TransAlta Centralia Generation LLC, et al.; Electric Rate and Corporate Filings, 4834-4836 [E5-354]
Download as PDF
4834
Federal Register / Vol. 70, No. 19 / Monday, January 31, 2005 / Notices
Operation Agreement between FPL and
Seminole Electric Cooperative, Inc. FPL
requests an effective date of January 1,
2005.
Comment Date: 5 p.m. Eastern Time
on February 3, 2005.
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
4. California Independent System
Operator Corporation
BILLING CODE 6717–01–P
[Docket No. ER05–449–000]
DEPARTMENT OF ENERGY
Take notice that on January 13, 2005,
the California Independent System
Operator Corporation (ISO) filed an
amendment (Amendment No. 4) to
revise the Metered Sybsystem
Agreement between the ISO and Silicon
Valley Power (SVP). The ISO requests
an effective date of February 21, 2005.
The ISO states that the non-privileged
elements of this filing have been served
on SVP, the California Public Utilities
Commission, and all entities on the
official service lists for Docket Nos.
ER02–2321–000, ER04–185–000, ER04–
940 and ER05–81–000.
Comment Date: 5 p.m. Eastern Time
on February 3, 2005.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
VerDate jul<14>2003
16:59 Jan 28, 2005
Jkt 205001
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–349 Filed 1–28–05; 8:45 am]
Federal Energy Regulatory
Commission
[Docket No. EG05–31–000, et al.]
October 25, 2004 in Docket No. ER98–
2329–003, as supplemented on
November 9, 2005 in Docket No. ER98–
2329–004.
Central Vermont states that a copy of
the filing was served upon all parties to
the Commission’s official service list in
Docket Nos. ER98–2329, the Vermont
Public Service Board, and the New
Hampshire Public Utilities Commission.
Comment Date: 5 p.m. Eastern Time
on February 3, 2005.
4. Hermiston Generating Company, L.P.
[Docket No. ER01–2159–005]
TransAlta Centralia Generation LLC, et
al.; Electric Rate and Corporate Filings
January 24, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. TransAlta Centralia Generation LLC
[Docket No. EG05–31–000]
On January 14, 2005, TransAlta
Centralia Generation LLC (TACG) filed
with the Commission an application for
redetermination of exempt wholesale
generator (EWG) status pursuant to part
365 of the Commission’s regulations.
TACG states that copies of the
application were sent to the Securities
and Exchange Commission and the
Oregon Public Utility Commission, the
Washington Utilities and Transportation
Commission, the California Public
Utilities Commission, the Wyoming
Public Service Commission, the Idaho
Public Utility Commission, and the
Utah Public Service Commission.
Comment Date: 5 p.m. Eastern Time
on February 4, 2005.
2. Florida Power Corporation
[Docket No. ER97–2846–004]
Take notice that on December 23,
2004, Florida Power Corporation
submitted a compliance filing pursuant
to the Commission’s Orders issued May
13, 2004 in Docket No. ER02–1406–001,
et al., Arcadia Power Partners, LLC, 107
FERC ¶ 61,168 and July 8, 2004 in
Docket No. ER96–2495–018, et al., AEP
Power Marketing, Inc., 108 FERC
¶ 61,026.
Comment Date: 5 p.m. Eastern Time
on February 3, 2005.
3. Central Vermont Public Service
Corporation
[Docket No. ER98–2329–005]
Take notice that on January 13, 2005,
Central Vermont Public Service
Corporation (Central Vermont) tendered
for filing information and data in
support of its request for renewal of
market-based rate authority filed on
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Take notice that on January 13, 2005,
Hermiston Generating Company, L.P.
(Hermiston), submitted for filing a
notice of a change in facts with respect
to its ownership that represents a
departure from the characteristics the
Commission relied upon in granting
market-based rate authority to
Hermiston.
Comment Date: 5 p.m. Eastern Time
on February 3, 2005.
