TransAlta Centralia Generation LLC, et al.; Electric Rate and Corporate Filings, 4834-4836 [E5-354]

Download as PDF 4834 Federal Register / Vol. 70, No. 19 / Monday, January 31, 2005 / Notices Operation Agreement between FPL and Seminole Electric Cooperative, Inc. FPL requests an effective date of January 1, 2005. Comment Date: 5 p.m. Eastern Time on February 3, 2005. (866) 208–3676 (toll free). For TTY, call (202) 502–8659. 4. California Independent System Operator Corporation BILLING CODE 6717–01–P [Docket No. ER05–449–000] DEPARTMENT OF ENERGY Take notice that on January 13, 2005, the California Independent System Operator Corporation (ISO) filed an amendment (Amendment No. 4) to revise the Metered Sybsystem Agreement between the ISO and Silicon Valley Power (SVP). The ISO requests an effective date of February 21, 2005. The ISO states that the non-privileged elements of this filing have been served on SVP, the California Public Utilities Commission, and all entities on the official service lists for Docket Nos. ER02–2321–000, ER04–185–000, ER04– 940 and ER05–81–000. Comment Date: 5 p.m. Eastern Time on February 3, 2005. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call VerDate jul<14>2003 16:59 Jan 28, 2005 Jkt 205001 Linda Mitry, Deputy Secretary. [FR Doc. E5–349 Filed 1–28–05; 8:45 am] Federal Energy Regulatory Commission [Docket No. EG05–31–000, et al.] October 25, 2004 in Docket No. ER98– 2329–003, as supplemented on November 9, 2005 in Docket No. ER98– 2329–004. Central Vermont states that a copy of the filing was served upon all parties to the Commission’s official service list in Docket Nos. ER98–2329, the Vermont Public Service Board, and the New Hampshire Public Utilities Commission. Comment Date: 5 p.m. Eastern Time on February 3, 2005. 4. Hermiston Generating Company, L.P. [Docket No. ER01–2159–005] TransAlta Centralia Generation LLC, et al.; Electric Rate and Corporate Filings January 24, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. TransAlta Centralia Generation LLC [Docket No. EG05–31–000] On January 14, 2005, TransAlta Centralia Generation LLC (TACG) filed with the Commission an application for redetermination of exempt wholesale generator (EWG) status pursuant to part 365 of the Commission’s regulations. TACG states that copies of the application were sent to the Securities and Exchange Commission and the Oregon Public Utility Commission, the Washington Utilities and Transportation Commission, the California Public Utilities Commission, the Wyoming Public Service Commission, the Idaho Public Utility Commission, and the Utah Public Service Commission. Comment Date: 5 p.m. Eastern Time on February 4, 2005. 2. Florida Power Corporation [Docket No. ER97–2846–004] Take notice that on December 23, 2004, Florida Power Corporation submitted a compliance filing pursuant to the Commission’s Orders issued May 13, 2004 in Docket No. ER02–1406–001, et al., Arcadia Power Partners, LLC, 107 FERC ¶ 61,168 and July 8, 2004 in Docket No. ER96–2495–018, et al., AEP Power Marketing, Inc., 108 FERC ¶ 61,026. Comment Date: 5 p.m. Eastern Time on February 3, 2005. 3. Central Vermont Public Service Corporation [Docket No. ER98–2329–005] Take notice that on January 13, 2005, Central Vermont Public Service Corporation (Central Vermont) tendered for filing information and data in support of its request for renewal of market-based rate authority filed on PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 Take notice that on January 13, 2005, Hermiston Generating Company, L.P. (Hermiston), submitted for filing a notice of a change in facts with respect to its ownership that represents a departure from the characteristics the Commission relied upon in granting market-based rate authority to Hermiston. Comment Date: 5 p.m. Eastern Time on February 3, 2005. 5. CalPeak Power—Midway LLC, CalPeak Power—Panoche LLC, CalPeak Power—Vaca Dixon LLC, CalPeak Power—El Cajon LLC, CalPeak Power— Enterprise LLC, CalPeak Power— Border LLC [Docket Nos. ER01–2537–001, ER01–2543– 001, ER01–2544–001, ER01–2545–001, ER01–2546–001, ER01–2547–001] Take notice that on January 13, 2005, CalPeak Power—Midway LLC, CalPeak Power—Panoche LLC, CalPeak Power— Vaca Dixon LLC, CalPeak Power—El Cajon LLC, CalPeak Power—Enterprise LLC, and CalPeak Power—Border LLC (collectively, the CalPeak Entities) submitted a triennial updated power analysis and revised tariff sheets to incorporate the Commission’s market behavior rules adopted in Investigation of Terms and Conditions of Public Utility Market-Based Rate Authorizations, 105 FERC ¶ 61,218 (2003), order on reh’g, 107 FERC ¶ 61,175 (2004). The CalPeak Entities state that copies of the filing were served upon parties on the official service lists in abovecaptioned proceedings. Comment Date: 5 p.m. Eastern Time on February 3, 2005. 6. HC Power Marketing L.L.C. [Docket No. ER02–388–003] Take notice that on January 13, 2005, HC Power Marketing (HCPM) submitted for filing a triennial updated market analysis. HCPM states that copies of the filing were served upon the parties listed on the official service list compiled by the Secretary in Docket No. ER02–388. E:\FR\FM\31JAN1.SGM 31JAN1 Federal Register / Vol. 70, No. 19 / Monday, January 31, 2005 / Notices Comment Date: 5 p.m. Eastern Time on February 3, 2005. 