Duke Power; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 4842-4843 [E5-336]
Download as PDF
4842
Federal Register / Vol. 70, No. 19 / Monday, January 31, 2005 / Notices
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the ‘‘efiling’’ link. k. This application has been
accepted for filing and is now ready for
environmental analysis.
l. The existing Nantahala Project
operates in a peaking mode and consists
of the following features: (1) A 1,042foot-long, 250-foot-high earth and
rockfill dam; (2) a spillway for the dam
located at the east abutment; (3) a 1,605acre reservoir, with a normal reservoir
elevation of 3,012.2 feet National
Geodetic Vertical Datum and a storage
capacity of 38,336 acre-feet; (4) a
reinforced concrete powerhouse
containing one generating unit having
an installed capacity of 42 megawatts
(MW); (5) two stream diversions (Dicks
Creek and Whiteoak Creek) that provide
additional flow into the project; and (6)
appurtenant facilities. m. A copy of the
application is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item (h) above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Public notice of the filing of the
initial development application, which
has already been given, established the
due date for filing competing
applications or notices of intent. Under
the Commission’s regulations, any
competing development application
must be filed in response to and in
compliance with public notice of the
initial development application. No
competing applications or notices of
intent may be filed in response to this
notice.
All filings must (1) Bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
VerDate jul<14>2003
16:59 Jan 28, 2005
Jkt 205001
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b), and
385.2010.
Magalie R. Salas,
Secretary.
[FR Doc. E5–335 Filed 1–28–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[P–2698–033]
Duke Power; Notice of Application
Ready for Environmental Analysis and
Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
January 21, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2698–033.
c. Date filed: February 20, 2004.
d. Applicant: Duke Power.
e. Name of Project: East Fork
Hydroelectric Project.
f. Location: On the East Fork of the
Tuckasegee River, in Jackson County,
North Carolina. There are 23.15 acres of
United States Forest Service land
(Nantahala National Forest) within the
boundary of the project.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: John C. Wishon,
Nantahala Area Relicensing Project
Manager, Duke Power, 301 NP&L Loop,
Franklin, NC 28734, (828) 369–4604,
jcwishon@duke-energy.com.
i. FERC Contact: Carolyn Holsopple at
(202) 502–6407 or
carolyn.holsopple@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions is 60 days
from the issuance of this notice; reply
comments are due 105 days from the
issuance date of this notice.
All documents (original and eight
copies) should be filed with: Magalie R.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Comments, recommendations, terms
and conditions, and prescriptions may
be filed electronically via the Internet in
lieu of paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the ‘‘efiling’’ link.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. The existing East Fork Project
operates in a peaking mode and is
comprised of three developments: Cedar
Cliff, Bear Creek and Tennessee Creek.
The Cedar Cliff development consists of
the following features: (1) A 590-footlong, 173-foot-tall earth core and rockfill
dam (Cedar Cliff Dam); (2) a service
spillway excavated in rock at the right
abutment; (3) a 221-foot-long emergency
spillway located at the left abutment; (4)
a 121-acre reservoir, with a normal
reservoir elevation of 2,330 feet National
Geodetic Vertical Datum and a storage
capacity of 6,200-acre-feet; (5) a
concrete powerhouse containing one
generating unit having an installed
capacity of 6.1 megawatts (MW); and (6)
appurtenant facilities.
The Bear Creek development consists
of the following features: (1) A 760-footlong, 215-foot-tall earth core and rockfill
dam (Bear Creek Dam); (2) a spillway on
the right abutment; (3) a 473-acre
reservoir, with a normal reservoir
elevation of 2,560 feet National Geodetic
Vertical Datum and a storage capacity of
34,650-acre-feet; (4) a concrete
powerhouse containing one generating
unit having an installed capacity of 8.2
MW; and (5) appurtenant facilities.
The Tennessee development consists
of the following features: (1) A 385-footlong, 140-foot-tall earth core and rockfill
dam (Tanasee Creek Dam) with a 225foot-long, 15-foot-tall earth and rockfill
saddle dam located 600 feet south of the
Tanasee Creek Dam left abutment; (2) a
spillway located in a channel excavated
in the right abutment; (3) a 810-footlong, 175-foot-tall earth core and rockfill
dam (Wolf Creek Dam); (4) a spillway
E:\FR\FM\31JAN1.SGM
31JAN1
Federal Register / Vol. 70, No. 19 / Monday, January 31, 2005 / Notices
located in a channel excavated in the
right abutment; (5) a 40-acre reservoir
(Tanasee Creek Lake), with a normal
reservoir elevation of 3,080 feet National
Geodetic Vertical Datum and a storage
capacity of 1,340-acre-feet; (6) a 176acre reservoir (Wolf Creek Lake), with a
normal reservoir elevation of 3,080 feet
National Geodetic Vertical Datum and a
storage capacity of 10,040-acre-feet; (7)
a concrete powerhouse containing one
generating unit having an installed
capacity of 8.75 MW.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item (h) above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Public notice of the filing of the
initial development application, which
has already been given, established the
due date for filing competing
applications or notices of intent. Under
the Commission’s regulations, any
competing development application
must be filed in response to and in
compliance with public notice of the
initial development application. No
competing applications or notices of
intent may be filed in response to this
notice.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
VerDate jul<14>2003
16:59 Jan 28, 2005
Jkt 205001
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b), and
385.2010.
Magalie R. Salas,
Secretary.