5. CalPeak Power—Midway LLC,
CalPeak Power—Panoche LLC, CalPeak
Power—Vaca Dixon LLC, CalPeak
Power—El Cajon LLC, CalPeak Power—
Enterprise LLC, CalPeak Power—
Border LLC
[Docket Nos. ER01–2537–001, ER01–2543–
001, ER01–2544–001, ER01–2545–001,
ER01–2546–001, ER01–2547–001]
Take notice that on January 13, 2005,
CalPeak Power—Midway LLC, CalPeak
Power—Panoche LLC, CalPeak Power—
Vaca Dixon LLC, CalPeak Power—El
Cajon LLC, CalPeak Power—Enterprise
LLC, and CalPeak Power—Border LLC
(collectively, the CalPeak Entities)
submitted a triennial updated power
analysis and revised tariff sheets to
incorporate the Commission’s market
behavior rules adopted in Investigation
of Terms and Conditions of Public
Utility Market-Based Rate
Authorizations, 105 FERC ¶ 61,218
(2003), order on reh’g, 107 FERC
¶ 61,175 (2004).
The CalPeak Entities state that copies
of the filing were served upon parties on
the official service lists in abovecaptioned proceedings.
Comment Date: 5 p.m. Eastern Time
on February 3, 2005.
6. HC Power Marketing L.L.C.
[Docket No. ER02–388–003]
Take notice that on January 13, 2005,
HC Power Marketing (HCPM) submitted
for filing a triennial updated market
analysis.
HCPM states that copies of the filing
were served upon the parties listed on
the official service list compiled by the
Secretary in Docket No. ER02–388.
E:\FR\FM\31JAN1.SGM
31JAN1
Federal Register / Vol. 70, No. 19 / Monday, January 31, 2005 / Notices
Comment Date: 5 p.m. Eastern Time
on February 3, 2005.
7. Southern California Edison Company
[Docket No. ER05–170–001]
Take notice that on January 13, 2005,
Southern California Edison Company
(SCE) submitted the Devil Canyon
Service Agreement for Wholesale
Distribution Service, Service Agreement
No. 126, under FERC Electric Tariff,
First Revised Volume No. 5 as a
supplement to its November 2, 2004
filing under Docket No. ER05–170–000.
SCE states that copies of the filing
were served upon those persons whose
names appear on the official service list
compiled by the Commission in this
Docket No. ER05–170–000.
Comment Date: 5 p.m. Eastern Time
on January 31, 2005.
official service list in Docket No. ER05–
197 and the Virginia State Corporation
Commission.
Comment Date: 5 p.m. Eastern Time
on February 3, 2005.
11. JPMorgan Chase Bank, N.A.
[Docket No. ER05–283–001]
Take notice that on January 13, 2005,
JPMorgan Chase Bank, N.A. (JPMCB)
filed an amendment to its December 2,
2004 filing in Docket No. ER05–283–000
for acceptance of JPMCB’s Rate
Schedule FERC No. 1; the granting of
certain blanket approvals, including the
authority to sell electricity at marketbased rates; and the waiver of certain
Commission regulations.
Comment Date: 5 p.m. Eastern Time
on February 3, 2005.
12. Avista Energy, Inc.
8. Kansas City Power & Light Company
[Docket No. ER05–313–001]
[Docket No. ER05–177–001]
Take notice that on January 13, 2005,
Avista Energy, Inc. (Avista Energy) filed
proposed revisions to its First Revised
Rate Schedule FERC No. 1 originally
filed on December 7, 2004 in Docket No.
ER05–313–000.
Comment Date: 5 p.m. Eastern Time
on February 3, 2005.
Take notice that on January 14, 2005,
Kansas City Power & Light Company
(KCPL) submitted a compliance filing
pursuant to the Commission’s Order
issued December 28, 2004 in Docket No.
ER05–177–000. KCPL states that this
filing pertains to service schedules for
the City of Baldwin City, Kansas.
KCPL states that copies of the filing
were served on the City of Baldwin City,
Kansas as well as the Missouri Public
Service Commission and the Kansas
State Corporation Commission.
Comment Date: 5 p.m. Eastern Time
on February 4, 2005.
9. Carolina Power & Light Company
[Docket No. ER05–183–000]
Take notice that on January 14, 2005,
Carolina Power & Light Company filed
a notice of withdrawal of its November
4, 2004 filing in Docket No. ER05–183–
000 regarding a Generator Balancing
Service Schedule under the Open
Access Transmission Tariffs of CP&L
and Florida Power Corporation.
Comment Date: 5 p.m. Eastern Time
on February 4, 2005.