7. Southern California Edison Company [Docket No. ER05–170–001] Take notice that on January 13, 2005, Southern California Edison Company (SCE) submitted the Devil Canyon Service Agreement for Wholesale Distribution Service, Service Agreement No. 126, under FERC Electric Tariff, First Revised Volume No. 5 as a supplement to its November 2, 2004 filing under Docket No. ER05–170–000. SCE states that copies of the filing were served upon those persons whose names appear on the official service list compiled by the Commission in this Docket No. ER05–170–000. Comment Date: 5 p.m. Eastern Time on January 31, 2005. official service list in Docket No. ER05– 197 and the Virginia State Corporation Commission. Comment Date: 5 p.m. Eastern Time on February 3, 2005. 11. JPMorgan Chase Bank, N.A. [Docket No. ER05–283–001] Take notice that on January 13, 2005, JPMorgan Chase Bank, N.A. (JPMCB) filed an amendment to its December 2, 2004 filing in Docket No. ER05–283–000 for acceptance of JPMCB’s Rate Schedule FERC No. 1; the granting of certain blanket approvals, including the authority to sell electricity at marketbased rates; and the waiver of certain Commission regulations. Comment Date: 5 p.m. Eastern Time on February 3, 2005. 12. Avista Energy, Inc. 8. Kansas City Power & Light Company [Docket No. ER05–313–001] [Docket No. ER05–177–001] Take notice that on January 13, 2005, Avista Energy, Inc. (Avista Energy) filed proposed revisions to its First Revised Rate Schedule FERC No. 1 originally filed on December 7, 2004 in Docket No. ER05–313–000. Comment Date: 5 p.m. Eastern Time on February 3, 2005. Take notice that on January 14, 2005, Kansas City Power & Light Company (KCPL) submitted a compliance filing pursuant to the Commission’s Order issued December 28, 2004 in Docket No. ER05–177–000. KCPL states that this filing pertains to service schedules for the City of Baldwin City, Kansas. KCPL states that copies of the filing were served on the City of Baldwin City, Kansas as well as the Missouri Public Service Commission and the Kansas State Corporation Commission. Comment Date: 5 p.m. Eastern Time on February 4, 2005. 9. Carolina Power & Light Company [Docket No. ER05–183–000] Take notice that on January 14, 2005, Carolina Power & Light Company filed a notice of withdrawal of its November 4, 2004 filing in Docket No. ER05–183– 000 regarding a Generator Balancing Service Schedule under the Open Access Transmission Tariffs of CP&L and Florida Power Corporation. Comment Date: 5 p.m. Eastern Time on February 4, 2005. 10. Virginia Electric and Power Company 13. American Electric Power Service Corporation [Docket No. ER05–450–000] Take notice that on January 14, 2005, the American Electric Power Service Corporation (AEPSC), tendered for filing an Interconnection and Local Delivery Service Agreement between AEPSC and the City of Dowagiac, Michigan, designated as Substitute Service Agreement No. 532 under the Operating Companies of the American Electric Power System FERC Electric Tariff, Third Revised Volume No. 6. AEPSC requests an effective date of January 1, 2005. AEPSC states that a copy of the filing was served upon the Party and the Michigan Public Service Commission. Comment Date: 5 p.m. Eastern Time on February 4, 2005. 14. Wisconsin Electric Power Company [Docket No. ER05–197–001] [Docket No. ER05–451–000] Take notice that on January 13, 2005, Virginia Electric and Power Company (VEPCO) submitted for filing a response to the deficiency letter issued on December 15, 2004 regarding VEPCO’s November 8, 2004 filing in Docket No. ER005–197–000 of an executed Standard Large Generator Interconnection Agreement with CPV Warren, LLC. VEPCO requests an effective date of November 9, 2004. VEPCO states that copies of the filing were served upon the Commission’s Take notice that on January 14, 2005, Wisconsin Electric Power Company (Wisconsin Electric) submitted for filing revised Exhibit No. 4.4 of two Generation-Transmission Must Run Agreements between Wisconsin Electric and American Transmission Company, LLC (ATCLLC) to reflect updated inputs to the formula rate applicable to the sale of must run energy from several Wisconsin Electric generation units. Wisconsin Electric requests an effective date of January 1, 2005. VerDate jul<14>2003 16:59 Jan 28, 2005 Jkt 205001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 4835 Wisconsin Electric states that copies of this filing were served upon ATCLLC, the Michigan Public Service Commission and the Public Service Commission of Wisconsin. Comment Date: 5 p.m. Eastern Time on February 4, 2005. 15. Public Service Company of New Mexico [Docket No. ER05–452–000] Take notice that on January 14, 2005, Public Service Company of New Mexico (PNM) submitted for filing an executed service agreement for firm point-topoint transmission service and ancillary services between PNM Transmission Development and Contracts and PNM Wholesale Marketing, under the terms of PNM’s open access transmission tariff. PNM requests an effective date of January 1, 2005. PNM states that copies of the filing have been sent to PNM Wholesale Marketing, PNM Transmission Development and Contracts, the New Mexico Public Regulation Commission and the New Mexico Attorney General. Comment Date: 5 p.m. Eastern Time on February 4, 2005. 16. Wisconsin River Power Company [Docket No. ER05–453–000] Take notice that on January 14, 2005, Wisconsin River Power Company (Wisconsin River) filed a market-based rate tariff for sales of energy and capacity into the Midwest Independent Transmission System Operator, Inc. (MISO) and the PJM Interconnection, L.L.C. (PJM) centralized markets and minor revisions to two power sales agreements to facilitate such sales. Wisconsin River requests an effective date of February 28, 2005. Wisconsin River states that copies of the filing were served upon PJM, MISO, and the Michigan Public Service Commission. Comment Date: 5 p.m. Eastern Time on February 4, 2005. 