy Services, Inc. (ESI) and Entergy Louisiana, Inc. (ELI) submitted additional information amending the November 5, 2004 filings of PEP in Docket No. ER05–191–000, ESI in Docket No. ER05–189–000 and ELI in Docket No. ER05–188–000 in response to the Commission’s deficiency letter issued December 29, 2004 in the abovereferenced proceedings. Comment Date: 5 p.m. eastern time on February 11, 2005. 12. El Paso Electric Company [Docket No. ER05–201–001] Take notice that on January 21, 2005, El Paso Electric Company (EPE) submitted a compliance filing pursuant to the Commission’s Letter Order issued January 6, 2005 in Docket No. ER05– 201–000. EPE states that a copy of the filing was served on the parties on the official service list for this proceeding, the Public Utility Commission of Texas, the New Mexico Regulatory Commission and the Public Service Company of New Mexico. Comment Date: 5 p.m. eastern time on February 11, 2005. 13. PacifiCorp [Docket No. ER05–163–001] PO 00000 Take notice that on January 21, 2005, Kansas City Power & Light Company (KCPL) submitted a compliance filing pursuant to the Commission’s order issued December 28, 2004 in Docket No. ER05–177–000. KCPL states that this filing pertains to service schedules for the City of Marshall, Missouri. KCPL states that copies of the filing were served upon the City of Marshall, Missouri as well as the Missouri Public Service Commission and the Kansas State Corporation Commission. Comment Date: 5 p.m. eastern time on February 11, 2005. [Docket No. ER05–278–001] Take notice that on January 24, 2005, PacifiCorp tendered for filing in accordance with 18 CFR 35 of the Commission’s rules and regulations an amendment to its filing dated November 29, 2004 under FERC Docket No. ER05– 278–000. PacifiCorp states that copies of this filing were supplied to the Public Utility E:\FR\FM\04FEN1.SGM 04FEN1 5992 Federal Register / Vol. 70, No. 23 / Friday, February 4, 2005 / Notices Commission of Oregon, the Washington Utilities and Transportation Commission, and NorthWestern Energy. Comment Date: 5 p.m. eastern time on February 14, 2005. 14. Duke Energy Corporation [Docket No. ER05–281–001] Take notice that on January 21, 2005, Duke Energy Corporation, on behalf of Duke Electric Transmission (collectively Duke) filed an amendment of its December 1, 2004 filing of an executed revised Network Integration Service Agreement with North Carolina Electric Membership Corporation (NCEMC) which is designated as Fourth Revised Service Agreement No. 208 under Duke Electric Transmission FERC Electric Tariff Third Revised Volume No. 4. Duke states that copies of the filing were served on NCEMC and the South Carolina and North Carolina State public service commissions. Comment Date: 5 p.m. eastern time on February 11, 2005. 15. JPMorgan Chase Bank, N.A. [Docket No. ER05–283–002] Take notice that on January 24, 2005, JPMorgan Chase Bank, N.A. (JPMCB) submitted an amendment to its filing dated January 13, 2005 on market power analysis to reflect recent changes in generation ownership in Docket No. ER05–283–002. JPMCB states that this filing replaces the market power analysis filed on January 13, 2005, in support of: JPMCB’s December 2, 2004 request for acceptance of JPMCB rate schedule FERC No. 1; the granting of certain blanket approvals, including the authority to sell electricity at marketbased rates; and the waiver of certain Commission regulations. JPMCB also states that it intends to engage in wholesale electric energy and capacity transactions as a marketer and a broker. JPMCB indicates that it is not in the business of generating or transmitting electric power. Comment Date: 5 p.m. eastern time on February 14, 2005. Comment Date: 5 p.m. eastern time on February 14, 2005. 17. PacifiCorp [Docket No. ER05–299–001] Take notice that on January 24, 2005 PacifiCorp tendered for filing in accordance with 18 CFR 35 of the Commission’s rules and regulations an amendment to its filing dated December 3, 2004 under FERC Docket No. ER05– 299–000. PacifiCorp states that copies of this filing were supplied to the Public Utility Commission of Oregon, the Washington Utilities and Transportation Commission, and the Central Lincoln People’s Utility District. Comment Date: 5 p.m. eastern time on February 14, 2005. 