10. Virginia Electric and Power
Company
13. American Electric Power Service
Corporation
[Docket No. ER05–450–000]
Take notice that on January 14, 2005,
the American Electric Power Service
Corporation (AEPSC), tendered for filing
an Interconnection and Local Delivery
Service Agreement between AEPSC and
the City of Dowagiac, Michigan,
designated as Substitute Service
Agreement No. 532 under the Operating
Companies of the American Electric
Power System FERC Electric Tariff,
Third Revised Volume No. 6. AEPSC
requests an effective date of January 1,
2005.
AEPSC states that a copy of the filing
was served upon the Party and the
Michigan Public Service Commission.
Comment Date: 5 p.m. Eastern Time
on February 4, 2005.
14. Wisconsin Electric Power Company
[Docket No. ER05–197–001]
[Docket No. ER05–451–000]
Take notice that on January 13, 2005,
Virginia Electric and Power Company
(VEPCO) submitted for filing a response
to the deficiency letter issued on
December 15, 2004 regarding VEPCO’s
November 8, 2004 filing in Docket No.
ER005–197–000 of an executed
Standard Large Generator
Interconnection Agreement with CPV
Warren, LLC. VEPCO requests an
effective date of November 9, 2004.
VEPCO states that copies of the filing
were served upon the Commission’s
Take notice that on January 14, 2005,
Wisconsin Electric Power Company
(Wisconsin Electric) submitted for filing
revised Exhibit No. 4.4 of two
Generation-Transmission Must Run
Agreements between Wisconsin Electric
and American Transmission Company,
LLC (ATCLLC) to reflect updated inputs
to the formula rate applicable to the sale
of must run energy from several
Wisconsin Electric generation units.
Wisconsin Electric requests an effective
date of January 1, 2005.
VerDate jul<14>2003
16:59 Jan 28, 2005
Jkt 205001
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
4835
Wisconsin Electric states that copies
of this filing were served upon ATCLLC,
the Michigan Public Service
Commission and the Public Service
Commission of Wisconsin.
Comment Date: 5 p.m. Eastern Time
on February 4, 2005.
15. Public Service Company of New
Mexico
[Docket No. ER05–452–000]
Take notice that on January 14, 2005,
Public Service Company of New Mexico
(PNM) submitted for filing an executed
service agreement for firm point-topoint transmission service and ancillary
services between PNM Transmission
Development and Contracts and PNM
Wholesale Marketing, under the terms
of PNM’s open access transmission
tariff. PNM requests an effective date of
January 1, 2005.
PNM states that copies of the filing
have been sent to PNM Wholesale
Marketing, PNM Transmission
Development and Contracts, the New
Mexico Public Regulation Commission
and the New Mexico Attorney General.
Comment Date: 5 p.m. Eastern Time
on February 4, 2005.
16. Wisconsin River Power Company
[Docket No. ER05–453–000]
Take notice that on January 14, 2005,
Wisconsin River Power Company
(Wisconsin River) filed a market-based
rate tariff for sales of energy and
capacity into the Midwest Independent
Transmission System Operator, Inc.
(MISO) and the PJM Interconnection,
L.L.C. (PJM) centralized markets and
minor revisions to two power sales
agreements to facilitate such sales.
Wisconsin River requests an effective
date of February 28, 2005.
Wisconsin River states that copies of
the filing were served upon PJM, MISO,
and the Michigan Public Service
Commission.
Comment Date: 5 p.m. Eastern Time
on February 4, 2005.
17. Bear Swamp Power Company LLC
[Docket No. ER05–454–000]
Take notice that on January 14, 2005,
Bear Swamp Power Company LLC (Bear
Swamp) submitted for filing, pursuant
to section 205 of the Federal Power Act
and Part 35 of the Commission’s
regulations an application for marketbased rate authorization to sell energy,
capacity, and ancillary services, and
reassign transmission capacity and
resell firm transmission rights. Bear
Swamp also requests the waivers and
exemptions from regulations typically
granted to the holders of market-based
rate authorization. Bear Swamp requests
an effective date of March 15, 2005.
E:\FR\FM\31JAN1.SGM
31JAN1
4836
Federal Register / Vol. 70, No. 19 / Monday, January 31, 2005 / Notices
Comment Date: 5 p.m. Eastern Time
on February 4, 2005.