17. Bear Swamp Power Company LLC [Docket No. ER05–454–000] Take notice that on January 14, 2005, Bear Swamp Power Company LLC (Bear Swamp) submitted for filing, pursuant to section 205 of the Federal Power Act and Part 35 of the Commission’s regulations an application for marketbased rate authorization to sell energy, capacity, and ancillary services, and reassign transmission capacity and resell firm transmission rights. Bear Swamp also requests the waivers and exemptions from regulations typically granted to the holders of market-based rate authorization. Bear Swamp requests an effective date of March 15, 2005. E:\FR\FM\31JAN1.SGM 31JAN1 4836 Federal Register / Vol. 70, No. 19 / Monday, January 31, 2005 / Notices Comment Date: 5 p.m. Eastern Time on February 4, 2005. Comment Date: 5 p.m. Eastern Time on February 4, 2005. 18. Bellows Falls Power Company, LLC 21. Wisconsin Electric Power Company [Docket No. ER05–455–000] [Docket No. ER05–458–000] Take notice that on January 14, 2005, Bellows Falls Power Company, LLC (Bellows Falls) submitted for filing, pursuant to section 205 of the Federal Power Act and part 35 of the Commission’s regulations an application for market-based rate authorization to sell energy, capacity, and ancillary services, and reassign transmission capacity and resell firm transmission rights. Bellow Falls also requests the waivers and exemptions from regulations typically granted to the holders of market-based rate authorization. Bellows Falls requests an effective date as of the date of closing on the lease of the Bellows Falls Hydroelectric Project which is expected to occur by the end of the first quarter of 2005. Comment Date: 5 p.m. Eastern Time on February 4, 2005. Take notice that on January 14, 2005, Wisconsin Electric Power Company (Wisconsin Electric) submitted proposed amendments to Wisconsin Electric’s Electric Tariff, Second Revised Volume No. 2. Wisconsin Electric states that the amendments would revise Service Schedule F—Dynamic Regulation and Frequency Response Service to broaden its applicability to new generators locating within the control area historically (prior to January 1, 2001) operated by Wisconsin Electric Power Company and the historical service territory of Edison Sault Electric Company (Wisconsin Electric Control Area). Wisconsin Electric requests an effective date of March 15, 2005. Wisconsin Electric states that copies of the filing were served on its CST customers and on the state regulatory bodies in Wisconsin and Michigan. Comment Date: 5 p.m. Eastern Time on February 4, 2005. 19. PJM Interconnection, L.L.C. [Docket No. ER05–456–000] Take notice that on January 14, 2005, PJM Interconnection, L.L.C. (PJM), submitted for filing an executed interconnection service agreement (ISA) among PJM, American Municipal Power-Ohio, Inc. as agent for Ohio Municipal Electric Generation Joint Venture 5, and American Electric Power Service Corporation as agent for Ohio Power Company doing business as AEP, and a notice of cancellation of an interim service agreement that has been superseded. PJM requests an effective date of December 16, 2004 for the ISA. PJM states that copies of this filing were served upon the parties to the agreement and the state regulatory commissions within the PJM region. Comment Date: 5 p.m. Eastern Time on February 4, 2005. 20. Duquesne Light Company [Docket No. ER05–457–000] Take notice that on January 14, 2005, Duquesne Light Company (Duquesne) submitted an amendment to an Interchange Agreement between affiliates of FirstEnergy Corp. (FirstEnergy) and Duquesne to reflect the disconnection and retirement from operation of one of the 69kV transmission lines that interconnects the transmission systems of FirstEnergy and Duquesne. Duquesne states that copies of the filing were served on the state regulatory commissions with jurisdiction over Duquesne and FirstEnergy. VerDate jul<14>2003 16:59 Jan 28, 2005 Jkt 205001 Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties to this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Linda Mitry, Deputy Secretary. [FR Doc. E5–354 Filed 1–28–05; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 287–009—IL] Midwest Hydro Inc.; Notice of Availability of Environmental Assessment January 24, 2005. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s regulations, 18 CFR part 380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has reviewed the application for a new license for the Dayton Hydroelectric Project, located on the Fox River, in La Salle County, Illinois, and has prepared an Environmental Assessment (EA). In the EA, Commission staff analyze the potential environmental effects of relicensing the project and conclude that issuing a new license for the project, with appropriate environmental measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. Any comments should be filed within 30 days from the issuance date of this notice, and should be addressed to the Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1–A, Washington, DC 20426. Please affix ‘‘Dayton Project No. 287’’ to all comments. Comments may be filed electronically via Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web E:\FR\FM\31JAN1.SGM 31JAN1

