Elsinore Municipal Water District and the Nevada Hydro Company, Inc.; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests, 5437-5438 [E5-377]
Download as PDF
Federal Register / Vol. 70, No. 21 / Wednesday, February 2, 2005 / Notices
these instructions to ensure that your
comments are received in time and
properly recorded:
• Send an original and two copies of
your letter to: Magalie R. Salas,
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.;
Room 1A, Washington, DC 20426.
• Label one copy of the comments for
the attention of Gas Branch 1.
• Reference Docket No. CP02–378–
002.
• Mail your comments so that they
will be received in Washington, DC on
or before February 25, 2005.
The Commission encourages
electronic filing of comments. See 18
Code of Federal Regulations
385.2001(a)(1)(iii) and the instructions
on the Commission’s Internet Web site
at https://www.ferc.gov under the
‘‘eFiling’’ link and the link to the User’s
Guide. Prepare your submission in the
same manner as you would if filing on
paper and save it to a file on your hard
drive. Before you can file comments you
will need to create an account by
clicking on ‘‘Login to File’’ and then
‘‘New User Account.’’ You will be asked
to select the type of filing you are
making. This filing is considered a
‘‘Comment on Filing.’’
We may mail the EA for comment. If
you are interested in receiving it, please
return the Information Request
(Appendix 3). If you do not return the
Information Request, you will be taken
off the mailing list.
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an official party to the
proceeding known as an ‘‘intervenor.’’
Intervenors play a more formal role in
the process. Among other things,
intervenors have the right to receive
copies of case-related Commission
documents and filings by other
intervenors. Likewise, each intervenor
must send one electronic copy (using
the Commission’s eFiling system) or 14
paper copies of its filings to the
Secretary of the Commission and must
send a copy of its filings to all other
parties on the Commission’s service list
for this proceeding. If you want to
become an intervenor you must file a
motion to intervene according to rule
214 of the Commission(s Rules of
Practice and Procedure (18 CFR
385.214) (see Appendix 2). 3 Only
intervenors have the right to seek
rehearing of the Commission’s decision.
Affected landowners and parties with
environmental concerns may be granted
3 Interventions
may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
VerDate jul<14>2003
14:19 Feb 01, 2005
Jkt 205001
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208-FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the ‘‘eLibrary’’ link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202)502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Magalie R. Salas,
Secretary.
[FR Doc. E5–394 Filed 2–1–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 11858–002]
Elsinore Municipal Water District and
the Nevada Hydro Company, Inc.;
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene and Protests
January 25, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
5437
a. Type of Application: Major
unconstructed project.
b. Project No.: 11858–002.
c. Date Filed: February 2, 2004.
d. Applicant: Elsinore Municipal
Water District and the Nevada Hydro
Company, Inc.
e. Name of Project: Lake Elsinore
Advanced Pumped Storage Project.
f. Location: On Lake Elsinore and San
Juan Creek, in the Town of Lake
Elsinore, Riverside County, California.
The project would occupy federal lands,
including lands managed by the Forest
Service (Cleveland National Forest),
Bureau of Land Management, and the
Department of Defense (Camp
Pendleton).
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Rexford Wait,
The Nevada Hydro Company, 2416
Cades Way, Vista, California 92083,
(760) 599–0086.
i. FERC Contact: Jim Fargo at (202)
502–6095; e-mail james.fargo@ferc.gov.
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, motions to intervene and
protests may be filed electronically via
the Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application is not ready for
environmental analysis at this time.
l. The proposed project would consist
of: (1) A new upper reservoir (Morrell
Canyon) having a 180-foot-high main
dam and a gross storage volume of 5,750
feet, at a normal reservoir surface
elevation of 2,880 feet above mean sea
level (msl); (2) a powerhouse with two
reversible pump-turbine units with a
total installed capacity of 500
megawatts; (3) the existing Lake
Elsinore to be used as a lower reservoir;
(4) about 30 miles of 500 kV
transmission line connecting the project
to an existing transmission line owned
by Southern California Edison located
E:\FR\FM\02FEN1.SGM
02FEN1
5438
Federal Register / Vol. 70, No. 21 / Wednesday, February 2, 2005 / Notices
north of the proposed project and to an
existing San Diego Gas & Electric
Company transmission line located to
the south.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified deadline date for the
particular application, a competing
development application, or a notice of
intent to file such an application.
Submission of a timely notice of intent
allows an interested person to file the
competing development application no
later than 120 days after the specified
deadline date for the particular
application. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
When the application is ready for
environmental analysis, the
Commission will issue a public notice
requesting comments,
recommendations, terms and
conditions, or prescriptions.
VerDate jul<14>2003
14:19 Feb 01, 2005
Jkt 205001
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION,’’ or ‘‘COMPETING
APPLICATION;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
Magalie R. Salas,
Secretary.