18. PacifiCorp [Docket No. ER05–301–001] Take notice that on January 24, 2005, PacifiCorp tendered for filing in accordance with 18 CFR 35 of the Commission’s rules and regulations an amendment to its filing dated December 3, 2004 under FERC Docket No. ER05– 301–000. PacifiCorp states that copies of this filing were supplied to the Public Utility Commission of Oregon, the Washington Utilities and Transportation Commission, and the Utah Associated Municipal Power Systems. Comment Date: 5 p.m. eastern time on February 14, 2005. 19. Telemagine, Inc. [Docket Nos. ER05–419–001, ER05–419–002] Take notice that on January 21, 2005 and January 27, 2005, Telemagine, Inc. (Telemagine) filed amendments to its January 4, 2005 petition for acceptance of initial rate schedule, waivers and blanket authority. Comment Date: 5 p.m. eastern time on February 14, 2005. 20. Transmission Owners of the Midwest Independent, Transmission System Operator Inc. 16. PacifiCorp [Docket No. ER05–447–001] [Docket No. ER05–296–001] Take notice that on January 26, 2005, the Transmission Owners of the Midwest Independent Transmission System Operator (Midwest ISO Transmission Owners) submitted an amendment to the proposed Schedule 23 to the Midwest Independent Transmission System Operator, Inc.’s tariff, that was filed January 13, 2005 in Docket No. ER05–447–000. The Midwest ISO Transmission Owners state that they are serving this filing on all Midwest ISO’s affected customers as well as on all applicable Take notice that on January 24, 2005, PacifiCorp tendered for filing in accordance with 18 CFR 35 of the Commission’s rules and regulations an amendment to its filing dated December 3, 2004 under FERC Docket No. ER05– 296–000. PacifiCorp states that copies of this filing were supplied to the Public Utility Commission of Oregon, the Washington Utilities and Transportation Commission, and the Milton-Freewater Electric Department. VerDate jul<14>2003 18:52 Feb 03, 2005 Jkt 205001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 State commissions. The Midwest ISO also states that it will post a copy on its home page. Comment Date: 5 p.m. eastern time on February 4, 2005. 21. Public Service Company of New Mexico [Docket No. ER05–471–000] Take notice that on January 21, 2005, Public Service Company of New Mexico (PNM) submitted for filing two executed service agreements with Texas-New Mexico Power Company (TNMP) for firm point-to-point transmission service. PNM requests a January 1, 2005 effective date for each agreement. PNM states that copies of the filing have been sent to TNMP, the New Mexico Public Regulation Commission and the New Mexico Attorney General. Comment Date: 5 p.m. eastern time on February 11, 2005. 22. California Independent System Operator Corporation [Docket No. ER05–479–000] Take notice that on January 21, 2005, the California Independent System Operator Corporation (ISO) submitted an informational filing in accordance with Article IX, section B of the Stipulation and Agreement approved by the Commission on May 28, 1999, California Independent System Operator Corp., 87 FERC ¶ 61,250 (1999) (Stipulation and Agreement). ISO states that this provision requires the ISO to provide on a confidential basis to the Commission: (1) Information regarding any notice from an RMR Unit requesting a change of Condition; (2) the date the chosen Condition will begin; and (3) if the change is from Condition 2, the applicable level of Fixed Option Payment. ISO further states as required by the provision, it has provided notice of the changes of condition described in the informational filing (subject to the applicable Non-Disclosure and Confidentiality Agreement in the RMR Contract) to the designated RMR contact persons at the California Public Utilities Commission, the California Electricity Oversight Board, the applicable Responsible Utilities, and the relevant RMR Owners. Comment Date: 5 p.m. eastern time on February 11, 2005. 23. Pacific Gas and Electric Company [Docket No. ER05–480–000] Take notice that on January 21, 2005, Pacific Gas and Electric Company (PG&E), submitted proposed amendments to the Scheduling Coordinator Services Tariff, FERC Electric Tariff First Revised Volume No. E:\FR\FM\04FEN1.SGM 04FEN1 Federal Register / Vol. 70, No. 23 / Friday, February 4, 2005 / Notices 9 to recover the cost PG&E incurs from the California Independent System Operator Corporation as Scheduling Coordinator for certain existing transmission service customers. PG&E states that copies of this filing have been served upon the California Public Utilities Commission and all parties designated on the official service lists in Docket Nos. ER00–565–000 and ER04–1233–000. Comment Date: 5 p.m. eastern time on February 11, 2005. 