Agencies

[Federal Register Volume 70, Number 19 (Monday, January 31, 2005)]
[Notices]
[Pages 4834-4836]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-354]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EG05-31-000, et al.]


TransAlta Centralia Generation LLC, et al.; Electric Rate and 
Corporate Filings

January 24, 2005.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. TransAlta Centralia Generation LLC

[Docket No. EG05-31-000]

    On January 14, 2005, TransAlta Centralia Generation LLC (TACG) 
filed with the Commission an application for redetermination of exempt 
wholesale generator (EWG) status pursuant to part 365 of the 
Commission's regulations.
    TACG states that copies of the application were sent to the 
Securities and Exchange Commission and the Oregon Public Utility 
Commission, the Washington Utilities and Transportation Commission, the 
California Public Utilities Commission, the Wyoming Public Service 
Commission, the Idaho Public Utility Commission, and the Utah Public 
Service Commission.
    Comment Date: 5 p.m. Eastern Time on February 4, 2005.

2. Florida Power Corporation

[Docket No. ER97-2846-004]

    Take notice that on December 23, 2004, Florida Power Corporation 
submitted a compliance filing pursuant to the Commission's Orders 
issued May 13, 2004 in Docket No. ER02-1406-001, et al., Arcadia Power 
Partners, LLC, 107 FERC ] 61,168 and July 8, 2004 in Docket No. ER96-
2495-018, et al., AEP Power Marketing, Inc., 108 FERC ] 61,026.
    Comment Date: 5 p.m. Eastern Time on February 3, 2005.