Comment Date: 5 p.m. Eastern Time
on February 4, 2005.
18. Bellows Falls Power Company, LLC
21. Wisconsin Electric Power Company
[Docket No. ER05–455–000]
[Docket No. ER05–458–000]
Take notice that on January 14, 2005,
Bellows Falls Power Company, LLC
(Bellows Falls) submitted for filing,
pursuant to section 205 of the Federal
Power Act and part 35 of the
Commission’s regulations an
application for market-based rate
authorization to sell energy, capacity,
and ancillary services, and reassign
transmission capacity and resell firm
transmission rights. Bellow Falls also
requests the waivers and exemptions
from regulations typically granted to the
holders of market-based rate
authorization. Bellows Falls requests an
effective date as of the date of closing on
the lease of the Bellows Falls
Hydroelectric Project which is expected
to occur by the end of the first quarter
of 2005.
Comment Date: 5 p.m. Eastern Time
on February 4, 2005.
Take notice that on January 14, 2005,
Wisconsin Electric Power Company
(Wisconsin Electric) submitted
proposed amendments to Wisconsin
Electric’s Electric Tariff, Second Revised
Volume No. 2. Wisconsin Electric states
that the amendments would revise
Service Schedule F—Dynamic
Regulation and Frequency Response
Service to broaden its applicability to
new generators locating within the
control area historically (prior to
January 1, 2001) operated by Wisconsin
Electric Power Company and the
historical service territory of Edison
Sault Electric Company (Wisconsin
Electric Control Area). Wisconsin
Electric requests an effective date of
March 15, 2005.
Wisconsin Electric states that copies
of the filing were served on its CST
customers and on the state regulatory
bodies in Wisconsin and Michigan.
Comment Date: 5 p.m. Eastern Time
on February 4, 2005.
19. PJM Interconnection, L.L.C.
[Docket No. ER05–456–000]
Take notice that on January 14, 2005,
PJM Interconnection, L.L.C. (PJM),
submitted for filing an executed
interconnection service agreement (ISA)
among PJM, American Municipal
Power-Ohio, Inc. as agent for Ohio
Municipal Electric Generation Joint
Venture 5, and American Electric Power
Service Corporation as agent for Ohio
Power Company doing business as AEP,
and a notice of cancellation of an
interim service agreement that has been
superseded. PJM requests an effective
date of December 16, 2004 for the ISA.
PJM states that copies of this filing
were served upon the parties to the
agreement and the state regulatory
commissions within the PJM region.
Comment Date: 5 p.m. Eastern Time
on February 4, 2005.
20. Duquesne Light Company
[Docket No. ER05–457–000]
Take notice that on January 14, 2005,
Duquesne Light Company (Duquesne)
submitted an amendment to an
Interchange Agreement between
affiliates of FirstEnergy Corp.
(FirstEnergy) and Duquesne to reflect
the disconnection and retirement from
operation of one of the 69kV
transmission lines that interconnects the
transmission systems of FirstEnergy and
Duquesne.
Duquesne states that copies of the
filing were served on the state
regulatory commissions with
jurisdiction over Duquesne and
FirstEnergy.
VerDate jul<14>2003
16:59 Jan 28, 2005
Jkt 205001
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all parties to this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5–354 Filed 1–28–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 287–009—IL]
Midwest Hydro Inc.; Notice of
Availability of Environmental
Assessment
January 24, 2005.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380 (Order No. 486, 52 FR 47879), the
Office of Energy Projects has reviewed
the application for a new license for the
Dayton Hydroelectric Project, located on
the Fox River, in La Salle County,
Illinois, and has prepared an
Environmental Assessment (EA). In the
EA, Commission staff analyze the
potential environmental effects of
relicensing the project and conclude
that issuing a new license for the
project, with appropriate environmental
measures, would not constitute a major
federal action that would significantly
affect the quality of the human
environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
Any comments should be filed within
30 days from the issuance date of this
notice, and should be addressed to the
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Room 1–A, Washington, DC 20426.
