Download as PDF Federal Register / Vol. 70, No. 22 / Thursday, February 3, 2005 / Notices (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: February 16, 2005. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL05–58–000] ConocoPhillips Company, and Equilon Enterprises LLC d/b/a/ Shell Oil Products U.S., Complainant, v. Los Angeles Department of Water and Power, Respondent; Notice of Complaint January 27, 2005. Take notice that on January 26, 2005, ConocoPhillips Company and Equilon Enterprises LLC d/b/a/ Shell Oil Products US (collectively, Complainants) filed a formal complaint against Los Angeles Department of Water and Power (LADWP) pursuant to 16 U.S.C. alleging that LADWP has instituted rates for standby service which are unjust and unreasonable under section 206 and under the Public Utility Regulatory Policies Act of 1978. The Complainants state that copies of the complaint were served on the General Manager of LADWP. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call VerDate jul<14>2003 19:18 Feb 02, 2005 Jkt 205001 Linda Mitry, Deputy Secretary. [FR Doc. E5–404 Filed 2–2–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 4. PJM Interconnection, L.L.C. American Electric Power Service Corporation, et al.; Electric Rate and Corporate Filings January 27, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. American Electric Power Service Corporation [Docket No. EC05–2–000] Take notice that on January 24, 2005, American Electric Power Service Corporation (AEP), on behalf of its affiliate, AEP Texas Central Company (TCC), submitted supplemental information regarding its October 7, 2004 application for authorization of a disposition of jurisdictional facilities. Comment Date: 5 p.m. eastern time on February 7, 2005. 2. USGen New England, Inc., Town of Rockingham, Vermont, Bellows Falls Power Company, LLC [Docket No. EC05–41–000] Take notice that on January 25, 2005, USGen New England, Inc. (USGenNE), the Town of Rockingham, Vermont (Town), and Bellows Falls Power Company, LLC (BFPC) (collectively, Applicants) filed with the Federal Energy Regulatory Commission an application pursuant to section 203 of the Federal Power Act for authorization to permit USGenNE to transfer to the Town jurisdictional facilities associated with USGenNE’s approximately 49 MW Bellows Falls hydroelectric generating facility and the lease of those facilities from the Town to BFPC. Comment Date: 5 p.m. eastern time on February 15, 2005. 3. Idaho Power Company [Docket No. ER97–1481–007] Take notice that on January 19, 2005, Idaho Power Company (Idaho Power) submitted its response to the Commission’s deficiency letter issued December 20, 2004 requesting Frm 00039 Fmt 4703 Sfmt 4703 additional information regarding Idaho Power’s September 27, 2004 filing in Docket No. ER97–1481–004, as amended on October 8, 2004 in ER97– 1481–005. Idaho Power Company states that copies of the filing were served on parties on the official service list in Docket No. ER97–1481. Comment Date: 5 p.m. eastern time on February 9, 2005. [Docket No. ER03–1101–007] [Docket No. EC05–2–000, et al.] PO 00000 5639 Take notice that on January 19, 2005, PJM Interconnection, L.L.C. (PJM), submitted a compliance filing pursuant to the Commission’s Order issued December 20, 2004 order in Docket No. ER03–1101–001, et al., 109 FERC ¶ 61,286 (2004). d collateral. PJM requests an effective date of March 1, 2005. PJM states that copies of this filing have been served on all PJM members and the utility regulatory commissions in the PJM region. Comment Date: 5 p.m. eastern time on February 9, 2005. 5.Jersey Central Power & Light Company [Docket No. ER05–64–001] Take notice that on January 19, 2005, Jersey Central Power & Light Company, a FirstEnergy Company, (Jersey Central) submitted an amendment to its October 22, 2004 filing in Docket No. ER05–64– 000, pursuant to the Commission’s deficiency letter issued December 20, 2004. Jersey Central states that copies of the filing have been served on regulators in New Jersey, Atlantic City Electric Company, PJM and FERC Staff. Comment Date: 5 p.m. eastern time on February 9, 2005. 6.PJM Interconnection, L.L.C. [Docket No. ER05–85–004] Take notice that on January 19, 2005, PJM Interconnection, L.L.C. (PJM), and Duquesne Light Company (Duquesne Light), submitted a compliance filing pursuant to the Commission’s Order issued December 20, 2004 in Docket No. ER05–85–000, et al., 109 FERC ¶ 61,299. PJM and Duquesne Light state that copies of this filing were served upon all persons on the service list in Docket No. ER05–85. Comment Date: 5 p.m. eastern time on February 9, 2004. 