Summary: EPA has no objections to
the preferred alternative.
ERP No. F–FHW–F40409–IN IN–25
Transportation Corridor Improvements
from I–65 Interchange to U.S. 24,
Funding, Right-of-Way and U.S. Army
COE Section 404 Permit Issuance,
Hoosier Heartland Highway,
Tippecanoe, Carroll and Cass Counties,
IN.
Summary: EPA has no objections to
the preferred alternative.
ERP No. F–FHW–L40206–WA WA–
104/Edmonds Crossing Project,
Connecting Ferries, Bus and Rail,
Funding, NPDES Permit and COE
Section 10 and 404 Permits, City of
Edmonds, Snohomish County, WA.
Summary: No comment letter was
sent to the preparing agency.
Dated: January 25, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–1628 Filed 2–3–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6660–2]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements filed January 24, 2005
through January 28, 2005 pursuant to
40 CFR 1506.9.
EIS No. 050029, Final Supplement,
FHW, FL, FL–23 Extension (Branan
Field-Chaffe Road), Construction from
FL–134 (103rd Street) to FL–8 (I–10)
and FL–10 (US–90/Beaver Street),
NPDES and US Army COE Section
404 Permits Issuance, Clay and Duval
Counties, FL, Wait Period Ends:
March 7, 2005, Contact: Donald E.
Davis (404) 562–9521.
EIS No. 050030, Draft EIS, NPS, CA,
Non-Native Deer Management Plan of
Axis Deer (Axis axis) and Fallow Deer
(Dama dama), Implementation, Point
Reyes National Seashore (PRNS) and
Golden Gate National Recreation
Area, Marin County, CA, Comment
Period Ends: April 05, 2005, Contact:
Natalie Gates (415) 464–5189.
EIS No. 050031, Final EIS, USA, TX,
Fort Bliss, Texas Proposed Leasing of
Lands, Proposed Siting, Construction
and Operation, by the City of El Paso
of a Brackish Water Desalination Plant
and Support Facilities, El Paso Water
VerDate jul<14>2003
18:52 Feb 03, 2005
Jkt 205001
Utilities (EPWU), City of El Pasco, TX
and New Mexico, Wait Period Ends:
March 7, 2005, Contact: John Barrera
(915) 568–3908.
EIS No. 050032, Draft EIS, AFS, WV,
Fernow Experimental Forest, To
Continue Long-Term Research and
Initiate New Research, Involving
Removal of Trees, Prescribed Burning,
Stem Injection of Selected of Trees,
Control Invasive Plant Species,
Northeastern Research Station,
Parson, Tucker County, WV,
Comment Period Ends: March 21,
2005, Contact: Mary Beth Adams
(304) 478–2000 Ext 130.
EIS No. 050033, Draft EIS, IBR, NV,
Humboldt Project Conveyance,
Transferring 83,530 Acres from
Federal Ownership to the Pershing
County Water Conservation District
(PCWCD), Pershing and Lander
Counties, NV, Comment Period Ends:
April 01, 2005, Contact: Caryn Huntt
DeCarlo (775) 884–8352.
EIS No. 050034, Final EIS, NSF,
Development and Implementation of
Surface Traverse Capabilities in
Antarctic Comprehensive
Environmental Evaluation, Antarctica,
Wait Period Ends: March 7, 2005,
Contact: Polly A. Pinhole (703) 292–
8033.
EIS No. 050035, Final EIS, AFS, WY,
Upper Green River Area Rangeland
Project, Propose Site Specific Grazing
Management Practices, Bridger-Teton
Forest, Sublette, Teton and Fremont
Counties, WY, Wait Period Ends:
March 7, 2005, Contact: Craig Trulock
(307) 367–4326.
EIS No. 050036, Draft EIS, AFS, CA,
Burlington Ridge Trails Project, To
Eliminate, Reconstruct/or Reroute
Unsound Trail Sections, Tahoe
National Forest, Yuba River Ranger
District, Camptonville, Nevada
County, NV, Comment Period Ends:
March 21, 2005, Contact: Mary Furney
(053) 478–6263.