Please affix ‘‘Dayton Project No. 287’’ to
all comments. Comments may be filed
electronically via Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
E:\FR\FM\31JAN1.SGM
31JAN1
Agencies
[Federal Register Volume 70, Number 19 (Monday, January 31, 2005)]
[Notices]
[Pages 4834-4836]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-354]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG05-31-000, et al.]
TransAlta Centralia Generation LLC, et al.; Electric Rate and
Corporate Filings
January 24, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. TransAlta Centralia Generation LLC
[Docket No. EG05-31-000]
On January 14, 2005, TransAlta Centralia Generation LLC (TACG)
filed with the Commission an application for redetermination of exempt
wholesale generator (EWG) status pursuant to part 365 of the
Commission's regulations.
TACG states that copies of the application were sent to the
Securities and Exchange Commission and the Oregon Public Utility
Commission, the Washington Utilities and Transportation Commission, the
California Public Utilities Commission, the Wyoming Public Service
Commission, the Idaho Public Utility Commission, and the Utah Public
Service Commission.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
2. Florida Power Corporation
[Docket No. ER97-2846-004]
Take notice that on December 23, 2004, Florida Power Corporation
submitted a compliance filing pursuant to the Commission's Orders
issued May 13, 2004 in Docket No. ER02-1406-001, et al., Arcadia Power
Partners, LLC, 107 FERC ] 61,168 and July 8, 2004 in Docket No. ER96-
2495-018, et al., AEP Power Marketing, Inc., 108 FERC ] 61,026.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
3. Central Vermont Public Service Corporation
[Docket No. ER98-2329-005]
Take notice that on January 13, 2005, Central Vermont Public
Service Corporation (Central Vermont) tendered for filing information
and data in support of its request for renewal of market-based rate
authority filed on October 25, 2004 in Docket No. ER98-2329-003, as
supplemented on November 9, 2005 in Docket No. ER98-2329-004.
Central Vermont states that a copy of the filing was served upon
all parties to the Commission's official service list in Docket Nos.
ER98-2329, the Vermont Public Service Board, and the New Hampshire
Public Utilities Commission.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
4. Hermiston Generating Company, L.P.
[Docket No. ER01-2159-005]
Take notice that on January 13, 2005, Hermiston Generating Company,
L.P. (Hermiston), submitted for filing a notice of a change in facts
with respect to its ownership that represents a departure from the
characteristics the Commission relied upon in granting market-based
rate authority to Hermiston.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
5. CalPeak Power--Midway LLC, CalPeak Power--Panoche LLC, CalPeak
Power--Vaca Dixon LLC, CalPeak Power--El Cajon LLC, CalPeak Power--
Enterprise LLC, CalPeak Power--Border LLC
[Docket Nos. ER01-2537-001, ER01-2543-001, ER01-2544-001, ER01-2545-
001, ER01-2546-001, ER01-2547-001]
Take notice that on January 13, 2005, CalPeak Power--Midway LLC,
CalPeak Power--Panoche LLC, CalPeak Power--Vaca Dixon LLC, CalPeak
Power--El Cajon LLC, CalPeak Power--Enterprise LLC, and CalPeak Power--
Border LLC (collectively, the CalPeak Entities) submitted a triennial
updated power analysis and revised tariff sheets to incorporate the
Commission's market behavior rules adopted in Investigation of Terms
and Conditions of Public Utility Market-Based Rate Authorizations, 105
FERC ] 61,218 (2003), order on reh'g, 107 FERC ] 61,175 (2004).
The CalPeak Entities state that copies of the filing were served
upon parties on the official service lists in above-captioned
proceedings.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
6. HC Power Marketing L.L.C.
[Docket No. ER02-388-003]
Take notice that on January 13, 2005, HC Power Marketing (HCPM)
submitted for filing a triennial updated market analysis.
HCPM states that copies of the filing were served upon the parties
listed on the official service list compiled by the Secretary in Docket
No. ER02-388.
[[Page 4835]]
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
7. Southern California Edison Company
[Docket No. ER05-170-001]
Take notice that on January 13, 2005, Southern California Edison
Company (SCE) submitted the Devil Canyon Service Agreement for
Wholesale Distribution Service, Service Agreement No. 126, under FERC
Electric Tariff, First Revised Volume No. 5 as a supplement to its
November 2, 2004 filing under Docket No. ER05-170-000.