24. Trimont Wind I LLC Take notice that on January 21, 2005, Trimont Wind I LLC (Trimont) submitted an application for authorization to sell energy, capacity and ancillary services at market-based rates. Trimont also requests that the Commission grant waivers and blanket approvals provided to applicants that receive authority for market-based rates. Comment Date: 5 p.m. eastern time on February 11, 2005. 25. Cottonwood Energy Company LP [Docket No. ER05–483–000] Take notice that on January 24, 2005, Cottonwood Energy Company LP, (Cottonwood) submitted for filing, pursuant to section 205 of the Federal Power Act (16 U.S.C. 824d), and part 35 of the Commission’s regulations (18 CFR part 35), a rate schedule for reactive power to be provided under the amended and restated interconnection agreement between Cottonwood Energy Company LP and Entergy Gulf States, Inc. Cottonwood requests an effective date of February 1, 2005. Comment Date: 5 p.m. eastern time on February 14, 2005. 26. Puget Sound Energy, Inc. [Docket No. ER05–484–000] Take notice that on January 24, 2005, Puget Sound Energy, Inc. (Puget Sound Energy) filed with the Commission an agreement for a temporary puget sound area and Northern Intertie Redispatch Pilot Program, which establishes a temporary, voluntary redispatch program on the Federal Columbia River Transmission System, which is owned and operated by the Bonneville Power Administration. Puget Sound Energy requests an effective date of December 8, 2004. Comment Date: 5 p.m. eastern time on February 14, 2005. 27. West Texas Wind Energy Partners, L.P. [Docket No. ER05–486–000] Take notice that on January 24, 2005, West Texas Wind Energy Partners, L.P. 18:52 Feb 03, 2005 28. FPL Energy Cowboy Wind, LLC [Docket No. ER05–487–000] [Docket No. ER05–481–000] VerDate jul<14>2003 (West Texas Wind) tendered for filing a notice of cancellation pursuant to 18 CFR 35.15 to reflect the cancellation of its market-based rate tariff, designated as FERC Electric Tariff, Original Volume No. 1, that was originally accepted for filing in Docket No. ER98–1965–000. West Texas Wind states that copies of the filing were served upon the Florida Public Service Commission. Comment Date: 5 p.m. eastern time on February 14, 2005. Jkt 205001 Take notice that on January 24, 2005, FPL Energy Cowboy Wind, LLC (FPLE Cowboy Wind) submitted an application for market-based rate authority. FPLE Cowboy Wind states that copies of the filing were served upon the Florida Public Service Commission. Comment Date: 5 p.m. eastern time on February 14, 2005. 29. Deseret Generation & Transmission Co-operative, Inc. [Docket No. ER05–491–000] Take notice that on January 24, 2004, Deseret Generation & Transmission Cooperative, Inc. (Deseret) submitted a filing detailing a wholesale power cost rebate for 2004 to each of its six member cooperatives under Service Agreement Nos. 1 through 6 of FERC Electric Tariff, Original Volume No. 1. Deseret requests an effective date of January 24, 2005. Deseret states that a copy of this filing has been provided to each of Deseret’s members. Comment Date: 5 p.m. eastern time on February 14, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 5993 Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Linda Mitry, Deputy Secretary. [FR Doc. E5–418 Filed 2–3–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP04–366–000] Gulf South Pipeline Company, LP; Notice of Availability of the Environmental Assessment for the Proposed Jackson Gas Storage Expansion Project January 31, 2005. The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) on the natural gas pipeline facilities proposed by Gulf South Pipeline Company, LP (Gulf South) in the above-referenced docket number. The EA was prepared to satisfy the requirements of the National Environmental Policy Act. The staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major Federal action significantly affecting the quality of the human environment. The EA assesses the potential environmental effects of the construction and operation of the proposed Jackson Gas Storage Expansion Project. Gulf South wants to expand the capacity of its facilities in Rankin County, Mississippi. In Docket No. CP04–366–000, Gulf South proposes to construct, operate, and maintain the following facilities at the existing Jackson Gas Storage Facility. • Up to three (3) storage injection/ withdrawal wells, 8-inch well head lines, well head measurement, one (1) pig launcher, and other appurtenant E:\FR\FM\04FEN1.SGM 04FEN1