EIS No. 050037, Draft EIS, AFS, MO,
Mark Twain National Forest Land and
Resource Management Plan,
Implementation, Revise to the 1986
Land and Resource Management Plan,
several counties, MO, Comment
Period Ends: May 5, 2005, Contact:
Laura Watts (573) 341–7471.
EIS No. 050038, Draft EIS, BLM, NM,
McGregor Range Resource
Management Plan Amendment
(RMPA), Implementation, Otero
County, NM, Comment Period Ends:
May 5, 2005, Contact: Tom Phillips
(505) 525–4377.
EIS No. 050039, Draft EIS, AFS, NM,
Tajique Watershed Restoration
Project, Proposes Fuel Reduction and
Restore Forest Health, Cibola National
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
Forest, Torraine County, NM,
Comment Period Ends: March 21,
2005, Contact: Vicky Estrada (505)
847–2990.
EIS No. 050040, Final Supplement,
AFS, UT, Table Top Exploratory Oil
and Gas Wells, New Information from
the Approval 1994 Final EIS,
Wasatch-Cache National Forest,
Evanston Ranger District, Summit
County, UT, Wait Period Ends: March
7, 2005, Contact: Roger Kesterson
(307) 782–6555.
EIS No. 050041, Final Supplement, BIA,
AZ, NM, Programmatic EIS—Navajo
Nation 10-Year Forest Management
Plan, Selected Preferred Alternative
Four, Chuska Mountain and Defiance
Plateau Area, AZ and NM, Wait
Period Ends: March 7, 2005, Contact:
Jonathan Martin (928) 729–7228.
EIS No. 050042, Final EIS, AFS, WY,
Tongue Allotment Management Plan,
Proposal to Continue Livestock
Grazing on All or Portions of the 22
Allotment, Bighorn National Forest,
Tongue and Medicine Wheel/
Paintrock Ranger Districts, Johnson,
Sheridan and Bighorn Counties, WY,
Wait Period Ends: March 7, 2005,
Contact: Craig L. Yancey (307) 674–
2600.
EIS No. 050043, Draft Supplemental
EIS, FHW, UT, US 6 Highway Project,
Improvements from Interstate 15 (I–
15) in Spanish Fork to Interstate (I–
70) near Green River, New
Information, Funding, Right-of-Way
Permit and U.S. Army COE Section
404 Permit, Utah, Wasatch, Carbon,
Emery Counties, UT, Comment Period
Ends: March 28, 2005, Contact: Jeff
Berna (801) 963–0182.
Amended Notices
EIS No. 050000, Draft EIS, AFS, UT,
Ogden Ranger District Travel Plan, To
Update the Travel Management Plan,
Wasatch-Cache National Plan, Ogden
Ranger District, Box Elder, Cache,
Morgan, Weber and Rich Counties,
UT, Comment Period Ends: March 30,
2005, Contact: Rick Vallejos (801)
625–5112. Revision of Federal
Register Notice Published on 1/28/05:
CEQ Comment Period Ending 02/22/
2005 has been Extended to 03/01/
2005.
EIS No. 250017, Final EIS, NOA, ME,
MA, RI, NH, CT, Atlantic Herring
Fishery Management Plan,
Minimizing Impacts on Essential Fish
Habitat of Any Species, Gulf of
Maine—Georges Bank, ME, NH, MA,
CT and RI, Wait Period Ends: March
1, 2005, Contact: Peter D. Colosi (978)
281–3332. Revision of Federal
Register Notice Published on 1/28/05:
CEQ Comment Period Ending 02/22/
E:\FR\FM\04FEN1.SGM
04FEN1
Federal Register / Vol. 70, No. 23 / Friday, February 4, 2005 / Notices
2005 has been Extended to 03/01/
2005.
Dated: February 1, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–2177 Filed 2–3–05; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6660–3]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under Section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act, as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
(202) 564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in the
Federal Register dated April 2, 2004 (69
FR 17403).
Draft EISs
ERP No. D–FAA–E51051–FL Rating
EC2, Panama City-Bay County
International Airport (PFN), Proposed
Relocation to a New Site, NPDES Permit
and U.S. Army COE Section 404 Permit,
Bay County, FL.