SCE states that copies of the filing were served upon those persons
whose names appear on the official service list compiled by the
Commission in this Docket No. ER05-170-000.
Comment Date: 5 p.m. Eastern Time on January 31, 2005.
8. Kansas City Power & Light Company
[Docket No. ER05-177-001]
Take notice that on January 14, 2005, Kansas City Power & Light
Company (KCPL) submitted a compliance filing pursuant to the
Commission's Order issued December 28, 2004 in Docket No. ER05-177-000.
KCPL states that this filing pertains to service schedules for the City
of Baldwin City, Kansas.
KCPL states that copies of the filing were served on the City of
Baldwin City, Kansas as well as the Missouri Public Service Commission
and the Kansas State Corporation Commission.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
9. Carolina Power & Light Company
[Docket No. ER05-183-000]
Take notice that on January 14, 2005, Carolina Power & Light
Company filed a notice of withdrawal of its November 4, 2004 filing in
Docket No. ER05-183-000 regarding a Generator Balancing Service
Schedule under the Open Access Transmission Tariffs of CP&L and Florida
Power Corporation.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
10. Virginia Electric and Power Company
[Docket No. ER05-197-001]
Take notice that on January 13, 2005, Virginia Electric and Power
Company (VEPCO) submitted for filing a response to the deficiency
letter issued on December 15, 2004 regarding VEPCO's November 8, 2004
filing in Docket No. ER005-197-000 of an executed Standard Large
Generator Interconnection Agreement with CPV Warren, LLC. VEPCO
requests an effective date of November 9, 2004.
VEPCO states that copies of the filing were served upon the
Commission's official service list in Docket No. ER05-197 and the
Virginia State Corporation Commission.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
11. JPMorgan Chase Bank, N.A.
[Docket No. ER05-283-001]
Take notice that on January 13, 2005, JPMorgan Chase Bank, N.A.
(JPMCB) filed an amendment to its December 2, 2004 filing in Docket No.
ER05-283-000 for acceptance of JPMCB's Rate Schedule FERC No. 1; the
granting of certain blanket approvals, including the authority to sell
electricity at market-based rates; and the waiver of certain Commission
regulations.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
12. Avista Energy, Inc.
[Docket No. ER05-313-001]
Take notice that on January 13, 2005, Avista Energy, Inc. (Avista
Energy) filed proposed revisions to its First Revised Rate Schedule
FERC No. 1 originally filed on December 7, 2004 in Docket No. ER05-313-
000.
Comment Date: 5 p.m. Eastern Time on February 3, 2005.
13. American Electric Power Service Corporation
[Docket No. ER05-450-000]
Take notice that on January 14, 2005, the American Electric Power
Service Corporation (AEPSC), tendered for filing an Interconnection and
Local Delivery Service Agreement between AEPSC and the City of
Dowagiac, Michigan, designated as Substitute Service Agreement No. 532
under the Operating Companies of the American Electric Power System
FERC Electric Tariff, Third Revised Volume No. 6. AEPSC requests an
effective date of January 1, 2005.
AEPSC states that a copy of the filing was served upon the Party
and the Michigan Public Service Commission.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
14. Wisconsin Electric Power Company
[Docket No. ER05-451-000]
Take notice that on January 14, 2005, Wisconsin Electric Power
Company (Wisconsin Electric) submitted for filing revised Exhibit No.
4.4 of two Generation-Transmission Must Run Agreements between
Wisconsin Electric and American Transmission Company, LLC (ATCLLC) to
reflect updated inputs to the formula rate applicable to the sale of
must run energy from several Wisconsin Electric generation units.
Wisconsin Electric requests an effective date of January 1, 2005.
Wisconsin Electric states that copies of this filing were served
upon ATCLLC, the Michigan Public Service Commission and the Public
Service Commission of Wisconsin.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
15. Public Service Company of New Mexico
[Docket No. ER05-452-000]
Take notice that on January 14, 2005, Public Service Company of New
Mexico (PNM) submitted for filing an executed service agreement for
firm point-to-point transmission service and ancillary services between
PNM Transmission Development and Contracts and PNM Wholesale Marketing,
under the terms of PNM's open access transmission tariff. PNM requests
an effective date of January 1, 2005.