3. Central Vermont Public Service Corporation

[Docket No. ER98-2329-005]

    Take notice that on January 13, 2005, Central Vermont Public 
Service Corporation (Central Vermont) tendered for filing information 
and data in support of its request for renewal of market-based rate 
authority filed on October 25, 2004 in Docket No. ER98-2329-003, as 
supplemented on November 9, 2005 in Docket No. ER98-2329-004.
    Central Vermont states that a copy of the filing was served upon 
all parties to the Commission's official service list in Docket Nos. 
ER98-2329, the Vermont Public Service Board, and the New Hampshire 
Public Utilities Commission.
    Comment Date: 5 p.m. Eastern Time on February 3, 2005.

4. Hermiston Generating Company, L.P.

[Docket No. ER01-2159-005]

    Take notice that on January 13, 2005, Hermiston Generating Company, 
L.P. (Hermiston), submitted for filing a notice of a change in facts 
with respect to its ownership that represents a departure from the 
characteristics the Commission relied upon in granting market-based 
rate authority to Hermiston.
    Comment Date: 5 p.m. Eastern Time on February 3, 2005.

5. CalPeak Power--Midway LLC, CalPeak Power--Panoche LLC, CalPeak 
Power--Vaca Dixon LLC, CalPeak Power--El Cajon LLC, CalPeak Power--
Enterprise LLC, CalPeak Power--Border LLC

[Docket Nos. ER01-2537-001, ER01-2543-001, ER01-2544-001, ER01-2545-
001, ER01-2546-001, ER01-2547-001]

    Take notice that on January 13, 2005, CalPeak Power--Midway LLC, 
CalPeak Power--Panoche LLC, CalPeak Power--Vaca Dixon LLC, CalPeak 
Power--El Cajon LLC, CalPeak Power--Enterprise LLC, and CalPeak Power--
Border LLC (collectively, the CalPeak Entities) submitted a triennial 
updated power analysis and revised tariff sheets to incorporate the 
Commission's market behavior rules adopted in Investigation of Terms 
and Conditions of Public Utility Market-Based Rate Authorizations, 105 
FERC ] 61,218 (2003), order on reh'g, 107 FERC ] 61,175 (2004).
    The CalPeak Entities state that copies of the filing were served 
upon parties on the official service lists in above-captioned 
proceedings.
    Comment Date: 5 p.m. Eastern Time on February 3, 2005.

6. HC Power Marketing L.L.C.

[Docket No. ER02-388-003]

    Take notice that on January 13, 2005, HC Power Marketing (HCPM) 
submitted for filing a triennial updated market analysis.
    HCPM states that copies of the filing were served upon the parties 
listed on the official service list compiled by the Secretary in Docket 
No. ER02-388.

[[Page 4835]]

    Comment Date: 5 p.m. Eastern Time on February 3, 2005.

7. Southern California Edison Company

[Docket No. ER05-170-001]

    Take notice that on January 13, 2005, Southern California Edison 
Company (SCE) submitted the Devil Canyon Service Agreement for 
Wholesale Distribution Service, Service Agreement No. 126, under FERC 
Electric Tariff, First Revised Volume No. 5 as a supplement to its 
November 2, 2004 filing under Docket No. ER05-170-000.
    SCE states that copies of the filing were served upon those persons 
whose names appear on the official service list compiled by the 
Commission in this Docket No. ER05-170-000.
    Comment Date: 5 p.m. Eastern Time on January 31, 2005.

8. Kansas City Power & Light Company

[Docket No. ER05-177-001]

    Take notice that on January 14, 2005, Kansas City Power & Light 
Company (KCPL) submitted a compliance filing pursuant to the 
Commission's Order issued December 28, 2004 in Docket No. ER05-177-000. 
KCPL states that this filing pertains to service schedules for the City 
of Baldwin City, Kansas.
    KCPL states that copies of the filing were served on the City of 
Baldwin City, Kansas as well as the Missouri Public Service Commission 
and the Kansas State Corporation Commission.
    Comment Date: 5 p.m. Eastern Time on February 4, 2005.