Summary: EPA expressed concerns
due to wetland and secondary impacts,
and requested additional information on
secondary development and impacts
induced by the proposed airport
relocation, wetland mitigation, and the
sponsor’s site selection process.
ERP No. D–FHW–H40183–00 Rating
LO, Council Bluffs Interstate System
Improvements Project, Transportation
Improve from Missouri River on I–80 to
East of the I–480 Interchange, (Tier 1),
Pottawattamie County, IA and Douglas
County, NB.
Summary: EPA has no objections to
the proposed project. ERP No. D–FRC–
G03023–TX Rating EC2, Cheniere
Corpus Christi Liquefied Natural Gas
(LNG) Project, To Provide Facilities for
the Importation, Storage and
Vaporization of Liquefied Natural Gas,
Nueces and San Patricio Counties, TX.
Summary: EPA expressed
environmental concerns and requested
additional information regarding
wetlands mitigation measures, the
potential for invasive species
introduction, and air quality impacts.
VerDate jul<14>2003
18:52 Feb 03, 2005
Jkt 205001
ERP No. D–NIH–G84000–TX Rating
LO, Galveston National Laboratory for
Biodefense and Emerging Infectious
Diseases Research Facility at the
University of Texas Medical Branch,
Construction, Partial Funding, Grant,
Galveston, TX.
Summary: EPA had no objection to
the selection of the preferred alternative.
However, EPA asked that the Final EIS
include a discussion of general air
quality conformity.
ERP No. D–STB–G53010–TX Rating
EC2, Southwest Gulf Railroad Project,
Construction and Operation Exemption,
To Transport Limestone from Vulcan
Construction Materials (VCM) Quarry to
Del Rio Subdivision, Medina County,
TX.
Summary: EPA expressed
environmental concerns about the
proposed project regarding the Spill
Prevention, Containment and
Countermeasure Plan, aquatic steam
crossing mitigation measures, and air
quality impacts.
Final EISs
ERP No. F–BIA–L02031–OR Wanapa
Energy Center, Construction and
Operation a New 1,200 Megawatt (MW)
Natural Gas-Fired Electric Power
Generating Facility, Confederated Tribes
of the Umatilla Indian Reservation
(CTUIR), in the City of Hermiston and
the Port of Umatilla, OR.
Summary: No formal comment letter
was sent.
ERP No. F–FHW–D40093–PA City of
Lebanon Bridge Over Norfolk Southern
Railroad Tracks Construction Project,
12th Street to Lincoln Avenue, Funding,
Lebanon County, PA.
Summary: EPA has no objections to
the preferred alternative.
ERP No. F–FHW–F40408–00 Trunk
Highway 60 Reconstruction Project,
Improvements from 1.8 miles south of
the Minnesota-Iowa Border (120th
Street) to I–90 north of the City of
Worthington, Funding, U.S. Army COE
Section 404 and NPDES Permits
Issuance, Nobles County, MN and
Osceola County, IA.
Summary: EPA has no objections to
the preferred alternative.
ERP No. F–FRC–G03022–LA Sabine
Pass Liquefied Natural Gas (LNG) and
Pipeline Project, Construction and
Operation LNG Import Terminal and
Natural Gas Pipeline Facilities, Several
Permits, Cameron Parish, LA.
Summary: EPA expressed
environmental concerns and requested
additional information regarding postconstruction monitoring of wetland
mitigation and sediment toxicity testing
of dredged material. EPA will also
continue coordination efforts with the
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
6005
U.S. Army Corps of Engineers as the
Aquatic Resources Mitigation Plan is
finalized and the Clean Water Act
Section 404 permit application is
reviewed.
ERP No. F–FTA–D54041–VA Dulles
Corridor Rapid Transit Project, HighQuality and High-Capacity Transit
Service in the Dulles Corridor, West
Falls Church Metrorail Station in
Fairfax County to the Vicinity of Route
772 in Loudoun County, VA.
Summary: EPA’s comments have been
adequately addressed in the Final EIS
and has no objections to the preferred
alternative.