[FR Doc. E5–336 Filed 1–28–05; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Surrender of
License andSoliciting Comments,
Motions To Intervene, and Protests
January 19, 2005.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Surrender of
License.
b. Project No.: 8535–039.
c. Date filed: December 20, 2004.
d. Licensee: Virginia Hydrogeneration
and Historical Society, LC.
e. Name of Project: Battersea Dam.
f. Location: Located on the
Appomattox River, in Chesterfield and
Dinwiddie Counties, Virginia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Licensee Contact: Paul V. Nolan,
Esq., 5515 North 17th Street, Arlington,
Virginia 22205, (703) 534–5509.
i. FERC Contact: Regina Saizan, (202)
502–8765.
j. Status of Environmental Analysis:
This application is ready for
environmental analysis at this time, and
the Commission is requesting
comments, reply comments, and
recommendations for terms and
conditions.
k. Deadline for filing responsive
documents: comments, motions to
intervene, protests, and
recommendations for terms and
conditions concerning the application
shall be filed with the Commission by
February 22, 2005. All reply comments
must be filed with the Commission by
March 7, 2005.
Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
4843
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, the
intervenor must also serve a copy of the
document on that resource agency.
l. Description of Proposed Action: The
licensee seeks to surrender the license
because its lease of the project lands and
facilities has been cancelled and it does
not have the means or the intent to
reacquire the project lands and to
operate the project. The 500 kilowatt
project is currently not operating.
m. Locations of Application: A copy
of the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street NE,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number, here P–8535, in the docket
number field to access the document.
For assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h.
above.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
p. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘REPLY COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and eight copies to: Magalie
E:\FR\FM\31JAN1.SGM
31JAN1
Agencies
[Federal Register Volume 70, Number 19 (Monday, January 31, 2005)]
[Notices]
[Pages 4842-4843]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-336]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[P-2698-033]
Duke Power; Notice of Application Ready for Environmental
Analysis and Soliciting Comments, Recommendations, Terms and
Conditions, and Prescriptions
January 21, 2005.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2698-033.
c. Date filed: February 20, 2004.
d. Applicant: Duke Power.
e. Name of Project: East Fork Hydroelectric Project.
f. Location: On the East Fork of the Tuckasegee River, in Jackson
County, North Carolina. There are 23.15 acres of United States Forest
Service land (Nantahala National Forest) within the boundary of the
project.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: John C. Wishon, Nantahala Area Relicensing
Project Manager, Duke Power, 301 NP&L Loop, Franklin, NC 28734, (828)
369-4604, jcwishon@duke-energy.com.
i. FERC Contact: Carolyn Holsopple at (202) 502-6407 or
carolyn.holsopple@ferc.gov.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions is 60 days from the issuance of this
notice; reply comments are due 105 days from the issuance date of this
notice.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Comments, recommendations, terms and conditions, and prescriptions
may be filed electronically via the Internet in lieu of paper. The
Commission strongly encourages electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
(https://www.ferc.gov) under the ``e-filing'' link.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. The existing East Fork Project operates in a peaking mode and is
comprised of three developments: Cedar Cliff, Bear Creek and Tennessee
Creek. The Cedar Cliff development consists of the following features:
(1) A 590-foot-long, 173-foot-tall earth core and rockfill dam (Cedar
Cliff Dam); (2) a service spillway excavated in rock at the right
abutment; (3) a 221-foot-long emergency spillway located at the left
abutment; (4) a 121-acre reservoir, with a normal reservoir elevation
of 2,330 feet National Geodetic Vertical Datum and a storage capacity
of 6,200-acre-feet; (5) a concrete powerhouse containing one generating
unit having an installed capacity of 6.1 megawatts (MW); and (6)
appurtenant facilities.
The Bear Creek development consists of the following features: (1)
A 760-foot-long, 215-foot-tall earth core and rockfill dam (Bear Creek
Dam); (2) a spillway on the right abutment; (3) a 473-acre reservoir,
with a normal reservoir elevation of 2,560 feet National Geodetic
Vertical Datum and a storage capacity of 34,650-acre-feet; (4) a
concrete powerhouse containing one generating unit having an installed
capacity of 8.2 MW; and (5) appurtenant facilities.
The Tennessee development consists of the following features: (1) A
385-foot-long, 140-foot-tall earth core and rockfill dam (Tanasee Creek
Dam) with a 225-foot-long, 15-foot-tall earth and rockfill saddle dam
located 600 feet south of the Tanasee Creek Dam left abutment; (2) a
spillway located in a channel excavated in the right abutment; (3) a
810-foot-long, 175-foot-tall earth core and rockfill dam (Wolf Creek
Dam); (4) a spillway
[[Page 4843]]
located in a channel excavated in the right abutment; (5) a 40-acre
reservoir (Tanasee Creek Lake), with a normal reservoir elevation of
3,080 feet National Geodetic Vertical Datum and a storage capacity of
1,340-acre-feet; (6) a 176-acre reservoir (Wolf Creek Lake), with a
normal reservoir elevation of 3,080 feet National Geodetic Vertical
Datum and a storage capacity of 10,040-acre-feet; (7) a concrete
powerhouse containing one generating unit having an installed capacity
of 8.75 MW.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item (h) above.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Public notice of the filing of the initial development
application, which has already been given, established the due date for
filing competing applications or notices of intent. Under the
Commission's regulations, any competing development application must be
filed in response to and in compliance with public notice of the
initial development application. No competing applications or notices
of intent may be filed in response to this notice.
All filings must (1) bear in all capital letters the title
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b), and 385.2010.
Magalie R. Salas,
Secretary.
[FR Doc. E5-336 Filed 1-28-05; 8:45 am]
BILLING CODE 6717-01-P