Agencies

[Federal Register Volume 70, Number 23 (Friday, February 4, 2005)]
[Notices]
[Pages 5990-5993]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-418]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL04-112-000, et al.]


The Governors, et al.; Electric Rate and Corporate Filings

January 28, 2005.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. The Governors of Connecticut, Maine, Massachusetts, New Hampshire, 
Rhode Island and Vermont

[Docket No. EL04-112-000]

    On January 11, 2005, the Governors of Connecticut, Maine, 
Massachusetts, New Hampshire, Rhode Island, and Vermont (New England 
Governors) filed a motion to lodge amendments to the Joint Petition for 
Declaratory Order to Form a New England Regional State Committee, filed 
on June 25, 2004 in the above-docketed proceeding.
    Comment Date: 5 p.m. eastern time on February 7, 2005.

2. Wisconsin Public Service Corporation, WPS Power Development, Inc., 
WPS Energy Services, Inc.

[Docket Nos. ER95-1528-010 and ER96-1088-035]

    Take notice that WPS Resources Corporation (WPSR), on January 24, 
2005, tendered for filing its response to the Commission's January 3, 
2005 deficiency letter issued in Docket Nos. ER95-1528-008 and ER96-
1088-033 regarding a renewal of the market-based rate authority of 
WPSR's subsidiaries. WPSR states that part of this information was 
submitted on a confidential basis. In addition, WPSR states that it is 
submitting a market

[[Page 5991]]

power analyses using the footprint of the Midwest System Independent 
Transmission System, Inc. as a whole.
    Comment Date: 5 p.m. eastern time on February 14, 2005.

3. Merrill Lynch Capital Services, Inc.

[Docket No. ER99-830-009]

    Take notice that on January 21, 2005, Merrill Lynch Capital 
Services, Inc. (MLCS) filed a triennial updated market analysis.
    MLCS states that copies of the filing were served on the parties 
listed on the official service list in this proceeding.
    Comment Date: 5 p.m. eastern time on February 11, 2005.

4. Entergy Services, Inc.

[Docket No. ER01-2214-005]

    Take notice that on January 24, 2005, Entergy Services, Inc., 
(Entergy) filed a refund report in the above captioned docket relating 
to Entergy's ancillary services schedules 3-6.
    Entergy states that a copy of the refund report has been served on 
all parties to the service lists in the above-referenced proceedings 
and State commissions in the Entergy region.
    Comment Date: 5 p.m. eastern time on February 14, 2005.

5. Commonwealth Edison Company and Commonwealth Edison Company of 
Indiana, Inc.; PJM Interconnection, LLC and Commonwealth Edison Company 
and Commonwealth Edison Company of Indiana, Inc.