ERP No. F–IBR–K39088–CA
Sacramento River Settlement
Contractors (SRSC), To Renew the
Settlement Contractors Long-Term
Contract Renewal for 145 Contractors,
Central Valley Project (CVP),
Sacramento River, Shasta, Tehama,
Butte, Glenn, Colusa, Sutter, Yolo,
Sacramento, Portion of Placer and
Solano Counties, CA.
Summary: EPA expressed continuing
concerns regarding direct, indirect, and
cumulative impacts to water quality
associated with the contract renewals.
EPA requested additional information
on water quality degradation in the area,
water demand calculations, and
methods of water conservation that will
be implemented.
ERP No. F–USA–J11020–UT
Activities Associated with Future
Programs at U.S. Army Dugway Proving
Ground, Implementation, Tooele and
Jaub Counties, UT.
Summary: No formal comment letter
was sent.
ERP No. FB–FTA–L40205–00 South
Corridor Project, I–205/Portland Mall
Light Rail (Phase I), Selected the Locally
Preferred Alternative (LPA), Clackamas
and Multnomah Counties, OR.
Summary: No formal comment letter
was sent.
ERP No. FS–GSA–G80000–TX Del Rio
Port of Entry (POE), Increased Security
Measures Associated with Phase II
Expansion, Supplement to the 1992 Del
Rio Border Patrol Station, Del Rio, Val
Verde County, TX.
Summary: EPA has no objections to
the proposed project.
Dated: February 1, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 05–2178 Filed 2–3–05; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\04FEN1.SGM
04FEN1
Agencies
[Federal Register Volume 70, Number 23 (Friday, February 4, 2005)]
[Notices]
[Pages 6004-6005]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 05-2177]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6660-2]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements filed January 24,
2005 through January 28, 2005 pursuant to 40 CFR 1506.9.
EIS No. 050029, Final Supplement, FHW, FL, FL-23 Extension (Branan
Field-Chaffe Road), Construction from FL-134 (103rd Street) to FL-8 (I-
10) and FL-10 (US-90/Beaver Street), NPDES and US Army COE Section 404
Permits Issuance, Clay and Duval Counties, FL, Wait Period Ends: March
7, 2005, Contact: Donald E. Davis (404) 562-9521.
EIS No. 050030, Draft EIS, NPS, CA, Non-Native Deer Management Plan of
Axis Deer (Axis axis) and Fallow Deer (Dama dama), Implementation,
Point Reyes National Seashore (PRNS) and Golden Gate National
Recreation Area, Marin County, CA, Comment Period Ends: April 05, 2005,
Contact: Natalie Gates (415) 464-5189.
EIS No. 050031, Final EIS, USA, TX, Fort Bliss, Texas Proposed Leasing
of Lands, Proposed Siting, Construction and Operation, by the City of
El Paso of a Brackish Water Desalination Plant and Support Facilities,
El Paso Water Utilities (EPWU), City of El Pasco, TX and New Mexico,
Wait Period Ends: March 7, 2005, Contact: John Barrera (915) 568-3908.
EIS No. 050032, Draft EIS, AFS, WV, Fernow Experimental Forest, To
Continue Long-Term Research and Initiate New Research, Involving
Removal of Trees, Prescribed Burning, Stem Injection of Selected of
Trees, Control Invasive Plant Species, Northeastern Research Station,
Parson, Tucker County, WV, Comment Period Ends: March 21, 2005,
Contact: Mary Beth Adams (304) 478-2000 Ext 130.
EIS No. 050033, Draft EIS, IBR, NV, Humboldt Project Conveyance,
Transferring 83,530 Acres from Federal Ownership to the Pershing County
Water Conservation District (PCWCD), Pershing and Lander Counties, NV,
Comment Period Ends: April 01, 2005, Contact: Caryn Huntt DeCarlo (775)
884-8352.
EIS No. 050034, Final EIS, NSF, Development and Implementation of
Surface Traverse Capabilities in Antarctic Comprehensive Environmental
Evaluation, Antarctica, Wait Period Ends: March 7, 2005, Contact: Polly
A. Pinhole (703) 292-8033.
EIS No. 050035, Final EIS, AFS, WY, Upper Green River Area Rangeland
Project, Propose Site Specific Grazing Management Practices, Bridger-
Teton Forest, Sublette, Teton and Fremont Counties, WY, Wait Period
Ends: March 7, 2005, Contact: Craig Trulock (307) 367-4326.