7. Kansas City Power & Light Company [Docket No. ER05–177–004] Take notice that on January 19, 2005, Kansas City Power & Light Company E:\FR\FM\03FEN1.SGM 03FEN1 5640 Federal Register / Vol. 70, No. 22 / Thursday, February 3, 2005 / Notices (KCPL) submitted a compliance filing pursuant to the Commission’s order issued December 28, 2004 in Docket No. ER05–177–000. KCPL states that this filing pertains to service schedules for the City of Higginsville, Missouri. KCPL states that copies of the filing were served upon the City of Higginsville, Missouri as well as the Missouri Public Service Commission and the Kansas State Corporation Commission. Comment Date: 5 p.m. eastern time on February 9, 2005. receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. 8. Kansas City Power & Light Company ENVIRONMENTAL PROTECTION AGENCY [Docket No. ER05–177–005] Take notice that on January 19, 2005, Kansas City Power & Light Company (KCPL) submitted a compliance filing pursuant to the Commission’s order issued December 28, 2004 in Docket No. ER05–177–000. KCPL states that this filing pertains to service schedules for the City of Garnett, Kansas. KCPL states that copies of the filing were served upon the City of Garnett, Kansas as well as the Missouri Public Service Commission and the Kansas State Corporation Commission. Comment Date: 5 p.m. eastern time on February 9, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to VerDate jul<14>2003 19:18 Feb 02, 2005 Jkt 205001 Linda Mitry, Deputy Secretary. [FR Doc. E5–406 Filed 2–2–05; 8:45 am] BILLING CODE 6717–01–P [OECA–2004–0018; FRL–7867–7] Agency Information Collection Activities; Submission for OMB Review and Approval; Comment Request; NSPS for Polymeric Coating of Supporting Substrates Facilities, ICR Number 1284.07, OMB Number 2060– 0181 Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: In compliance with the Paperwork Reduction Act, this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. This ICR is scheduled to expire on January 31, 2005. Under OMB regulations, the Agency may continue to conduct or sponsor the collection of information while this submission is pending at OMB. This ICR describes the nature of the information collection and its estimated burden and cost. DATES: Additional comments may be submitted on or before March 7, 2005. ADDRESSES: Submit your comments, referencing docket ID number OECA– 2004–0018, to (1) EPA online using EDOCKET (our preferred method), by email to docket.oeca@epa.gov, or by mail to: Environmental Protection Agency, EPA Docket Center (EPA/DC), Enforcement and Compliance Docket and Information Center, Mail Code 2201T, 1200 Pennsylvania Avenue, NW., Washington, DC 20460, and (2) OMB at: Office of Information and Regulatory Affairs, Office of Management and Budget (OMB), Attention: Desk Officer for EPA, 725 17th Street, NW., Washington, DC 20503. FOR FURTHER INFORMATION CONTACT: Leonard Lazarus, Compliance Assessment and Media Programs PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 Division, Office of Compliance (2223A), Environmental Protection Agency, 1200 Pennsylvania Avenue, NW., Washington, DC 20460; telephone number: (202) 564–6369; fax number: (202) 564–0050; e-mail address: lazarus.leonard@epa.gov. SUPPLEMENTARY INFORMATION: EPA has submitted the following ICR to OMB for review and approval according to the procedures prescribed in 5 CFR 1320.12. On May 25, 2004 (69 FR 29718), EPA sought comments on this ICR pursuant to 5 CFR 1320.8(d). EPA received no comments. EPA has established a public docket for this ICR under Docket ID No. OECA– 2004–0018, which is available for public viewing at the Enforcement and Compliance Docket and Information Center in the EPA Docket Center (EPA/ DC), EPA West, Room B102, 1301 Constitution Avenue, NW., Washington, DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Reading Room is (202) 566–1744, and the telephone number for the Enforcement and Compliance Docket and Information Center Docket is: (202) 566–1752. An electronic version of the public docket is available through EPA Dockets (EDOCKET) at https://www.epa.gov/edocket. Use EDOCKET to submit or view public comments, access the index listing of the contents of the public docket, and to access those documents in the public docket that are available electronically. When in the system, select ‘‘search,’’ then key in the docket ID number identified above. Any comments related to this ICR should be submitted to EPA and OMB within 30 days of this notice. EPA’s policy is that public comments, whether submitted electronically or in paper, will be made available for public viewing in EDOCKET as EPA receives them and without change, unless the comment contains copyrighted material, Confidential Business Information (CBI), or other information whose public disclosure is restricted by statute. When EPA identifies a comment containing copyrighted material, EPA will provide a reference to that material in the version of the comment that is placed in EDOCKET. The entire printed comment, including the copyrighted material, will be available in the public docket. Although identified as an item in the official docket, information claimed as CBI, or whose disclosure is otherwise restricted by statute, is not included in the official public docket, and will not be available for public viewing in E:\FR\FM\03FEN1.SGM 03FEN1