[Docket Nos. ER03-1335-003, ER04-367-005]

    Take notice that on January 21, 2005, Commonwealth Edison Company 
and PJM Interconnection, L.L.C. filed a compliance filing pursuant to 
the Commission's Order issued December 22, 2004 in Docket No. ER03-
1335-000, et al., 109 FERC ] 61,228.
    Comment Date: 5 p.m. eastern time on February 11, 2005.

6. Pacific Gas and Electric Company

[Docket No. ER04-443-005]

    Take notice that on January 21, 2005, Pacific Gas and Electric 
Company (PG&E) tendered for filing revisions to its Transmission Owner 
Tariff, FERC Electric Tariff, Sixth Revisied Volume No. 5. PG&E states 
that the revisions are intended to comply with Commission Order Nos. 
2003 and 2003-A. PG&E requests that the revisions become effective on 
the same date as companion filings made by the California Independent 
System Operator Corporation on January 5, 2005, in compliance with 
Order No. 2003.
    Comment Date: 5 p.m. eastern time on February 11, 2005.

7. Mystic I, LLC; Mystic Development, LLC; Fore River Development, LLC

[Docket Nos. ER04-657-004, ER04-660-004, ER04-659-004]

    Take notice that on January 21, 2005, Mystic I, LLC, Mystic 
Development, LLC and Fore River Development, LLC submitted an amendment 
to their September 24, 2004 filing, as supplemented on October 1, 2004, 
of a joint triennial updated market analysis.
    Comment Date: 5 p.m. eastern time on February 11, 2005.

8. Midwest Independent Transmission System Operator, Inc.; Public 
Utilities with Grandfathered Agreements in the Midwest ISO Region

[Docket Nos. ER04-691-019, EL04-104-018]

    Take notice that on January 21, 2005, the Midwest Independent 
Transmission System Operator, Inc. (Midwest ISO) submitted a compliance 
filing pursuant to the Commission's August 6, 2004 order, Midwest 
Independent Transmission System Operator, Inc., et al., 108 FERC ] 
61,163 (2004) and its December 20, 2004 order, Midwest Independent 
Transmission System Operator, Inc., et al., 109 FERC ] 61,285 (2004).
    The Midwest ISO states that it has electronically served a copy of 
this filing, with attachments, upon all Midwest ISO members, member 
representatives of transmission owners and non-transmission owners, the 
Midwest ISO advisory committee participants, policy subcommittee 
participants, as well as all State commissions within the region.
    In addition, the Midwest ISO states that the filing has been 
electronically posted on the Midwest ISO's Web site at https://
www.midwestiso.org under the heading ``Filings to FERC'' for other 
interested parties in this matter. The Midwest ISO indicates that it 
will provide hard copies to any interested party upon request.
    Comment Date: 5 p.m. eastern time on February 11, 2005.

9. Milford Power Company, LLC

[Docket No. ER05-163-001]

    Take notice that on January 21, 2005, Milford Power Company, LLC 
(Milford) tendered for filing its responses to the Commission's 
deficiency letter issued December 22, 2004 regarding Milford's November 
1, 2004 filing in Docket No. ER05-163-000.
    Comment Date: 5 p.m. eastern time on February 11, 2005.

10. Kansas City Power & Light Company

[Docket No. ER05-177-006]

    Take notice that on January 21, 2005, Kansas City Power & Light 
Company (KCPL) submitted a compliance filing pursuant to the 
Commission's order issued December 28, 2004 in Docket No. ER05-177-000. 
KCPL states that this filing pertains to service schedules for the City 
of Marshall, Missouri.
    KCPL states that copies of the filing were served upon the City of 
Marshall, Missouri as well as the Missouri Public Service Commission 
and the Kansas State Corporation Commission.
    Comment Date: 5 p.m. eastern time on February 11, 2005.