EIS No. 050036, Draft EIS, AFS, CA, Burlington Ridge Trails Project, To
Eliminate, Reconstruct/or Reroute Unsound Trail Sections, Tahoe
National Forest, Yuba River Ranger District, Camptonville, Nevada
County, NV, Comment Period Ends: March 21, 2005, Contact: Mary Furney
(053) 478-6263.
EIS No. 050037, Draft EIS, AFS, MO, Mark Twain National Forest Land and
Resource Management Plan, Implementation, Revise to the 1986 Land and
Resource Management Plan, several counties, MO, Comment Period Ends:
May 5, 2005, Contact: Laura Watts (573) 341-7471.
EIS No. 050038, Draft EIS, BLM, NM, McGregor Range Resource Management
Plan Amendment (RMPA), Implementation, Otero County, NM, Comment Period
Ends: May 5, 2005, Contact: Tom Phillips (505) 525-4377.
EIS No. 050039, Draft EIS, AFS, NM, Tajique Watershed Restoration
Project, Proposes Fuel Reduction and Restore Forest Health, Cibola
National Forest, Torraine County, NM, Comment Period Ends: March 21,
2005, Contact: Vicky Estrada (505) 847-2990.
EIS No. 050040, Final Supplement, AFS, UT, Table Top Exploratory Oil
and Gas Wells, New Information from the Approval 1994 Final EIS,
Wasatch-Cache National Forest, Evanston Ranger District, Summit County,
UT, Wait Period Ends: March 7, 2005, Contact: Roger Kesterson (307)
782-6555.
EIS No. 050041, Final Supplement, BIA, AZ, NM, Programmatic EIS--Navajo
Nation 10-Year Forest Management Plan, Selected Preferred Alternative
Four, Chuska Mountain and Defiance Plateau Area, AZ and NM, Wait Period
Ends: March 7, 2005, Contact: Jonathan Martin (928) 729-7228.
EIS No. 050042, Final EIS, AFS, WY, Tongue Allotment Management Plan,
Proposal to Continue Livestock Grazing on All or Portions of the 22
Allotment, Bighorn National Forest, Tongue and Medicine Wheel/Paintrock
Ranger Districts, Johnson, Sheridan and Bighorn Counties, WY, Wait
Period Ends: March 7, 2005, Contact: Craig L. Yancey (307) 674-2600.
EIS No. 050043, Draft Supplemental EIS, FHW, UT, US 6 Highway Project,
Improvements from Interstate 15 (I-15) in Spanish Fork to Interstate
(I-70) near Green River, New Information, Funding, Right-of-Way Permit
and U.S. Army COE Section 404 Permit, Utah, Wasatch, Carbon, Emery
Counties, UT, Comment Period Ends: March 28, 2005, Contact: Jeff Berna
(801) 963-0182.
Amended Notices
EIS No. 050000, Draft EIS, AFS, UT, Ogden Ranger District Travel Plan,
To Update the Travel Management Plan, Wasatch-Cache National Plan,
Ogden Ranger District, Box Elder, Cache, Morgan, Weber and Rich
Counties, UT, Comment Period Ends: March 30, 2005, Contact: Rick
Vallejos (801) 625-5112. Revision of Federal Register Notice Published
on 1/28/05: CEQ Comment Period Ending 02/22/2005 has been Extended to
03/01/2005.
EIS No. 250017, Final EIS, NOA, ME, MA, RI, NH, CT, Atlantic Herring
Fishery Management Plan, Minimizing Impacts on Essential Fish Habitat
of Any Species, Gulf of Maine--Georges Bank, ME, NH, MA, CT and RI,
Wait Period Ends: March 1, 2005, Contact: Peter D. Colosi (978) 281-
3332. Revision of Federal Register Notice Published on 1/28/05: CEQ
Comment Period Ending 02/22/
[[Page 6005]]
2005 has been Extended to 03/01/2005.
Dated: February 1, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.