9. Carolina Power & Light Company

[Docket No. ER05-183-000]

    Take notice that on January 14, 2005, Carolina Power & Light 
Company filed a notice of withdrawal of its November 4, 2004 filing in 
Docket No. ER05-183-000 regarding a Generator Balancing Service 
Schedule under the Open Access Transmission Tariffs of CP&L and Florida 
Power Corporation.
    Comment Date: 5 p.m. Eastern Time on February 4, 2005.

10. Virginia Electric and Power Company

[Docket No. ER05-197-001]

    Take notice that on January 13, 2005, Virginia Electric and Power 
Company (VEPCO) submitted for filing a response to the deficiency 
letter issued on December 15, 2004 regarding VEPCO's November 8, 2004 
filing in Docket No. ER005-197-000 of an executed Standard Large 
Generator Interconnection Agreement with CPV Warren, LLC. VEPCO 
requests an effective date of November 9, 2004.
    VEPCO states that copies of the filing were served upon the 
Commission's official service list in Docket No. ER05-197 and the 
Virginia State Corporation Commission.
    Comment Date: 5 p.m. Eastern Time on February 3, 2005.

11. JPMorgan Chase Bank, N.A.

[Docket No. ER05-283-001]

    Take notice that on January 13, 2005, JPMorgan Chase Bank, N.A. 
(JPMCB) filed an amendment to its December 2, 2004 filing in Docket No. 
ER05-283-000 for acceptance of JPMCB's Rate Schedule FERC No. 1; the 
granting of certain blanket approvals, including the authority to sell 
electricity at market-based rates; and the waiver of certain Commission 
regulations.
    Comment Date: 5 p.m. Eastern Time on February 3, 2005.

12. Avista Energy, Inc.

[Docket No. ER05-313-001]

    Take notice that on January 13, 2005, Avista Energy, Inc. (Avista 
Energy) filed proposed revisions to its First Revised Rate Schedule 
FERC No. 1 originally filed on December 7, 2004 in Docket No. ER05-313-
000.
    Comment Date: 5 p.m. Eastern Time on February 3, 2005.

13. American Electric Power Service Corporation

[Docket No. ER05-450-000]

    Take notice that on January 14, 2005, the American Electric Power 
Service Corporation (AEPSC), tendered for filing an Interconnection and 
Local Delivery Service Agreement between AEPSC and the City of 
Dowagiac, Michigan, designated as Substitute Service Agreement No. 532 
under the Operating Companies of the American Electric Power System 
FERC Electric Tariff, Third Revised Volume No. 6. AEPSC requests an 
effective date of January 1, 2005.
    AEPSC states that a copy of the filing was served upon the Party 
and the Michigan Public Service Commission.
    Comment Date: 5 p.m. Eastern Time on February 4, 2005.

14. Wisconsin Electric Power Company

[Docket No. ER05-451-000]

    Take notice that on January 14, 2005, Wisconsin Electric Power 
Company (Wisconsin Electric) submitted for filing revised Exhibit No. 
4.4 of two Generation-Transmission Must Run Agreements between 
Wisconsin Electric and American Transmission Company, LLC (ATCLLC) to 
reflect updated inputs to the formula rate applicable to the sale of 
must run energy from several Wisconsin Electric generation units. 
Wisconsin Electric requests an effective date of January 1, 2005.
    Wisconsin Electric states that copies of this filing were served 
upon ATCLLC, the Michigan Public Service Commission and the Public 
Service Commission of Wisconsin.
    Comment Date: 5 p.m. Eastern Time on February 4, 2005.

15. Public Service Company of New Mexico

[Docket No. ER05-452-000]

    Take notice that on January 14, 2005, Public Service Company of New 
Mexico (PNM) submitted for filing an executed service agreement for 
firm point-to-point transmission service and ancillary services between 
PNM Transmission Development and Contracts and PNM Wholesale Marketing, 
under the terms of PNM's open access transmission tariff. PNM requests 
an effective date of January 1, 2005.
    PNM states that copies of the filing have been sent to PNM 
Wholesale Marketing, PNM Transmission Development and Contracts, the 
New Mexico Public Regulation Commission and the New Mexico Attorney 
General.
    Comment Date: 5 p.m. Eastern Time on February 4, 2005.