Agencies

[Federal Register Volume 70, Number 22 (Thursday, February 3, 2005)]
[Notices]
[Pages 5639-5640]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-406]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EC05-2-000, et al.]


American Electric Power Service Corporation, et al.; Electric 
Rate and Corporate Filings

January 27, 2005.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. American Electric Power Service Corporation

[Docket No. EC05-2-000]

    Take notice that on January 24, 2005, American Electric Power 
Service Corporation (AEP), on behalf of its affiliate, AEP Texas 
Central Company (TCC), submitted supplemental information regarding its 
October 7, 2004 application for authorization of a disposition of 
jurisdictional facilities.
    Comment Date: 5 p.m. eastern time on February 7, 2005.

2. USGen New England, Inc., Town of Rockingham, Vermont, Bellows Falls 
Power Company, LLC

[Docket No. EC05-41-000]

    Take notice that on January 25, 2005, USGen New England, Inc. 
(USGenNE), the Town of Rockingham, Vermont (Town), and Bellows Falls 
Power Company, LLC (BFPC) (collectively, Applicants) filed with the 
Federal Energy Regulatory Commission an application pursuant to section 
203 of the Federal Power Act for authorization to permit USGenNE to 
transfer to the Town jurisdictional facilities associated with 
USGenNE's approximately 49 MW Bellows Falls hydroelectric generating 
facility and the lease of those facilities from the Town to BFPC.
    Comment Date: 5 p.m. eastern time on February 15, 2005.

3. Idaho Power Company

[Docket No. ER97-1481-007]

    Take notice that on January 19, 2005, Idaho Power Company (Idaho 
Power) submitted its response to the Commission's deficiency letter 
issued December 20, 2004 requesting additional information regarding 
Idaho Power's September 27, 2004 filing in Docket No. ER97-1481-004, as 
amended on October 8, 2004 in ER97-1481-005.
    Idaho Power Company states that copies of the filing were served on 
parties on the official service list in Docket No. ER97-1481.
    Comment Date: 5 p.m. eastern time on February 9, 2005.

4. PJM Interconnection, L.L.C.

[Docket No. ER03-1101-007]

    Take notice that on January 19, 2005, PJM Interconnection, L.L.C. 
(PJM), submitted a compliance filing pursuant to the Commission's Order 
issued December 20, 2004 order in Docket No. ER03-1101-001, et al., 109 
FERC ] 61,286 (2004). d collateral. PJM requests an effective date of 
March 1, 2005.
    PJM states that copies of this filing have been served on all PJM 
members and the utility regulatory commissions in the PJM region.
    Comment Date: 5 p.m. eastern time on February 9, 2005.

5.Jersey Central Power & Light Company

[Docket No. ER05-64-001]

    Take notice that on January 19, 2005, Jersey Central Power & Light 
Company, a FirstEnergy Company, (Jersey Central) submitted an amendment 
to its October 22, 2004 filing in Docket No. ER05-64-000, pursuant to 
the Commission's deficiency letter issued December 20, 2004.
    Jersey Central states that copies of the filing have been served on 
regulators in New Jersey, Atlantic City Electric Company, PJM and FERC 
Staff.
    Comment Date: 5 p.m. eastern time on February 9, 2005.

6.PJM Interconnection, L.L.C.

[Docket No. ER05-85-004]

    Take notice that on January 19, 2005, PJM Interconnection, L.L.C. 
(PJM), and Duquesne Light Company (Duquesne Light), submitted a 
compliance filing pursuant to the Commission's Order issued December 
20, 2004 in Docket No. ER05-85-000, et al., 109 FERC ] 61,299.
    PJM and Duquesne Light state that copies of this filing were served 
upon all persons on the service list in Docket No. ER05-85.
    Comment Date: 5 p.m. eastern time on February 9, 2004.

7. Kansas City Power & Light Company

[Docket No. ER05-177-004]

    Take notice that on January 19, 2005, Kansas City Power & Light 
Company

[[Page 5640]]

(KCPL) submitted a compliance filing pursuant to the Commission's order 
issued December 28, 2004 in Docket No. ER05-177-000. KCPL states that 
this filing pertains to service schedules for the City of Higginsville, 
Missouri.
    KCPL states that copies of the filing were served upon the City of 
Higginsville, Missouri as well as the Missouri Public Service 
Commission and the Kansas State Corporation Commission.
    Comment Date: 5 p.m. eastern time on February 9, 2005.

8. Kansas City Power & Light Company

[Docket No. ER05-177-005]

    Take notice that on January 19, 2005, Kansas City Power & Light 
Company (KCPL) submitted a compliance filing pursuant to the 
Commission's order issued December 28, 2004 in Docket No. ER05-177-000. 
KCPL states that this filing pertains to service schedules for the City 
of Garnett, Kansas.
    KCPL states that copies of the filing were served upon the City of 
Garnett, Kansas as well as the Missouri Public Service Commission and 
the Kansas State Corporation Commission.
    Comment Date: 5 p.m. eastern time on February 9, 2005.

Standard Paragraph

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all parties to this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Linda Mitry,
Deputy Secretary.
[FR Doc. E5-406 Filed 2-2-05; 8:45 am]