11. Entergy Louisiana, Inc.; Entergy Services, Inc.; Perryville Energy 
Partners, LLC.

[Docket Nos. ER05-188-001, ER05-189-001, ER05-191-001]

    Take notice that on January 21, 2005, Perryville Energy Partners, 
LLC (PEP), Entergy Services, Inc. (ESI) and Entergy Louisiana, Inc. 
(ELI) submitted additional information amending the November 5, 2004 
filings of PEP in Docket No. ER05-191-000, ESI in Docket No. ER05-189-
000 and ELI in Docket No. ER05-188-000 in response to the Commission's 
deficiency letter issued December 29, 2004 in the above-referenced 
proceedings.
    Comment Date: 5 p.m. eastern time on February 11, 2005.

12. El Paso Electric Company

[Docket No. ER05-201-001]

    Take notice that on January 21, 2005, El Paso Electric Company 
(EPE) submitted a compliance filing pursuant to the Commission's Letter 
Order issued January 6, 2005 in Docket No. ER05-201-000.
    EPE states that a copy of the filing was served on the parties on 
the official service list for this proceeding, the Public Utility 
Commission of Texas, the New Mexico Regulatory Commission and the 
Public Service Company of New Mexico.
    Comment Date: 5 p.m. eastern time on February 11, 2005.

13. PacifiCorp

[Docket No. ER05-278-001]

    Take notice that on January 24, 2005, PacifiCorp tendered for 
filing in accordance with 18 CFR 35 of the Commission's rules and 
regulations an amendment to its filing dated November 29, 2004 under 
FERC Docket No. ER05-278-000.
    PacifiCorp states that copies of this filing were supplied to the 
Public Utility

[[Page 5992]]

Commission of Oregon, the Washington Utilities and Transportation 
Commission, and NorthWestern Energy.
    Comment Date: 5 p.m. eastern time on February 14, 2005.

14. Duke Energy Corporation

[Docket No. ER05-281-001]

    Take notice that on January 21, 2005, Duke Energy Corporation, on 
behalf of Duke Electric Transmission (collectively Duke) filed an 
amendment of its December 1, 2004 filing of an executed revised Network 
Integration Service Agreement with North Carolina Electric Membership 
Corporation (NCEMC) which is designated as Fourth Revised Service 
Agreement No. 208 under Duke Electric Transmission FERC Electric Tariff 
Third Revised Volume No. 4.
    Duke states that copies of the filing were served on NCEMC and the 
South Carolina and North Carolina State public service commissions.
    Comment Date: 5 p.m. eastern time on February 11, 2005.

15. JPMorgan Chase Bank, N.A.

[Docket No. ER05-283-002]

    Take notice that on January 24, 2005, JPMorgan Chase Bank, N.A. 
(JPMCB) submitted an amendment to its filing dated January 13, 2005 on 
market power analysis to reflect recent changes in generation ownership 
in Docket No. ER05-283-002. JPMCB states that this filing replaces the 
market power analysis filed on January 13, 2005, in support of: JPMCB's 
December 2, 2004 request for acceptance of JPMCB rate schedule FERC No. 
1; the granting of certain blanket approvals, including the authority 
to sell electricity at market-based rates; and the waiver of certain 
Commission regulations. JPMCB also states that it intends to engage in 
wholesale electric energy and capacity transactions as a marketer and a 
broker. JPMCB indicates that it is not in the business of generating or 
transmitting electric power.
    Comment Date: 5 p.m. eastern time on February 14, 2005.

16. PacifiCorp

[Docket No. ER05-296-001]

    Take notice that on January 24, 2005, PacifiCorp tendered for 
filing in accordance with 18 CFR 35 of the Commission's rules and 
regulations an amendment to its filing dated December 3, 2004 under 
FERC Docket No. ER05-296-000.
    PacifiCorp states that copies of this filing were supplied to the 
Public Utility Commission of Oregon, the Washington Utilities and 
Transportation Commission, and the Milton-Freewater Electric 
Department.
    Comment Date: 5 p.m. eastern time on February 14, 2005.