16. Wisconsin River Power Company

[Docket No. ER05-453-000]

    Take notice that on January 14, 2005, Wisconsin River Power Company 
(Wisconsin River) filed a market-based rate tariff for sales of energy 
and capacity into the Midwest Independent Transmission System Operator, 
Inc. (MISO) and the PJM Interconnection, L.L.C. (PJM) centralized 
markets and minor revisions to two power sales agreements to facilitate 
such sales. Wisconsin River requests an effective date of February 28, 
2005.
    Wisconsin River states that copies of the filing were served upon 
PJM, MISO, and the Michigan Public Service Commission.
    Comment Date: 5 p.m. Eastern Time on February 4, 2005.

17. Bear Swamp Power Company LLC

[Docket No. ER05-454-000]

    Take notice that on January 14, 2005, Bear Swamp Power Company LLC 
(Bear Swamp) submitted for filing, pursuant to section 205 of the 
Federal Power Act and Part 35 of the Commission's regulations an 
application for market-based rate authorization to sell energy, 
capacity, and ancillary services, and reassign transmission capacity 
and resell firm transmission rights. Bear Swamp also requests the 
waivers and exemptions from regulations typically granted to the 
holders of market-based rate authorization. Bear Swamp requests an 
effective date of March 15, 2005.

[[Page 4836]]

    Comment Date: 5 p.m. Eastern Time on February 4, 2005.

18. Bellows Falls Power Company, LLC

[Docket No. ER05-455-000]

    Take notice that on January 14, 2005, Bellows Falls Power Company, 
LLC (Bellows Falls) submitted for filing, pursuant to section 205 of 
the Federal Power Act and part 35 of the Commission's regulations an 
application for market-based rate authorization to sell energy, 
capacity, and ancillary services, and reassign transmission capacity 
and resell firm transmission rights. Bellow Falls also requests the 
waivers and exemptions from regulations typically granted to the 
holders of market-based rate authorization. Bellows Falls requests an 
effective date as of the date of closing on the lease of the Bellows 
Falls Hydroelectric Project which is expected to occur by the end of 
the first quarter of 2005.
    Comment Date: 5 p.m. Eastern Time on February 4, 2005.

19. PJM Interconnection, L.L.C.

[Docket No. ER05-456-000]

    Take notice that on January 14, 2005, PJM Interconnection, L.L.C. 
(PJM), submitted for filing an executed interconnection service 
agreement (ISA) among PJM, American Municipal Power-Ohio, Inc. as agent 
for Ohio Municipal Electric Generation Joint Venture 5, and American 
Electric Power Service Corporation as agent for Ohio Power Company 
doing business as AEP, and a notice of cancellation of an interim 
service agreement that has been superseded. PJM requests an effective 
date of December 16, 2004 for the ISA.
    PJM states that copies of this filing were served upon the parties 
to the agreement and the state regulatory commissions within the PJM 
region.
    Comment Date: 5 p.m. Eastern Time on February 4, 2005.

20. Duquesne Light Company

[Docket No. ER05-457-000]

    Take notice that on January 14, 2005, Duquesne Light Company 
(Duquesne) submitted an amendment to an Interchange Agreement between 
affiliates of FirstEnergy Corp. (FirstEnergy) and Duquesne to reflect 
the disconnection and retirement from operation of one of the 69kV 
transmission lines that interconnects the transmission systems of 
FirstEnergy and Duquesne.
    Duquesne states that copies of the filing were served on the state 
regulatory commissions with jurisdiction over Duquesne and FirstEnergy.
    Comment Date: 5 p.m. Eastern Time on February 4, 2005.

21. Wisconsin Electric Power Company

[Docket No. ER05-458-000]

    Take notice that on January 14, 2005, Wisconsin Electric Power 
Company (Wisconsin Electric) submitted proposed amendments to Wisconsin 
Electric's Electric Tariff, Second Revised Volume No. 2. Wisconsin 
Electric states that the amendments would revise Service Schedule F--
Dynamic Regulation and Frequency Response Service to broaden its 
applicability to new generators locating within the control area 
historically (prior to January 1, 2001) operated by Wisconsin Electric 
Power Company and the historical service territory of Edison Sault 
Electric Company (Wisconsin Electric Control Area). Wisconsin Electric 
requests an effective date of March 15, 2005.
    Wisconsin Electric states that copies of the filing were served on 
its CST customers and on the state regulatory bodies in Wisconsin and 
Michigan.
    Comment Date: 5 p.m. Eastern Time on February 4, 2005.

Standard Paragraph

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all parties to this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Linda Mitry,
Deputy Secretary.
[FR Doc. E5-354 Filed 1-28-05; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.