PNM states that copies of the filing have been sent to PNM
Wholesale Marketing, PNM Transmission Development and Contracts, the
New Mexico Public Regulation Commission and the New Mexico Attorney
General.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
16. Wisconsin River Power Company
[Docket No. ER05-453-000]
Take notice that on January 14, 2005, Wisconsin River Power Company
(Wisconsin River) filed a market-based rate tariff for sales of energy
and capacity into the Midwest Independent Transmission System Operator,
Inc. (MISO) and the PJM Interconnection, L.L.C. (PJM) centralized
markets and minor revisions to two power sales agreements to facilitate
such sales. Wisconsin River requests an effective date of February 28,
2005.
Wisconsin River states that copies of the filing were served upon
PJM, MISO, and the Michigan Public Service Commission.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
17. Bear Swamp Power Company LLC
[Docket No. ER05-454-000]
Take notice that on January 14, 2005, Bear Swamp Power Company LLC
(Bear Swamp) submitted for filing, pursuant to section 205 of the
Federal Power Act and Part 35 of the Commission's regulations an
application for market-based rate authorization to sell energy,
capacity, and ancillary services, and reassign transmission capacity
and resell firm transmission rights. Bear Swamp also requests the
waivers and exemptions from regulations typically granted to the
holders of market-based rate authorization. Bear Swamp requests an
effective date of March 15, 2005.
[[Page 4836]]
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
18. Bellows Falls Power Company, LLC
[Docket No. ER05-455-000]
Take notice that on January 14, 2005, Bellows Falls Power Company,
LLC (Bellows Falls) submitted for filing, pursuant to section 205 of
the Federal Power Act and part 35 of the Commission's regulations an
application for market-based rate authorization to sell energy,
capacity, and ancillary services, and reassign transmission capacity
and resell firm transmission rights. Bellow Falls also requests the
waivers and exemptions from regulations typically granted to the
holders of market-based rate authorization. Bellows Falls requests an
effective date as of the date of closing on the lease of the Bellows
Falls Hydroelectric Project which is expected to occur by the end of
the first quarter of 2005.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
19. PJM Interconnection, L.L.C.
[Docket No. ER05-456-000]
Take notice that on January 14, 2005, PJM Interconnection, L.L.C.
(PJM), submitted for filing an executed interconnection service
agreement (ISA) among PJM, American Municipal Power-Ohio, Inc. as agent
for Ohio Municipal Electric Generation Joint Venture 5, and American
Electric Power Service Corporation as agent for Ohio Power Company
doing business as AEP, and a notice of cancellation of an interim
service agreement that has been superseded. PJM requests an effective
date of December 16, 2004 for the ISA.
PJM states that copies of this filing were served upon the parties
to the agreement and the state regulatory commissions within the PJM
region.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
20. Duquesne Light Company
[Docket No. ER05-457-000]
Take notice that on January 14, 2005, Duquesne Light Company
(Duquesne) submitted an amendment to an Interchange Agreement between
affiliates of FirstEnergy Corp. (FirstEnergy) and Duquesne to reflect
the disconnection and retirement from operation of one of the 69kV
transmission lines that interconnects the transmission systems of
FirstEnergy and Duquesne.
Duquesne states that copies of the filing were served on the state
regulatory commissions with jurisdiction over Duquesne and FirstEnergy.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
21. Wisconsin Electric Power Company
[Docket No. ER05-458-000]
Take notice that on January 14, 2005, Wisconsin Electric Power
Company (Wisconsin Electric) submitted proposed amendments to Wisconsin
Electric's Electric Tariff, Second Revised Volume No. 2. Wisconsin
Electric states that the amendments would revise Service Schedule F--
Dynamic Regulation and Frequency Response Service to broaden its
applicability to new generators locating within the control area
historically (prior to January 1, 2001) operated by Wisconsin Electric
Power Company and the historical service territory of Edison Sault
Electric Company (Wisconsin Electric Control Area). Wisconsin Electric
requests an effective date of March 15, 2005.
Wisconsin Electric states that copies of the filing were served on
its CST customers and on the state regulatory bodies in Wisconsin and
Michigan.
Comment Date: 5 p.m. Eastern Time on February 4, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-354 Filed 1-28-05; 8:45 am]
BILLING CODE 6717-01-P