17. PacifiCorp

[Docket No. ER05-299-001]

    Take notice that on January 24, 2005 PacifiCorp tendered for filing 
in accordance with 18 CFR 35 of the Commission's rules and regulations 
an amendment to its filing dated December 3, 2004 under FERC Docket No. 
ER05-299-000.
    PacifiCorp states that copies of this filing were supplied to the 
Public Utility Commission of Oregon, the Washington Utilities and 
Transportation Commission, and the Central Lincoln People's Utility 
District.
    Comment Date: 5 p.m. eastern time on February 14, 2005.

18. PacifiCorp

[Docket No. ER05-301-001]

    Take notice that on January 24, 2005, PacifiCorp tendered for 
filing in accordance with 18 CFR 35 of the Commission's rules and 
regulations an amendment to its filing dated December 3, 2004 under 
FERC Docket No. ER05-301-000.
    PacifiCorp states that copies of this filing were supplied to the 
Public Utility Commission of Oregon, the Washington Utilities and 
Transportation Commission, and the Utah Associated Municipal Power 
Systems.
    Comment Date: 5 p.m. eastern time on February 14, 2005.

19. Telemagine, Inc.

[Docket Nos. ER05-419-001, ER05-419-002]

    Take notice that on January 21, 2005 and January 27, 2005, 
Telemagine, Inc. (Telemagine) filed amendments to its January 4, 2005 
petition for acceptance of initial rate schedule, waivers and blanket 
authority.
    Comment Date: 5 p.m. eastern time on February 14, 2005.

20. Transmission Owners of the Midwest Independent, Transmission System 
Operator Inc.

[Docket No. ER05-447-001]

    Take notice that on January 26, 2005, the Transmission Owners of 
the Midwest Independent Transmission System Operator (Midwest ISO 
Transmission Owners) submitted an amendment to the proposed Schedule 23 
to the Midwest Independent Transmission System Operator, Inc.'s tariff, 
that was filed January 13, 2005 in Docket No. ER05-447-000.
    The Midwest ISO Transmission Owners state that they are serving 
this filing on all Midwest ISO's affected customers as well as on all 
applicable State commissions. The Midwest ISO also states that it will 
post a copy on its home page.
    Comment Date: 5 p.m. eastern time on February 4, 2005.

21. Public Service Company of New Mexico

[Docket No. ER05-471-000]

    Take notice that on January 21, 2005, Public Service Company of New 
Mexico (PNM) submitted for filing two executed service agreements with 
Texas-New Mexico Power Company (TNMP) for firm point-to-point 
transmission service. PNM requests a January 1, 2005 effective date for 
each agreement.
    PNM states that copies of the filing have been sent to TNMP, the 
New Mexico Public Regulation Commission and the New Mexico Attorney 
General.
    Comment Date: 5 p.m. eastern time on February 11, 2005.

22. California Independent System Operator Corporation

[Docket No. ER05-479-000]

    Take notice that on January 21, 2005, the California Independent 
System Operator Corporation (ISO) submitted an informational filing in 
accordance with Article IX, section B of the Stipulation and Agreement 
approved by the Commission on May 28, 1999, California Independent 
System Operator Corp., 87 FERC ] 61,250 (1999) (Stipulation and 
Agreement). ISO states that this provision requires the ISO to provide 
on a confidential basis to the Commission: (1) Information regarding 
any notice from an RMR Unit requesting a change of Condition; (2) the 
date the chosen Condition will begin; and (3) if the change is from 
Condition 2, the applicable level of Fixed Option Payment. ISO further 
states as required by the provision, it has provided notice of the 
changes of condition described in the informational filing (subject to 
the applicable Non-Disclosure and Confidentiality Agreement in the RMR 
Contract) to the designated RMR contact persons at the California 
Public Utilities Commission, the California Electricity Oversight 
Board, the applicable Responsible Utilities, and the relevant RMR 
Owners.
    Comment Date: 5 p.m. eastern time on February 11, 2005.

23. Pacific Gas and Electric Company

[Docket No. ER05-480-000]

    Take notice that on January 21, 2005, Pacific Gas and Electric 
Company (PG&E), submitted proposed amendments to the Scheduling 
Coordinator Services Tariff, FERC Electric Tariff First Revised Volume 
No.