[FR Doc. E5–377 Filed 2–1–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Non-Project
Use of Project Lands and Waters and
Soliciting Comments, Motions To
Intervene, and Protests
January 25, 2005.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-Project Use
Of Project Lands And Waters.
b. Project No: 2232–480.
c. Date Filed: December 16, 2004.
d. Applicant: Duke Power, a division
of Duke Energy Corporation.
e. Name of Project: Catawba-Wateree
Project.
f. Location: This project is located on
the Catawba and Wateree Rivers, in nine
counties in North Carolina (Burke,
Alexander, McDowell, Iredell, Caldwell,
Lincoln, Catawba, Gaston, and
Mecklenburg Counties) and five
counties in South Carolina (York,
Chester, Lancaster, Fairfield and
Kershaw Counties). This project does
not occupy any tribal or Federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a) 825(r) and § § 799
and 801.
h. Applicant Contact: Mr. Joe Hall,
Lake Management Representative; Duke
Energy Corporation; PO Box 1006;
Charlotte, NC; 28201–1006; 704–382–
8576.
i. FERC Contact: Any questions on
this notice should be addressed to Brian
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
Romanek at (202) 502–6175 or by email: Brian.Romanek@ferc.gov.
j. Deadline for filing comments and or
motions: February 28, 2005.
All documents (original and eight
copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington DC 20426.
Please include the project number (P–
2232–480) on any comments or motions
filed. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages efilings.
k. Description of Request: Duke
Power, licensee for the Catawba-Wateree
Hydroelectric Project, has requested
Commission authorization to lease to
The Sanctuary At Lake Wylie, LLC and
The Sanctuary Property Owners
Association (The Sanctuary) 0.416 acres
of project lands for a Commercial
Residential Marina at the Sanctuary.
The Sanctuary is located in
Mecklenburg County off of NC 49 South.
The marina would consist of one cluster
dock with ten boat slips, one fishing
pier, 20,700 feet of shoreline
stabilization, and an irrigation intake
with a maximum pumping capacity of
150,000 gallons per day. The pump
would run an average of three hours per
day, three to four times per week, using
27,000 gallons per day. No dredging
would be required.
l. Location of the Application: This
filing is available for review at the
Commission or may be viewed on the
Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
E:\FR\FM\02FEN1.SGM
02FEN1
Agencies
[Federal Register Volume 70, Number 21 (Wednesday, February 2, 2005)]
[Notices]
[Pages 5437-5438]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-377]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 11858-002]
Elsinore Municipal Water District and the Nevada Hydro Company,
Inc.; Notice of Application Accepted for Filing and Soliciting Motions
To Intervene and Protests
January 25, 2005.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Major unconstructed project.
b. Project No.: 11858-002.
c. Date Filed: February 2, 2004.
d. Applicant: Elsinore Municipal Water District and the Nevada
Hydro Company, Inc.
e. Name of Project: Lake Elsinore Advanced Pumped Storage Project.
f. Location: On Lake Elsinore and San Juan Creek, in the Town of
Lake Elsinore, Riverside County, California. The project would occupy
federal lands, including lands managed by the Forest Service (Cleveland
National Forest), Bureau of Land Management, and the Department of
Defense (Camp Pendleton).
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Rexford Wait, The Nevada Hydro Company, 2416
Cades Way, Vista, California 92083, (760) 599-0086.
i. FERC Contact: Jim Fargo at (202) 502-6095; e-mail
james.fargo@ferc.gov.
j. Deadline for filing motions to intervene and protests: 60 days
from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, motions to intervene
and protests may be filed electronically via the Internet in lieu of
paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site (https://www.ferc.gov) under the ``e-Filing''
link.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application is not ready for environmental analysis at this
time.
l. The proposed project would consist of: (1) A new upper reservoir
(Morrell Canyon) having a 180-foot-high main dam and a gross storage
volume of 5,750 feet, at a normal reservoir surface elevation of 2,880
feet above mean sea level (msl); (2) a powerhouse with two reversible
pump-turbine units with a total installed capacity of 500 megawatts;
(3) the existing Lake Elsinore to be used as a lower reservoir; (4)
about 30 miles of 500 kV transmission line connecting the project to an
existing transmission line owned by Southern California Edison located
[[Page 5438]]
north of the proposed project and to an existing San Diego Gas &
Electric Company transmission line located to the south.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Any qualified applicant desiring to file a competing application
must submit to the Commission, on or before the specified deadline date
for the particular application, a competing development application, or
a notice of intent to file such an application. Submission of a timely
notice of intent allows an interested person to file the competing
development application no later than 120 days after the specified
deadline date for the particular application. Applications for
preliminary permits will not be accepted in response to this notice.
A notice of intent must specify the exact name, business address,
and telephone number of the prospective applicant, and must include an
unequivocal statement of intent to submit a development application. A
notice of intent must be served on the applicant(s) named in this
public notice.
Anyone may submit a protest or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210, 385.211, and 385.214. In determining the appropriate action to
take, the Commission will consider all protests filed, but only those
who file a motion to intervene in accordance with the Commission's
Rules may become a party to the proceeding. Any protests or motions to
intervene must be received on or before the specified deadline date for
the particular application.
When the application is ready for environmental analysis, the
Commission will issue a public notice requesting comments,
recommendations, terms and conditions, or prescriptions.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION,'' or ``COMPETING APPLICATION;'' (2) set forth in
the heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person protesting or intervening;
and (4) otherwise comply with the requirements of 18 CFR 385.2001
through 385.2005. Agencies may obtain copies of the application
directly from the applicant. A copy of any protest or motion to
intervene must be served upon each representative of the applicant
specified in the particular application.
Magalie R. Salas,
Secretary.
[FR Doc. E5-377 Filed 2-1-05; 8:45 am]
BILLING CODE 6717-01-P