[[Page 5993]]

9 to recover the cost PG&E incurs from the California Independent 
System Operator Corporation as Scheduling Coordinator for certain 
existing transmission service customers.
    PG&E states that copies of this filing have been served upon the 
California Public Utilities Commission and all parties designated on 
the official service lists in Docket Nos. ER00-565-000 and ER04-1233-
000.
    Comment Date: 5 p.m. eastern time on February 11, 2005.

24. Trimont Wind I LLC

[Docket No. ER05-481-000]

    Take notice that on January 21, 2005, Trimont Wind I LLC (Trimont) 
submitted an application for authorization to sell energy, capacity and 
ancillary services at market-based rates. Trimont also requests that 
the Commission grant waivers and blanket approvals provided to 
applicants that receive authority for market-based rates.
    Comment Date: 5 p.m. eastern time on February 11, 2005.

25. Cottonwood Energy Company LP

[Docket No. ER05-483-000]

    Take notice that on January 24, 2005, Cottonwood Energy Company LP, 
(Cottonwood) submitted for filing, pursuant to section 205 of the 
Federal Power Act (16 U.S.C. 824d), and part 35 of the Commission's 
regulations (18 CFR part 35), a rate schedule for reactive power to be 
provided under the amended and restated interconnection agreement 
between Cottonwood Energy Company LP and Entergy Gulf States, Inc. 
Cottonwood requests an effective date of February 1, 2005.
    Comment Date: 5 p.m. eastern time on February 14, 2005.

26. Puget Sound Energy, Inc.

[Docket No. ER05-484-000]

    Take notice that on January 24, 2005, Puget Sound Energy, Inc. 
(Puget Sound Energy) filed with the Commission an agreement for a 
temporary puget sound area and Northern Intertie Redispatch Pilot 
Program, which establishes a temporary, voluntary redispatch program on 
the Federal Columbia River Transmission System, which is owned and 
operated by the Bonneville Power Administration. Puget Sound Energy 
requests an effective date of December 8, 2004.
    Comment Date: 5 p.m. eastern time on February 14, 2005.

27. West Texas Wind Energy Partners, L.P.

[Docket No. ER05-486-000]

    Take notice that on January 24, 2005, West Texas Wind Energy 
Partners, L.P. (West Texas Wind) tendered for filing a notice of 
cancellation pursuant to 18 CFR 35.15 to reflect the cancellation of 
its market-based rate tariff, designated as FERC Electric Tariff, 
Original Volume No. 1, that was originally accepted for filing in 
Docket No. ER98-1965-000.
    West Texas Wind states that copies of the filing were served upon 
the Florida Public Service Commission.
    Comment Date: 5 p.m. eastern time on February 14, 2005.

28. FPL Energy Cowboy Wind, LLC

[Docket No. ER05-487-000]

    Take notice that on January 24, 2005, FPL Energy Cowboy Wind, LLC 
(FPLE Cowboy Wind) submitted an application for market-based rate 
authority.
    FPLE Cowboy Wind states that copies of the filing were served upon 
the Florida Public Service Commission.
    Comment Date: 5 p.m. eastern time on February 14, 2005.

29. Deseret Generation & Transmission Co-operative, Inc.

[Docket No. ER05-491-000]

    Take notice that on January 24, 2004, Deseret Generation & 
Transmission Co-operative, Inc. (Deseret) submitted a filing detailing 
a wholesale power cost rebate for 2004 to each of its six member 
cooperatives under Service Agreement Nos. 1 through 6 of FERC Electric 
Tariff, Original Volume No. 1. Deseret requests an effective date of 
January 24, 2005.
    Deseret states that a copy of this filing has been provided to each 
of Deseret's members.
    Comment Date: 5 p.m. eastern time on February 14, 2005.

Standard Paragraph

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all parties to this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Linda Mitry,
Deputy Secretary.
[FR Doc. E5-418 Filed 2-3-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.